ReMCoDS Discussion Request / Market Change Request
06/05/2015 Page 1 of 4 Discussion Request 1165
Discussion Request 1165
Market Design Process Diagrams &
Messages – conversion from ARIS to Document format
Status Issued to Market Priority High Status Date 06/05/2015
Date Version Reason for Change Version Status
06/01/2015 1.0 DR for the conversion of the Market Design from ARIS. This DR is the third (3 of 3) and final DR to approve the last remaining 11 of the 41 MPDs. Issued to Market.
Final
Part 1 DETAIL OF DISCUSSION REQUEST / MARKET CHANGE REQUEST
Requesting Organisation(s) RMDS Originating
Jurisdiction RoI
Request Originator Name Jessica Gregory Date Raised 06/05/2015
Classification of Request
Jurisdictional Applicability RoI Jurisdictional
Implementation RoI Specific
If jurisdictional implementation is for one jurisdiction only – is the
other jurisdiction required to effect any changes?
N/A Co-Ordinated Baseline
Version No. TBC
Change Type Non-Schema Impacting
Detail of Request Reason for Request
The RoI Retail Market currently uses ARIS, a Business Process Modelling tool, to display the Market Design (Market Process Diagrams, Market Messages, Market Segments and Codes and other documents relevant to the Market Design). In 2013 further to discussions with Market Participants and approval from CER, a decision was made to exit from ARIS. This aligns with the format in use by NIE and Gaslink. Due to the volume of MPDs and Market Messages to be converted multiple DR/MCRs are required:-
At the IGG on 26th
March 2014 DR 1145 was approved. The MCR was subsequently approved at the IGG on 28
th May 2015 which covered 21 of the 41 MPDs and these are available on the RMDS website.
At the IGG on 14
th January 2015 DR&MCR 1155 were approved. The MCR covered 9 of the 41 MPDs and
these are available on the RMDS website. This DR&MCR is intended to cover the final 11MPDs to be converted as well as documenting where all the documentation held in ARIS is now located on the RMDS website. This brings to a close the full transfer of all information held in ARIS to document format.
-
ReMCoDS Discussion Request / Market Change Request
06/05/2015 Page 2 of 4 Discussion Request 1165
Proposed Solution
This solution will be delivered by generating MPD documents and Market Messages using Visio diagrams incorporated into MSWord documents They will be generated into PDF format and published to the RMDS website for access by Market Participants. Market Messages will be drafted in Visio format as per their current structure in ARIS but generating the HTML from Visio and publishing to the web. These would facilitate the ability to drill down to Segments and Data Codes. This project will be delivered in three stages (this being the final DR) and a new DR/MCR will be drafted for each stage. As these MPDs were being drafted and converted there were some corrections identified that are also recorded in the History of Changes for each converted MPD. As this is the final DR/MCR related to the ARIS conversion it is necessary to summarise the overall changes in a project close-out document for future reference. This close-out document is embedded in this DR/MCR here and can also be found on the RMDS Website under the ARIS tab in the Retail Market Design main tab. The above document ensures that all items contained within ARIS were converted where necessary and located on the Retail Market Design section of the RMDS website. The ARIS conversion project required:-
ages for the Briefing Documents, Working Practices, Un-metered template. Market Message MPD Matrix,
The final 11 MPDs to be converted are listed below:-
MPD No. Name & File Material Changes from ARIS End to End PDF
01 Change of Supplier NQH MIC replaced with Connection Voltage
02 Change of Supplier QH Metered No
04 SoLR – Process Design Document SMO Changed to SEMO
07.1.1 New Distribution Connected Non-Participant Generator
No
08.1.1 Changes to Connection Characteristics SMO changed to TSO
08.1.2 Replace Export Arrangements with Submetering SEMO incorrectly referenced as a role in the swimlane in ARIS.
16.2.1 Data Aggregation SMO changed to SEMO. Changes to step 24. Changes documented in MCR0178 reflected in MPD.
21 MPD 21 – De-Registration SEMO incorrectly referenced as a role in the swimlane in ARIS, changed to TSO
28.1.2 New Unmetered Single Point Connection No
36.1.1 Change of Group MPRN CoS No
36.1.2 Change of Group No MPRN CoS No
Scope of Change
Jurisdiction Design
Documentation Business Process
DSO Backend System Change
MP Backend System Change
Tibco
Sup
plie
r
EM
MA
Sch
ema
Web
form
s
Ext
rane
t/NI
Mar
ket
Web
site
ROI ☐ ☒ ☐ ☐ ☐ ☐ ☐
☐ ☐ NI ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐
-
MARKET PROCESS DESIGN
MPD 01 – CoS NQH
-
MPD 01 CoS NQH Market Design Version 10.5
Page 2 of 23
TABLE OF CONTENTS
1. INTRODUCTION .......................................................................................................................................................................................................................... 3
1.1 SCOPE ............................................................................................................................................................................................................................... 3
1.2 HISTORY OF CHANGES ........................................................................................................................................................................................................ 3
2. PROCESS MAP ........................................................................................................................................................................................................................... 7
2.1 PROCESS DESCRIPTION .................................................................................................................................................................................................... 13
3. SUPPLEMENTARY INFORMATION .................................................................................................................................................................................... 19
-
MPD 01 CoS NQH Market Design Version 10.5
Page 3 of 23
1. Introduction
1.1 Scope
This Procedure describes the Change of Supplier (CoS) process.
1.2 History of Changes
This Procedure includes the following changes:-
Version in which last
change Implemented
Source of Change Description of Change Date of Version Release
Draft 235 Changes to Provisional Acceptance criteria for change of legal entity
Draft B14 Restriction on MCC Changes
Draft B21 CoS validation checks prior to sending 110 old Supplier notification
Draft B031 Implicit energisation during Registration process
Draft B039 Customer read may be provided as part of, or following, Registration
Draft B066 Read Date Management
Draft B067 Changes to validation rules and use of readings
Draft B093 Identification of CoS and withdrawn meter readings
Draft B097 Rejection of Customer Reads
Draft Removal of 103 flow to New Supplier to inform of delay in processing due to
need for additional information
Draft Further Changes since version 3.1
Draft B099 Energisation and meter works, where requested, will not be performed by
DSO till the objection period has expired
-
MPD 01 CoS NQH Market Design Version 10.5
Page 4 of 23
Version in which last
change Implemented
Source of Change Description of Change Date of Version Release
Draft B099 Updated to include Time-out rules
Draft
B110
Updated to include token meters
Draft MIG 3/9/03 Standardised on use of QH/NQH terminology
Draft Design Modified text to show that 252 MM is used to request a binding estimate
rather than 208 MM
Draft B138 Updated MPD to include processing of CoS requests mid way through meter
works.
Draft Updates arising from Supplier clarifications
Draft Proposed
Modification 3
Clarify diagram to show the route by which a request for a binding estimate is
processed
Draft B168 / Proposed
Modifications 1 & 2
Changes to handling of Customer Own Reads
Draft B193 – MIG
19/11/03
Updated text in section 3.1 to handle CoS at sites where QH metering is
required
Draft B204 / Written
Supplier Clarification
(MPD 14) 10
Updated to clarify that a Customer read received whilst a Scheduled Meter
Read Order is open will be used for DUoS Billing (Section 3.2)
Draft B192- MIG 28/11/03 Process updated to remove delay on meter works for expiry of objection
period.
Version 4.2 MCR 0021 Addition of New 105L MM (CoS Confirmation of Loss) sent to the Old
Supplier
-
MPD 01 CoS NQH Market Design Version 10.5
Page 5 of 23
Version in which last
change Implemented
Source of Change Description of Change Date of Version Release
Version 4.2 MCR 0010 Addition to Supplementary Information 3.1 : EAI must be valid and not blank
for sites over 30KVA
Version 4.2 MCR 0040 Updated text to Clarify wording around Page 10 (‘Where a Customer read is
requested then…..”)
Version 4.2 MCR 0024 Steps 14, 15 updated to clarify that a Registration Request will not be fully
accepted until all conditions for Provisional Acceptance have been met.
Version 4.3 DRR 0011 Updated to reflect the treatment of Special Reads used to dispute CoS reads
Version 5.1 MCR 0050 Addition to Supplementary Information-Modifications to CoS Readings
Process in CoS Loss Scenario.
