mark burgess, chief executive officer, australian police federation

28
Police Federation of Australia RadComms2013

Upload: acma-australian-communications-and-media-authority

Post on 20-Aug-2015

967 views

Category:

Business


0 download

TRANSCRIPT

Police Federation of Australia

RadComms2013

RadComm2013

Why Police and Emergency Services need modern mobile broadband communications?

RadComms2013

RadComm2013

RadComms2013

RadComms2013

RadComms2013

RadComms2013

RadComms2013

RadComms2013

RadComms2013

RadioCommunications Act 1992

RadComms2013

Factors in valuing spectrum

RadComms2013

RadComms2013

The argument about a dedicated public safety mobile broadband

network

RadComms2013

The committee recommends the Commonwealth Government allocate sufficient spectrum for dedicated broadband public protection and disaster relief (PPDR) radiocommunications in Australia.

RadComms2013

20MHz should be allocated to public safety in either the 700 or

800 band

Severity of the incident

» Data Dispatch» Automatic Vehicle Location» Records Lookup» Traffic Citations» Resource Tracking» Real-Time Field Supervision» Operational Video» Machine-to-Machine

» Fixed, Deployed, Enterprise, Vehicular Video

» Remote State,Fed Database Lookups

» Remote Applications » Fixed, Deployed Sensors» Detection of

CBRNE Threats» Personnel Information» Automated Vehicle Locations» Electronic Command Board» Fireground Management» Computer Aided Dispatch

» Tactical Video» Analytics» Perimeter Controls» Hazardous Materials» Data Dispatch» Automatic Vehicle Location» Records Lookup» Traffic Citations» Resource Tracking» Real-Time Field Supervision» Asset Management» Machine-to-Machine

Applications

Public Safety utilization of broadband resources will vary based on the nature and intensity of the incident

Traffic Stops,Patrol,Inspections

Demonstrations, Special Events,Hazardous Materials

Hurricane,Bridge Collapse,Major Fire

Day-to-DayOperations

Incident & Event Management

Catastrophic Incident

» Triage Applications» Telemetry» Internet Access» VoIP

Communications» Mobile Data» Asset Management» Evacuee Tracking

Applications Applications

PUBLIC SAFETY vs. CARRIER NETWORKCARRIER MODEL PUBLIC SAFETY MODEL

BUSINESS OBJECTIVE Revenue growth Protect life and property

CAPACITY DESIGN For “typical day” For “worst day”

COVERAGE DESIGN Based on population density Based on full geographic coverage

COMMUNICATIONS DESIGN One-to-one communications One-to-many and

Off-network communications

BROADBAND DATA NEED

Centralized Internet Access and Heavy Download

Distributed Access(Traffic is Locally Generated, Logged and Consumed with

Heavy Upload)

NETWORK RESILIENCY Commercial Grade Mission Critical Hardening

SERVICE PRIORITY DIFFERENTIATION Device or application only Dynamic Priority based

on Incident Type and User Role

SECURITYCONSIDERATIONS

Carrier ControlledDevice Authentication Only

Federated Agency-Based Identity Mgt.

User- based Authentication

RadComms2013

Did the Federal election change anything?

RadComms2013

“The PFA seeks your party’s commitment to provide a minimum of 20 MHz of the 700 or 800 MHz band spectrum for a dedicated mobile broadband network for Australia’s public safety agencies so that inter-operable communications become a reality across the nation”

RadComms2013

If elected, a Coalition government will conduct a rigorous cost-benefit analysis into the question of emergency services wireless communications and consider the most cost effective means of upgrading Australia’s law enforcement and emergency services mobile broadband network

RadComms2013

The Coalition will continue to carefully investigate this issue and seek to weigh the various competing public interests in consultation with stakeholders and State and Territory Governments.”

RadComms2013

On a social cost-benefit basis the benefits of assigning broadband spectrum to dedicated PPDR services on an exclusive basis far outweigh the costs as measured by opportunity cost

RadComms2013

There is justification on a cost-benefit basis for allocating the spectrum that is considered sufficient for national needs. In all cases the cost-benefit analysis seems to support a case for up to 20MHz and in every case except Singapore up to 30MHz if necessary.

RadComms2013

The decision would need to be based upon a realistic assessment in each country of what contribution broadband would make to reducing the risk of loss

RadComms2013

On a cost-benefit basis the opportunity cost is insufficient to justify market-based assignments of spectrum for PPDR purposes.

RadComms2013

PFA’s conclusions

RadComms2013

Thank you