    __i Margalla View Housing Scheme- A project of Twin City (Pvt.) Ltd

    Bahria University, IslamabadMay, 2009

  • 8/14/2019 Margalla View Report

    2/32

  • 8/14/2019 Margalla View Report

    3/32

    _________________________________________________________________

    __i Margalla View Housing Scheme- A project of Twin City (Pvt.) Ltd

  • 8/14/2019 Margalla View Report

    4/32

    Acknowledgments

    First of all we are very much thankful to ALLAH ALMIGHTY, who gave us

    strength & power to complete this task efficiently & effectively.

    We thank our most prestigious Professor Mr. Tahir Masood to provide us

    guidelines for each & every aspect.

    We would like to especially thank Mr. Avais Shahid, Director Finance Margalla

    View Housing (Pvt.) Ltd. Who was very cooperative and considerate during the whole

    period of our collection of information.

    We are also very grateful to all those who helped us & gave us up-to-date

    information or any other information regarding this analysis while completing this task.

    Thank you in anticipation.

    ____________________________________________________________ii

    Margalla View Housing Scheme- A project of Twin City (Pvt.) Ltd.

  • 8/14/2019 Margalla View Report

    5/32

    Executive Summary

    The project is based on Margalla Housing Scheme, one of the three projects of theTwin City Society, a private limited company established by four people which has

    gained popularity overtime due to their provision of value to the customer. This scheme

    was located in Islamabad, Zone 2 which increased its feasibility for us as a project to be

    undertaken. This project was selected as an extension to the Project Management coursethat is a part of our MBA curriculum.

    The project starts off with information about the Zone distribution in Islamabad as

    well as the procedure or processes required for the provision of NOC by CDA.

    Later on we have discussed the organizational vision of the company and theirunique features. The structure of business and the project life cycle has clearly been

    elaborated in this report. Margalla housing scheme has properly allocated its scheduling,

    performance and specifications objectives, which in return has made it a unique housingscheme.

    ____________________________________________________________iii

    Margalla View Housing Scheme- A project of Twin City (Pvt.) Ltd.

  • 8/14/2019 Margalla View Report

    6/32

    TTABLEABLEOFOF CCONTENTSONTENTSCHAPTER 1.AN INTRODUCTION ............ ............... .............. .............. .............. .............. ...........1

    ISLAMABAD ZONES: ............................................................................................................ ...... ...... ..1

    CDAs Requirements for processing a housing scheme ............................................................1

    Issuance and Schemes of NOC .................................................................................................1

    CHAPTER 2.THE ORGANIZATION ............. .............. .............. .............. .............. ........... ..... ......2

    TWIN CITY HOUSING (PVT.) LTD: .......................................................................................................2

    MARGALLA HOUSING SCHEME:...........................................................................................................3

    Unique Features of Margalla Housing: ...................................................................................4

    Structure of the Business: .........................................................................................................5

    MISSIONAND VISIONOFTHE BUSINESS: ...............................................................................................6

    Mission ....................................................................................................................................6

    Vision ................................................................................................................................. ......7

    CHAPTER 3.SELECTION MODEL ............. ............... .............. .............. .............. ............. ...... ....7

    NUMERIC MODEL: ............................................................................................................. ...... ...... ....7

    NON NUMERIC MODEL: ......................................................................................................................7

    CHAPTER 4.PROJECT LIFE-CYCLE ............ ............... .............. .............. .............. ....... ...... ......7

    CONCEPT: .........................................................................................................................................7

    INITIATE: ...........................................................................................................................................8

    IMPLEMENTING MONITORING CONTROL: .................................................................................. ...... ..8

    TERMINATING: ...................................................................................................................................8

    CHAPTER 5.MANAGING PROJECT .........................................................................................9

    PROJECT MANAGERAND TYPEOF TEAM: ..............................................................................................9

    OTHERMEMBERSOFTHETEAMINCLUDESFOLLOWING:.............................................................................9

    SCHEDULING SPECIFICATION PERFORMANCE: .......................................................................... ...... ....9

    CHAPTER 6.PROJECT PLANNING PROCESS ............. .............. .............. .............. ....... ..... ...10

    NATUREOF ORGANISATION: ...............................................................................................................10

    Registration with SECP: ........................................................................................................10

    Water Availability: ..................................................................................................................10

    Compact piece: .......................................................................................................................10

    Ownership: .............................................................................................................................11

    Documentation: .............................................................................................................. ...... ..11

    Land Acquisition & NOC process: ............................................................................. ...... ......11

    Layout Plan: ...........................................................................................................................11

    Bank Nomination: ...................................................................................................................11

    Advertisement Approval: .................................................................................... ...... ...... ...... ..11

    ____________________________________________________________iv

    Margalla View Housing Scheme- A project of Twin City (Pvt.) Ltd.

