marine environmental & construction project management projects on time and within budget
TRANSCRIPT
Marine Environmental & Construction Project Management
Projects on time and within budget
O&G Construction-Marine ProjectsHarvey Solutions formed 2007Marine Environmental & Construction Project ManagementCliff Harvey-Owner/Director
Clients & Projects:1. Ocean Engineering Systems;
1. Hong Kong- Pipeline trenching, 2. Turkey (Marmara & Black Sea)
2. Woodside;1. Karratha-shore crossing & pipe pull2. Pipeline trenching3. Berth pocket blasting & dredging
3. Chevron-KJV;1. LNG access channel dredging2. MOF island construction reclamation3. Temporary island wharf construction
4. APLNG-Conocophillips1. 43% Gladstone LNG dredging & reclamation (~14 Mil cubes)2. Construction of Jetty, MOF, Landing ramps, ferry terminals, aggregate import and
export terminals
Environmental
• 10 years prawn farm construction, operation management, development & assesments
• Plume modelling and monitoring-– national & international
• Interface management/relationship development– Excellent track record with State, Federal agencies
• Marine transport (MSQ), regulation (AMSA), Parks (GBRMPA & DAFF)
• Hydrocarbon spill management– Marine & intertidal
Previous Projects: Hong KongTwin Pipeline burial
Previous Projects: Hong KongFleet management
500t Derrick Barge Hong Kong
Previous Projects: Hong KongPlant
Mixed air diving
Post-lay Trenching machine
Barge deck layoutOn the fly engineering
Previous Projects: Hong KongVessel & Plant import/export
Previous Projects: Business developmentCNG compressor distributorship Turkey
Concurrent contracts for Botas and VISCAS Turkey
Previous Projects: Pluto-material offload facility & berth pocketMarine Blasting
Previous Projects: Pluto Shore crossing Pipe pull
Previous Projects: Pluto Shore Crossing Backfill
Previous Projects: Pluto Shore Crossing Backfill
Previous Projects: Pluto BMF Dredging & Blasting
EnvironmentalSite management: (EMP’s)• Waste (WMP’s)
• General• Contaminated• Hard waste• Waste stream procedures and procedures
• Training of staff increasing awareness and behavioural change
• Interface management• Sub-contractor • Client
Oil spill management (>10m3)
River health assessments
Peak flow management
Plume management
Seabed Survey
Stairway to the moon