MANCOM Meeting March 05, 2014

DTI-CAR Conference Room

Page 2: MANCOM Meeting March 05, 2014 DTI-CAR Conference Room

STATUS OF PROCUREMENT ofBRC FACILITIES

As of March 04, 2014

Page 3: MANCOM Meeting March 05, 2014 DTI-CAR Conference Room

Status of Procurement of BRC FacilitiesAs of March 04, 2014

Particulars

No. of

Units

Unit Cost

Total Cost

Status of Procurement

Remarks

Delivered

For Delivery

Others

IT EQUIPMENT  

Computer Sets 2 76,900.00

153,800.00

153,800.00      

Laptop 2 66,500.00

133,000.00

133,000.00      

Laser Printer, Colored 1 44,900.0

0 44,900.00 44,900.00      

Risograph 1 98,600.00 98,600.00 98,600.00      

LCD Projector 1 25,995.00 25,995.00 25,995.00      

Digital SLR Camera 1 42,000.0

0 42,000.00 42,000.00      

Sub Total   354,895.00

498,295.00

498,295.00      

Regional Office

Page 4: MANCOM Meeting March 05, 2014 DTI-CAR Conference Room

Status of Procurement of BRC FacilitiesAs of March 04, 2014Regional Office

ParticularsNo. of

Units

Unit Cost

Total Cost

Status of Procurement

Remarks

Delivered

For Delive

ry OthersOTHER FACILITIES  

Junior Executive Table (Solid wood/combo)

18

10,000.00 180,000.00

   180,000.

00 For JO

preparation

Junior Executive Chair 8 6,995.00 55,960.00

   55,960.0

0 PO for approval

Executive Chair 3 8,995.00 26,985.00    

26,985.00 PO for approval

Reception Couch (at least 3-piece) 2 17,500.00 35,000.00

   35,000.0

0 PO for approval

Voice recorder 3 9,600.00 28,800.00    

28,800.00 PO for approval

Window blinds 1 116,984.00

116,984.00    

116,984.00 JO for approval

Office Exhaust/Ventilation system 1 74,355.00 74,355.00

   74,355.0

0 JO for approval

Sub Total     498,884.00    

498,884.00  

TOTAL    997,179.

00 498,295.

