Mani SrivastavaUCLA - EE DepartmentRoom: 7702-B Boelter HallEmail: [email protected]: 310-267-2098WWW: http://www.ee.ucla.edu/~mbs
Copyright 2001 Mani Srivastava
RTOS Scheduling – IIEE202A (Fall 2001): Lecture #5
2 Copyright 2001 Mani Srivastava
Reading List for This Lecture
Required Waldspurger, C.A.; Weihl, W.E. Lottery
scheduling: flexible proportional-share resource management. Proceedings of the First USENIX Symposium on Operating Systems Design and Implementation (OSDI), Monterey, CA, USA, 14-17 Nov. 1994. p.1-11. 280 pp.
Recommended none
Others none
3 Copyright 2001 Mani Srivastava
Deadline Driven Scheduling
Priorities are assigned to tasks according to the deadlines of their current requests
highest priority to task whose current request has the closest deadline
lowest to the one whose deadline is the furthest highest priority task with an unfulfilled request is run
Priorities of tasks change with time!
4 Copyright 2001 Mani Srivastava
Preemptive Earliest Deadline First (EDF)
Processor executes the task whose absolute deadline is the earliest
Priorities change with the closeness of a task to its absolute deadline
Example:
Task Arrival Time Execution Time
Absolute Deadline
T1 0 10 30
T2 4 3 10
T3 5 10 25
5 Copyright 2001 Mani Srivastava
EDF Schedulability
Optimal for single processor If EDF cannot schedule a task set on a single processor, then
no other scheduling algorithm can Simple schedulability test if tasks are periodic, and have
relative deadlines equal to their periods if the total utilization U of the task set is no greater than 1, the
task set can be feasibly scheduled by EDF on a single processor.
If relative deadlines are not equal to the periods, there is no simple schedulability test
one will have top develop a schedule using EDF to see whether all the deadlines are met over a given time interval
6 Copyright 2001 Mani Srivastava
EDF Schedulability for Deadline==Period Case
Theorem: Suppose we have a set of n periodic tasks (Ti, Ci, Di) , each of whose relative deadline Di equals its period Ti. The tasks can be feasibly scheduled by EDF on a single processor iff:
C1/T1 + C2/T2 + … + Cn/Tn 1
7 Copyright 2001 Mani Srivastava
EDF Schedulability for Deadline!=Period Case
Theorem: A set of n tasks (Ti, Ci, Di) is not schedulable by EDF iff
Utilization U > 1, or there exists
t < min { T + Dmax, U/(1-U) * max1 in{Ti – Di}}
such that h(t) > t, whereDmax = max1 in{Di}T = lcm(T1,…Tn)h (t) = sum of the execution times of all tasks
whose absolute deadlines are ≤ t.
With the above theorem, we only need to check for feasibility up to some finite time.
Proof see Theorem 3.1.2 + related Lemmas at
http://nesl.ee.ucla.edu/pw/ee202a/edf.pdf Note the difference in notation (T, C, D) → (P, e, d)
8 Copyright 2001 Mani Srivastava
Allowing for Precedence Constraints
So far: independent task, preemptible by others Now we relax these condition
10 Copyright 2001 Mani Srivastava
Heuristic for Uniprocessor Scheduling (contd.)
Schedule after step 2
Schedule after step 3
11 Copyright 2001 Mani Srivastava
Primary and Alternative Tasks So far: there must be sufficient time for the
critical tasks to execute assumed worst case execution time (WCET) quite often WCET >> mean execution time
One way: reclaim unused time for other tasks Another approach: multiple versions of tasks
Precise version Alternate version
– shorter processing time but imprecise result– just acceptable “bare bones” result
13 Copyright 2001 Mani Srivastava
Imprecise or Approximate Computation
A time-critical task designed in such a way that an approximate result is produced when the entire precise computation cannot be completed
Motivation: tasks become easier to schedule when a tolerable amount of error can be introduced into the system
Examples: Iterative division algorithm On-line arithmetic
– Bit-serial where the output is produced MSB first
O ptiona l Task5 cycles
M andatory Task (Im precise)7 cycles
1.10111011101
Precise C om putation - 12 cycles
14 Copyright 2001 Mani Srivastava
Scheduling Model for Imprecise Computation
IRIS: Increased Reward for Increased Service Each Task, Ti, is decomposed logically into two
tasks Mi (mandatory) and Oi (optional) i = mi + oi (12 = 7 + 5)
Classical model => oi = 0
O ptiona l Task5 cycles
M andatory Task (Im precise)7 cycles
1.10111011101
Precise C om putation - 12 cycles
15 Copyright 2001 Mani Srivastava
Uniprocessor Scheduling of IRIS Tasks
Reward function
Schedule the tasks such that the reward is maximized, subject to the requirement that the mandatory portions of all the tasks are complete
16 Copyright 2001 Mani Srivastava
QoS-based Resource Allocation Model (Q-RAM)
Different total system utility by resource allocations (Rajkumar et al. 1997, 1998)
R1 5 7 4R2 5 3 6U1 5 6.5 4U2 2 2 5U 7 8.5 9
17 Copyright 2001 Mani Srivastava
RM in Distributed/Networked Embedded Systems?