Version 6.0 MCR 0088 Amended validation rules to allow for the New Supplier Unit ID, to satisfy
requirements of SEM implementation.
A Supplier Unit entity has been added to the Data Model and will be required
within CoS Processing and Market Messaging
Additional validation rules will be required surrounding Trading Site Supplier
Units.
This will necessitate changes to:-
Supplementary Information, Market Message structures, Data Definitions,
Reject Codes and Reasons.
Version 8.0 RMDS QA MPD clean-up: objects enlarged to make text readable, swimlane actors
shifted left, swimlanes tightened.
Version 8.0 MCR 0169 In Supplementary Info, inserted New text on warning about VC deletion. No
update to process flow.
Version 8.0a MCR 0161 Updated to reflect implementation of "MCR 0161 - Increasing the threshold for
connection agreement return". Changed references of threshold from "100
kVA" to "MV (Medium Voltage)" in Supplementary Information for this MPD.
Updated description of the step 'Check if prov. Acceptance is required'.
-
MPD 01 CoS NQH Market Design Version 10.5
Page 6 of 23
Version in which last
change Implemented
Source of Change Description of Change Date of Version Release
Version 10.2 MCR 1019 Updated Supplementary Information only to reflect implementation of MCR
1019. Section Processing of outstanding meter works requests updated to
include process where initial MRSO check shows an open Service Order for
De-Energisation and where the 010MM has a CoLE (either Explicit or
Implicit).
Version 10.5 MCR 1165 – Conversion of MPDs from ARIS to document format.
ARIS Process flow converted to Visio format and Step Table included. AIQ 2508- Supplementary Information reference to MIC replaced with Connection Voltage.
27.05.2015
-
MPD 01 CoS NQH Market Design Version 10.5
Page 7 of 23
2. Process Map
MPD 01 – CoS NQH
ES
B N
etw
ork
s O
ld S
up
plie
rN
ew
Su
pp
lie
r
Request
registration with
MRSO
1
New Supplier
requests Registration
of customer
Registration
invalid
x
010MM
2
Receive CoS request
Registration valid
3
Validate
Registration
4
Send Rejection to
New Supplier
102RMM
5
Receive Rejection
Message
6
Notify Old Supplier
V
110MM
7
Receive notification
of CoS
8
Check if Provisional
Acceptance required
Provisional
Acceptance not
required
x
Provisional
Acceptance
required
To step 14
To step 9
-
MPD 01 CoS NQH Market Design Version 10.5
Page 8 of 23
MPD 01 – CoS NQH
ES
B N
etw
ork
s O
ld S
up
plie
rN
ew
Su
pp
lie
r
14
Update CoS
Registration as
Accepted
V
9
Refer Provisional
Acceptance to
DSO
V
10
Send notification to
New Supplier of
Provisional
Acceptance
102PMM
11
Receive
Provisional
Acceptance
13
Re-energise and
take read if required
V
15
Send Acceptance
to New Supplier
102MM
16
Receives CoS
Registration
Acceptance
17
Determine if Meter
Works required
Meter works
not required
x
Meter works
required
From “Provisional
acceptance not required”
From “Provisional acceptance required”
To step 18
12Get Connection
Agreement if required
To step 22
-
MPD 01 CoS NQH Market Design Version 10.5
Page 9 of 23
MPD 01 – CoS NQH
ES
B N
etw
ork
s O
ld S
up
plie
rN
ew
Su
pp
lie
r
Read received
x
No read
received
19
Determine Special
Read requested
Special Read not
requested
x
Special Read
requested
20
Wait for scheduled
or customer read
V
21
Take Special
Read
New Supplier gets
Customer Read
23
Send Customer
read to MRSO
where not already
sent
210MM
24
Receive and
validate Customer
Read
Customer Read
not acceptable
x
Customer Read
acceptable
Take schedule
read as normal
25
Scheduled read
obtained
26
Validates &
processes
reading
x
To step31
To step 27
18
Determine if CoS
read received
22
Perform Meter
Works & take
read
From step 17
-
MPD 01 CoS NQH Market Design Version 10.5
Page 10 of 23
MPD 01 – CoS NQH
ES
B N
etw
ork
s O
ld S
up
plie
rN
ew
Su
pp
lie
r
Valid reading
Invalid reading
V
27
Determine if
Estimate allowed
Estimate allowed
x
Estimate not
allowed
28
Create estimate
29
Determine if DC
can obtain read
DC cannot obtain
read
x
DC can obtain
read
30
Get check read
Back to Step26
31
Register MPRN
with New Supplier
V 32Send confirmation of New CoS to New
Supplier
33
Receive confirmation
34
Send confirmation
of CoS to Old
Supplier
35
Receive confirmation
of CoS
36
Send readings to
New Supplier
320MM
37
Receive Reading
details and meter
point details
38
Send readings to
Old Supplier
39
Receive Reading
details and meter
point details
To step 26
From step 26
From step 26
310MM
105LMM
105MM
-
MPD 01 CoS NQH Market Design Version 10.5
Page 11 of 23
MPD 01 – CoS NQH
ES
B N
etw
ork
s O
ld S
up
plie
rN
ew
Su
pp
lie
r
Request Special
Read or binding
estimate
40
Send request for
special read/
estimate
252MM
Requests Special
Read or binding
estimate
42
Sends request for Special Read/estimate
252MM
43
Receives request
41
Receives request
V
Estimate required
x
Estimate not
required
44
Determine if binding
estimate required
45
Provide binding
estimate
V 54Receive
Replacement Read
46
Take special read
V
49
Produce Extrapolated
Estimate
Agree replacement
read
52
Send replacement
read
208MM
Agree Replacement
read
50
Send replacement
read
208MM
51
Read received
53
Received Read
Replacement
47
Send Special Read to
New Supplier
300SMM
48
Receive Special Read
To step 55/57
-
MPD 01 CoS NQH Market Design Version 10.5
Page 12 of 23
MPD 01 – CoS NQH
ES
B N
etw
ork
s O
ld S
up
plie
rN
ew
Su
pp
lie
r
V
55
Advise final CoS read
to Old Supplier
310MM
310WMM
56
Receive final CoS read
57
Advise final CoS read
to New Supplier
320MM
320WMM
58
Receive final CoS read
From step 54
V
V
-
MPD 01 CoS NQH Market Design Version 10.5
Page 13 of 23
2.1 Process Description
Process Step Role Process Step Description Interface
1 New Supplier requests Registration of
Customer
New Supplier The New Supplier provides a Registration Application, completed in accordance with the applicable rules, to Meter Registration System Operator (MRSO). The New
Supplier may provide a Customer reading to MRSO dated at, and as part of, the Registration Request. The Supplier is responsible for the validity of all information provided for the purposes of registering a Meter Point.
010 MM
2 Receive CoS request ESBN ESB Networks Ltd (ESBN) Receive Change of Supplier (CoS) Registration Request.
3 Validate Registration ESBN MRSO will validate the Registration in accordance with the applicable validation rules (see Supplementary Information).
Registration Invalid - Next Step 4
Registration Valid - Next Step 6
4 Send Rejection to New Supplier
ESBN Where Registration is rejected the requesting Supplier is informed of the Rejection with the reasons.
102R MM
5 Receive Rejection Message
New Supplier Supplier receives Rejection Message.
6 Notify Old Supplier ESBN If the Registration is not automatically rejected then MRSO will notify the old Supplier that a Registration has been received.
110 MM
7 Receive notification of CoS
Old Supplier Old Supplier receives notification of CoS.
8 Check if Provisional Acceptance required
ESBN MRSO checks to see if Provisional Acceptance is needed to progress the CoS. (See Supplementary Information for more details of validation checks.)
Provisional Acceptance not required - Next Step 14
Provisional Acceptance required - Next Step 9
9 Refer Provisional Acceptance to DSO
ESBN If the Registration is Provisionally accepted then MRSO will make available the Registration details to Distribution System Operator (DSO).
10 Send notification to New Supplier of Provisional Acceptance
ESBN If the Registration is Provisionally accepted the New Supplier will be informed of the Provisional Acceptance, with reasons.
102P
11 Receive Provisional Acceptance
New Supplier New Supplier Receives Provisional Acceptance.