00  498,884

.00  Percentage of completion       50%   50%  

Page 5: MANCOM Meeting March 05, 2014 DTI-CAR Conference Room

Status of Procurement of BRC FacilitiesAs of March 04, 2014

Abra

ParticularsNo. of

Units

Unit Cost

Total Cost

Status of Procurement

Remarks

Delivered

For Delive

ryOthe

rsIT EQUIPMENT  

Desktop computer 2 76,900.00

153,800.00

153,800.00      

Laptop 2 66,500.00

133,000.00

133,000.00      

Laser printer, colored 1 44,900.00

44,900.00

44,900.00      

Laser printer, BW 1 7,900.00

7,900.00

7,900.00      

Facsimile machine 1 12,500.00

12,500.00

12,500.00      

Risograph machine 1 98,600.00

98,600.00

98,600.00      

Document scanner 1 3,500.00

3,500.00

3,500.00      

Digital SLR camera 1 42,000.00

42,000.00

42,000.00      

Sub Total     496,200.00

496,200.00      

Page 6: MANCOM Meeting March 05, 2014 DTI-CAR Conference Room

Status of Procurement of BRC FacilitiesAs of March 04, 2014Abra

Particulars

No. of

Units

Unit Cost

Total Cost

Status of Procurement

Remarks

Delivered

For Delivery

Others

OTHER FACILITIES  Airconditioning unit 1

52,868.00

52,868.00

52,868.00      Lapel/clip microphone 1

14,500.00

14,500.00

14,500.00      

PA sound system 2 24,225.00

48,450.00

48,450.00      

Wireless microphone 1

13,950.00

13,950.00

13,950.00      

Desk microphone 3 1,695.00

5,085.00

5,085.00      

Electrical peripherals  

4,721.50

4,721.50

4,721.50      

Monobloc chairs 50 329.75

16,487.50

16,487.50      

Electric fans 5 5,500.00

27,500.00

27,500.00      

Water dispenser 1 6,350.00

6,350.00

6,350.00      

Filing cabinet 4 10,000.00

40,000.00

40,000.00      

Percolator 1 5,300.00

5,300.00

5,300.00

LCD projector 1 54,000.00 54,000.00   54,000.00  

to be delivered 2nd

Week of March

Sub Total     289,912.00

235,212.00

54,000.00   

Page 7: MANCOM Meeting March 05, 2014 DTI-CAR Conference Room

Status of Procurement of BRC FacilitiesAs of March 04, 2014Abra

ParticularsNo. of

Units

Unit Cost

Total Cost

Status of Procurement

Remarks Deliver

ed For

Delivery OthersOTHER

FACILITIES

Folding tables 12

1,799.00

21,588.00

7,196.00

14,392.0

0  

bal to be delivered 3rd Week of March

Multimedia rack 1

14,000.0

0

14,000.00

 

14,000.00

 to be delivered 2nd Week

of March

TV rack 1

14,000.0

0

14,000.00

 

14,000.00

 to be delivered 2nd Week

of March

Cabinet 1

24,000.0

0

24,000.00

 

24,000.00

 to be delivered 2nd Week

of March

Console table 1

7,000.00

7,000.00  

7,000.00

 to be delivered 2nd Week

of MarchTripad with filler 1

2,000.00 2,000.00    

2,000.00 for procurement

Modular partition 1

50,000.0

0 50,000.00    

50,000.0

0 for procurement

Modular conference table 1

25,000.0

0

25,000.00

   

25,000.00

for procurement

Display cabinet for Abra products 1

28,000.0

0

28,000.00

   

28,000.00

for procurement

Signage for business center 1

5,000.00

5,000.00

   

5,000.00 for procurement

CCTV 124,000.0

0 24,000.00    

24,000.00

for procurement

Sub Total 

 

214,588.00 7,196.00

73,392.00

134,000.00  

TOTAL   1,000,000

.00 738,608

.00 127,392

.00 134,000

.00  Percentage of completion  74% 13% 13% 

Page 8: MANCOM Meeting March 05, 2014 DTI-CAR Conference Room

Status of Procurement of BRC FacilitiesAs of March 04, 2014

Apayao

ParticularsNo. of

Units

Unit Cost

Total Cost

Status of Procurement

Remarks Delivered For

Delivery

IT EQUIPMENT           Desktop Computer with licenses 2

76,900.00

153,800.0

0

153,800.0

0    

Notebook Computer with licenses 2

66,500.0

0

133,000.0

0

133,000.0

0    

Laser Printer, Colored 1

44,900.00

44,900.00

44,900.00

   

Photocopier 1

97,880.00

97,880.00

97,880.00

   

Multimedia Projector 1

25,995.00

25,995.00

25,995.00

   

Digital SLR Camera 1

42,000.00

42,000.00

42,000.00

   

Subtotal   

497,575.

00

497,575.

00    

Page 9: MANCOM Meeting March 05, 2014 DTI-CAR Conference Room

Status of Procurement of BRC FacilitiesAs of March 04, 2014Apayao

Particulars

No. of

Units

Unit Cost Total Cost

Status of Procurement

Remarks Delivered

For Delivery

OTHER FACILITIES            

Laser Printer B/W1

7,300.00 27,300.00

27,300.00  

 

Document Scanner1

11,200.00

11,200.00

11,200.00  

 

Cignal Cable Satellite 1

3,710.00

3,710.00

3,710.00  

 

Television Set (42") 1

38,900.00 38,900.00

38,900.00  

 