  • 8/14/2019 Margalla View Report

    7/32

    Mortgage Land: ......................................................................................................................11

    Final NOC ..............................................................................................................................12

    Development work: ...............................................................................................................12

    Discard IESCO and SNGPL: .......................................................................................... ...... .12

    Plot Possession: ....................................................................................................................12Maps approval: .................................................................................................................... .12

    Construction of houses and Public places: ...........................................................................12

    CDA takeover: .......................................................................................................................12

    HIERARCHALBREAKDOWN STRUCTURE (HBS): ........................................................................ ...... .....13

    NETWORKING: ............................................................................................................................ .....13

    CHAPTER 7.ALLOCATION OF RESOURCES: ............ ............... .............. ............. ..... ..... ......14

    A)ACCOUNTING: ..............................................................................................................................14

    B)DOCUMENTATIONOFFILES: .............................................................................................................15

    CHAPTER 8.CONTROLLING AT TWIN CITY: ............. .............. .............. ............... ....... ...... .16

    CYBERNETIC CONTROL.....................................................................................................................16

    POST CONTROL................................................................................................................................ 16

    SCOPE CREEP: .................................................................................................................................16

    ENVIRONMENTAL CHANGES: ..................................................................................................... ...... ...17

    CHAPTER 9.TERMINATING THE PROJECT: ............. .............. .............. .............. ....... ..... ....17

    VARIETIESOFTERMINATION: ..............................................................................................................17

    Termination by extinction .......................................................................................................17

    Termination by addition ........................................................................................................ .18

    Termination by integration .....................................................................................................18

    Termination by starvation .......................................................................................................18

    Post project report: ................................................................................................................18

    HANDOVERTO CDA: ......................................................................................................................19

    CHAPTER 10.RECOMMENDATIONS ............. ............... .............. .............. .............. ........... .....19

    BIBLIOGRAPHY 20

    ANNEXURE ...............................................................................................................................21

    COMPLETE PROGRESS REPORTOFTHE PROJECT....................................................................................21

    INDEXOFALL NOC AND CERTIFICATION............................................................................................21

    BROCHUREOF MARGALLA VIEW HOUSING SCHEME.............................................................................21

    CALL REPORT 1 ............................................................................................................... ...... ...... ...21

    CALL REPORT 2 ............................................................................................................... ...... ...... ...21

    CALL REPORT 3 ............................................................................................................... ...... ...... ...21

    PICTURESOFTHE PROJECT SITE.........................................................................................................21

    SCREENSHOTSOFSOFTWAREUSED...................................................................................................... 21

    ____________________________________________________________v

    Margalla View Housing Scheme- A project of Twin City (Pvt.) Ltd.

  • 8/14/2019 Margalla View Report

    8/32

    ............................................................................................................................................22

    .....................................................................................................................................................22

    .....................................................................................................................................................22

    ____________________________________________________________vi

    Margalla View Housing Scheme- A project of Twin City (Pvt.) Ltd.

  • 8/14/2019 Margalla View Report

    9/32

    TTABLEABLEOFOF IILLUSTRATIONSLLUSTRATIONS

    FIGURE 1- MAP OF ISLAMABAD UNDER ZONING PLAN..................................................2

    FIGURE 2-HIERARCHY...............................................................................................................6FIGURE 3-HBS 13

    ____________________________________________________________vii

    Margalla View Housing Scheme- A project of Twin City (Pvt.) Ltd.

  • 8/14/2019 Margalla View Report

    10/32

  • 8/14/2019 Margalla View Report

    11/32

    Chapter 1.An Introduction

    Islamabad Zones:

    Islamabad the Scenic Capital City of Pakistan has been expanding swiftly over past few years. This expansion has taken place due to the prevailing national and

    international scenarios. At present, the population of Islamabad is just above the million

    mark. Day by day increasing population and vast foreign investment has given a boom to

    the real estate industry of this area. Sources reveal that Islamabad is facing a shortage of

    40,000 housing units. The existing number of houses here are 70,000 while 110,000

    housing units are required1. Government alone cannot cope up with the current housing

    situation and therefore framed under ICT (Zoning) Regulation, 1992 has allowed

    investment for the development of Private Housing Schemes in Zone II and Zone V of

    Islamabad, sponsored by a registered company or a cooperative society. Ever since, the

    real estate business is experiencing boom in the market, Housing projects in Islamabad

    are coming up by the dozens, all focused on providing good investment opportunities at

    large and a little on actual housing options. The only information available to the investor

    or to the genuine house seeker is what is being advertised or being informed by the

    property deals. This leaves a huge space in between the ground reality and what is being

    portrayed and often the buyers get misled in making the right choice.

    CDAs Requirements for processing a housing scheme

    A housing scheme can be sponsored by a registered company or a

    cooperative society, hereinafter referred as Sponsor, for an area not lessthan 50 acres (400 Kanals) present in Zone V and 100 acres (800 Kanals)

    falling in Zone II, as single piece of land, of ICT Zoning Plan.

