Page 1: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Managing Production across the Supply Chain

Page 2: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Alphabet Soup

TLA (Three Letter Acronym) Definitions

ATP: Available to PromiseBOM: Bill of MaterialsDRP: Distribution Requirements PlanningMPS: Master Production ScheduleMRP: Materials Requirements PlanningPAC: Production Activity ControlS&OP: Sales and Operations Planning

Page 3: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

The Big Picture

S&OP

MPS

MRP

Vendor OrderManagmentPAC

Tactical Capacity Planning

Production, Order Fulfillment, Cushions

Material Quantities and Timing

Supply Chain Management and PDCA

Production Management and PDCA

Page 4: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Master Scheduling I

• Controls the timing and quantity of production for products or product families

• Primary interface point for actual customer orders

• Coordinates forecasted demand and actual orders with production activity

• Serves as tool for agreement between marketing and operations (but at a different level than S&OP)

Page 5: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Master Scheduling II

• Feeds data to more detailed material planning

• Indicates the quantity and timing (i.e., delivery times) for a product or group of products

• More detailed than S&OP

weekly versus monthly

specific products versus “average”

Page 6: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Link between S&OP and MPS

Month: January February MarchOutput: 200 300 400

Push Mowers 25 25 25 25Self-propelled 35 40Riding 12 13

January (weeks) 1 2 3 4

S&OP

MPS

Page 7: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Master Scheduling Criteria

The Master Production Schedule must:

Satisfy the needs of marketing

Be feasible for operations

Match with supply chain capability

Page 8: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

MPS Formulas: Definitions

• ATPt = Available to promise in period t

• EIt = Ending Inventory for period t (same as projected on-hand inventory for next period)

• Ft = Forecasted demand for period t

• MPSt = MPS quantity available in period t

• OBt = orders booked for period t

Page 9: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

MPS Formulas:

dueisMPSpositivenextwhenperiodzwhere

OBMPSEIATP

OBFMPSEIEI

t

z

tiittt

ttttt

1

1

1 ),max(

Page 10: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Detailed MPS for a Product

Notes: Planning time fence cumulative lead time for product What seems to be the lot-sizing rule here?

On-hand inventory at end of October = 100

Month November December

Week 45 46 47 48 49 50 51 52

Forecast Demand 150 150 150 150 125 125 125 125

Orders Booked 170 165 140 120 85 45 20 0

Master Schedule 300 0 300 0 250 0 250 0

Page 11: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Projected On-Hand Inventory

On-hand inventory at end of October = 100

Month November December

Week 45 46 47 48 49 50 51 52

Forecast Demand 150 150 150 150 125 125 125 125

Orders Booked 170 165 140 120 85 45 20 0

Projected On-Hand Inventory 230 65 215 65 190 65 190 65

Master Schedule 300 0 300 0 250 0 250 0

e.g., Projected on-hand inventory for week 47: = 65 + 300 – 150 = 215

Page 12: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Available-to-Promise

ATP (Week 45) = 100 + 300 – (170 + 165) = 65ATP (Week 47) = 300 – (140+120) = 40ATP (Week 49) = 250 – (85 + 45) = 120

On-hand inventory at end of October = 100

Month November December

Week 45 46 47 48 49 50 51 52

Forecast Demand 150 150 150 150 125 125 125 125

Orders Booked 170 165 140 120 85 45 20 0

Projected On-Hand Inventory 230 65 215 65 190 65 190 65

Master schedule 300 0 300 0 250 0 250 0

Available-to-Promise 65   40   120   230  

Page 13: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Change in Forecast Demand

Are we in trouble yet?

On-hand inventory at end of October = 100

Month November December

Week 45 46 47 48 49 50 51 52

Forecast Demand 150 150 150 150 150 150 150 150

Orders Booked 170 165 140 120 85 45 20 0

Projected On-Hand Inventory 230 65 215 65 190 65 190 65

Master schedule 300 0 300 0 250 0 250 0

Available-to-Promise 65   40   120   230  

Page 14: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Change in Orders Booked

Note impact on ATP ( Week 45) and on-hand inventory projections

On-hand inventory at end of October = 100

Month November December

Week 45 46 47 48 49 50 51 52

Forecast Demand 150 150 150 150 125 125 125 125

Orders Booked 170 230 140 120 85 45 20 0

Projected On-Hand Inventory 230 0 0 0 125 0 125 0

Master schedule 300 0 300 0 250 0 250 0

Available-to-Promise 0   40   70   230  

Page 15: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Planning Horizon

How far an MPS looks into the future depends on

• Variability in demand and market conditions

• Variability in supplier deliveries and lead times

• Length of the production process.

