march 7, 2013

55
March 7, 2013 Dr. Loren C. Scott Loren C. Scott & Associates, Inc. www.lorencscottassociat

Upload: balin

Post on 22-Jan-2016

34 views

Category:

Documents


0 download

DESCRIPTION

Port Association Of Louisiana. March 7, 2013. Dr. Loren C. Scott Loren C. Scott & Associates, Inc. www.lorencscottassociates.com. Natural Gas. A Key Driver In Louisiana & Its Ports. Logistical Issues. Each hydraulic fracking stage requires: 300,000 gallons of water 200 tons of sand - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: March 7, 2013

March 7, 2013

Dr. Loren C. ScottLoren C. Scott & Associates, Inc.www.lorencscottassociates.com

Page 2: March 7, 2013

Natural Gas

A Key Driver In Louisiana

& Its Ports

Page 3: March 7, 2013

1

2

3

4

5

6

7

8

9

1990 1995 2000 2005 2010

PGA PGAL PGAH

Figure 4: Price of Natural GasP

er

MM

BT

U

2013 2014PGA $3.00 $3.10Low $2.00 $2.00High $4.00 $4.00

Page 4: March 7, 2013
Page 5: March 7, 2013

Logistical Issues

• Each hydraulic fracking stage requires:– 300,000 gallons of water– 200 tons of sand

• Port of Caddo-Bossier – space for firms providing these products & services

• 20-40% of fluid solids used in fracking flow back to the surface as hazardous waste and require transportation to other well sites or treatment and/or disposal sites

Page 6: March 7, 2013

Subsurface water contamination?

• Significant distance between frac zone and aquifer

• Proper casing & cementing and regulatory oversight are important

Page 7: March 7, 2013
Page 8: March 7, 2013

Fracking and Contamination of Drinking Water

• Hydraulic fracking is subject to both federal and state regulations

• There have been no instances of fracking causing contamination of drinking water.

Page 9: March 7, 2013

Michael Economides in Offshore Engineer 11/11

• 2011:– 35,000 wells drilled in U.S.

– 120,000 hydraulic fracturing treatments executed; 4 stages per well on average

– Zero cases of drinking water contamination

• 60 years of fracturing– 1.2 million wells

– No scientific cases of drinking water contamination

Page 10: March 7, 2013

Energy’s Political Influence Has Widened Markedly

Page 11: March 7, 2013
Page 12: March 7, 2013

Increased Demand For Port Services:

#1 Boom in Manufacturing

Page 13: March 7, 2013

Manufacturing in general;Chemicals specifically

Three Major Benefits to Chemical Producers

Page 14: March 7, 2013

Makeup in Louisiana

Sector Value of Shipments*

Total $58.2 Billion

Basic chemicals $37.4 Billion

Resins, synthetic rubber, artificial synthetic fibers &

filaments

$7.4 Billion

Pesticides, fertilizers & other agricultural chemicals

$4.6 Billion

Plastics products manufacturing

$0.8 Billion

Rubber products manufacturing

$0.3 Billion

Page 15: March 7, 2013

Price of Major Input has Declined

• Ammonia fertilizer• From natural gas liquids like ethane we get

ethylene which is the foundation of– Food packaging, toys, house wares– Swimming pool liners, vinyl pipes– Pantyhose, clothing, carpets– Bottles, cups– Tires, foot ware, auto antifreeze

• Clean burning boiler fuel

Page 16: March 7, 2013

$0

$2

$4

$6

$8

$10

$12

$14

$16

$18

Natural Gas Prices by Region($/mmBtu)

Japan LNG Import Price

Europe Import Price Index

Henry Hub

Page 17: March 7, 2013

3rd: Naphtha v. Ethane

• Ethylene made of– In Europe: • naphtha derived from oil• Oil @ $100 $1,400 to make ton of ethylene