    The sponsor cannot advertise or publicize the proposed scheme in anymanner except otherwise stated

    Issuance and Schemes of NOC

    The NOC conveying the approval of the detailed layout plan and engineering

    design of the scheme is sent to the sponsor after registration of mortgage deed and

    transfer deed in favor of CDA, and meeting the objections, if any. Thereafter, the schemecan be advertised.

    The development works of the schemes is completed within the time frame

    allotted by the CDA ranging from Three years to Six years depending upon the covered

    area.

  • 8/14/2019 Margalla View Report

    12/32

    Out of total 41 housing societies registered with Islamabad Capital Territory (ICT)

    Administration, only 9 have been issued No Objection Certificates (NOCs) from the

    Capital Development Authority (CDA) to launch their housing projects in Zones II and V.

    However, another eight housing schemes have got approval of layout plan from CDA,

    while the rest of the cases are at different stages of process to fulfill the required criteria.

    Most of these unregistered and illegal societies were active in Islamabad for the last few

    months and were indulged in looting the public without having land for the schemes.

    Figure 1- Map of Islamabad under Zoning Plan

    Chapter 2.The Organization

    Twin City Housing (Pvt.) Ltd:

    Twin City is a private limited company that was established in 1993. Currently the

    company is supporting three projects including Margalla View Housing Scheme, Pine

    City Islamabad and Bhurban Terraces Murree.

  • 8/14/2019 Margalla View Report

    13/32

    Margalla Housing Scheme:

    Margalla View Housing Scheme is located approximately 20 minutes drive from

    Zero Point ideally situated on main G.T Road in Zone II of Islamabad. The scheme has

    40% area allocated to residential and 5% to commercial; where as the rest of 55% is

    under Roads, Parks/Open Spaces and Community Building. A full system of ElectricPower and Sui Gas is available in the vicinity. Underground cable system is used with

    maintenance friendly power supply to the scheme. All roads and streets are minimum 40

    ft. wide.

    MARGALLA VIEW HOUSING SCHEME ATA GLANCE

    Sr. No. Description Date

    1 Permission of Advertisements Dec,1993

    2 Clearance of Layout Jan,1995

    3 NOC June, 2002

    4 Supply of Gas June, 2004

    5 Water Supply Oct, 2002

    6 IESCO Nov, 2004

    Table 1-NOC Issuance Date:

    Further details are being attached in the annexure of this report.

    Following table shows the current and proposed status of the facilities in MargallaView D-17 sector:

    Table of Features

    Society Formed 1993

    Location Sector D-17

    Drive Time

    (Approximately)

    Zero

    Point

    GPO

    Rawalpindi

    Zone V Airport

    30Minutes

    20 Minutes 30 Minutes 25 Minutes

  • 8/14/2019 Margalla View Report

    14/32

    Development

    Earth

    Work

    Sewerage

    WorkElectricity Gas

    Compl

    etedCompleted

    50%

    CompletedCompleted

    Plots Water Direct Link Boundary Wall

    SoldOut

    Supply fromSandymar Dam and

    Tube Wells

    Situated onMain GT Road

    Proposed 6 FeetHigh Brick Wall

    System of Allotment Direct Physical Allotment of Plots to the Owners

    Sizes of Plots233 Sq

    Yard356 Sq Yard 500 Sq Yard 1000 Sq Yard

    Pricing

    Booking Price (500 Sq Yd) Current Market Value (500 Sq Yd)

    500,000 to 900,000 PKR 2,800,000 PKR

    Expansion Plan No, the land available in surroundings has prices that are not feasible to start a new project.

    Advertisement

    Sources

    Print and Tele Media was used for advertising.

    Public ServicesOffered

    Marke

    ts

    Gas Stations Mosques Schools

    Yes Yes Yes Yes

    Hospit

    als

    Transport Parks Cinema

    No Yes (Taxi) Yes No (Proposed)

    Sweepers

    FiltrationPlants

    SecurityGuards

    CommunityCenters

    Yes No

    (Proposed)

    Yes No (Proposed)

    Any Other Public Service Offered

    Tube wells for water supply

    Sewerage Treatment Plant for Garbage Disposal

    Construction

    Measures

    As per CDA Building Control Rules and Regulations.

    Table 2-Basic Necessities Table Available

    Unique Features of Margalla Housing:

    Margalla Housing is the first project in Islamabad Zone-2 which has been given

    NOC by CDA. It is located in Sector D-17 which is a 20 minutes drive from Zero Point

    (Islamabad) and G.P.O (Rawalpindi).

  • 8/14/2019 Margalla View Report

    15/32

    Moreover, a picturesque view of Sandymar Dam located at the Eastern boundary

    of the housing scheme provides a marvelous sight with a lake that offers excellent

    opportunities for picnics and water related sports such as boating, sailing, fishing and so

    on.