-
MPD 01 CoS NQH Market Design Version 10.5
Page 14 of 23
Process Step Role Process Step Description Interface
12 Get Connection Agreement if required
ESBN ESBN receive Connection Agreement if required. DSO will obtain a connection agreement where a Registration has been accepted pending receipt of a connection agreement.
13 Re-energise and take read if required
ESBN DSO will provide changeover readings to MRSO as follows:-
A re-energisation reading if the meter point was de-energised.
A meter installation reading if no meters were previously installed.
Meter works reading associated with permitted MCC Changes in accordance with instructions from the Supplier.
Meter works reading associated with removal of token meter.
14 Update CoS Registration as Accepted
ESBN If the Registration is accepted, the New Supplier will be informed of the Acceptance. The Registration Request will not be fully accepted until all conditions for Provisional Acceptance have been met.
15 Send Acceptance to New Supplier
ESBN ESBN send Acceptance of Registration to New Supplier. 102 MM
16 Receive CoS Registration Acceptance
New Supplier New Supplier will receive CoS Registration Acceptance message.
17 Determine if Meter Works required
ESBN ESBN will Determine if Meter works required:-
If Meter Works not required - Next Step 18
If Meter Works required - Next Step 22
18 Determine if CoS read received
ESBN ESBN determine if CoS read received:-
If CoS read received - Next Step 26
If CoS read not received - Next Step 19
19
Determine Special Read requested
ESBN ESBN determine if Special Read Requested:-
If Special Read not requested - Next Step 20
If Special Read requested - Next Step 21
20 Wait for scheduled or
Customer read ESBN ESBN wait for Scheduled or Customer Read.
21
Take Special Read ESBN The Data Collector (DC) will collect Special Read in accordance with instructions
from the Supplier and make these available to MRSO.
Special Read obtained - Next Step 26
22 Perform Meter Works & take read
ESBN The DC will Perform Meter Works & take read and make these available to MRSO.
-
MPD 01 CoS NQH Market Design Version 10.5
Page 15 of 23
Process Step Role Process Step Description Interface
23 Send Customer read to MRSO where not already sent
ESBN The New Supplier may also provide a Customer reading to MRSO at any time subsequent to the Registration Request before the completion of the CoS.
210 MM
24
Receive and validate Customer Read
ESBN MRSO will reject the readings where Customer reads fail the following validation: - Readings cannot be matched to meters at the Meter Point.
Meter Point is a Maximum Demand site.
A complete set of readings is not provided.
Customer Read acceptable - Next Step 26
25 Scheduled read obtained
ESBN Scheduled Read obtained and passed to MRSO.
26
Validates & processes reading
ESBN MRSO will select and validate in accordance with the instructions provided by the
New Supplier meter change, Special, scheduled, re-energisation or Customer read for use as the CoS reading. This selection shall not be made before the required date (or scheduled date if a scheduled read was requested). Rules are described in the Supplementary Information.
If read is Valid - Next Step 31
If read is Invalid - Next Step 27
27
Determine if Estimate allowed
ESBN MRSO Determine if Estimate Allowed.
If Estimate is Allowed - Next Step 28
If Estimate is not Allowed - Next Step 29
28 Create estimate ESBN ESBN will generate Estimate Read - Next Step 31
29
Determine if DC can obtain read
ESBN ESBN will Determine if Data Collection (DC) can obtain Read.
DC can obtain read - Next Step 30
30
Get check read ESBN Where a scheduled read could not be obtained and an estimate is not allowable the DC will arrange for the provision of the non-chargeable Special Read to MRSO. The
DC may, at their option, (but not for MD sites) provide a Customer read.
Reading obtained - Back to Step 26
-
MPD 01 CoS NQH Market Design Version 10.5
Page 16 of 23
Process Step Role Process Step Description Interface
31
Register MPRN with New Supplier
ESBN
MRSO will complete the CoS, within the permitted period**, when the following are complete: -
Five days have elapsed after the notification to the old Supplier.
Any reasons for Provisional Acceptance have been resolved.
Any outstanding objection expires or is withdrawn.
A full set of valid CoS readings is available:- The CoS is completed using the effective reading date (The effective
reading date is the date that DSO collects the reading or, for a Customer read provided by the Supplier, the date specified by the Supplier) to determine the CoS date. The CoS will be effected at 00h00 on the CoS
date (The changeover date is, for a Customer, Special or scheduled read, the day following the read and for a meter exchange, the day of the meter exchange), meaning that consumption on that date will be provided to and settled by the New Supplier.
** The permitted period for a CoS is:- Where a scheduled read was requested, twenty days after the date of the
next scheduled reading date.
Where meter works or energisation has been requested and remains outstanding, an unlimited period is allowed for completion.
Forty days after the Registration Acceptance in all other cases where a CoS has not been completed five days prior to the permitted period then a warning report will be sent to the New Supplier.
32 Send confirmation of New CoS to New Supplier
ESBN MRSO will confirm the completion of the CoS to the New Supplier. 105 MM
33 Receive confirmation New Supplier New Supplier will receive confirmation of the CoS.
34 Send confirmation of CoS to old Supplier
ESBN MRSO will confirm the completion of the CoS to the Old Supplier. 105L MM
35 Receive confirmation of CoS
Old Supplier Old Supplier will receive confirmation of CoS.
36 Send readings to New Supplier
ESBN MRSO will send CoS Readings to New Supplier. 320 MM
37 Receive Reading details and Meter Point details
New Supplier New Supplier will receive reading details and meter details.
-
MPD 01 CoS NQH Market Design Version 10.5
Page 17 of 23
Process Step Role Process Step Description Interface
38 Send readings to Old Supplier
ESBN MRSO will send CoS readings to Old Supplier. 310 MM
39 Receive Reading details and Meter Point details
Old Supplier Old Supplier will receive reading and meter details.
40
Request for Special Read estimate
Old Supplier Either Supplier has the option to dispute a CoS reading by requesting a Special Read. This will be chargeable to the requesting Supplier if the original read proves to be valid. Alternatively, either Supplier may request a binding estimate as at the CoS date. Old Supplier sends request for Special Read to ESBN.
252 MM
41 Receives request ESBN ESBN receives Special Read request from Old Supplier.
42
Request for Special Read estimate
New Supplier Either Supplier has the option to dispute a CoS reading by requesting a Special Read. This will be chargeable to the requesting Supplier if the original read proves to be valid. Alternatively, either Supplier may request a binding estimate as at the CoS date. New Supplier sends request for Special Read to ESBN.
252 MM
43 Receives request ESBN ESBN receives Special read request from New Supplier.
44
Determine if binding estimate required
ESBN MRSO determine if binding estimate is required.
If Estimate is required - Next Step 45
If Estimate is not required - Next Step 46
45 Provide binding estimate
ESBN Where requested, MRSO will provide a binding estimate for use as the Replacement Read.
46 Take Special Read ESBN Where requested, the DC will arrange for the provision of a Special Read to MRSO.
47 Send Special Read to New Supplier
ESBN Where a Special Read has been provided by the DC for the purposes of a CoS read dispute MRSO will provide the Special Read to the new Supplier.
300S MM
48 Receive Special Read New Supplier New Supplier receives Special Read.
-
MPD 01 CoS NQH Market Design Version 10.5
Page 18 of 23
Process Step Role Process Step Description Interface
49
Produce Extrapolated Estimate
ESBN Where a Special Read has been provided by the DC for the purposes of a CoS read dispute then MRSO will use this Special Read to extrapolate an estimate as at the original read date.
50 Send Replacement Read
New Supplier Either Supplier has the option to dispute a CoS reading by providing a Replacement Read. New Supplier sends a Replacement Read.
208 MM
51 Read received ESBN ESBN receive Replacement Read from New Supplier.
52 Send Replacement Read
Old Supplier Either Supplier has the option to dispute a CoS reading by providing a Replacement Read. Old Supplier sends a Replacement Read.
208 MM
53 Receives Replacement Read
ESBN ESBN receives Replacement Read from Old Supplier.