Task is essentially scheduled on multiple resources in series
Need to schedule communication messages over the interconnect
propagation delay & jitter queuing delay & jitter
Divide end-to-end deadline into subsystem deadlines Need buffering to mitigate jitter problem as task may
arrive too early
18 Copyright 2001 Mani Srivastava
Assignment of Tasks to Processors
NP complete in most cases Typical heuristics:
Allocate tasks according to some simple criterion– E.g. processor utlization
Check feasibility– Communiction cost, task precedences
If not feasible, modify the allocation and retry
19 Copyright 2001 Mani Srivastava
Utilization-Balancing Algorithm
Attempts to balance processor utilization Allocate tasks one by one, and selecting the least
utilized processor Takes into account the possibility of running
multiple copies of the same task for fault tolerance
20 Copyright 2001 Mani Srivastava
Next-Fit Algorithm for RM
User defines M>3 classes as follows: Task Ti is in class j<M if In class M otherwise
Corresponding to each class is a set of processors that is only allocated tasks of that class
Tasks are allocated one by one to appropriate processor class until all the tasks have been scheduled, adding processors to classes if that is need for RM schedulability
22 Copyright 2001 Mani Srivastava
Bin-packing Algorithm for EDF Periodic independent preemptible tasks assigned to
a multiprocessor with identical processors Goal EDF schedulability
assign tasks such that U no greater than 1 First-fir decreasing algorithm
24 Copyright 2001 Mani Srivastava
Distributed Case with Data Precedence
Implicit start and stop nodes in each task Rate constraint and deadline for each task
Period may not be constant: lower/upper bounds Execution time of processes may not be constant
Lower/upper bounds
25 Copyright 2001 Mani Srivastava
Performance Analysis
The problem of deciding whether the deadline of each task is met is NP hard
Given the schedule, allocation, and architecture Unrolling the schedule doesn’t work
Cannot easily handle non-constant period and computation times
– Can’t just use the worst case execution time!
28 Copyright 2001 Mani Srivastava
Lottery Scheduling: Flexible Proportional-Share Resource Management
A randomized mechanism that provides responsive control over the relative execution rates of computations
Does away with “primitive” priority based schemes Implements proportional-share resource management
whereby the resource consumption rates are proportional to the relative shares that they are allocated
“Found to provide efficient, flexible control over relative execution rates”
29 Copyright 2001 Mani Srivastava
Allocation of Resource Rights
Resource allocation determined by holding a lottery
This effectively allocates resources to competing clients in proportion to the number of tickets that they hold
30 Copyright 2001 Mani Srivastava
Lottery
Scheduling by lottery is probabilistically fair Number of lotteries won by a client has a binomial
distribution P = t/T E[w] = np
= np(1-p)
Number of lotteries required for a client’s first win has a geometric distribution E[n] = 1/p
= (1-p)/p2
Typical scheduling quantum is 10 ms (100 lotteries per second)
31 Copyright 2001 Mani Srivastava
Lottery Tickets
Properties Abstract Relative Uniform
Analogous to that of money in computational economics Abstractly encapsulate resource rights Allow for modular resource management
32 Copyright 2001 Mani Srivastava
Modular Resource Management
Ticket transfers Explicit transfers of tickets from one client to another Can be used in any situation where a client blocks due to some
dependency Solves conventional priority inversion problem in a manner similar
to priority inheritance
Ticket inflation Alternative to explicit ticket transfers Escalate resource rights by creating more lottery tickets Need for mutual trust among clients Inflation and deflation can be used to adjust resource allocations
w/o explicit communication
33 Copyright 2001 Mani Srivastava
Modular Resource Management (cont’d)
Ticket currencies Resources rights could be expressed in “local” units, with
granularity tuned for that particular resource Each currency is backed, or funded, by tickets that are
denominated in more primitive currencies Exchange rates could be established between local currency and
base currency Compensation Tickets
Compensation ticket granted for client only consuming only a fraction f of its allocated resource quantum, inflate its value by 1/f
Ex: Threads A and B each hold tickets valued at 400 base units (1:1 ratio)
Thread A always consumes its entire 100 ms of quantum Thread B uses only 20 ms => f = 1/5
34 Copyright 2001 Mani Srivastava
Implementation Modified Mach 3.0 microkernel running on a 25MHz MIPS-
based DECStation 5000/125 Kernel representation of tickets and currencies
1000Base
amountcurrency
alice300
Ticket
List of backing tickets
List of issued tickets
Unique name
Active amount
Currency
35 Copyright 2001 Mani Srivastava
System Overhead
Core lottery scheduling mechanism Ex: tree-based lottery need only generate a random
number and perform log n additions and comparisons to select winner among n clients
Comparing unoptimized kernel to unmodified Mach kernel, it was found that application executed 1.7% faster
36 Copyright 2001 Mani Srivastava
Experimental Results
Multimedia Applications 3 MPEG viewers, 3:2:1 allocation ratio Actual ratio, 1.92:1.50:1 No need for cooperation between media-based
applications, nor feedback to adjust frame rates Load Insulation
Two tasks A and B w/ equal funding Subtasks A1 and A2 have allocations of 100 and 200,
respectively Subtasks B1 and B2 have identical allocations
Currency has an abstract barrier that locally contains intra-currency fluctuations
System was found to be fair, flexible, and robust
37 Copyright 2001 Mani Srivastava
Inverse Lotteries
Basic idea: a “loser” is chosen to relinquish a unit of a resource that it holds
Instead of obtaining a resource, client tries to prevent having its resource allocation revoked
P = 1/(n-1)*(1-t/T)
38 Copyright 2001 Mani Srivastava
Multiple Resources
Clients can make quantitative comparisons to make decisions involving tradeoffs between different resources
Questions Funding policies? Frequency of fund allocation evaluation?
39 Copyright 2001 Mani Srivastava
“Financial Advisor”
Abstract the evaluation of resource management options
Financial manager would be allocated a fixed small percentage (e.g. 1%) of application’s overall funding (or computation time)
Default simple managers for most applications, complex management strategies for sophisticated applications
40 Copyright 2001 Mani Srivastava
Lottery Scheduling Summary
Lottery scheduling is conceptually very simple and easily implemented
Used to manage any resource where management is necessary to resolve multiple requests
Current ongoing work involves exploring various applications of lottery scheduling in interactive systems, including GUI element