making the zonal system work -feedback from southern zone- miriam cavaco head of authorization of...

24
Making the zonal system work -Feedback from Southern Zone- Miriam Cavaco Head of Authorization of Plant Protection Products Division General Directorate of Food and Veterinary 1 Regulatory Conference-ECPA/ECCA, Brussels, 12 th March 2015

Upload: annabella-may

Post on 18-Dec-2015

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Making the zonal system work -Feedback from Southern Zone- Miriam Cavaco Head of Authorization of Plant Protection Products Division General Directorate

Making the zonal system work

-Feedback from Southern Zone-

Miriam Cavaco

Head of Authorization of Plant Protection Products Division

General Directorate of Food and Veterinary

1Regulatory Conference-ECPA/ECCA, Brussels, 12th March 2015Regulatory Conference-ECPA/ECCA, Brussels, 12th March 2015

Page 2: Making the zonal system work -Feedback from Southern Zone- Miriam Cavaco Head of Authorization of Plant Protection Products Division General Directorate

Working procedures in Southern Zone;

Feedback from zonal submissions: Zonal submissions and areas to improve;

•Harmonisation within the zone;

•Harmonisation between the zones;

Concluding remarks.

2

OVERVIEW

Page 3: Making the zonal system work -Feedback from Southern Zone- Miriam Cavaco Head of Authorization of Plant Protection Products Division General Directorate

1 representative from each MS of the zone;

Chair: one MS for 1 year on a rotational basis plus one co –chair;

Since October 2014 is chaired by Spain and Portugal (co-chair);

Contacts: Regular emails exchanges; Teleconferences: every 2 months; Face to face meetings: 1 per year (July 2014 – Paris)

Zonal Steering Committee

WORKING PROCEDURES IN SOUTHERN ZONE

Page 4: Making the zonal system work -Feedback from Southern Zone- Miriam Cavaco Head of Authorization of Plant Protection Products Division General Directorate

Stage of progress with regard to the assessment of plant

protection products (New PPP, re-registration);

Distribution of work among MS;

Update the data base of applications and authorizations;

Discution of issues raised by MS or/and by applicants;

Discution of topics from iZSC and report issues from SC.

Steering Committee Tasks

WORKING PROCEDURES IN SOUTHERN ZONE

Page 5: Making the zonal system work -Feedback from Southern Zone- Miriam Cavaco Head of Authorization of Plant Protection Products Division General Directorate

Organisation of teleconferences and the face to face meeting;

Prepare the agenda;

Minutes of the teleconferences/ Annual Meeting;

Attend the iZSC;

Manage the updating of the Files with the zonal applications;

Collect remarks on relevant GD.

Chair tasks

WORKING PROCEDURES IN SOUTHERN ZONE

Page 6: Making the zonal system work -Feedback from Southern Zone- Miriam Cavaco Head of Authorization of Plant Protection Products Division General Directorate

• Worload for the chair is not negligible;

• All MS are not equally involved in the activities of ZSC /SMS;

• New sharing of the tasks in order to reduce the workload of the chair

• Chair: coordinate the SMS-SC and contact with iZSC;

• Other MS: drafting the minutes, update EXCELL worksharing tables.

SMS - SC of July 2014 in Paris

WORKING PROCEDURES IN SOUTHERN ZONE

IMPORTANT

INFORMATION

Page 7: Making the zonal system work -Feedback from Southern Zone- Miriam Cavaco Head of Authorization of Plant Protection Products Division General Directorate

Working procedures in Southern Zone;

Feedback from zonal submissions: Zonal submissions and areas to improve;

•Harmonisation within the zone;

•Harmonisation between the zones;

Concluding remarks.

7

OVERVIEW

Page 8: Making the zonal system work -Feedback from Southern Zone- Miriam Cavaco Head of Authorization of Plant Protection Products Division General Directorate

8

Pre-notifications; Pre-submission meetings; Completeness check; Quality of the dRR; Efficacy data.