Steel Filing Cabinet 2

9,500.00 19,000.00

19,000.00  

 Safe Steel Filing Cabinet 1

28,500.00 28,500.00

28,500.00    

Jr. Executive Chair 3 3,500.00 10,500.00  

10,500.00 to be delivered

on March 17Outdoor Waiting Seats - Gang Seaters-4 seaters 2

8,500.00 17,000.00  

17,000.00 to be delivered

on March 17

Monoblock Chairs - High Back 30 360.00

10,800.00

10,800.00    

Coffee Trolley with Standard Airpot 1 4,500.00

4,500.00   4,500.00

to be delivered on March 17

Oval Conference Table (2805 x1205x750 mm) 1

24,075.00 24,075.00

24,075.00    

Airconditioning Unit - 3 Toner Cabinet Type

1 55,741.00

55,741.00  

55,741.00 to be delivered

on March 28

Subtotal   

251,226.0

0

163,485.

00

87,741.0

0  

Page 10: MANCOM Meeting March 05, 2014 DTI-CAR Conference Room

Status of Procurement of BRC FacilitiesAs of March 04, 2014Apayao

Particulars

No. of

Units

Unit Cost

Total Cost

Status of Procurement

Remarks Delivered For

DeliveryOTHER FACILITIES            

Office Outdoor Signage 1 5,775.00

5,775.00

5,775.00  

 

Refurbishing of Office Furniture & Fixtures 22

26,153.0

0

26,153.00

26,153.00    

Executive Filing Rack (182 cm x 160 cm x 50cm)

2

12,000.00

24,000.00  

24,000.0

0

to be delivered on April 30

Filing Rack (188 cm x 90 cm x 50 cm) 1

9,000.00

9,000.00   9,000.00

to be delivered on April 30

Office Divider (250 cm x 160 cm x 50 cm) 1

15,000.0

0

15,000.00  

15,000.0

0

to be delivered on April 30

Receiving Counter (75 cm x 100 cm x 70 cm) 1

12,000.0

0

12,000.00  

12,000.0

0

to be delivered on April 30

Vertical Blinds (Mint Green) 8

12,240.0

0

97,920.00

97,920.00  

 

Portable Public Address System 1

58,926.0

0

58,926.00

58,926.00  

 

Divan Furniture 1 2,425.00

2,425.00

2,425.00  

 

Subtotal    

251,199.00

191,199.0

0

60,000.

00  

TOTAL    1,000,000

.00

852,259.0

0

147,741

.00  Percentage of completion       85% 15%

 

Page 11: MANCOM Meeting March 05, 2014 DTI-CAR Conference Room

Status of Procurement of BRC FacilitiesAs of March 04, 2014

Benguet

Particulars

No. of

Units

Unit Cost

Total Cost

Status of Procurement

Remarks

Delivered For Delive

ryOther

s

IT EQUIPMENT              

Desktop Computer 2 76,900.00 153,800.00

153,800.00      

Notebook Computer 2 66,500.00 133,000.00

133,000.00      

Laser Printer, Colored 1 44,900.00 44,900.00

44,900.00      

Laser Printer, BW 1 7,900.00 7,900.00

7,900.00      

Document Scanner 1 3,500.00 3,500.00

3,500.00      

Facsimile Machine 1 12,500.00 12,500.00

12,500.00      

Digital SLR Camera 1 42,000.00 42,000.00

42,000.00      

Photocopier/Xerox Machine 1 97,880.00

97,880.00

97,880.00      

Subtotal 

 

495,480.00

495,480.0

0      

Page 12: MANCOM Meeting March 05, 2014 DTI-CAR Conference Room

Status of Procurement of BRC FacilitiesAs of March 04, 2014Benguet

ParticularsNo. of

Units

Unit Cost

Total Cost

Status of Procurement

Remarks Delivere

d

For Delivery

Others

OTHER FACILITIES              

LCD Projector 1 77,910.00

77,910.00

77,910.00     

Chair, Monobloc, without armrest, beige

30 266.25 7,987.50 7,987.50     

Generator, Diesel Powered 1 68,000.

