![Page 1: MARCEL PERA, SENIOR PROJECT MANAGER · PDF fileOCEAN TRANSPORTATION –NOMINATED VESSEL Happy Dynamic • Built: 2011 ... Original rigging position Adjusted rigging position ... vertical](https://reader031.vdocuments.net/reader031/viewer/2022030508/5ab805957f8b9a28468c5570/html5/thumbnails/1.jpg)
MARCEL PERA, SENIOR PROJECT MANAGER
BREAKBULK HOUSTON 2014
![Page 2: MARCEL PERA, SENIOR PROJECT MANAGER · PDF fileOCEAN TRANSPORTATION –NOMINATED VESSEL Happy Dynamic • Built: 2011 ... Original rigging position Adjusted rigging position ... vertical](https://reader031.vdocuments.net/reader031/viewer/2022030508/5ab805957f8b9a28468c5570/html5/thumbnails/2.jpg)
OCEAN TRANSPORTATION - INTRODUCTION
BigLift Shipping
- World leader in heavy lift shipping
- Established in 1973
- Lifting capacity up to 1800 mton
- Focus on quality and technical
solutions
- Member of the Spliethoff group
- 15 specialized heavy lift vessels
Happy Sky (2 * 900 mton)
Cargo: knocked-down overhead crane
![Page 3: MARCEL PERA, SENIOR PROJECT MANAGER · PDF fileOCEAN TRANSPORTATION –NOMINATED VESSEL Happy Dynamic • Built: 2011 ... Original rigging position Adjusted rigging position ... vertical](https://reader031.vdocuments.net/reader031/viewer/2022030508/5ab805957f8b9a28468c5570/html5/thumbnails/3.jpg)
HAPPY R-TYPE
2 * 400 mton
Open hatch sailing
Cargo: offshore equipment
![Page 4: MARCEL PERA, SENIOR PROJECT MANAGER · PDF fileOCEAN TRANSPORTATION –NOMINATED VESSEL Happy Dynamic • Built: 2011 ... Original rigging position Adjusted rigging position ... vertical](https://reader031.vdocuments.net/reader031/viewer/2022030508/5ab805957f8b9a28468c5570/html5/thumbnails/4.jpg)
OCEAN TRANSPORTATION – HAPPY BUCCANEER
2 * 700 mton
Fly jib (SWL max. 700 mton)
Cargo: wharf modules
![Page 5: MARCEL PERA, SENIOR PROJECT MANAGER · PDF fileOCEAN TRANSPORTATION –NOMINATED VESSEL Happy Dynamic • Built: 2011 ... Original rigging position Adjusted rigging position ... vertical](https://reader031.vdocuments.net/reader031/viewer/2022030508/5ab805957f8b9a28468c5570/html5/thumbnails/5.jpg)
OCEAN TRANSPORTATION – CARGO DETAILS
• 6 brand new Coke Drums
• Each 30,2*8,4*8,9 meter – 250 mton
• Port of Loading: Aviles – Spain
• Port of Discharge: LA – USA
• Time of shipment: December 2012
• Contract partner: IDESA (Spanish
manufacturer)
![Page 6: MARCEL PERA, SENIOR PROJECT MANAGER · PDF fileOCEAN TRANSPORTATION –NOMINATED VESSEL Happy Dynamic • Built: 2011 ... Original rigging position Adjusted rigging position ... vertical](https://reader031.vdocuments.net/reader031/viewer/2022030508/5ab805957f8b9a28468c5570/html5/thumbnails/6.jpg)
OCEAN TRANSPORTATION – NOMINATED VESSEL
Happy Dynamic
• Built: 2011
• Length: 157 meter (515 ft)
• Beam: 25,6 meter (84 ft)
• 2 cranes, each 400 mton SWL
• 1 crane, 120 mton SWL
• Fully equipped with lifting and lashing materials
• Large lifting height
• Large stability (a stability pontoon is not
necessary)
![Page 7: MARCEL PERA, SENIOR PROJECT MANAGER · PDF fileOCEAN TRANSPORTATION –NOMINATED VESSEL Happy Dynamic • Built: 2011 ... Original rigging position Adjusted rigging position ... vertical](https://reader031.vdocuments.net/reader031/viewer/2022030508/5ab805957f8b9a28468c5570/html5/thumbnails/7.jpg)
OCEAN TRANSPORTATION – CHEVRON
Additional Chevron requirements (outside
and above contractual agreements with
Idesa).