– In U.S.• Ethane, derived from natural gas• $730 to make ton of ethylene

Page 18: March 7, 2013

Baton Rouge: Chemical & Related Construction

• Westlake Chemical: $466 mm chlor-alkali in Geismar – 100 new jobs, & expansion at site; Construction underway 7/12

• $300 mm upgrade at Georgia Pacific

• Air Liquid – Ascension:– $85 mm capex; 5 jobs

• DMC Carter Chambers – Baton Rouge:– $10 mm capex; 80 jobs

Page 19: March 7, 2013

Baton Rouge: Chemical & Related Construction

• Methanex Corp-Geismar (7/12)– Moving idle methanol plant from Chile to

Ascension Parish– $550 mm capex; 130 new jobs; Avg salary =

$56,000; open late 2014; hiring starts before end 2012.

– Fitch Rating says second, equal size, plant to be moved here as well (12/11/12)

Page 20: March 7, 2013

Baton Rouge: Chemical & Related Construction

• Shintech – Plaquemine (4/12)– New $120mm plant to make key ingredient in

latex paint; 30 new jobs

• Avalon Rare Metals – Geismar– Feasibility study being conducted $300

million rare earth elements separation plant– Complete study 2013-II; +175 jobs

Page 21: March 7, 2013

Baton Rouge: Chemical & Related Construction

• BASF– New $120 mm acid plant (7/12); 11 jobs; At

engineering/ground prep phase; Ground breaking 10/12; Done by end 2013.

– Two surfactant plants; $120 mm; groundbreaking spring ’12; end 2013-II

– Several smaller projects totaling $100 mm; 50% chance

– Less than 25% chance on couple of mega projects ($500 mm - $1 bill); competing with TX

Page 22: March 7, 2013

Baton Rouge: Chemical & Related Construction

• Honeywell: $33 mm expansion (7/11)– Start 12/11; end 2013; 11 new jobs

• Williams: $350-$400 mm to increase ethylene production at Geismar plant (9/11)

• Huntsman – Geismar: (8/12)– Commissioned engineering design study to increase size

of plant• ExxonMobil - Baton Rouge: (9/12)– $215 mm in facility upgrades – State-of-the-art synthetic aviation oil blending center in

Port Allen– Facility in Port Allen to be largest producer of finished

lubricants in the world

Page 23: March 7, 2013

Baton Rouge: Chemical & Related Construction

• SNF Polymer Project: Iberville Parish– $362 mm capex over 5 years; 1st unit completed

fall ‘11– 500 direct jobs & 100 contract employees (100 in

2011; 100 each additional year)

• Emerson Process Management - Gonzales– $10 mm expansion & regional HQ; +50 jobs– Make and refurbish valves for chemical industry

Page 24: March 7, 2013

Baton Rouge: Chemical & Related Construction

• Cf Industries – Donaldsonville (11/12)– $2.1 bill to build nation’s largest nitrogen plant

– Finish 2016; +93 jobs

• Waller Marine – Port of Baton Rouge (3/13)– $200-$400 mm small LNG facility

– Service supply vessels that have to start using cleaner-burning, low sulfur diesel fuels in 2015

– 45 jobs; operational by mid-to-late 2014

Page 25: March 7, 2013

Potentials

• BioNitrogen Corp. – Pointe Coupe (3/13)– $1.25 billion in tax exempt bonds preliminarily

approved by LA Community Development Authority;

– letter of intent signed to buy 250 acres of land next to Pointe Coupe Parish Port

– Build 5 plants to convert agricultural waste into fertilizer; 260 jobs

– Start construction 2014; Open 2015.

Page 26: March 7, 2013

New Orleans MSA Construction

• Dow: Restarting cracker in St. Charles Parish– $400 mm capex ; 64 jobs; start 2013-I

• Dyno Nobel International – Waggaman (5/12)– Feasibility study for $800 mm ammonia

production facility @ existing Cornerstone Chemical Company site.

