Managing Change in Construction Projects: A Knowledge-based Approach

Download Managing Change in Construction Projects: A Knowledge-based Approach

Post on 07-Jan-2017

215 views

Category:

Documents

3 download

Embed Size (px)

TRANSCRIPT

  • This article was downloaded by: [University of Western Ontario]On: 03 June 2014, At: 02:47Publisher: RoutledgeInforma Ltd Registered in England and Wales Registered Number: 1072954 Registered office: Mortimer House,37-41 Mortimer Street, London W1T 3JH, UK

    Construction Management and EconomicsPublication details, including instructions for authors and subscription information:http://www.tandfonline.com/loi/rcme20

    Managing Change in Construction Projects: AKnowledge-based ApproachRussell Kenley aa Swinburne University of Technology , AustraliaPublished online: 28 Feb 2012.

    To cite this article: Russell Kenley (2012) Managing Change in Construction Projects: A Knowledge-based Approach,Construction Management and Economics, 30:2, 179-180, DOI: 10.1080/01446193.2012.655751

    To link to this article: http://dx.doi.org/10.1080/01446193.2012.655751

    PLEASE SCROLL DOWN FOR ARTICLE

    Taylor & Francis makes every effort to ensure the accuracy of all the information (the Content) containedin the publications on our platform. However, Taylor & Francis, our agents, and our licensors make norepresentations or warranties whatsoever as to the accuracy, completeness, or suitability for any purpose of theContent. Any opinions and views expressed in this publication are the opinions and views of the authors, andare not the views of or endorsed by Taylor & Francis. The accuracy of the Content should not be relied upon andshould be independently verified with primary sources of information. Taylor and Francis shall not be liable forany losses, actions, claims, proceedings, demands, costs, expenses, damages, and other liabilities whatsoeveror howsoever caused arising directly or indirectly in connection with, in relation to or arising out of the use ofthe Content.

    This article may be used for research, teaching, and private study purposes. Any substantial or systematicreproduction, redistribution, reselling, loan, sub-licensing, systematic supply, or distribution in anyform to anyone is expressly forbidden. Terms & Conditions of access and use can be found at http://www.tandfonline.com/page/terms-and-conditions

    http://www.tandfonline.com/loi/rcme20http://www.tandfonline.com/action/showCitFormats?doi=10.1080/01446193.2012.655751http://dx.doi.org/10.1080/01446193.2012.655751http://www.tandfonline.com/page/terms-and-conditionshttp://www.tandfonline.com/page/terms-and-conditions

  • Book Reviews

    Managing Change in Construction Projects: A

    Knowledge-based Approach

    Sepani Senaratne and Martin Sexton, Wiley-Blackwell,

    London, 2011

    200 pp., ISBN 978 1 4443 3515 6, 74.99 (hb)

    Managing Change in Construction Projects is a book that

    seems not to know its purpose. It is a beautifully writ-

    ten research publication, but one that presents in the

    style of a PhD or major research project, and seems

    well described by the abstract for the first authors

    thesis, although no such acknowledgement or refer-

    ence is given. Indeed, as an academic, I eventually

    suspended my attempts to read it as a book and

    instead read the work as a thesis. This indicates that

    the audience is limited to those interested in highly

    structured research publications. This is a shame,

    because those who fail to persevere will miss out on a

    great deal of valuable information. For the research

    student, this will be a very useful reference and it can

    provide the foundation for much subsequent research.

    In contrast, this is not a book for practitioners.

    The title of the book misled me; I inferred that the

    book would be about change management: the pro-

    cess of managing change in people and processes.

    This reflects reader bias as much as imprecision in

    the title. The book actually targets managing reactive

    change in construction projects, as it discusses varia-

    tions or change orders that occur during the construc-

    tion phase of a project.

    As a research publication the book is well struc-

    tured, if concise. The chapters follow a structured

    academic format:

    Introduction

    Key issues from the literature

    Research methodology

    Case study results

    Cross-case analysis

    Conclusion

    The work draws heavily on knowledge management

    literature as it may be applied to change in construc-

    tion projects and develops models for knowledge-

    based reactive change management.

    The short introduction rapidly builds a powerful

    case for the investigation and leads directly into the

    literature review. This is an exhaustive review of the

    nature of construction, the nature of change, the nat-

    ure of change in construction, knowledge manage-

    ment and its role in reactive change processes. This

    erudite chapter is well worth the time devoted. As a

    reference, it will be both informative and interesting.

    However, a dichotomy emerges which is never

    resolved.

    The work discusses change from the premise of a

    dictionary definition and draws upon organizational

    change literature. However, as one is drawn through

    the argument, it becomes apparent that the changes

    included in the scope of the subsequent research are

    much more limited: to reactive changes (variations or

    change orders). One is left wondering at the connec-

    tion between managing change in organizations and

    managing reactive change events.

    Further, the literature draws upon previous work

    identifying the likely causes of reactive change, but

    does not resolve the separation of client-driven change

    and change required due to errors (whether design or

    construction). As such, the fundamental premise

    comes into question.

    The work implies that knowledge management can

    improve our capacity to manage or prevent change

    events, although the mechanism is not clear. This is a

    reasonable premise. Certainly one can see that knowl-

    edge has a role in preventing errors. However, the

    connection between knowledge management and pre-

    venting a client from making design changes (request-

    ing a variation to the design) is never established nor,

    I suspect, can it be.