00 68,000.0

0 68,000.0

0     

Office Cabinets (18.5" x 65" x 56") 6 11,480.

00 68,880.0

0   68,880.00   to be delivered

March 15Office Cabinets (18.5" x 65" x 80") 2 13,917.

00 27,834.0

0   27,834.00   to be delivered

March 15Office Cabinets(18.5" x 50" x 57") 2 9,001.0

0 18,002.0

0   18,002.00   to be delivered

March 15Folding Table, Modular Type 7 3,316.0

0 23,212.0

0   23,212.00   to be delivered 2nd

Week of MarchFabrication of Jr. Executive Tables w/ glass top

20 5,500.00

110,000.00   110,000.

00   to be delivered 2nd Week of April

Subtotal     401,825.50

153,897.50

247,928.00   

Page 13: MANCOM Meeting March 05, 2014 DTI-CAR Conference Room

Status of Procurement of BRC FacilitiesAs of March 04, 2014Benguet

Particulars

No. of

Units

Unit Cost

Total Cost

Status of Procurement

Remarks Delivered

For Delivery

Others

OTHER FACILITIES

             

Sala set 1          

Suppliers can't meet specifications, change with office blinds and 4

seaters conference table

Ergonomic Dividers 2          

No local supplier. Change with Fender

SpeakerOffice Roll Up Window Blinds

13

3,668.81 47,694.50     47,694.5

0 for procurement

4 Seaters Conference Table

1 10,000.00 10,000.00     10,000.0

0 for procurement

Fender Speaker 1 45,000.

00 45,000.00     45,000.00 for procurement

Subtotal     102,694.50 102,694

.50  

TOTAL     1,000,000.00

649,377.50

247,928.00

102,694.50  

Percentage of

completion       65% 25% 10% 

Page 14: MANCOM Meeting March 05, 2014 DTI-CAR Conference Room

Status of Procurement of BRC FacilitiesAs of March 04, 2014

Ifugao

Particulars

No. of

Units

Unit Cost

Total Cost

Status of Procurement

Remarks

Delivered

For Delive

ry

Others

IT EQUIPMENT              

Desktop Computer with licenses 2 76,900.00

153,800.0

0

153,800.0

0      

Notebook Computer with licenses 2 66,500.00

133,000.0

0

133,000.0

0      

Laser Printer, Colored 1 44,900.00

44,900.00

44,900.00      

Photocopier 1 97,880.00 97,880.00

97,880.00      

Multimedia Projector 1 25,995.00

25,995.00

25,995.00      

Digital SLR Camera 1 42,000.00 42,000.00

42,000.00      

Subtotal    

497,575.00

497,575.

00      

Page 15: MANCOM Meeting March 05, 2014 DTI-CAR Conference Room

Status of Procurement of BRC FacilitiesAs of March 04, 2014Ifugao

Particulars

No. of

Units

Unit Cost

Total Cost

Status of Procurement

Remarks Delivered

For Delivery

Others

OTHER FACILITIES              

Airconditioning Unit 1 22,400.0

0 22,400.0

0

22,400.0

0     

Digital Signage 1 48,550.00

48,550.0

0

48,550.0

0     

CCTV 1 32,800.00

32,800.00

32,800.00     

Trolley Speakers 2 8,250.00 16,500.00

16,500.0

0     

Power Generator 1 62,350.00

62,350.0

0

62,350.0

0     

Voice Recorder 2 7,494.00

14,988.00

14,988.0

0     

Lapel Microphone 2 2,990.00

5,980.00

5,980.00     

Televison Set 32" LED Samsung with DVD Palyer

1 28,048.00

28,048.00

28,048.00     

Junior Executive Chairs 10 3,800.00

38,000.0

0   38,000.0

0   to be delivered on March 10

Office Tables 5 7,500.00

37,500.00

  37,500.00   to be delivered on

March 10

Filling Cabinets 4 8,500.00

34,000.00

  34,000.00   to be delivered on

March 10

Conference Table 1 34,000.00

34,000.0

0  

34,000.0

0   to be delivered on

March 10

Subtotal    

375,116.00

231,616.