54
Receives all Replacement Read
ESBN MRSO will replace the change of supplier read, in accordance with Supplier instructions, with:-
• An estimate as at the CoS date calculated from the Special Read • An estimate as at the CoS date, provided this is agreed by both Suppliers • A Replacement Read provided by an Old or New Supplier provided this is agreed by both Suppliers • A dispute concerning a CoS meter reading does not affect the CoS date. The original readings are withdrawn and Replacement Reads will be provided to the Old and New Suppliers.
55 Advise final CoS read to Old Supplier
ESBN Market Message 310 issues with the Replacement Read. Market Message 310W withdraws original CoS reading.
310 MM 310W MM
56 Receive final CoS read
Old Supplier Old Supplier receives withdrawal of agreement CoS and Replacement final Read.
57 Advise final CoS read to New Supplier
ESBN Market Message 320 issues with the Replacement Read. Market Message 320W withdraws original CoS reading.
320 MM 320W MM
58 Receive final CoS read
New Supplier New Supplier receives final CoS read.
-
MPD 01 CoS NQH Market Design Version 10.5
Page 19 of 23
3. Supplementary Information
Registration Validation Rules for a CoS (NQH Settled)
Failure of the following validations will cause the Registration to be rejected:-
The Supplier must have provided all mandatory information.
The MPRN must have been assigned and not terminated.
The Supplier ID is a valid one and the Supplier has a DUoS agreement.
The Supplier must be entitled to register a Meter Point under the legislation and in accordance with the Trading and Settlement Code.
The Supplier must warrant that a supply agreement exists with the Customer at the Meter Point being registered. The Supplier must provide a Supplier Unit that is valid for the Supplier.
The Supplier Unit must not be a Trading Site Supplier Unit.
The Supplier must provide a sub-aggregation code (SSAC) that is valid for the Supplier Unit and for the class of metering.
A separate CoS may not be in progress for this meter point.
A CoS was completed with an effective date less than twenty days before the required date for the requested Change of Supply. This rule does not apply if the CoS includes a change of tenancy or legal entity.
Any Meter Configuration change request must be from the list of permitted Meter Configuration code changes. In cases where the change requires a wiring certificate, connection agreement or quotation then the Meter Configuration change is not permitted. If a Meter Configuration change is not permitted then the CoS must be completed before the Meter Configuration change can be considered. The
New Supplier will be required to submit a separate meter works request.
The read arrangements for the CoS are valid.
A Customer read is not allowable for a Maximum Demand site. Required date must be no more than forty days after the Registration receipt (required date is not required for a scheduled read).
Required date is mandatory if a Customer read is to be used and may not be more than three days prior to receipt date. Required date must provide at least five days notice for a Special Read or meter works site visit.
Meter point is listed as eligible to change Supplier only if QH metering is installed and QH metering and communications have not yet been installed. In this instance DSO will be requested to prioritise QH meter and communications installation and, following this, the Supplier will be asked to re-submit the Registration as a QH Metered Registration.
EAI must be valid & not blank for sites over 30Kva.
Failure of the following validations will cause the Registration to be rejected unless the DSO agrees that the exception is allowable:-
Meter Point Address advised by Supplier is materially inconsistent with Meter Point Address known to MRSO. DSO may accept or reject the New address submitted by the Supplier.
Failure of the following validations will cause the Registration to be Provisionally accepted, unless rejected above, pending approval by the DSO:-
The Meter Point is de-energised. In this case the CoS will be effected using the re-energisation reading.
-
MPD 01 CoS NQH Market Design Version 10.5
Page 20 of 23
The Connection Voltage is equal to or exceeds MV (Medium Voltage) and there is no Connection Agreement in place or there is a change of Customer name or registered company number. In this case the DSO must confirm the existence of a signed Connection Agreement before the Registration is accepted.
A token meter is installed. In this case the DSO is requested to remove the token meter and the CoS is effected using the readings taken at removal.
Requests for the use of a scheduled, Customer or Special Read will be cancelled.
Treatment of Requests for Estimates
An estimate is not allowable for Maximum Demand sites or where there has been no actual read in the previous twelve months. In these circumstances
MRSO will disregard a request for an estimate but shall not reject the Registration.
CoS Read Selection
MRSO will endeavour to select a CoS reading in accordance with the instructions of the New Supplier.
However, the following situations can occur:-
Where a Customer Read is requested then:-
If a meter works, re-energisation or Special Read becomes available in the five days following the required date then this will be selected and used in preference to a Customer reading.
If a Customer reading is requested but not provided & validated with the Registration Request then if no valid reading becomes available in the five days following the required date the MRSO will estimate a reading, dated at the required date, if an estimate is allowable and the New Supplier has indicated an estimate is acceptable.
A Customer reading provided by a Supplier may not be dated more than three days prior to the DSO receipt date.
An estimate shall not be used in preference to a Customer reading.
Where a Special Read is requested but does not become available within five days of the required date, then:-
If a meter works, re-energisation or scheduled read is available in the five days following the required date then this will be selected and used.
If no valid reading becomes available in the five days following the required date the MRSO will estimate a reading, dated at the required date, if an estimate is allowable and the New Supplier has indicated an estimate is acceptable.
-
MPD 01 CoS NQH Market Design Version 10.5
Page 21 of 23
Where a Scheduled Read is requested the following should be noted:-
If a scheduled read which is usable for a CoS is collected during the five day objection period, MRSO will not issue a 300 MM for this reading and then withdraw it when the CoS is completed subsequently.
Similarly where an estimate is used the 305 MM is not sent and subsequently withdrawn. These CoS readings are sent only on the 310 MM / 320 MM.
If the New Supplier indicates 'No' to an estimate, and the read is an estimate, a 305 MM will issue to the Old Supplier and then be withdrawn if the New Supplier subsequently agrees to use the estimate for the CoS. (The estimate could result from a planned estimated read, or an implausible Scheduled Read or Customer Read which is subsequently adjusted to an estimate.)
If the site is Provisionally accepted, and a read is received while awaiting for conditions to be met, the 300 MM / 305 MM will issue to the existing Supplier (Old Supplier) and when the conditions are met and complete the COS back to the read - we will withdraw the 300 MM / 305 MM and issue 310 MM to the old Supplier.
The issue of 300 MM / 305 MM is suppressed by means of a billing block. The billing block can be removed manually by a user. Where a user
does remove the billing block while the CoS is still in progress, a 300 MM / 305 MM will issue and then subsequently be withdrawn if used for
the CoS.
Where a Scheduled Read is requested then while the meter reading order is open:-
If a meter works, re-energisation or Special Read becomes available then this will be used for the CoS.
If a Customer read becomes available and is allowable then the Customer read will be used for the CoS.
Where a Scheduled Read is requested, but the meter reading order is closed and no reading has been obtained then:-
If a Customer read becomes available and is allowable then the Customer read will be used for the CoS.
If an estimate is not allowable because the site is a Maximum Demand site MRSO will request a non-chargeable Special Read.
If an estimate is allowable MRSO will estimate a reading, dated at the scheduled read date, for use as the CoS reading.
Where no reading becomes available or can be estimated under the above rules then MRSO will inform the New Supplier of the situation.
If an estimate is not allowable because there has been no read in the previous twelve months, then the Supplier may either:- o Provide a Customer read. o Provide an access arrangement to allow DSO to collect a non-chargeable Special Read.
In other circumstances the Supplier should contact MRSO to determine an alternative read arrangement.
-
MPD 01 CoS NQH Market Design Version 10.5
Page 22 of 23
An estimate is not allowable for Maximum Demand sites or where there has been no actual read in the previous twelve months.
Change of Read Arrangements
If a Supplier opts to alter the read arrangements for a CoS read then, provided a valid read has not already been obtained and the New
arrangements are valid the MRSO will instruct DSO accordingly.
Processing of outstanding Meter Works requests
When a CoS request is received by MRSO a check will be made for any open service orders. Where such orders exist, MRSO will manually
notify both the old and New Supplier of any outstanding Meter Works or de-energisation request. As a result of this notification then:-
The Old Supplier may cancel the work order subject to the applicable DSO/MO rules. In this case the New Supplier will be informed of the cancellation of the work order.
The New Supplier may cancel the Registration Request.
In the event that neither Supplier cancels their request, both the meter work and CoS proceed as normal then the Old Supplier will remain
liable for any charges arising from the work they have requested.