– +60 new jobs; decision early 2013

Page 27: March 7, 2013

Lake Charles Construction Potential

• Sasol Gas-to-Liquids Facility– 96,000 bbls per day of diesel, naphtha & other chemical

products; 2 stages of 48,000 each; 1st opens 2018; 2nd opens year later

– Up to $11 -14 bill over 2013-17;Front End Engineering Design (FEED) started 12/12.

– 700 jobs; $95 mm payroll; Feasibility study underway; due late 2012

• Sasol Ethylene Cracker & derivatives complex– $5-7 bill over 2013-17; – 528 Sasol jobs + 358 contract workers; $58.9 mm payroll– Feasibility study to be completed in late 2012.

Page 28: March 7, 2013

Lake Charles Construction Potential

• G2X Energy (1/16/13)– $1.3 billion plant at Port of Lake Charles to

turn natural gas into gasoline– Construction 2014-17; hiring complete by

end of 2015– 243 jobs @ $66,500– Final decision by end of 2013

Page 29: March 7, 2013

Other non-MSA Developments

• Mosaic – St James Parish (12/12)– FED being done on $700 mm ammonia plant

– 53 new jobs @ $83,000

– Make decision mid 2013; Construction start – 2014; operation – 2016

• Zero Emission Energy – St. James (3/13)– $1.3 bill ethanol plant---largest in North America---

across from Nucor

– 63 new jobs @ $66,500

– Construction start 2013-IV; end mid-2016

Page 30: March 7, 2013

Other non-MSA Developments:Potentials

• Shell Gas-to-Diesel Refinery (4/12)– $10 billion plant; feasibility study underway: TX v

LA– 2 years to develop detailed engineering plans to

determine if feasible– Between LA & TX; One of two parishes in LA;

abundant natural gas is key

Page 31: March 7, 2013

Manufacturing in general should gain worldwide market share

Cheap energy off-setting cheap labor advantage

Example: Benteler Steel$900 mm capex; 675 jobs

Port of Caddo Bossier

Page 32: March 7, 2013

Potentials

• Ozkan Steel USA – BTR MSA (1/13)– Looking at sites on River for $150 mm steel plant;

350 jobs– Phase 1 – facility to sort scrap metal (summer

2013)– Phase 2 – melting plant (June 2014)– Phase 3 – rolling plant (June 2015)– 300,000 tons of specialty steel for shipbuilders

Page 33: March 7, 2013

Potential Problem for Chemicals:European Shale Gas Plays

Page 34: March 7, 2013
Page 35: March 7, 2013

European Barriers to Shale Development

• Generally, mineral rights owned by government, not individuals.– Greens more influential with government than

individuals– Lease & royalty payments make locals more

tolerant of drilling activity• Little geological data on foreign shale deposits.– U.S.: tens of thousands of wells drilled with geologic

data publicly available via state regulators– Little known about rocks overseas & whether

characteristics make fracking possible• Once found little to no infrastructure in place

to move product to market.

Page 36: March 7, 2013

Thank God for France!

• May 11, 2011 National Assembly voted to prohibit hydraulic fracing in the country

• Bulgaria recently disallowed as well

• 11/21/12: European Parliament implemented a Europe-wide moratorium on shale gas development

Page 37: March 7, 2013

#2 WatchPower producers

EPA attacks on coal-fired power plants: an alternative low cost fuel

is great

Page 38: March 7, 2013

Power Use of Natural Gas

• Next 2-3 years little change

• After that, between 35-75 gigawatts of coal-fired power plants will be shut down

• Amount depends on how rapidly EPA regulations on cross-state pollution & mercury emissions are implemented

Page 39: March 7, 2013

Baton Rouge: Chemical & Related Construction

• Trafigura: – Re-Opened Ormet’s Burnside terminal @ $100

mm as Impala Warehousing– State-of-the-art bulk terminal for coal, bauxite,

and alumina– Adding $270 mm coal export terminal: design

phase (7/12)