00

143,500.00

-  

Page 16: MANCOM Meeting March 05, 2014 DTI-CAR Conference Room

Status of Procurement of BRC FacilitiesAs of March 04, 2014Ifugao

Particulars

No. of

Units

Unit Cost

Total Cost

Status of Procurement

Remarks Delivered

For Delivery

Others

OTHER FACILITIES              

Open Shelves 2

4,200.00

8,400.00

 

8,400.00  

to be delivered on March 10

Magazines Rack 1

7,000.00

7,000.00

 

7,000.00  

to be delivered on March 10

Display Cabinets (46"x 14"x 60") 1

9,800.0

0

9,800.00

 

9,800.00  

to be delivered on March 10

Display Cabinets(40"x 15"x 70") 2

8,500.0

0

17,000.00

 

17,000.00

 to be delivered on

March 10

Powerpoint Presenter 2

1,600.0

0

3,200.00

   

3,200.00 RFQ floated

Biometrics 1

15,000.00

15,000.00

   

15,000.00

RFQ floated

Glass Divider 1

30,000.00

30,000.00

   

30,000.00

RFQ floated

Paper Cutter, Heavy Duty 1

9,000.0

0

9,000.00

   

9,000.00 RFQ floated

Subtotal    

99,400.00

-

42,200.0

0

57,200.0

0  

TOTAL    

972,091.00

729,191.

00

185,700.

00

57,200.0

0  

Percentage of completion

      75% 19% 6% 

Page 17: MANCOM Meeting March 05, 2014 DTI-CAR Conference Room

Status of Procurement of BRC FacilitiesAs of March 04, 2014

Kalinga

Particulars No. of Units Unit Cost Total Cost

Status of Procurement

Remarks

Delivered For

Delivery

IT EQUIPMENT            

Desktop Computer 2 76,900.00

153,800.00

153,800.00    

Notebook Computer 2 66,500.00

133,000.00

133,000.00    

Laser Printer (colored) 1 44,900.00

44,900.00 44,900.00    

Multimedia Projector 1 25,995.00

25,995.00

25,995.00    

Digital SLR Camera 1 42,000.00

42,000.00

42,000.00    

Photocopier 1 97,880.00 97,880.00 97,880.00    

Subtotal     497,575.00

497,575.0

0    

Page 18: MANCOM Meeting March 05, 2014 DTI-CAR Conference Room

Status of Procurement of BRC FacilitiesAs of March 04, 2014Kalinga

Particulars

No. of

Units

Unit Cost Total Cost

Status of Procurement

Remarks

Delivered For Delivery

OTHER FACILITIES            

Foldable Table 1 14,950.00 14,950.00 14,950.00    

Extention Wires 1 4,399.00 4,399.00 4,399.00    

Multi-purpose Ladder 1 3,795.00 3,795.00 3,795.00    

Swevel Chair, with arm LT 201 AX 1

9,180.00 9,180.00 9,180.00    

Center Table (QL311) 1 5,650.00 5,650.00 5,650.00    

Conference Table (L1800C) 1

10,500.00 10,500.00 10,500.00    

Filing Cabinet (FC-4D) 1 7,500.00 7,500.00 7,500.00    

Office Table (5 drawers, laminated wood)

    15,600.00 15,600.00    

Executive Chair (low back with arm)     38,000.00

38,000.00    

Coffee Tables (set of table and 2 chairs)