    So the work must necessarily deal with changes

    arising from mistakes. Chapter 4 discusses the meth-

    odology for the investigation. This provides a fairly

    typical case-based design. Surprisingly, however, the

    design only includes three cases. Cases were supposed

    to be theoretically significant cases such as represen-

    tative, disconfirming and/or extreme cases. Here,

    representative cases were chosen, but the selection is

    not representative of reactive change, nor indeed par-

    ticularly interesting. Certainly they were not cases

    that, on the surface, would reveal any inherent truths

    Construction Management and EconomicsISSN 0144-6193 print/ISSN 1466-433X online

    http://www.tandfonline.comhttp://dx.doi.org/10.1080/01446193.2012.655751

    Construction Management and Economics (February 2012) 30, 179187

    Dow

    nloa

    ded

    by [

    Uni

    vers

    ity o

    f W

    este

    rn O

    ntar

    io]

    at 0

    2:47

    03

    June

    201

    4

  • about the role of knowledge management in managing

    reactive change.

    The cases were:

    A change in floor specification required to preventoperational disruption to the owners businessanimpact of which the contractor had previouslyadvised the client, yet the advice (knowledge) wasignored until construction. This, as a client change,arose too late to prevent disruption.

    Incorrect installation height of whiteboards due toa design change (client request) and failure of pro-cesses of documenting and following up the change(the change was neglected). This is a process error,where a design change failed to be activatedbecause a proper process was not followed.

    Change in location of radiant panels due to adesign error. This is a change arising from identify-ing a design error during construction.

    While each case is different, it is difficult to accept

    that one case of each type is sufficient to draw conclu-

    sions about that type of change. Further, while the

    cases may be representative, they do not seem repre-

    sentative of changes that would have benefited from

    knowledge management.

    The results and cross-case analysis chapters make a

    compelling and interesting case. The book benefits

    from innovative cognitive maps illustrating the various

    situations and strategies provided by the literature.

    For those interested in detailed observations of knowl-

    edge theory applied to cases of reactive change in

    construction, this does not disappoint. The chapter

    develops models of such issues as knowledge

    properties during change, knowledge identification,

    intra-project knowledge creation and inter-project

    knowledge transfer.

    The book concludes with a summary of the

    research propositions and models of knowledge flows

    during reactive project change, enablers and barriers

    in knowledge-based reactive change process and

    draws the theory together in some really cool dia-

    grams illustrating the prevalent reactive change pro-

    cess and a knowledge-based reactive change process.

    Overall I think the work has considerable merit and

    is a sound use of theory and research method to

    develop powerful models for knowledge-based reac-

    tive change management. However, it fails to con-

    vince in the sample size and in the range of change

    contexts analysed. Further, issues of logic in relation

    to defining and exploring change and reactive change,

    of explaining the difference between error-driven

    change and client-driven change, cast doubt on the

    analysis which exacerbates concern over sampling.

    The book ultimately lacks substance and would have

    benefited from both further cases and, for the sake of

    a broader audience, more context and discussion.

    Without this, it seems a bit disconnected from the

    reality of construction projects generally.

    RUSSELL KENLEYSwinburne University of Technology, Australia

    rkenley@swin.edu.au 2012, Russell Kenley

    Who Needs Migrant Workers? Labour

    Shortages, Immigration, and Public Policy

    Martin Ruhs and Bridget Anderson (eds), Oxford

    University Press, Oxford, 2011

    352 pp., ISBN 978 0 19 958059 0, 60.00 (hb)

    Introduction

    In present times of economic downturn and falling

    employment, the rather provocatively titled Who Needs

    Migrant Workers? will surely catch the eye, not only of

    those who study the labour market, but of a larger con-

    stituency of those who participate in it alsoeither as

    employer or as employed. Martin Ruhs and Bridget

    AndersonSenior Economist and Research Fellow

    respectively at the ESRC-funded Centre of Migration

    Policy and Society (COMPAS) at Oxford University

    have drawn together a set of papers from a diverse

    authorship that cover the more general theoretical and

    policy issues relating to the demand for migrant labour,

    as well as focusing more specifically on the need for

    and role of migrant labour in six key sectors in the UK

    economy. These six sectors are health, social care, food

    production, hospitality, construction and financial ser-

    vicesthe latter something of a surprise, at least to this

    reviewer (more on that later).

    The central concern of the book is with the idea

    that migrant workers are needed to meet specific staff

    shortages expressed as skills deficiencies, and the

    rather problematic distinction between the more qual-

    itative concept of skills and the more quantitative and

    numerical one of labour shortage is discussed in some

    detail. Indeed, it is partly to understand the implica-

    tions of this distinction for UK immigration policy

    that the UK government established the Migration

    Advisory Committee (MAC) that commissioned some

    of the originating research reported in this book. Of

    course, the problem of skills deficiencies is particu-

    larly important for construction alsoas will be

    seenand raises some very interesting questions for

    research about current industry practice and govern-

    ment policy. But this is rather getting ahead and into

    the detail. It is perhaps important first to consider the

    relevance of this book to the construction sector, for

    180 Book reviews