Page 40: March 7, 2013

Plaquemines Port: Doubling Coal Exporting

• IMT Coal – $12 mm expansion

• Ram Terminals:– $150 mm on new terminal

• Oiltanking Inc.– $136 mm project

Page 41: March 7, 2013

#3 WatchLNG Exports

Page 42: March 7, 2013
Page 43: March 7, 2013

Construction in Lake Charles Future:LNG

• Re-Build for Export Terminal: Cheniere Energy – Sabine Pass LNG: $5.6 billion project for first 2 of 4 trains

– convert import/export terminal; started construction 8/12;

– Now has four 20-year contracts for 10.5 bcf annually. (1/12); BG Group – Britain; Gas Natural Fenosa – Spain; GAIL – India; KOGAS;

– 2nd train $4.5 bill contract let to Bechtel 12/12. – FEED & Permitting work started on 3rd train 12/12. – Construction of 3rd and 4th units determined by demand.

New agreement with Total Gas & Power (9/12) will allow for 5th train to be built.

– Approval from DOE given to export LNG (5/11) to non free trade partners of U.S. (valuable asset); Japan & Spain not free trade partners & import 4.12 tcf per year.

Page 44: March 7, 2013

LNG Retrofit• Re-Build for Export Terminal– Cameron LNG (Sempra) asked FERC for 2-year authority

to re-export; Inked deals w Mitsubishi and Mitsui Corps to work together in exchange for 1.7 bcfd (620 bcf annually) of export capacity to Japan. Plus GDF Suez of France agreed to about 0.4 bcfd. Total 657 BCF annually. Start construction late 2013; operate 2016. $6 billion project; 130 jobs. Asked FERC for permission to begin building 12/12

– Lake Charles Exports, LLC (Trunkline) • Received DOE permission to export domestic gas from its terminal

7/11; 2 bcfd for 25 years (8/11)

• Applied to FERC to start construction by 2014; ship by 2018 (4/12)

• Financial support from BG Group & Southern Union

• Note: LNG export price - $18 mmbtu

Page 45: March 7, 2013

Huge Construction Potential

• Magnolia LNG (1/18/13)– $2.2 bill natural gas liqufaction plant at Port

of Lake Charles; – Final decision late 2014; start construction

2015– 45 jobs @ $75,000– Australian company

• Careful! Who will head EPA & DOE?

Page 46: March 7, 2013

Impact of GOM Recovery on Ports along Southern Coast:

Page 47: March 7, 2013

0

20

40

60

80

100

120

90 92 94 96 98 00 02 04 06 08 10 12 14

POA POAL POAH

Fig. 2: Oil PricesP

rice p

er

Barr

el

2012 2013 2014Average $95 $95 $95Low $80 $80High $110 $110

Page 48: March 7, 2013

The Recovery

• Pre-spill: 33 rigs in deep waters

• Post-spill: 11 rigs

• 11 deepwater drill ships left the GOM after spill

• As of 5/12---24 rigs in deep waters

• Good news: 9 new drill ships or semi-submersibles on way & in place by 2013-II

Page 49: March 7, 2013

GOM Deepwater Expected Rig Count: ISI

• 2013: 36

• Mid 2014: 50

• 2015-17: 60+

Page 50: March 7, 2013

Benefits of the Gulf?

• Elephant finds– Chevron St. Malo Field, lower tertiary: 13,000 bbl/d

(Bakken: 1,000 b/d)

• Straddles world’s biggest consumer• Politically stable area (Argentina alarm)• Cost of taxes, royalties, and regulations among

lowest in world• Lots of opportunities from small, low risk

prospects to giant targets in extreme conditions• Vast network of pipelines & refineries

Page 51: March 7, 2013
Page 52: March 7, 2013
Page 53: March 7, 2013

My Favorite “Blonde Energy” Story

“I lost my 710 cap.”

Page 54: March 7, 2013
Page 55: March 7, 2013

March 7, 2013

Dr. Loren C. ScottLoren C. Scott & Associates, Inc.www.lorencscottassociates.com