    The presence of Army Welfare Trust Housing Scheme and Engineers CooperativeHousing Society in the neighborhood provide excellent socio-economic advantages.

    Structure of the Business:

    Normally, societies are seen to have Directors or management personnel that have

    been elected by the members of that particular society. However, in the case of Margalla

    Housing, being a private limited company, there are no elected personnel but are fixed

    position holders including Directors as well as other management personnel. There are no

    external stakeholders as all the owners support their stakes in the company. The owners

    normally have more than enough experience exhibited due to their tenure as real estate

    agents, constructors and hence deemed as eligible and capable to manage the variousprojects and operations.

    There is no specific hierarchy that is followed at Margalla Housing. In fact, all the

    departments supplement each other in case of an issue or problem to resolve the

    complication. They have a large low level staff including security, gardeners, etc,

    however, the technical staff is comparatively limited.

    The hierarchy of the organization is as follows:

  • 8/14/2019 Margalla View Report

    16/32

    Figure 2-Hierarchy

    Mission and Vision of the Business:

    Mission

    Margalla Housing aspires to be one of the nations first class housing schemes

    with projects offered to a wide array of segments, at choice locations with quality

    services, while maintaining the highest international standards, timely delivery, and

    lifelong customer satisfaction.

    Direct

    or Marketing

    Direct

    or Admin

    Direct

    or Finance

    CEO/

    Director

    Engineering/

    Site

    In-charge

    Site

    En ineer

    Accou

    ntants

  • 8/14/2019 Margalla View Report

    17/32

    Vision

    Their vision is to provide high quality affordable homes in communities where

    people have a sense of pride and place. They wish to develop effective and productive

    relationships with all of their customers depicting their values such as honesty,

    transparency, respect of right, supporting values and being there for the customer.

    Chapter 3.Selection Model

    To select a project a company can use different models to make them assist in

    making the decision either to pursue the project or not. For this particular project Twin

    City used non-numeric model and numeric as well.

    Numeric Model:

    As being a privately owned company, they are reluctant to share the actual

    feasibility model which helps them to decide on the pricing decision of the plots of the

    Margalla View. Such information is highly confidential for any such organization.

    Non Numeric Model:

    In case of selecting a project two types of models can supplement the decision of

    an organization a) numeric models and b) non-numeric models. Project selection and

    criteria of choices is an important fact which needs to be addressed before making anyinvestments; either the project fit in some minimum standards of the organization or not.

    After the interview we found out that the company has to initiate the project to make its

    market presence and the time was ideal after the CDA zoning regulation. Basically the

    project was like a Sacred Cow for the organization and they have to pursue this project.

    Some other important factors which make it an important project are a) availability of

    land near proposed airport, b) acquisition of land was not in sight of land mafia, c) CDA

    zoning regulation was proposed d) other important housing schemes were planned in

    vicinity of the acquired land and there are other number of reasons which make it as a

    sacred cow for the organization.

    Chapter 4.Project Life-Cycle

    Concept:

    After the development of zoning regulations in 1992, Islamabad was divided in

    various zones which provided Twin City an opportunity to divest into the booming

  • 8/14/2019 Margalla View Report

    18/32

    business. They developed Margalla Housing in 1994 as a project with the concept of

    attracting middle class families as their customers. These same middle class families did

    not only become the end users of their project but also supported the investors role.

    Initiate:

    The Margalla Housing project was initiated in 1993, however, the master plan was

    approved in 1995 including CDA regulation affirmation and architecture. NOC was

    granted to the project in June 2002 which led to the major development work to be

    initiated and completed in 2004. Provision of electricity by IESCO assisted in the

    progression of their work which finished in Dec 2007. There is still half of the work to be

    completed with expectations of completion by end of 2009.

    Implementing Monitoring Control:

    Implementation of Margalla Housing is depicted by their aggressive operations

    including the following:

    Construction of a central water supply system with overhead and underground

    water reservoirs with a separate connection for each house.

    A sewerage network is to be laid connected to the second largest sewage treatment

    plant in conformity with the standards of WHO/NEQS.

    Underground cable systems of Electric Power and Sui Gas, support from SNGPL

    and IESCO, are to be laid to ensure beauty of roads and a safe power supply to the

    scheme.

    None of the streets are expected to be less than 40 ft. wide and will be Asphaltconcrete machine streets designed as per American Standards.

    A team of consultants handle the engineering, construction, as well as site

    designing and other aspects of the project. The monitoring and controlling of these

    activities is taken care of by the CEO himself.

    Terminating:

    After the completion of all of the basic activities as mentioned in the Initiation

    and Implementing phases above, the project will then be handed over to CDA whichleads to the termination of their project. However, CDA has not delivered any policy that

    would dictate the time of the takeover.