Zonal submissions received and areas to improve

FEEDBACK FROM ZONAL SUBMISSIONS

NEW PPP

Page 9: Making the zonal system work -Feedback from Southern Zone- Miriam Cavaco Head of Authorization of Plant Protection Products Division General Directorate

Influences the time keeping process and resource efficiency of CAs;

RR is supposed to be a stand-alone document:

dRR making reference to other RR

Acess to a complete “Annex II” dossier ( a.s. - Reg. 283/2013) must be demonstrated.

9

Quality of the dRR

ZONAL SUBMISSIONS RECEIVED AND AREAS TO IMPROVE

not supposed to happennot supposed to happen

Page 10: Making the zonal system work -Feedback from Southern Zone- Miriam Cavaco Head of Authorization of Plant Protection Products Division General Directorate

• The GAP does not represent the uses in the zone;

is not the same in all parts of the dRR;

in dRR conflits with the GAP in national application.

• Changes of the GAP by the applicant during the evaluation of the dRRlimited timeframes do not allow to revisit evaluations already carried out

10

Quality of the dRR

ZONAL SUBMISSIONS RECEIVED AND AREAS TO IMPROVE

Page 11: Making the zonal system work -Feedback from Southern Zone- Miriam Cavaco Head of Authorization of Plant Protection Products Division General Directorate

Working procedures in Southern Zone;

Feedback from zonal submissions: Zonal submissions and areas to improve;

•Harmonisation within the zone;

•Harmonisation between the zones;

Concluding remarks.

11

OVERVIEW

Page 12: Making the zonal system work -Feedback from Southern Zone- Miriam Cavaco Head of Authorization of Plant Protection Products Division General Directorate

• South MS rely mostly on EU data requirements;

Are rather limited to specifics crops;

Risk mitigation measures are not fully harmonized:

Depends on national rules in MS; Better harmonization of risk mitigation measures

to gain efficiency in worksharing

12

HARMONIZATION WITHIN THE ZONEHARMONIZATION WITHIN THE ZONE

Evaluation based on harmonized basis

National data requirements

Page 13: Making the zonal system work -Feedback from Southern Zone- Miriam Cavaco Head of Authorization of Plant Protection Products Division General Directorate

The applicants are advised to follow the requirements described in Southern Zone Guidance document (version December 2013):

13

HARMONIZATION WITHIN THE ZONEHARMONIZATION WITHIN THE ZONE

National data requirements

The procedure for appointing zRMS is described; Contact Points in Each MS; Definition of the national data requirements.

https://circabc.europa.eu/w/browse/71968c1f-bf75-4f4a-867b-47a9f7453319

“Working document on the voluntary work-sharing of the Southern Zone Member states in the re-registration of PPP following the inclusion of an a.i. in Annex I of Council Directive 917414/EEC”

Evaluation based on harmonized basis National data requirements

Page 14: Making the zonal system work -Feedback from Southern Zone- Miriam Cavaco Head of Authorization of Plant Protection Products Division General Directorate

CoordinationCommunicationPlanningMonitoring

• Between MSs (ZSC and iZSC)

• Between MSs and applicants

• Between MSs (ZSC and iZSC)

• Between MSs and applicants

14

One zone one approach

HARMONISATION WITHIN THE ZONEHARMONISATION WITHIN THE ZONE

PT organized a Director’s Consultation Group Meeting on 17th November 2014 in Lisbon.

Page 15: Making the zonal system work -Feedback from Southern Zone- Miriam Cavaco Head of Authorization of Plant Protection Products Division General Directorate

To improve the sharing of the regulatory process for greater efficiency and effectiveness;

To increase the mutual understanding of current policies;

To harmonise practices between Competent Authorities of SMS.

15

Director’s Consultation Group (DCG) of SMS

HARMONISATION WITHIN THE ZONEHARMONISATION WITHIN THE ZONE

Page 16: Making the zonal system work -Feedback from Southern Zone- Miriam Cavaco Head of Authorization of Plant Protection Products Division General Directorate

FR proposed to host a South EG on efficacy in 2015 (?)FR proposed to host a South EG on efficacy in 2015 (?)