Main topics
• Vessel and office audit
• Inmarsat tracking 24/7
• Limited acceleration forces
• 25% contingency added to theoretical
weight of cargo (crane capacity and
deck stress)
• Marine Warranty Surveyor Idesa
• Marine Warranty Surveyor Chevron
![Page 8: MARCEL PERA, SENIOR PROJECT MANAGER · PDF fileOCEAN TRANSPORTATION –NOMINATED VESSEL Happy Dynamic • Built: 2011 ... Original rigging position Adjusted rigging position ... vertical](https://reader031.vdocuments.net/reader031/viewer/2022030508/5ab805957f8b9a28468c5570/html5/thumbnails/8.jpg)
OCEAN TRANSPORTATION – LIFTING
Original rigging position Adjusted rigging position
Due to an incorrect Centre of Gravity the location of rigging had to be adjusted
![Page 9: MARCEL PERA, SENIOR PROJECT MANAGER · PDF fileOCEAN TRANSPORTATION –NOMINATED VESSEL Happy Dynamic • Built: 2011 ... Original rigging position Adjusted rigging position ... vertical](https://reader031.vdocuments.net/reader031/viewer/2022030508/5ab805957f8b9a28468c5570/html5/thumbnails/9.jpg)
OCEAN TRANSPORTATION – STOWAGE
Hold:
1 coke drum and transit cargo
Deck:
5 coke drums
![Page 10: MARCEL PERA, SENIOR PROJECT MANAGER · PDF fileOCEAN TRANSPORTATION –NOMINATED VESSEL Happy Dynamic • Built: 2011 ... Original rigging position Adjusted rigging position ... vertical](https://reader031.vdocuments.net/reader031/viewer/2022030508/5ab805957f8b9a28468c5570/html5/thumbnails/10.jpg)
OCEAN TRANSPORTATION – SEA FASTENING
Longitudinal / Vertical sea fastening by
certified BigLift wire system
Transverse sea fastening by shear plates
(T-stopper)
![Page 11: MARCEL PERA, SENIOR PROJECT MANAGER · PDF fileOCEAN TRANSPORTATION –NOMINATED VESSEL Happy Dynamic • Built: 2011 ... Original rigging position Adjusted rigging position ... vertical](https://reader031.vdocuments.net/reader031/viewer/2022030508/5ab805957f8b9a28468c5570/html5/thumbnails/11.jpg)
OCEAN TRANSPORTATION – SHIP MOTIONS
Happy Dynamic is equipped with Octopus system
• Measuring actual acceleration values
• Predicting future acceleration values
• Captain decision support system
![Page 12: MARCEL PERA, SENIOR PROJECT MANAGER · PDF fileOCEAN TRANSPORTATION –NOMINATED VESSEL Happy Dynamic • Built: 2011 ... Original rigging position Adjusted rigging position ... vertical](https://reader031.vdocuments.net/reader031/viewer/2022030508/5ab805957f8b9a28468c5570/html5/thumbnails/12.jpg)
OCEAN TRANSPORTATION – SHIP MOTIONS
Z-accelerations:
Combination of heave and
vertical component of the pitch
acceleration.
Results in vertical forces
(uplift/downforce) between
ship and cargo.
X-accelerations:
Mainly due to surge motions
of the vessel.
Y-accelerations:
Combinations of the sway and
the horizontal component of
the roll-acceleration.
Results in longitudinal and
transversal force interaction
between ship and cargo.
![Page 13: MARCEL PERA, SENIOR PROJECT MANAGER · PDF fileOCEAN TRANSPORTATION –NOMINATED VESSEL Happy Dynamic • Built: 2011 ... Original rigging position Adjusted rigging position ... vertical](https://reader031.vdocuments.net/reader031/viewer/2022030508/5ab805957f8b9a28468c5570/html5/thumbnails/13.jpg)
OCEAN TRANSPORTATION – SHIP MOTIONS
Departure Aviles delayed due to
- Weather forecast
- Spanish custom offices closed around X-mas
- Confusion on instructions/advise from MWS
Chevron
criteria
Idesa design
criteria
DNV
(BigLift)
X 0,35 0,3 0,24
Y 0,65 0,5 0,32
Z 0,5 1,0 0,29
Maximum allowable accelerations (m/sec2)
![Page 14: MARCEL PERA, SENIOR PROJECT MANAGER · PDF fileOCEAN TRANSPORTATION –NOMINATED VESSEL Happy Dynamic • Built: 2011 ... Original rigging position Adjusted rigging position ... vertical](https://reader031.vdocuments.net/reader031/viewer/2022030508/5ab805957f8b9a28468c5570/html5/thumbnails/14.jpg)
OCEAN TRANSPORTATION – X-ACCELERATIONS
X-Accelerations on cargo due to
surge motions of the vessel.
X-accelerations for both cargo items nearly
equal. (mainly linear
surge motion)
![Page 15: MARCEL PERA, SENIOR PROJECT MANAGER · PDF fileOCEAN TRANSPORTATION –NOMINATED VESSEL Happy Dynamic • Built: 2011 ... Original rigging position Adjusted rigging position ... vertical](https://reader031.vdocuments.net/reader031/viewer/2022030508/5ab805957f8b9a28468c5570/html5/thumbnails/15.jpg)
OCEAN TRANSPORTATION – Y-ACCELERATIONS
Y-Accelerations on cargo due to sway
and rolling motions of the vessel.
Values according to DNV calculations.
Peak in y-accelerations due to heavy rolling
motions near Panama.
![Page 16: MARCEL PERA, SENIOR PROJECT MANAGER · PDF fileOCEAN TRANSPORTATION –NOMINATED VESSEL Happy Dynamic • Built: 2011 ... Original rigging position Adjusted rigging position ... vertical](https://reader031.vdocuments.net/reader031/viewer/2022030508/5ab805957f8b9a28468c5570/html5/thumbnails/16.jpg)
OCEAN TRANSPORTATION – Z-ACCELERATIONS
Z-Accelerations on cargo due to heave
and pitch motions of the vessel.
Values according to DNV calculations.
Peak in Z-accelerations just after departure in Aviles.
![Page 17: MARCEL PERA, SENIOR PROJECT MANAGER · PDF fileOCEAN TRANSPORTATION –NOMINATED VESSEL Happy Dynamic • Built: 2011 ... Original rigging position Adjusted rigging position ... vertical](https://reader031.vdocuments.net/reader031/viewer/2022030508/5ab805957f8b9a28468c5570/html5/thumbnails/17.jpg)
HAPPY DYNAMIC - COKE DRUMS (AVILES to L.A.)