  • 8/14/2019 Margalla View Report

    19/32

    Chapter 5.Managing Project

    Project Manager and Type of Team:

    The selection of a project manager is an important aspect to make a projectsuccessful. He should be credible not only in the eyes of the other team members but also

    got credibility of his work between his clients. The project manager of the Margalla

    Housing Scheme is Mr., who is also the CEO of the Twin City Housing (Pvt.) Ltd. He

    was the former secretary of Planning Commission which gave him multiple opportunities

    to develop his skills in town planning. This led him to polish and prove his skills further

    through depicting entrepreneurship with the initiation of Twin City Housing (Pvt.) Ltd.

    Other members of the team includes following:

    Director Administration Mr. have more than 23 years of experience inconstruction and previously worked on projects like M.E.S in Panu-Akil and many other

    worth mentioning projects.

    Director Finance Mr. brought vast experience he gained in Middle East into this

    project. Having experience of more than 9 years in construction industry make him

    precious member of this team.

    Director Finance Mr completed his MBA from Bahria University and after that he

    moved abroad and continued his education in management sciences. He is also a valuable

    member of this team bringing experience from USA about financial matters.

    All of the activities, such as leveling of ground, construction of roads, pipe lay-

    down, plotting, and so on are taken care of by a team of engineers provided by Margalla

    Housing project. This team is, however, advised and directed by consultants appointed

    for the project. The initial planning phase was completed by Unique consultants,

    however, the remainder of the activities have been supervised and directed by Objectives

    Scheduling Specification Performance:

    Although the project of Margalla Housing was expected to hold a completion

    schedule of 7 years, it was faced with a number of hurdles that did not only slow the

    overall process but also increased the cost of the project itself. The project was associated

    with a number of government bodies including IESCO, SNGPL, CDA, and Securities

    and Exchange Commission and so on. These bodies, although were given advances from

    the project authorities, failed to deliver on a timely basis till date. Margalla Housing had

    no written agreement with IESCO which led to the delay of carpeting of electric cables as

    only 50% of the work has been completed followed by a demand for more monetary

  • 8/14/2019 Margalla View Report

    20/32

    advancements before further work could be continued. Similarly, CDA depicted an

    extremely lazy association with the project by delaying the completion time through a

    slow analysis of water availability in the society. This led to the delivery of NOC to the

    project after a long period of 7 years. The inclusion of land mafia hurdles in its initial

    project stages as well as corruption faced by the company due to changing government

    regulations and political instability added to the lack of association with the governing

    authorities did not only delay their schedules but also effected their performance by

    increasing the project costs. If they had to pay 1 million to complete the project, that cost

    was increased 4 times. However, the project ownership did not let these difficulties

    trickle down to their end users and customers but accepted and handled the cost their

    selves throughout this tenure so to offer their investors with what was promised.

    Chapter 6.Project Planning Process

    Nature of Organisation:

    Twin City Housing Ltd consists of three projects including Margalla Housing,Pine City, and Bhurban Terraces. The company is a pure project organization that can be

    understood by the fact that they only take on the projects for specific authorities and deal

    with the construction and development of the projects. Once the construction processesare complete, they then hand the projects over to their respective authorities.

    This step is elaboration of processes that are carried out in the project. It explains

    the order of the processes and the resources that are required at each step. Margalla view

    housing scheme is planned on the following format as follows:

    Registration with SECP:

    Before starting any activity for Margalla view housing scheme, company need to

    be registered with the appropriate authority which in case of twin city housing is SECP.

    Water Availability:

    CDA post a critical need of water availability to a housing scheme before starting

    any acquisition of land for housing scheme.

    Compact piece:

    Square piece of land is needed for a housing scheme which is 1600square meter in

    case of Margalla Housing Scheme. This condition by CDA also helps to avoid any sort of

    hindrance in development work.

  • 8/14/2019 Margalla View Report

    21/32

    Ownership:

    Land acquisition is an important part of any housing scheme, but land mafias

    pose serious threats to the ownership acquisition of land. Most of the time fake ownership

    papers been sold to housing scheme or the important part of land is hostilely take over by

    mafia.

    Documentation:

    All the documents been purchased from the land owners are scrutinized from the

    appropriate authorities and a single ownership in the name of Twin City Housing was

    claimed to start the NOC process for the Margala View housing scheme.

    Land Acquisition & NOC process:

    After complete documentation and scrutinizing the ownership claims of the

    previous owners the land is secured and boundaries were demarcated by CDA. NOC is

    issued by CDA after a survey by CDA to insure that the appropriate land is acquired bythe Twin City housing.

    Layout Plan:

    During the NOC process a layout plan in which seismic survey, sewerage lines,

    gas pipeline, electricity lines, filtration plant line, other required underground work and

    public places development plan been submitted to CDA for scrutinizing the layout plan.

    Bank Nomination:

    After the initial NOC CDA appoints a bank which is MCB in case of Margala

    view housing scheme who submits financial position of scheme to CDA, SECP and TwinCity housing.