Page 16: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Key Points about MPS

• Provides more detail than S&OP

• Tracks the following information:

– Actual versus forecasted demand– Available-to-Promise

• This gives sales information for accepting or not accepting new orders for delivery in a given week

Page 17: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

A Final View of Master Scheduling

S&OP

MPS

MarketingOperations & Supply Chain

Rough-Cut Capacity Plan

Page 18: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Material Requirements Planning

• MRP in the planning cycle

• The logic of MRP

– an extended example

• Considerations of MRP

Page 19: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

So Far ...

We have only considered labor, overall inventory levels, and equipment:

S&OP Master scheduling Rough-Cut Capacity

Planning

But we haven’t ordered the materials!

Page 20: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

We’ve scheduled 500 chairs to be ready five weeks from now . . .

. . . Now what?

Page 21: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Back supports (3)

Side rails (2)

Front legs (2)

Cross bars (2)

Seat

Material Needed for a Chair

Page 22: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Chair Structure Tree(aka “Bill of Materials” or BOM)

Chair

LegAssembly

Seat Back Assembly

Legs (2) Crossbar

Siderails (2)

Crossbar

BackSupports

(3)

Page 23: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

ChairAssembly

(1 week)

Week 5Week 4

If final assembly takes one week, then we must startthe assembly at the beginningof Week 4 . . .

Lead-Time I

Page 24: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

ChairAssembly

BackAssembly

LegAssembly

(1 week)

(1 week)

(1 week)

Seats (2 weeks)

Week 5Week 4Week 3Week 2Whichmeans thatthe majorsubassembliesand seats must bedone by thebeginningof Week 4 ...

Lead-Time II

Page 25: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

ChairAssembly

BackAssembly

LegAssembly

(1 week)

(1 week)

(1 week)

Back Support (2 weeks)

Legs (2 weeks)

Side Rails (2 weeks)

Cross Bar (2 weeks)

Cross Bar (2 weeks)

Seats (2 weeks)

Week 5Week 4Week 3Week 2Week 1

Lead-Time III

Page 26: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Lead-Time Key Points

• To have finished chairs at the beginning of Week 5 with no work in progress or finished inventory, we must begin production and order materials in Week 1.

• “Exploding” the bill of materials tells us when to order things.

• Not much we can do to adjust output of chairs for the next 4 weeks. Why?

Page 27: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Material Requirements Planning (MRP)

Requires:

1. Bill-of-Materials (BOM)

2. Inventory record

3. Master schedule

to determine what should be ordered when, and how much to order.

Page 28: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

End items are also known as “Level 0” items

The MRP Process Starts with the MPS

Chairs Lead Time = 1 week

1 2 3 4 5 6 7MPS Due Date 0 0 0 0 500 400 400Start Assembly 0 0 0 500 400 400 0

Week

Page 29: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Where do the gross requirements come from?Do you understand the MRP logic?

The “Parent / Child” Relationship

ChairsLT = 1 week

1 2 3 4 5 6 7MPS Due Date 0 0 0 0 500 400 400Start Assembly 0 0 0 500 400 400 0

SeatLT = 2 weeksMinimum Order = 1 1 2 3 4 5 6 7Gross Requirements 0 0 0 500 400 400 0Scheduled ReceiptsProjected On Hand 0 0 0 0 0 0 0 0Net Requirements 500 400 400Planned Receipts 500 400 400Planned Order 500 400 400

Week

Week

Page 30: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Going Deeper…

ChairsLT = 1 week

1 2 3 4 5 6 7MPS Due Date 0 0 0 0 500 400 400Start Assembly 0 0 0 500 400 400 0

SeatLT = 2 weeksMinimum Order = 1 1 2 3 4 5 6 7Gross Requirements 0 0 0 500 400 400 0Scheduled ReceiptsProjected On Hand 0 0 0 0 0 0 0 0Net Requirements 500 400 400Planned Receipts 500 400 400Planned Order 500 400 400

Leg AssemblyLT = 1 weekMinimum Order = 1000 1 2 3 4 5 6 7Gross Requirements 0 0 0 500 400 400 0Scheduled ReceiptsProjected On Hand 25 25 25 25 525 125 725 725Net Requirements 475 275Planned Receipts 1000 1000Planned Order 1000 1000

Back AssemblyLT = 1 weekMinimum Order = 250 1 2 3 4 5 6 7Gross Requirements 0 0 0 500 400 400 0Scheduled Receipts 250

Week

Week

Week

Week

Page 31: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Where do the gross requirements for LEGS come from?