Treatment of Medical Equipment Special Needs
Special arrangements are in place for the management of Medical Equipment Special Needs (MESN) flags during COS operations which are
not also COLE. These arrangements include the restoration of previous MESN flags in cases where completed COS operations are
subsequently cancelled and MESN details could otherwise have been lost. These arrangements relate only to the two Medical Equipment
Special Needs (MESN) flags of Life Support (0003) and Non-Life Support (0004) and do not affect Customer Service Special Needs (CSSN)
flags.
Specifically:-
1. Where there is an MESN associated with an existing Customer and the 010 MM submitted includes an MESN, the existing MESN will be deleted and replaced with the submitted MESN value and VCAttributeDeleted=”false” will appear on the 102 MM.
2. Where there is an MESN associated with an existing Customer and the 010 MM submitted does not include an MESN, the existing MESN will be deleted and VCAttributeDelete=”true” will appear on the 102 MM.
-
MPD 01 CoS NQH Market Design Version 10.5
Page 23 of 23
3. The presence or absence of CSSN flags, either associated with an existing Customer or submitted on the 010 MM, will not impact in any way on the processing of MESNs above. For example, if an MESN is associated with an existing Customer and only CSSN flags are submitted on the 010, then a warning message will issue as in point 2 above.
In summary,
The deletion of an MESN will always be flagged where no Replacement MESN has been submitted on the 010 MM.
The deletion of CSSNs is done without warning.
The deletion of MESN flags is effective only when the CoS completes. If the CoS is subsequently cancelled after completion, the previous
MESN value, if any, is restored.
walshe_dFile AttachmentMPD 01 CoS NQH.pdf
-
MPD 01 – CoS NQH E
SB
Ne
two
rks
Old
Su
pp
lie
rN
ew
Su
pp
lie
r
Request
registration with
MRSO
1
New Supplier
requests Registration
of customer
Registration
invalid
x
010MM
2
Receive CoS request
Registration valid
3
Validate
Registration
4
Send Rejection to
New Supplier
102RMM
5
Receive Rejection
Message
6
Notify Old Supplier
V
110MM
7
Receive notification
of CoS
8
Check if Provisional
Acceptance required
Provisional
Acceptance not
required
x
Provisional
Acceptance
required
14
Update CoS
Registration as
Accepted
V
9
Refer Provisional
Acceptance to
DSO
V
10
Send notification to
New Supplier of
Provisional
Acceptance
102PMM
11
Receive
Provisional
Acceptance
13
Re-energise and
take read if required
V
15
Send Acceptance
to New Supplier
102MM
16
Receives CoS
Registration
Acceptance
17
Determine if Meter
Works required
Meter works
not required
x
Meter works
required
12Get Connection
Agreement if required
Read received
x
No read
received
19
Determine Special
Read requested
Special Read not
requested
x
Special Read
requested
20
Wait for scheduled
or customer read
V
21
Take Special
Read
New Supplier gets
Customer Read
23
Send Customer
read to MRSO
where not already
sent
210MM
24
Receive and
validate Customer
Read
Customer Read
not acceptable
x
Customer Read
acceptable
Take schedule
read as normal
25
Scheduled read
obtained
26
Validates &
processes
reading
x
18
Determine if CoS
read received
22
Perform Meter
Works & take
read
Valid reading
Invalid reading
V
27
Determine if
Estimate allowed
Estimate allowed
x
Estimate not
allowed
28
Create estimate
29
Determine if DC
can obtain read
DC cannot obtain
read
x
DC can obtain
read
30
Get check read
Back to Step26
31
Register MPRN
with New Supplier
V 32Send confirmation of New CoS to New
Supplier
33
Receive confirmation
34
Send confirmation
of CoS to Old
Supplier
35
Receive confirmation
of CoS
36
Send readings to
New Supplier
320MM
37
Receive Reading
details and meter
point details
38
Send readings to
Old Supplier
39
Receive Reading
details and meter
point details
310MM
105LMM
105MM
Request Special
Read or binding
estimate
40
Send request for
special read/
estimate
252MM
Requests Special
Read or binding
estimate
42
Sends request for Special Read/estimate
252MM
43
Receives request
41
Receives request
V
Estimate required
x
Estimate not
required
44
Determine if binding
estimate required
45
Provide binding
estimate
V 54Receive
Replacement Read
46
Take special read
V
49
Produce Extrapolated
Estimate
Agree replacement
read
52
Send replacement
read
208MM
Agree Replacement
read
50
Send replacement
read
208MM
51
Read received
53
Received Read
Replacement
47
Send Special Read to
New Supplier
300SMM
48
Receive Special Read
V
55
Advise final CoS read
to Old Supplier
310MM
310WMM
56
Receive final CoS read
57
Advise final CoS read
to New Supplier
320MM
320WMM
58
Receive final CoS read
V
V
Last change made at Version 10.5
On 27th
May 2015
MPD 01 CoS NQH End to End.vsd
Page-1
walshe_dFile AttachmentMPD 01 CoS NQH End to End.pdf
-
MARKET PROCESS DESIGN
MPD 02 – Change of Supplier QH
-
MPD 02 CoS QH Market Design Version 10.5
Page 2 of 12
TABLE OF CONTENTS
1. INTRODUCTION .......................................................................................................................................................................................................................... 3
1.1 SCOPE ............................................................................................................................................................................................................................... 3
1.2 HISTORY OF CHANGES ........................................................................................................................................................................................................ 3
2. PROCESS MAP ........................................................................................................................................................................................................................... 6
2.1 PROCESS DESCRIPTION ...................................................................................................................................................................................................... 8
3. SUPPLEMENTARY INFORMATION ........................................................................................................................................................................................ 11
-
MPD 02 CoS QH Market Design Version 10.5
Page 3 of 12
1. Introduction
1.1 Scope
2 This Procedure describes the Change of Supplier QH.
2.1 History of Changes
This Procedure includes the following changes:-
Version in which last change
Implemented
Source of Change Description of Change Date of Version Release
Draft 235 Changes to Provisional Acceptance criteria for Change of legal entity
Draft B037 Message 010 is used for Registrations
Draft B041 Removal of customer type
Draft B041 Removal of 103 flow to New Supplier to inform of delay in processing
due to need for additional information
Further Changes since version 3.1
Draft MIG September 3rd Standardisation of use of QH/NQH Terminology
Draft Written Supplier
Clarifications 4
Updated text on page 6 to Provisionally Accepted rather than
Registration
Draft Written Supplier
Clarifications 2
Updated section on MPRN assignment (Page 4)
Changes applied after version 4.1
Version 4.2 MCR 0010 Update to include business rules re: provision of EAI code. The
validation of EAI on 010 Message is included
-
MPD 02 CoS QH Market Design Version 10.5
Page 4 of 12
Version in which last change
Implemented
Source of Change Description of Change Date of Version Release
Version 6.0 MCR 0094 Amendments to MDP2 to satisfy new requirements of SEM
implementation regarding the Supplier Unit ID and additional
validation rules and processing required surrounding Trading Sites.
This will necessitate changes to :-
ARIS Process Flow Diagram (ARIS screenshot)
ARIS Process Flow Diagram – Supporting Text
Supplementary Information
Market Messages
Web-Form
Version 6.1 MCR 0145 Update to the validation rules within MPD 2 – QH CoS
Supplementary Information
Version 8.0 RMDS QA No business changes applied. MPD clean-up: objects enlarged to
make text readable, swimlane actors shifted left, swimlanes tightened.
Version 8.0a MCR 0161 Updated to reflect implementation of "MCR 0161 - Increasing the
threshold for connection agreement return". Changed references of
threshold from "100 kVA" to "MV (Medium Voltage)" in Supplementary
Information for this MPD. Updated description of the step 'Check if
prov. Acceptance is required'.
Version 10.2 MCR 1019 Supplementary Information only updated with section for Processing
of outstanding Meter Works Requests. This section has been
updated to include process where initial MRSO check shows an open
Service Order for De-Energisation and where the 010MM has a CoLE
(either Explicit or Implicit).
-
MPD 02 CoS QH Market Design Version 10.5
Page 5 of 12
Version in which last change
Implemented
Source of Change Description of Change Date of Version Release
Version 10.5 MCR 1165 – Conversion
of MPDs from ARIS to
document format.