    Advertisement Approval:

    Initial NOC process after some stage allows Twin city housing to advertise its

    housing scheme in all mediums of advertisement. Twin City outsourced the

    advertisement about this particular project initially but later they also even advertise it by

    themselves and even on commission based marketing.

    Mortgage Land:

    After the above stated processes the mortgaging of land is conducted. The land ismortgaged to the government on the basis of certain criteria. The areas that is planned to

    be allotted to commercial buildings, roads, parks, mosques etc is mortgaged to the CDA

    and then the rest of the housing part is mortgaged to CDA on the basis of the fact that out

    of 100% of the land 25% is mortgaged to CDA.

  • 8/14/2019 Margalla View Report

    22/32

    Final NOC

    The mortgaging process follows with the final NOC. That is, the company

    registers for the final NOC granting since the requirements are checked and then it is

    granted. It takes some time to go through this process Since the Margalla housing was

    fulfilling the requirements so it didnt take much time for them to go through it.

    Development work:

    This part of the project was the most crucial because this part need to meet the

    deadline of CDA regarding all the development work, as most of the plot were,

    mortgaged to CDA and they release as the developmental project progresses.

    Discard IESCO and SNGPL:

    After the termination of the stated processes in the development work the project

    owners request the IESCO and SNGPL to withdraw from the project.

    Plot Possession:

    Here the company starts giving possessions to the people who are the actual

    owners of the plots. The people who have filed for the plots will be given possession to

    start with the construction of houses of the project.

    Maps approval:

    Then the owners make plans and maps for their houses. These maps are checked

    with the requirements of CDA and then approved to start with the construction.

    Construction of houses and Public places:

    All the construction either house or public places were started after the final

    survey of CDA official to check whether all the activities necessary for construction been

    completed or not. Construction of public places like school, mosque, and parks were been

    constructed according to the needs.

    CDA takeover:

    After all the public place construction CDA will take over the housing scheme

    and that will be the termination of the project. This process will take place in 6months

    with different phases.

  • 8/14/2019 Margalla View Report

    23/32

    Hierarchal breakdown Structure (HBS):

    SECP Reg.

    Compact pieceWater

    availability

    Land aquisition

    NOC process

    Layout planBank

    nominationAD approval

    Complete

    outsource

    Done by them

    selves

    Commission

    basedSales report

    to all concerns

    Cash deposit

    Gas/ electricityWater supply/

    filtration plantRoad plan

    Sewerage/

    filtrationDrain layout

    Plot mortgage

    to CDA

    Final NOC

    Development

    work

    Gas/ electricity

    (outsourced to

    Authorities)

    Water supply/

    filtration plant

    Road plan

    (outsourced

    Paragon

    Builders)

    Sewerage/

    filtration

    Plot

    possession

    Map approval

    Construction of

    houses/ public

    places

    CDA takeover

    (termination)

    Drain layout

    (Paragon

    builders )

    Figure 3-HBS

    Networking:

    Sr. No Activity Duration predecessor

  • 8/14/2019 Margalla View Report

    24/32

    1 SECP 3 mons

    2 WATER AVAILABILITY 6 mons 1

    3 COMPACT PIECE CHECK 9 mons 1

    4 OWNERSHIP 9 mons 2,3

    5 DOCUMENTATION 18 mons 4

    6LAND ACQUISITION BY THECOMPANY 36 mons 5

    7 NOC PROCESS 12 mons 2,6

    8 LAYOUT PLAN 6 mons 7

    9 BANK NOMINATION 9 mons 7

    10 ADVERTISEMENT APPROVAL 3 mons 7

    11MORTAGE LAND 50% TOCDA 6 mons 8,9

    12 FINAL NOC 12 mons 8,11

    13 DEVELOPMENT WORK 65 mons 12,10

    14 DISCARD IESCO & SNGPL 12 mons 13

    15 PLOT POSSESION 14 days 13,14

    16 MAPS APPROVAL 2 mons 15

    17 CONSTRUCTION OF HOUSES 12 mons 16

    18CONSTRUCTION OF PUBLICPLACES 18 mons 16

    19 CDA TAKEOVER 3 mons 17,18

    Chapter 7.Allocation of Resources:

    Allocation of resource that is the usage of resources in both individual and

    multiple projects is considered to be the prime and most important part of the project.Allocating resources is directly linked to the scheduling because altering schedules will

    alter the resources. If the project schedule can be adjusted to smooth the use of resource,

    it may be possible to avoid project delay and, at the same time, not saddle the project

    with the high cost of excess resources allocated.

    The Margalla Housing society basically uses two softwares. The back of these

    softwares is supported by ORACLE whereas the FrontPage is based on Visual Basics.

    These are custom software specially designed for their project. The screenshots of the

    softwares are attached in the annexure. These two softwares together keep a check on the

    allocation of resources and keeping a balance in them. These are used for;

    a) Accounting:

    Through this software record keeping is done relating numbers such as sales,

    expenses or profits and the account keeping of various activities that are carried out on

    the projects.

