mare nostrum vms long distance corridor

22
Mare Nostrum VMS Long Mare Nostrum VMS Long Distance Corridor Distance Corridor Antonio Lucas Alba Antonio Lucas Alba DGT Consultant DGT Consultant Road Safety and Traffic Institute Road Safety and Traffic Institute University of Valencia University of Valencia

Upload: william-burns

Post on 03-Jan-2016

49 views

Category:

Documents


5 download

DESCRIPTION

Mare Nostrum VMS Long Distance Corridor. Antonio Lucas Alba DGT Consultant Road Safety and Traffic Institute University of Valencia. DGT + INTRAS = SIMVA Project ( SI stemas de M ensajes VA riables). 2001-2002 1200 VMS (now over 1600) 5 TCC (now 7) 4 official languages Goals: - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Mare Nostrum VMS Long Distance Corridor

Mare Nostrum VMS Long Mare Nostrum VMS Long Distance CorridorDistance Corridor

Antonio Lucas AlbaAntonio Lucas AlbaDGT ConsultantDGT Consultant

Road Safety and Traffic InstituteRoad Safety and Traffic InstituteUniversity of ValenciaUniversity of Valencia

Page 2: Mare Nostrum VMS Long Distance Corridor

DGT + INTRAS = SIMVA ProjectDGT + INTRAS = SIMVA Project((SISIstemas de stemas de MMensajes ensajes VAVAriables)riables)

2001-2002 1200 VMS (now over 1600) 5 TCC (now 7) 4 official languages Goals:

1. Analyze VMS displays homogeneity

2. Build a VMS standard catalogue Method: 75% of TCC operators

interviewed

Page 3: Mare Nostrum VMS Long Distance Corridor

Starring: Multipurpose-VMSStarring: Multipurpose-VMS

Normally one pictogram, sometimes two…

Normally 3 línes of text, Sometimes two, four…

Normally 12 characters, Sometimes 10, 16…

80%

Page 4: Mare Nostrum VMS Long Distance Corridor

One problem: pictogramsOne problem: pictograms

When no pictogram available or pictogram When no pictogram available or pictogram not understoodnot understood: operators rely on text : operators rely on text and problems appear … and problems appear …

• Multicultural and international issues• Heterogeneity and cognitive overloading• Literacy levels• Legality• Etc.

VMS heterogeneity can be seen as a problem derived from VMS heterogeneity can be seen as a problem derived from pictogram inadequacy or lack of traffic signspictogram inadequacy or lack of traffic signs

Page 5: Mare Nostrum VMS Long Distance Corridor

SolutionsSolutions

Innovation and/or pictogram re-designInnovation and/or pictogram re-design Determine principles for information organization: Determine principles for information organization:

specificity, consequence oriented pictogramsspecificity, consequence oriented pictograms

Page 6: Mare Nostrum VMS Long Distance Corridor

Some resultsSome results

Page 7: Mare Nostrum VMS Long Distance Corridor

International experienceInternational experience

European VMS Platform European VMS Platform (2001-2003)(2001-2003)

Mare Nostrum VMS Long Mare Nostrum VMS Long Distance Corridor (2003 -)Distance Corridor (2003 -) Specific interest on Specific interest on

Multipurpose-VMSMultipurpose-VMS Harmonization laboratoryHarmonization laboratory

UN “Small Group on VMS” UN “Small Group on VMS” (2003 - )(2003 - )

Cooperation with SOMS/IN-Cooperation with SOMS/IN-SAFETYSAFETY

Page 8: Mare Nostrum VMS Long Distance Corridor
Page 9: Mare Nostrum VMS Long Distance Corridor

Some outcomesSome outcomes

Page 10: Mare Nostrum VMS Long Distance Corridor

Judged comprehensibility: Judged comprehensibility: The samplesThe samples

Italian, French, Spanish (DGT, SCT) and Dutch sample characteristics

715

Page 11: Mare Nostrum VMS Long Distance Corridor

Results (I): LengthResults (I): Length83.3%

52.8%

54.2%

38.6%

27.0%

35.2%

32.7%

32.3%

36.9%

Page 12: Mare Nostrum VMS Long Distance Corridor

Results (II): DistanceResults (II): Distance

81.1%

29.5%

32.7%

28.8%

29.4%

Page 13: Mare Nostrum VMS Long Distance Corridor

Results (III): Location between two placesResults (III): Location between two places

54.4%

57.3%

55.9%

52.6%

49,7%

53.8%

51.3%

Up: 54.6%

Down: 52.3%

56.6%

51.1%

52.6%

Page 14: Mare Nostrum VMS Long Distance Corridor

Results (IV): Road kilometersResults (IV): Road kilometers

61.2%

54.1%

49.0%

46.2%

Page 15: Mare Nostrum VMS Long Distance Corridor

The referents (V): Length + location between two placesThe referents (V): Length + location between two places

77.8%

30.9%

48.9%

50.2%

43.9%

38.9%

Page 16: Mare Nostrum VMS Long Distance Corridor

Event length End of event

Event beginningQualitative location

Quantitative location

Combined formulations

Page 17: Mare Nostrum VMS Long Distance Corridor

Comprehension: computer test via internetComprehension: computer test via internet

Page 18: Mare Nostrum VMS Long Distance Corridor

Comprehension test: DesignComprehension test: Design

Page 19: Mare Nostrum VMS Long Distance Corridor

First resultsFirst results

Page 20: Mare Nostrum VMS Long Distance Corridor

Length and extensionLength and extensionShort and middle term alternativesShort and middle term alternatives

Incorporating a complete coding (alphanumeric language) in order to indicate Incorporating a complete coding (alphanumeric language) in order to indicate distance, length and combinationsdistance, length and combinations

Distance: Separate danger warning and informing about dangersDistance: Separate danger warning and informing about dangers

< 2 KM > 2 KM

8 KM

Page 21: Mare Nostrum VMS Long Distance Corridor

61,2%

57,3%

29,4%

14/20

14/20

3rd step: laboratory testing

Page 22: Mare Nostrum VMS Long Distance Corridor

Thanks for your attention

[email protected]