HARMONISATION OF ZONAL ASSESSMENTHARMONISATION OF ZONAL ASSESSMENT

16

RR (Part A +B +C)

Concerned Member States need:

Registration Report (A+B+C);

Copy of the authorisation.

Re-registration (Voluntary Worksharing)

New apllications

Eficaccy issuesArticle 37, paragraph 4:“The other Member States concerned shall at the latest within 120 days of the receipt of the assessment report and the copy of the authorisation of the Member State examining the application decide on the application as referred to in Article 36(2) and (3).”

Article 37, paragraph 4:“The other Member States concerned shall at the latest within 120 days of the receipt of the assessment report and the copy of the authorisation of the Member State examining the application decide on the application as referred to in Article 36(2) and (3).”

Page 17: Making the zonal system work -Feedback from Southern Zone- Miriam Cavaco Head of Authorization of Plant Protection Products Division General Directorate

17

Renewal of authorizations (Article 43)

PLANNING THE WORKLOAD

In order to plan the workload (As in Central Zone)

Have sent letters (July) to all applicants asking :

to notify the dossiers that will be submitted -EXCELL file.

Greece gathered all the information submitted.

Last teleconference made a distribution of all PPP.

Page 18: Making the zonal system work -Feedback from Southern Zone- Miriam Cavaco Head of Authorization of Plant Protection Products Division General Directorate

ZRM is a notified concerned MS:

oEven some uses are not registered in ZRMS

Between concerned MS:

o Choose the RMS or the co-RMS

Capacities of MS

PLANNING THE WORKLOAD

Allocation of ZRMS (AIR2)

Page 19: Making the zonal system work -Feedback from Southern Zone- Miriam Cavaco Head of Authorization of Plant Protection Products Division General Directorate

PLANNING THE WORKLOAD

Allocation of ZRMS (AIR2)

Page 20: Making the zonal system work -Feedback from Southern Zone- Miriam Cavaco Head of Authorization of Plant Protection Products Division General Directorate

The ZRMS will evaluate all the GAP in the southern zone

Decision:

Each Ms We will only renew the uses already authorized in that MS.

PLANNING THE WORKLOAD

Procedure of evaluation (AIR2)

Page 21: Making the zonal system work -Feedback from Southern Zone- Miriam Cavaco Head of Authorization of Plant Protection Products Division General Directorate

Working procedures in Southern Zone;

Feedback from zonal submissions: Zonal submissions and areas to improve;

•Harmonisation within the zone;

•Harmonisation between the zones;

Concluding remarks.

21

OVERVIEW

Page 22: Making the zonal system work -Feedback from Southern Zone- Miriam Cavaco Head of Authorization of Plant Protection Products Division General Directorate

22

To avoid duplication of the work :

• Facilitate work-sharing especially between zones

Interzonal worksharing Inter-Zonal Core dossier:

• Identity and analytical methods;•Toxicology;

HARMONISATION BETWEEN THE ZONESHARMONISATION BETWEEN THE ZONES

“Where the application is made in more than 1 zone, MS …. shall agree on the evaluating data which are not related to the environmental and agricultural conditions.” (Article 35)

Page 23: Making the zonal system work -Feedback from Southern Zone- Miriam Cavaco Head of Authorization of Plant Protection Products Division General Directorate

Offers the opportunity to: Discussion of commom problems;

Reduce workload by worksharing;

Harmonise requirements.

Requires from all partners:

Increase of cooperation between MS and MS/Applicants;

Trust in the work done by others;

Willingness to harmonize requirements .

23

Zonal evaluation

CONCLUDING REMARKS

Page 24: Making the zonal system work -Feedback from Southern Zone- Miriam Cavaco Head of Authorization of Plant Protection Products Division General Directorate

24

We need to make it work

Everyone benefits

[email protected]