ARIS Process flow converted to Visio format and Step Table included.
AIQ 2930 - Supplementary Information reference to MIC replaced with
Connection Voltage
27.05.2015
-
MPD 02 CoS QH Market Design Version 10.5
Page 6 of 12
2. Process Map
MPD 02 – CoS QH E
SB
Ne
two
rks
Old
Su
pp
lie
rN
ew
Su
pp
lie
rT
SO
SE
MO
Request MPRN
registration with
MRSO
1
New Supplier
requests
Registration of
Customer
Registration
invalid
x
010MM
2
Receive CoS
request
Registration
valid
5
Validate
Registration
6
Send rejection to
New Supplier
7
Receive 102R
Rejection
8
Notify Old Supplier
V
110MM
9
Receive notification
of CoS
10
Check if Provisional
Acceptance
required
x
V
Agreed Procedure 1
3
Inform MRSO of
updated Wholesale
Market Registration
details
Provisional
Acceptance not
required
Provisional
Acceptance
required
11
Refer Provisional
Acceptance to
DSO
V
12
Send notification to
New Supplier of
provisional
acceptance
Notify new
Supplier
102PMM
13
Receive
Provisional
Acceptance
Refer Provisional
Acceptance to
DSO
14
Get Connection
Agreement if
required
To step 15
To step 16
4
Receive Updated
Wholesale Market
Registration details
102RMM
-
MPD 02 CoS QH Market Design Version 10.5
Page 7 of 12
MPD 02 – CoS QH
ES
B N
etw
ork
s O
ld
Su
pp
lie
rN
ew
Su
pp
lie
rT
SO
SE
MO
15
Re-energise if
required
16
Update CoS
Registration as
Accepted
17
Send Acceptance
to Supplier
V
102MM
18
Receives CoS
Registration
Acceptance
19
Register MPRN with
New Supplier as per
required exchange
date
20
Determine if CoS
was for a Trading
Site
CoS was not for
Trading Site
x
CoS was for
Trading Site
V
V
105LMM
22
Receives CoS
Confirmation
25
Send Confirmation
of new CoS to New
Supplier
23
Send Meter
Technical details to
New Supplier
331MM
24
Receive Meter
details
26
Receives CoS
Confirmation
27
Send Confirmation
of CoS to TSO
105MM
28
Receives CoS
Confirmation
29
Send Confirmation
of CoS to SeMO
email
30
Receive CoS
Confirmation
From step 14
105MM
21
Send Confirmation
of CoS to Old
Supplier
From step 10
-
MPD 02 CoS QH Market Design Version 10.5
Page 8 of 12
3. Process Description
Process Step Role Process Step Description Interface
1 New Supplier requests Registration of Customer
New Supplier The new Supplier provides a Registration application, completed in accordance with the applicable rules, to Meter Registration System Operator (MRSO). The Supplier is responsible for the validity of all information provided for the purposes of registering a Meter Point.
010MM
2 Receive CoS request ESBN MRSO receive Change of Supplier (CoS) Registration request.
3 Inform MRSO of updated Wholesale Market Registration details
SEMO Single Electricity Market Operator (SEMO) informs MRSO of updated Wholesale Market Registration details per Agreed Procedure 1.
4 Receive Updated
Wholesale Market
Registration details
ESBN ESB Networks Ltd (ESBN) receives updated Wholesale Market Registration Details from SEMO.
5 Validate Registration ESBN MRSO will validate the Registration in accordance with the applicable validation rules (see section Supplementary Information).
If Registration Invalid - Next Step 6
If Registration is Valid - Next Step 8 & 10
6 Send rejection to New Supplier
ESBN Where the Registration is rejected the requesting Supplier is informed of the Rejection with the reasons.
102R MM
7 Receive rejection Message
New Supplier New Supplier receives Rejection Message.
8 Notify Old Supplier ESBN If the Registration is not automatically rejected then MRSO will notify the old Supplier that a Registration has been received.
110 MM
9 Receive notification of CoS
Old Supplier Old Supplier receives notification of CoS.
10 Check if Provisional Acceptance required
ESBN MRSO will check to see if Provisional Acceptance is needed to progress the CoS. (See Supplementary Information for more details of validation checks).
If Provisional Acceptance is not required - Next Step 16
If Provisional Acceptance is required - Next Step 11
-
MPD 02 CoS QH Market Design Version 10.5
Page 9 of 12
Process Step Role Process Step Description Interface
11 Refer Provisional Acceptance to DSO
ESBN If the Registration is Provisionally Accepted then MRSO will make available the Registration details to Distribution System Operator (DSO) and notify New Supplier.
Notify New Supplier - Next Step 12
Refer Provisional Acceptance to DSO - Next Step 14
12 Send notification to New Supplier of Provisional Acceptance
ESBN If the Registration is Provisionally Accepted the New Supplier will be informed of the Provisional Acceptance, with reasons.
102P MM
13 Receive Provisional Acceptance
New Supplier New Suppler receives Provisional Acceptance Notification.
14 Get Connection Agreement if required
ESBN DSO will get Connection Agreement if required.
15 Re-energise if required ESBN Where a Registration is Provisionally Accepted pending energisation, and providing a Connection Agreement has been agreed, then DSO will energise the site.
16 Update CoS Registration as Accepted
ESBN MRSO will update CoS Registration as Accepted.
17 Send Acceptance to Supplier
ESBN If the Registration is accepted the New Supplier will be informed of the Acceptance. The Registration request will not be fully accepted until all conditions for Provisional Acceptance have been met.
102 MM
18 Receives CoS Registration Acceptance
New Supplier New Supplier receives CoS Registration Acceptance.
19 Register MPRN with New Supplier as per required exchange date
ESBN MRSO will complete the CoS, within the permitted period, when all the following are satisfied:-
Five days have elapsed after the notification to the old Supplier.
Metering and communications are in place and the details are recorded sufficient to allow QH data processing and aggregation to take place
Any necessary connection agreement is in place.
20 Determine if CoS was for a Trading Site
ESBN MRSO will determine if CoS was for a Trading Site.
If CoS is not for a Trading Site - Next Step 21, 23, 25 & 27
If CoS is for a Trading Site - Next Step 29
-
MPD 02 CoS QH Market Design Version 10.5
Page 10 of 12
Process Step Role Process Step Description Interface
21 Send Confirmation of CoS to Old Supplier
ESBN MRSO will confirm the completion of the CoS to the Old Supplier and New Supplier. 105L MM
22 Receives CoS confirmation
Old Supplier Old Supplier receives CoS Confirmation.
23 Send Meter Technical details to New Supplier
ESBN MRSO will send Meter Technical details to New Supplier. 331 MM
24 Receive Meter details New Supplier New Supplier receives meter details.
25 Send Confirmation of new CoS to New Supplier
ESBN MRSO will send confirmation of new CoS to New Supplier. 105 MM
26 Receives CoS Confirmation
New Supplier New Supplier receives confirmation of new CoS.
27 Send Confirmation of CoS to TSO
ESBN MRSO will send Confirmation of CoS to TSO. 105 MM
28 Receives CoS Confirmation
ESBN TSO receives confirmation of CoS.
29 Send Confirmation of CoS to SEMO
ESBN MRSO send Confirmation of CoS, via email, to SEMO. Email
30 Receive CoS confirmation
ESBN SEMO will receive an email Confirmation of new CoS.
-
MPD 02 CoS QH Market Design Version 10.5
Page 11 of 12
4.0 Supplementary Information
Registration Validation Rules for a Change of Supplier (QH Metered)
Failure of the following validations will cause the Registration to be rejected.
The Supplier must have provided all mandatory information.
The MPRN must have been assigned and not terminated.
The Supplier Id is a valid one and the Supplier has a DUoS agreement.
The Supplier must be entitled to register a Meter Point under the legislation and in accordance with the Trading and Settlement Code.
The Supplier must warrant that a supply agreement exists with the customer at the Meter Point being registered.
The Supplier must provide a Supplier Unit that is valid for the Supplier.
The Supplier must provide a sub-aggregation code (SSAC) that is valid for the Supplier Unit and for the class of metering.
Where the CoS contains a Trading Site the Registration Request must be consistent with the Wholesale Market Registration details.
The required date must be no less than five and no more than forty days after the Registration receipt date.