    7,600.00 7,600.00    

Sofa sala set, black 1 12,500.00 12,500.00 12,500.00    

Laminating Machine 1 4,500.00 4,500.00 4,500.00    

Subtotal    

134,174.00

134,174.0

0    

Page 19: MANCOM Meeting March 05, 2014 DTI-CAR Conference Room

Status of Procurement of BRC FacilitiesAs of March 04, 2014Kalinga

Particulars

No. of

Units

Unit Cost Total Cost

Status of Procurement

Remarks

Delivered For Delivery

OTHER FACILITIES            Coffee Maker (good for 30-50 cups) 1 7,500.00 7,500.00 7,500.00   

HP Laserjet Pro P1102 1 5,350.00 5,350.00 5,350.00   Monoblock Chair with back rest, black     17,500.00 17,500.00   

LCD Projector (2,700 lum) 1 22,057.00 22,057.00 22,057.00   Generator set (diesel powered, 5 KVA) 1 66,000.00 66,000.00 66,000.00   

Portable Public Advisory System 1 39,900.00 39,900.00 39,900.00   

Espresso Machine with grinder, 1.5L 1 43,995.00 43,995.00 43,995.00   

Camera Lens (70 mm f/2.8G) 1 30,552.00 30,552.00 30,552.00   42" LED 3D Television 2013 Model 1 38,690.00 38,690.00 38,690.00   

Laser Printer (3 in 1) 1 15,957.00 15,957.00 15,957.00   Showcase Cabinets 2" x 70" x 15"     42,800.00 42,800.00   

Modular Glass Partition 1 35,400.00 35,400.00 35,400.00   

Floor Mop 1 750.00 750.00

750.00   

Mega Boxes     1,800.00 1,800.00   

Subtotal     368,251.00

368,251.00   

TOTAL     1,000,000.00

1,000,000.00    

Percentage of completion       100%    

Page 20: MANCOM Meeting March 05, 2014 DTI-CAR Conference Room

Status of Procurement of BRC FacilitiesAs of March 04, 2014

Mt. Province

ParticularsNo. of

Units

Unit Cost

Total Cost

Status of Procurement

Remarks

Delivered

For Deliver

y

Others

IT EQUIPMENT              

Desktop Computer with licenses 2 76,900.0

0 153,800.00 153,800.00      

Notebook Computer with licenses 2 66,500.0

0 133,000.00 133,000.00      

Laser Printer, Colored 1 44,900.0

0 44,900.00 44,900.00      

Photocopier 1 97,880.00 97,880.00 97,880.00      

Multimedia Projector 1 25,995.0

0 25,995.00 25,995.00      

Digital SLR Camera 1 42,000.00 42,000.00 42,000.00      

Subtotal     497,575.00

497,575.00      

Page 21: MANCOM Meeting March 05, 2014 DTI-CAR Conference Room

Status of Procurement of BRC FacilitiesAs of March 04, 2014Mt. Province

ParticularsNo. of

Units

Unit Cost

Total Cost

Status of Procurement

Remarks Delivered

For Delive

ryOthers

OTHER FACILITIES

             

Executive Office Table

1515,000.0

0 225,000.0

0    

225,000.00

PO Served, Fabrication in process, Delivery NLT March 31

Reception Counter

2

20,000.00

40,000.00    40,000.0

0

PO Served, Fabrication in process, Delivery NLT March 31

Couch 2

8,500.00 17,000.00    

17,000.00

PO Served, Delivery NLT March 31

Steel Cabinets 6

7,500.00 45,000.00    

45,000.00

PO Served, Delivery NLT March 31

Conference Table

4

7,995.00 31,980.00    

31,980.00

PO Served, Delivery NLT March 31

Conference Chairs

20

2,200.00 44,000.00    

44,000.00

PO Served, Delivery NLT March 31

Flat Screen TV 140,850.0

0 40,850.00    

40,850.00

PO Served, Delivery NLT March 31

Paper cutter 1

675.00 675.00     675.00

PO Served, Delivery NLT March 31

Paper Shredder 140,200.0

0 40,200.00    

40,200.00

PO to be served, Delivery NLT March 31

Binder Machine 1

6,160.00

6,160.00     6,160.00

PO Served, Delivery NLT March 31

Aluminum Ladder Multipurpose Ladder

1

5,145.00 5,145.00     5,145.00

PO Served, Delivery NLT March 31

Heavy Duty Extension Cord

3

1,325.00 3,975.00     3,975.00

PO Served, Delivery NLT March 31

Subtotal    499,985.