Moving from “Level 1” itemsto “Level 2” items . . . Leg AssemblyLT = 1 weekMinimum Order = 1000 1 2 3 4 5 6 7Gross Requirements 0 0 0 500 400 400 0Scheduled ReceiptsProjected On Hand 25 25 25 25 525 125 725 725Net Requirements 475 275Planned Receipts 1000 1000Planned Order 1000 1000

LegsLT = 2 weeksMinimum Order = 1 1 2 3 4 5 6 7Gross Requirements 0 0 2000 0 2000 0 0Scheduled ReceiptsProjected On Hand 0 0 0 0 0 0 0 0Net Requirements 2000 2000Planned Receipts 2000 2000Planned Order 2000 2000

Week

Week

Page 32: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Combining Requirements: “Cross Bars”

Note effect of differences in lead times and order sizes on

the gross requirements

for each component

Leg AssemblyLT = 1 weekMinimum Order = 1000 1 2 3 4 5 6 7Gross Requirements 0 0 0 500 400 400 0Scheduled ReceiptsProjected On Hand 25 25 25 25 525 125 725 725Net Requirements 475 275Planned Receipts 1000 1000Planned Order 1000 1000

Back AssemblyLT = 1 weekMinimum Order = 250 1 2 3 4 5 6 7Gross Requirements 0 0 0 500 400 400 0Scheduled Receipts 250Projected On Hand 0 0 250 250 0 100 200 200Net Requirements 250 400 300Planned Receipts 250 500 500Planned Order 250 500 500

CrossbarsLT = 2 weeksMinimum Order = 1 1 2 3 4 5 6 7Gross Requirements 0 0 1250 500 1500 0 0Scheduled ReceiptsProjected On Hand 0 0 0 0 0 0 0 0Net Requirements 1250 500 1500Planned Receipts 1250 500 1500Planned Order 1250 500 1500

Week

Week

Week

Page 33: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Impact of Longer Lead Times

We cannot do this since the planned order would be in the past…. Thus the 250 crossbars will be delivered late one week to back assembly. What does this do to our chair schedule?

Leg AssemblyLT = 1 weekMinimum Order = 1000 1 2 3 4 5 6 7Gross Requirements 0 0 0 500 400 400 0Scheduled ReceiptsProjected On Hand 25 25 25 25 525 125 725 725Net Requirements 475 275Planned Receipts 1000 1000Planned Order 1000 1000

Back AssemblyLT = 2 weeksMinimum Order = 250 1 2 3 4 5 6 7Gross Requirements 0 0 0 500 400 400 0Scheduled Receipts 250Projected On Hand 0 0 250 250 0 100 200 200Net Requirements 250 400 300Planned Receipts 250 500 500Planned Order 250 500 500

CrossbarsLT = 2 weeksMinimum Order = 1 1 2 3 4 5 6 7Gross Requirements 0 250 1500 500 1000 0 0Scheduled ReceiptsProjected On Hand 0 0 0 0 0 0 0 0Net Requirements 250 1500 500 1500Planned Receipts 250 1500 500 1500Planned Order 250 1500 500 1000

Week

Week

Week

Page 34: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Do You Understand ...

• Why it is important to have an accurate BOM and accurate inventory information?

• Why we need to “freeze” production schedules?

• Where gross requirements come from?

• The difference between planned and scheduled receipts?

Page 35: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Other Considerations I

Planned Orders

Feedback Feedback

Production Suppliers

MRP

Page 36: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Other Considerations II

• When do we update the system?

• Capacity requirements planning using MRP output

• MRP ‘nervousness’

– Increasing order chaos, the lower in the BOM structure of materials

– Lot sizing issues

Page 37: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Recall ...

Look at the “lumpiness” of demand for legs

Leg AssemblyLT = 1 weekMinimum Order = 1000 1 2 3 4 5 6 7Gross Requirements 0 0 0 500 400 400 0Scheduled ReceiptsProjected On Hand 25 0 0 0 525 125 725 725Net Requirements 475 275Planned Receipts 1000 1000Planned Order 1000 1000

LegsLT = 2 weeksMinimum Order = 1 1 2 3 4 5 6 7Gross Requirements 0 0 2000 0 2000 0 0Scheduled ReceiptsProjected On Hand 0 0 0 0 0 0 0 0Net Requirements 2000 2000Planned Receipts 2000 2000Planned Order 2000 2000

Week

Week

Page 38: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

If we order “lot-for-lot”

Much smoother demand for legs, lower average inventory

Leg AssemblyLT = 1 weekMinimum Order = 1 1 2 3 4 5 6 7Gross Requirements 0 0 0 500 400 400 0Scheduled ReceiptsProjected On Hand 25 0 0 0 0 0 0 0Net Requirements 475 400 400Planned Receipts 475 400 400Planned Order 475 400 400