The Supplier may not provide a read arrangement.
A separate Change of Supplier may not be in progress for this meter point.
A Change of Supplier was completed with an effective date less than 20 days before the required date for the requested Change of Supply. This rule does not apply if the Change of Supplier includes a change of tenancy or legal entity.
Meter point is listed as eligible to change Supplier only if QH metering is installed and QH metering and communications have not yet been installed. In this instance DSO will be requested to prioritise QH meter and communications installation and, following this, the Supplier will be asked to re-submit the Registration as a QH Metered Registration.
EAI must be valid and not blank for sites over 30kVA.
Failure of the following validations will cause the Registration to be rejected unless the new information is approved by the Distribution
System Operator:-
Meter Point Address advised by Supplier is materially inconsistent with Meter Point Address known to MRSO. DSO may accept or reject the new address submitted by the Supplier.
-
MPD 02 CoS QH Market Design Version 10.5
Page 12 of 12
Failure of the following validations will cause the Registration to be Provisionally Accepted, unless rejected above, pending approval by the
DSO:-
The Meter Point is de-energised. In this case the Change of Supplier will be effected upon re-energisation.
The MIC is equal to or exceeds MV (Medium Voltage) and there is no Connection Agreement in place or there is a change of customer name or registered company number. In this case the DSO must confirm the existence of a signed Connection Agreement before the Registration is accepted.
CoS for Generators
The market process as detailed for Change of Supplier Quarter Hourly sites can also be applied to Participant and Non Participant
Generators.
walshe_dFile AttachmentMPD 02 CoS QH.pdf
-
MPD 02 – CoS QH E
SB
Ne
two
rks
Old
Su
pp
lie
rN
ew
Su
pp
lie
rT
SO
SE
MO
Request MPRN
registration with
MRSO
1
New Supplier
requests
Registration of
Customer
Registration
invalid
x
010MM
2
Receive CoS
request
Registration
valid
5
Validate
Registration
6
Send rejection to
New Supplier
7
Receive 102R
rejection
8
Notify Old Supplier
V110MM
9
Receive notification
of CoS
10
Check if Provisional
Acceptance
required
x
V
Agreed Procedure 1
3
Inform MRSO of
updated Wholesale
Market Registration
details
Provisional
Acceptance not
required
Provisional
Acceptance
required
11
Refer Provisional
Acceptance to
DSO
V
12
Send notification to
New Supplier of
Provisional
Acceptance
Notify new
Supplier
102PMM
13
Receive
Provisional
Acceptance
Refer Provisional
Acceptance to
DSO
14
Get Connection
Agreement if
required
4
Receive Updated
Wholesale Market
Registration details
102RMM
15
Re-energise if
required
16
Update CoS
Registration as
Accepted
17
Send Acceptance
to Supplier
V102MM
18
Receives CoS
Registration
Acceptance
19
Register MPRN with
New Supplier as per
required exchange
date
20
Determine if CoS
was for a Trading
Site
CoS was not for
Trading Site
x
CoS was for
Trading Site
V
V
105LMM
22
Receives CoS
confirmation
25
Send Confirmation
of new CoS to New
Supplier
23
Send Meter
Technical details to
New Supplier
331MM
24
Receive Meter
details
26
Receives CoS
Confirmation
27
Send Confirmation
of CoS to TSO
105MM
28
Receives CoS
confirmation
29
Send Confirmation
of CoS to SeMO
email
30
Receive CoS
confirmation
105MM
21
Send Confirmation
of CoS to Old
Supplier
Last change made at Version 10.5
On 27th
May 2015
MPD 02 CoS QH End to End.vsd
Page-1
walshe_dFile AttachmentMPD 02 CoS QH End to End.pdf
-
MARKET PROCESS DESIGN
MPD 04 – Supplier of Last Resort (SoLR)
-
MPD 04 SoLR Market Design Version 10.5
Page 2 of 14
TABLE OF CONTENTS
1. INTRODUCTION .................................................................................................................................................................................................................................... 3
1.1 SCOPE ..................................................................................................................................................................................................................................................... 3
1.2 HISTORY OF CHANGES ........................................................................................................................................................................................................................... 3
2. PROCESS MAP ..................................................................................................................................................................................................................................... 5
2.1 PROCESS DESCRIPTION ......................................................................................................................................................................................................................... 9
3. SUPPLEMENTARY INFORMATION ............................................................................................................................................................................................. 13
-
MPD 04 SoLR Market Design Version 10.5
Page 3 of 14
1. Introduction
1.1 Scope
This Procedure describes the process for the Supplier of Last Resort.
1.2 History of Changes
This Procedure includes the following changes:-
Version in which last change
Implemented
Source of Change Description of Change Date of Version Release
Draft MIG September 17th Standardised on use of QH/NQH Terminology – Change applied
since Version 3.1
Draft MIG September 17th Updated diagram to show 210 flow (already included in text)
Updates arising from Supplier Clarification sessions
Draft Clarification 1 Update to scope of process.
Draft Written Supplier
Clarifications
All references to Profile/Non profile replaced by QH/NQH
Version 4.2 MCR 0021 Addition of New Market Message 105L sent to the Old Supplier
Version 5.0 DRR 0087 Amendments to text to cater for Single Point Unmetered & QH Sites
Version 6.0 MCR 0116 Amendments to satisfy a new requirement of SEM implementation to
inform the SEMO where there is a reversion to Supplier of Last
Resort for a Trading Site.
This will necessitate changes to:-
ARIS Process Flow Diagram
Supplementary Information
Version 8.0 RMDS QA No business changes applied. MPD clean-up: objects enlarged to
make text readable, swimlane actors shifted left, swimlanes tightened.
-
MPD 04 SoLR Market Design Version 10.5
Page 4 of 14
Version in which last change
Implemented
Source of Change Description of Change Date of Version Release
Version 9.0 Non-Conformance (AIQ-
1768 - Non-conformities
relating to MCR 162)
MPD 04 updated to align with MCR 162 and also to reflect recent
(March '11) discussions with MRSO on how the process actually
operates.
Version 10.5 MCR 1155 – Conversion of MPDs from ARIS to document format.
ARIS Process flow converted to Visio format and Step Table included. Swimlane name amended from Alternative Supplier to Alternative Suppliers. Changed from SMO to SEMO.