00

-  499,985.

00  

TOTAL    997,560.

00 497,575.

00

-

499,985.00

 

Percentage of completion

      50%   50% 

Page 22: MANCOM Meeting March 05, 2014 DTI-CAR Conference Room

STATUS OF funds

As of March 04, 2014

Page 23: MANCOM Meeting March 05, 2014 DTI-CAR Conference Room

2013 2014 INCREASE% OF

INCREASE

PS 45,330,000.00 45,827,000.00 497,000.00 1%

MOOE18,902,000.00 24,231,000.00 5,329,000.0

0 28%

BUB - 21,491,000.00 21,491,000.

00 100%

SSF 74,472,000.00 57,000,000.00 (17472000) (23%)

TOTAL

138,704,000.00

148,549,000.00

9,845,000.00 7%

2014 BUDGETF U N D 1 0 1

Page 24: MANCOM Meeting March 05, 2014 DTI-CAR Conference Room

2014 OTHER PROGRAM FUNDS

F U N D 1 0 1

 CAPITAL OUTLAY

MOOE TOTAL

SME ROVING ACADEMY   516,000.00 516,000.00

RDC FUND   352,000.00 352,000.00

       

TOTAL 868,000.00 868,000.00

Page 25: MANCOM Meeting March 05, 2014 DTI-CAR Conference Room

2014 BUB MONTHLY CASH PROGRAM

F U N D 1 0 1

1ST SEMESTER 2ND SEMESTER       

January   July 2,361,900.00

February

17,475.00 August

1,806,100.00

March 2,537,525.00

September

1,195,000.00

April 4,402,500.00 October

1,239,000.00

May 3,898,750.00

November

772,750.00

June 3,200,000.00

December

60,000.00

Total

14,056,250.00 Total

7,434,750.00

Page 26: MANCOM Meeting March 05, 2014 DTI-CAR Conference Room

BUB Monthly Cash Distribution Per Province

F U N D 1 0 1

MONTH ABRA

APAYAO BENGUET IFUGAO KALINGA

MT. PROVINCE R.O. TOTAL

JAN            

FEB           

17,475.00

17,475.00

MAR

1,000,000.00

 

100,000.00

400,000.0

0  

875,000.0

0

165,525.

00

2,537,525.

00

APR

2,200,000

.00  

812,500.0

0

730,000.0

0

600,000.0

0  

60,000.0

0

4,402,500.

00

MAY

270,000.0

0  

300,000.0

0

1,400,000.

00

635,000.0

0

1,750,000

.00

60,000.0

0

4,415,000.

00

JUN

740,000.0

0  

156,000.0

0

726,000.0

0

807,750.0

0

200,000.0

0

60,000.0

0

2,689,750.

00

JUL     

875,000.0

0

442,500.0

0

934,400.0

0

60,000.0

0

2,311,900.

00

AUG

724,500.0

0  

200,000.0

0

621,250.0

0

250,000.0

0  

10,000.0

0

1,805,750.

00

SEP     

875,000.0

0

90,000.00

170,000.0

0

60,000.0

0

1,195,000.

00

OCT

912,750.0

0  

144,000.0

0

166,250.0

0    

38,175.0

0

1,261,175.

00

NOV

612,750.0

0    

144,000.0

0    

38,175.0

0

794,925.0

0

DEC           

60,000.0

0

60,000.00

 

6,460,000

.00

-

1,712,500

.00

5,937,500.

00

2,825,250

.00

3,929,400

.00

626,350.