  • 8/14/2019 Margalla View Report

    25/32

    b) Documentation of files:

    Include government related registrations, plot related instructions and

    information, day to day operations are catered through that these are operated through

    oracle and front page is operated through VB (visual basic)

    We have discussed below the certain trade off involved in the Twin city housing

    limited, their allocation of resources to different projects and the relationship between

    resource loading and leveling.

    Critical Path Involved - Crashing a project

    The allocation problem requires more careful consideration if it is decided to

    speed up the accomplishment of tasks or the project. Margalla housing society using the

    standard practices and rules of thumb estimated the resources needed for normal

    progress. They estimated to complete the project by 2007. However the project got

    delayed by two years. Now, they are planning to expedite (crash) the project, they

    consumption and demand of additional resources and thus will try to complete the project

    by 2011. Additional resources utilize by the project are mostly human resource related

    that is labor. Example security guards can be provided at the site if or whenever required

    from other projects.

    Resource Loading

    It describes the amounts of individual resources the project require during specific

    time periods. Hence the requirements of each resource are simply listed as a function of

    time period. With the help of resource loading the Margalla housing society gave a

    general understanding of the demands a project makes on Twin city limited resources.With the help of resource loading Margalla housing society helped understanding and

    developing through project planning. This is the first step in attempting to reduce

    excessive demands on certain resources.

    Resource Leveling:

    Resource leveling aims to minimize the period-by-period variations in resource

    loading by shifting tasks within their slack allowances. This purpose is to create a

    smoother distribution of resource usage. Margalla Housing Society utilizes to take

    advantage on Resource leveling by utilizing the smoother resource usage which invloves

    less involvement of management as the usages of resource is nearly constant.

    The Project manager at Margalla housing society is leveling human resource.

    Thus utilizing the "just in time" inventory system in terms of increasing or decreasing

    labor levels according to the requirements. Thus a balance is maintained in the resources.

  • 8/14/2019 Margalla View Report

    26/32

    Chapter 8.Controlling at Twin City:

    The basic concept of controlling includes the regulation and control of resources

    and hence stands for bridging the gap when required between the standard to be

    maintained for those resources and the deviation that might be faced. The control process

    means the determination of the lag in the entire process of a project and applying

    resources accordingly to overcome that lag. Therefore it is mandatory to measure

    followed by monitoring and then controlling. There are three basic types of controls that

    are applied in this regard including Cybernetic Control, On-off/Go-No go/1-0/Yes-No,

    and Post Control. Out of these, the two that apply on Twin City are as follows:

    Cybernetic Control

    Twin City has depicted the use of this specific control throughout their projects

    including the Margalla Housing Scheme project. Usually, a comparison was carried out to

    find out if the project is running according to the budget and time allocated, throughidentification of current status. If there were any deviations found, the CEO would get in

    touch with the appointed consultants on the project who would then act as the effectors to

    speeding up the process or adding resources to bring the project back on line. Hence,

    their entire process of conversion into outputs was kept in check constantly for timely

    termination.

    Post Control

    Twin City has faced many challenges throughout the course of their project

    tenures, such as those identified earlier including challenges put forth by the variousgovernmental agencies, CDA and so on. To avoid the occurrence of any activities that

    could delay their projects and affect their overall performance, the company has

    identified the areas that could be controlled or effectively focused on for future projects

    and their objectives so to avoid any hassles or hurdles of the sort.

    At Twin City, the entire process of controlling is managed by the CEO. The CEO

    does consult with the management or the involved personnel in a certain or specific

    project, however, the end decision is always given by him so to keep the operations under

    control including the resource allocation required in every project.

    Scope Creep:

    Scope Creep is a phenomenon that stands for the drift experienced in the terms

    and conditions that had been initially set in the project contract. Twin City also had to

    face this phenomenon in the conduction process of their project. There are two reasons

    that usually lead to Scope Creep including environmental and technological changes.

  • 8/14/2019 Margalla View Report

    27/32

    Twin City, however, went through environmental changes that made an impact on their

    operations and project progress.

    Environmental Changes:

    Twin City has had to deal with this type of Scope Creep in the midst of their project. Initially, Twin City, according to the governmental laws, was planning on

    developing housing of not more than 3 stories high. However, when their construction

    started taking place, these laws were changed so that now buildings up to 15 stories high

    could be built. This of course, turned out to be an opportunity for Twin City for their

    projects and they acted out to opt for it. Hence, now they are deliberating working on

    buildings of that caliber. Similarly, Twin City was initially planning on completing their

    development project in a period of five years. However, due to the shortcomings of

    several governmental agencies, they had to extend their plan beyond that of 2007, the

    year earlier proposed. In June 2007, the company received a notice from the government

    to complete their project in five years with the ending date of December 2007. Thischange in the law also affected their progress in that project since they were given a

    deadline of only 6 months legally. They then had to act to obtain an issuance to complete

    the project on their own pace. Moreover, the many CDA, governmental and other

    regulations and/or policy changes borne by the company throughout their project course

    are included in this matter.