LegsLT = 2 weeksMinimum Order = 1 1 2 3 4 5 6 7Gross Requirements 0 0 950 800 800 0 0Scheduled ReceiptsProjected On Hand 0 0 0 0 0 0 0 0Net Requirements 950 800 800Planned Receipts 950 800 800Planned Order 950 800 800

Week

Week

Page 39: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Job Sequencing

• Rules:FCFS — first come, first servedEDD — earliest due dateCritical ratio — work time remaining divided

by days left before due date

• Performance measure:Average lateness — sum of days late for each

job divided by total number of jobs

Page 40: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Example Data

JobEstimated

TimeDays Until

DueCritical Ratio

Weldco 8 32 0.250

MetroArt 10 20 0.500

MMCC 9 9 1.000

Jones 6 15 0.400

Page 41: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Example FCFS

JobEstimated

Time

Days Until Due

Start EndDays Late

Weldco 8 32 0 8 0

MetroArt 10 20 8 18 0

MMCC 9 9 18 27 18

Jones 6 15 27 33 18

Average lateness = 36/4 = 9 days

Page 42: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Example EDD

JobEstimated

Time

Days Until Due

Start EndDays Late

MMCC 9 9 0 9 0

Jones 6 15 9 15 0

MetroArt 10 20 15 25 5

Weldco 8 32 25 33 1

Average lateness = 6/4 = 1.5 days

Page 43: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Example Critical Ratio(largest ratio first)

JobEstimated

Time

Days Until Due

Start EndDays Late

MMCC 9 9 0 9 0

MetroArt 10 20 9 19 0

Jones 6 15 19 25 10

Weldco 8 32 25 33 1

Average lateness = 11/4 = 2.75 days

Page 44: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Interpretation

• Here the EDD rule gives better average lateness. Compare with FCFS results.

• Note that the critical ratio does not do as well as EDD compared to the text example for Carlos Restoration. Why?

Page 45: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Distribution Requirements Planning (DRP)

• Anticipates downstream demand– Uses this information, not predetermined

reorder points or periodic reviews, to determine when to order

• Computer-based software systems needed to deal with the added complexity

Page 46: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Suppose we forecast demand for Wholesaler A for the next 8 days (the best time horizon to use will depend on many factors)

Based on this, we anticipate that Wholesaler A will order on Day 3

DRP Example I

Wholesaler A

ROP = 50, Q = 200 Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 Day 8Forecast Demand 20 20 20 20 20 20 20 20Ending Inventory 85 65 45 225 205 185 165 145 125Expected Order 200

Page 47: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

We extend the analysis to include Wholesaler B Combined, we expect to see orders on Days 3 and 4

Wholesaler A

ROP = 50, Q = 200 Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 Day 8Forecast Demand 20 20 20 20 20 20 20 20Ending Inventory 85 65 45 225 205 185 165 145 125Expected Order 200

Wholesaler B

ROP = 75, Q = 200 Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 Day 8Forecast Demand 14 14 14 14 14 14 14 14Ending Inventory 108 94 80 66 252 238 224 210 196Expected Order 200

Total Orders 200 200

DRP Example II

Page 48: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

The distributor then uses this information to plan its own orders. In this case, suppose it takes two days for the supplier to replenish; based on the information, the distributor would order on Day 1

Wholesaler A

ROP = 50, Q = 200 Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 Day 8Forecast Demand 20 20 20 20 20 20 20 20Ending Inventory 85 65 45 225 205 185 165 145 125Expected Order 200

Wholesaler B

ROP = 75, Q = 200 Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 Day 8Forecast Demand 14 14 14 14 14 14 14 14Ending Inventory 108 94 80 66 252 238 224 210 196Expected Order 200

Distributor

Q = 400 Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 Day 8Total Expected Orders 200 200Ending Inventory 50 50 50 250 50 50 50 50 50Planned Receipts 400Planned Orders 400

DRP Example III

Page 49: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

DRP Benefits

Helps improve customer service Provides a better and faster understanding of

the impact of shortages and/or promotions

Helps reduce costs InventoryFreightProduction

Provides integration between the stages in the supply chain

Page 50: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

DRP Constraints

• Accurate forecasts and inventory levels– Necessary to anticipate correctly when orders will be

placed• Consistent and reliable lead times

– To ensure that orders can be placed and arrive by the time they are needed

• “Nervousness”– Even light changes in demand for downstream partners

can have a significant impact on order volumes, especially when order sizes are relatively high

Page 51: Managing Production across the Supply Chain. Alphabet Soup TLA (Three Letter Acronym) Definitions ATP: Available to Promise BOM: Bill of Materials DRP:

Case Study in Managing Production

The Realco Breadmaster