march 2010 tb short visual resume

3
+ health sciences projects Visual Resume Tony Burley BA(hons) Dip. Arch. (UCL), ARB, RIBA March 2010

Upload: tonyburley

Post on 16-Apr-2017

666 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: March 2010 Tb Short Visual Resume

+ health sciences projects

Visual Resume

Tony Burley BA(hons) Dip. Arch. (UCL), ARB, RIBA

March 2010

Page 2: March 2010 Tb Short Visual Resume

Visual Resume Highlights

Tony BurleyBA(hons) Dip. Arch. (UCL), ARB, RIBA

March 2010

+tbMarch 2010

Page 3: March 2010 Tb Short Visual Resume

Visual Resume Highlights

Tony BurleyBA(hons) Dip. Arch. (UCL), ARB, RIBA

March 2010

+ Sidra Medical and Research Centre

Doha, Qatar260,000sqm - $2.2Bn (exc equip)360 bed Academic Teaching HospitalCompletion 2013

+ Senior Medical Planner | KEO

+ Shaikh Khalifa HospitalHoms, Syria45,000sqm - $50.m (exc equip)260 bed General HospitalCompetition Entry

+ Project Director | Dyer

+ Life CentreNewcastle, UK3,000sqm - $60.m Genetics Institute Labs

+ Package Architect | Terry Farrell & Partners

+ St James’s Hospital

Leeds, UK60,000sqm - 160.m Oncology Centre

+ Package Architect Anshen Dyer

+ Great Ormond Street Hospital

London, UK60,000sqm - 160.m Octav Botnar Wing

+ Project Architect Anshen Dyer

+ Pembury HospitalTunbridge Wells, UK65,000sqm - 200.m 512 Bed General HospitalFITN PFI Bid

+ Associate & Project Manager RTKL ( London)

+ Fable RoomAs presented at Healthcare Design 07 Conference, Dallas USA

+ Tony Burley & Roger Ulrich

+tbMarch 2010

+ St James’s HospitalDublin, Ireland3,000sqm - 11.m Inpatient & Research Labs

+ AssociateRTKL ( London)

+ Poole HospitalPoole, UKDevelopment Control Plan& department relocations

+ AssociateRTKL ( London)