    Chapter 9.Terminating the project:

    Termination comes to every project one day. The impact of the termination stage

    on technical success or failure is very little. The entire process of termination is not easy

    and its impossible to avoid the complication of the termination stage. The purpose is to

    achieve the termination stage with minimum level or amount of hurdles.

    Varieties of termination:

    There are four basic types of terminations which are as follows:

    Termination by extinction

    In termination by extinction, the project might have achieved its goal or was

    successful. The product is handed over to the client after completion. The project mightalso be stopped if it was unsuccessful. A special case of termination by extinction is,

    termination by murder. Two important features of termination by murder include the

    suddenness of project termination and the lack of obvious signals that death is

    forthcoming. In case of Margalla Housing Society, termination by extinction can be

    practiced, since after the completion of houses they are hands over to the respective

    parties and then CDA jumps in.

  • 8/14/2019 Margalla View Report

    28/32

    Termination by addition

    Termination by addition involves, bringing the project into the organization as a

    separate, ongoing entity. If a project is a major success, then in such case, it may be

    terminated by institutionalizing it as a formal part of the parent organization. After the

    extinction, the projects personnel, property and equipment are often simply transferredfrom the dying project to the newly born division. The budget and administrative

    practices that confirm to standard procedures in the firm help in carrying out the

    metamorphosis from project to department to division. Our project regarding Margalla

    Housing Society will in future, after the completion of the project will practice extinction

    by addition. After giving entire ownership to the required parties, and in other words

    completion of the project, the company will draw back its resources for instance the labor

    which was required for construction purposes, the tractors, the machinery, equipment and

    the like.

    Termination by integrationTermination by integration involves bringing the project activities into the

    organization and distributing them among existing functions. Margalla Housing Society

    can not practice termination by integration, since it is not practical or logical to bring the

    projects activities into the organization and distributing among the already existing

    functions.

    Termination by starvation

    Termination by starvation involves cutting a projects budget sufficiently to stop

    progress without actually killing the project. In case of Margalla Housing Society, there is

    no question of termination by starvation. Since, the company has a hefty budget in hand

    and lack of monetary resources is not in the picture anywhere. Hence, Margalla Housing

    Society has no plans of stopping the progress of their project.

    When terminated. What to do?

    Post project report:

    After the completion and termination of the project the Twin City Society will

    hand over a detailed report to CDA.This report will include all the problems,

    amendments, required processes, expected and unexpected hurdles, delays relating to the

    availability and unavailability of resources, , problems regarding resources, shortage or

    excess of resources etc faced during the Margalla Housing Society project was

    conducted.

  • 8/14/2019 Margalla View Report

    29/32

    Handover to CDA:

    After the construction of houses, ownership is given to the respective parties

    accordingly. Also, certain percentage of residential plots is transferred to CDA at the

    beginning of the project. When a certain percentage of the development work is

    completed by the firm, CDA carries a survey and then accordingly releases someresidential mortgage plots to the firm for sale.

    Chapter 10.Recommendations

    The real estate business is the one that has become more of lottery to the ones

    operating; the reason behind it could possibly be the huge investment made from abroad

    and within from the country. Due to the fact that it has become more lucrative to the

    investors brings out the idea of more fraudsters coming in to exploit the overall market

    patterns.

    The following recommendations can be made based on the facts and figures

    available:

    Recommendations for the Sponsors:

    Sponsors should go through proper procedures to get approval for floating the land in

    the market, and should avoid any public announcements before they are allowed to

    do so. Once they are allowed to float the land in the market, they should not book

    plots in excess to the number they are allowed. Sponsors should make it public, the

    exact information about the society and procedure for booking and possession.Sponsors should remain in contact with their members to keep them updated about

    the development stage. Sponsors should complete the development work within the

    time-frame allotted by the CDA to ensure that the worth of the land does not decline

    due to its uncertain nature.

    After the new ruling from CDA about High Rise building, a new opportunity was

    created for Twin City Housing to redesign the portion of Flats near the dam location.

    This high rise building project can be an estimated value of Rs. 200 million.

    They should focus on developing value addition through the development of Villas

    such as those developed by Eden Gardens and/or Bahria Safari Villas instead of

    limiting their scope to that of only selling plots.

  • 8/14/2019 Margalla View Report

    30/32

    Bibliography

    Twin City Housing (Pvt.) Ltd. Website

    www.Margallaview.com

  • 8/14/2019 Margalla View Report

    31/32

    ANNEXURE

    Complete Progress Report of the Project

    Index of all NOC and Certification

    Brochure of Margalla View Housing Scheme

    Call Report 1

    Call Report 2

    Call Report 3

    Pictures of the Project Site

    Screen shots of software used