00

21,491,00

0.00

Page 27: MANCOM Meeting March 05, 2014 DTI-CAR Conference Room

STATUS OF FUND UTILIZATION

A s o f F e b r u a r y 2 8 , 2 0 1 4

PARTICULARS BUDGET UTILIZATIO

N BALANCEPERCENTAGE

OF UTILIZATION

PS 45,827,000.00

7,569,304.51

38,257,695.49 16%

MOOE 24,231,000.00

1,738,658.00

22,492,342.00 7%

BUB 21,491,000.00 17,475.00 21,473,525.0

0 0.081%

SSF 57,589,000.00 0.00 57,589,000.0

0 0%

Total 149,138,000.00

9,325,437.51

139,812,562.49 6%

Page 28: MANCOM Meeting March 05, 2014 DTI-CAR Conference Room

Tentative distribution of

2014 MOOE BUDGET

FUND 101

Page 29: MANCOM Meeting March 05, 2014 DTI-CAR Conference Room

Tentative distribution of 2014 mooe budget Fund 101

 Regional

OfficeAbra Apayao

Baguio/ Benguet

Ifugao KalingaMt.

ProvinceTotal

Mandatory Expenses

3,750,872.08

702,997.50

341,557.

50

1,152,235.50

663,277.50

673,237.50

546,937.50

7,831,115.08

Non-Mandatory Expenses

4,429,900.00

737,900.00

777,900.00

1,067,600.00

736,700.00

718,100.00

756,900.00

9,225,000.00

Total - Mandatory & Non-Mandatory

               

Add: Priority Programs/Activities:

               

Market Dev't. for Cordi Products

 20,000.0

0 20,000.0

0 20,000.00

20,000.00

20,000.00

20,000.00

120,000.00

CWD Activities

150,000.00

20,000.00

20,000.00

40,000.00 20,000.0

0 20,000.0

0 20,000.0

0 290,000.0

0

Diskwento  15,000.0

0 15,000.0

0 30,000.00

15,000.00

15,000.00

15,000.00

105,000.00

ISO500,000.0

0            

500,000.00

Price Billboard

330,000.0

0            

330,000.00

Timbangan ng Bayan

925,000.00

           925,000.0

0

TOTAL 10,085,772.08

1,495,897.50

1,174,457.50

2,309,835.50

1,454,977.50

1,446,337.50

1,358,837.50

19,326,115.08

Page 30: MANCOM Meeting March 05, 2014 DTI-CAR Conference Room

Tentative distribution of 2014 mooe budget Fund 101

 Regional

OfficeAbra Apayao

Baguio/ Benguet

Ifugao KalingaMt.

ProvinceTotal

TOTAL 10,085,772.

08 1,495,897.

50 1,174,457.

50

2,309,835.

50

1,454,977.

50

1,446,337.

50

1,358,837.

50 19,326,115.

08 MOOE BUDGET FOR 2014              

24,231,000.

00 UNALLO-CATED              

4,904,884.

92* 2013 Budget Allocation

7,051,207.0

0

1,319,298.

00

1,002,658.

00

2,214,656.

00

1,274,148.

00

1,208,288.

00

1,092,298.

00  

Increase

3,034,565.0

8

176,599.5

0

171,799.5

0

95,179.50

180,829.5

0

238,049.5

0

266,539.5

0  Percentage Share from 2014 MOOE 42% 6% 5% 10% 6% 6% 6%  

Page 31: MANCOM Meeting March 05, 2014 DTI-CAR Conference Room

Tentative distribution of 2014 mooe budget Fund 101

*UNALLOCATED

Earmarked for:

Coffee Industry Cluster as IC Coordinator of DTI for the

10 Regions

Massive Standards Advocacy and Enforcement Activities

BPLS Monitoring & Evaluation Activities

LIIC & IRR Writeshop

Disaster Preparedness Program

Page 32: MANCOM Meeting March 05, 2014 DTI-CAR Conference Room

Thank you And

Have a Nice Day!