27.05.2015
-
MPD 04 SoLR Market Design Version 10.5
Page 5 of 14
2. Process Map
MPD 04 – SoLR E
SB
Ne
two
rks
So
LR
Alt
ern
ati
ve
Su
pp
lie
rsC
us
tom
er
TS
OS
EM
OD
efa
ult
ing
Su
pp
lie
rR
EG
AU
TH
OR
ITY
2
Suspension order
is issued by SEMO
to Defaulting
Supplier
Defaulting
Supplier identified
V
1
SEMO contact
Regulatory
Authority about
Defaulting Supplier
Regulatory
Authority informed
about defaulting
Supplier
Suspension order
issued
3
Regulatory Authority
suspends the
Defaulting Supplier
from trading
4
Terminates the
Defaulting
Supplier
7
Receive SoLR
direction
5
Alert MRSO of
termination
6
MRSO updates SAP
with details of
Defaulting Supplier
SoLR workflow to
be initiated
V8
MRSO given 1 day to
calculate the %
market share of the
Defaulting Supplier
9
MRSO forward the %
market share of the
Defaulting Supplier to
SoLR
Details of % of Market
Share of Defaulting
Supplier received by
SoLR
To step
10
SoLR Direction
issued
-
MPD 04 SoLR Market Design Version 10.5
Page 6 of 14
MPD 04 – SoLR
ES
B N
etw
ork
sS
oL
RA
lte
rna
tiv
e
Su
pp
lie
rsC
us
tom
er
TS
OS
EM
OD
efa
ult
ing
Su
pp
lie
r
RE
G
AU
TH
OR
IT
Y
14
Request DSO to
review incomplete
Service Orders
16
Cancel in Progress
Switches for Defaulting
Supplier
17
Identify and de-
register De-energised
sites of the Defaulting
Supplier
11
Alternative Suppliers
receive the list of
MPRNs of affected
Customers
12
SoLR receives a list
of MPRNs affected by
the MPRN event
13
Customer provided
with relevant SoLR
information within 5
working days
SoLR Notification
received by
Customer
15
Review and update
incomplete Service
Orders
All incomplete
Service Orders
dealt with
18
Notify DSO that a
special read is
required for MD
Customers
In Progress
Switches for the
Defaulting Supplier
cancelled
De-energised sties
of the Defaulting
Supplier de-
registered
Notification of
potential need for
special read for
MD sites received
From step 7
To step 19
10
Send list of affected
customers to SoLR
and Alternative
Suppliers
V
V
-
MPD 04 SoLR Market Design Version 10.5
Page 7 of 14
MPD 04 – SoLR
ES
B N
etw
ork
sS
oL
RA
lte
rna
tiv
e
Su
pp
lie
rsC
us
tom
er
TS
OS
EM
OD
efa
ult
ing
Su
pp
lie
rR
EG
AU
TH
OR
ITY
210MM
Not MD
Customer
Customer wishes
to register with
Alternative
Supplier
19
Register Customer
20
Register MPRNs and
provide Customer
Read where
appropriate
010MM
Daily checks of in-
progress switches
from Defaulting
Supplier
22
Check whether QH
or NQH
23
Determine if MD
Customerx
QH
V24Estimate
Readings
MD Customer
x25
Request DSO to
take a special
read
26
Take a special
read for MD sites
27
Validate Reading
(MRSO)
Reading
available
21
Receive Registration
and Reading
Messages from
Alternative Supplier
V
19 days after
SoRL direction
28
Send Non-
Registered
MPRNs to SoLR
29
Register MPRNs and
provide customer
read where
appropriate
210MM
010MM
30
Receive
Registration and
Reading messages
from SoLR
From step 11
To step 31
ITERATED PROCESS
NQH
-
MPD 04 SoLR Market Design Version 10.5
Page 8 of 14
MPD 04 – SoLR
ES
B N
etw
ork
sS
oL
RA
lte
rna
tiv
e
Su
pp
lie
rsC
us
tom
er
TS
OS
EM
OD
efa
ult
ing
Su
pp
lie
rR
EG
AU
TH
OR
ITY
32
Send confirmation of
CoS and readings to
Defaulting Supplier
34
Send Confirmation of
CoS and readings to
SoLR
36
Send confirmation of
CoS to TSO if QH
metered
38
Determine if CoS
was for a Trading
site
V
310MM
105LMM
33
Receive CoS
confirmation and
readings
320MM
105MM
35
Receive CoS
confirmation and
readings
331MM
700MM
105MM
331MM
37
Receive CoS
confirmation
CoS for
Trading site
CoS not for
Trading site
x
39
Notify SEMO of
CoSReading available
ITERATED PROCESS
31
Register MPRNs to
SoLR/alternative
Supplier
V
40
Receive
confirmation
-
MPD 04 SoLR Market Design Version 10.5
Page 9 of 14
2.1 Process Description
Process Step Role Process Step Description Interface
1 SEMO contact Regulatory Authority about Defaulting Supplier
SEMO Where a Default Supplier is identified the Single Electricity Market Operator (SEMO) contacts the Regulatory Authority regarding the Defaulting Supplier.
2 Suspension order issued by SEMO to Defaulting Supplier
SEMO Suspension Order issued by SEMO to Defaulting Supplier.
3 Regulatory Authority suspends the Defaulting Supplier from trading
Regulatory Authority
The Regulatory Authority suspends the Defaulting Supplier from trading and the SoLR direction is issued.
4 Terminates the Defaulting Supplier
SEMO SEMO will terminate the Defaulting Supplier.
5 Alert MRSO of termination
SEMO SEMO will alert Meter Registration Services Operator (MRSO) of termination.
6 MRSO updates SAP with details of Defaulting Supplier
ESBN MRSO will update SAP (SAP application for Utilities business) with details of Defaulting supplier. The SoLR workflow is initiated
7 Receive SoLR direction
ESBN MRSO receives SoLR direction from the Regulatory Authority.
8 MRSO given 1 day to calculate the % market share of the Defaulting Supplier
ESBN MRSO calculates the % market share of the Defaulting Supplier.
9 MRSO forward the % market share of the Defaulting Supplier to SoLR
ESBN MRSO advises the SoLR of the % market share of the Defaulting Supplier.
10 Send list of affected Customers to SoLR and Alternative Supplier
ESBN MRSO sends list of affected Customers to the SoLR and Alternative Suppliers.
11 Alternative Suppliers receives the list of MPRNs of affected Customers
Alternative Suppliers
The Alternative Suppliers receives a .CSV file containing a list of MPRN’s of affected Customers
Register Customer - next step 19
-
MPD 04 SoLR Market Design Version 10.5
Page 10 of 14
Process Step Role Process Step Description Interface
12 SoLR receives a list of MPRNs affected by the MPRN event
SoLR The SoLR receives a .CSV file containing a list of MPRN’s of affected Customers.
13 Customer provided with relevant SoLR information within 5 working days
SoLR The SoLR informs the affected Customers by letter, of the various CoS options (including list of alternative, active Suppliers in the market) within 5 working days of receiving the .CSV file.
14 Request Meter Operations to review incomplete Service Orders
ESBN MRSO will request Distribution Service Operator (DSO) to review all incomplete Service Orders for the MPRN’s on the .CSV file.
15 Review and update incomplete Service Orders
ESBN DSO will review and update incomplete Service Orders. [See Supplementary Information – Incomplete Service Orders].
16 Cancel in Progress Switches for Defaulting Supplier
ESBN MRSO will cancel all In-Progress Change of Supplier (CoS) switches to the Defaulting Supplier.
17 Identify and de-register de-energised sites of the Defaulting Supplier
ESBN MRSO will identify and de-register all de-energised sites of the Defaulting Supplier.
18 Notify DSO that a special read is required for MD Customers
ESBN MRSO will notify the DSO that special reads will be required for the Maximum Demand sites.
19 Register Customer Alternative Suppliers
Customer of Defaulting Supplier wishes to register with Alternative Supplier.
20 Register MPRNs and provide Customer Read where appropriate
Alternative Suppliers
The Alternative Supplier provides a registration application, completed in accordance with the applicable rules, to MRSO . The Alternative Supplier may provide a Customer reading to MRSO. The Supplier is responsible for the validity of all information provided for the purposes of registering a Meter Point.
210 MM 010 MM
21 Receive Registration and Reading Messages from Alternative Supplier
ESBN ESB Networks (ESBN) Receive Change of Supplier (CoS) Registration Requests.
22 Check whether QH or NQH
ESBN MRSO will carry out daily checks of In-Progress CoS switches from Defaulting Supplier to determine if they are QH or NQH sites.
-
MPD 04 SoLR Market Design Version 10.5
Page 11 of 14
Process Step Role Process Step Description Interface
23 Determine if MD Customer
ESBN MRSO will determine if In-Progress CoS is for a MD Customer.
Not MD Customer - Next Step 24
MD Customer - Next Step 25
24 Estimate Readings ESBN MRSO will provide estimate reading for NHQ site if required.
25 Request DSO to take a special read
ESBN MRSO will request the DSO to take a special reading for MD sites.
26 Take a special read for MD sites
ESBN The DSO arranges for the collection of readings for the affected Maximum Demand Meter Points. In exceptional circumstances, such as a high volume of meter points affected, the DSO may opt to provide estimates.
27 Validate Reading (MRSO)
ESBN MRSO will validate readings.
28 Send Non-Registered MPRNs to SoLR
ESBN 19 days after the SoLR Direction MRSO will send a .CSV file containing the list of MPRN’s which remain registered to the Defaulting Supplier.
29 Register MPRN and provide Customer ready where appropriate
ESBN The SoLR provides a registration application, completed in accordance with the applicable rules, to MRSO. The SoLR may provide a Customer reading to MRSO. The Supplier is responsible for the validity of all information provided for the purposes of registering a Meter Point.
210 MM 010 MM
30 Receive registration and reading messages from SoLR
ESBN ESB Networks (ESBN) Receive Change of Supplier (CoS) Registration Requests.
31 Register MPRNs to SoLR/Alternative Supplier
ESBN MRSO will complete the CoS process for both the SoLR and the Alternative Suppliers.
32 Send confirmation of CoS and readings to Defaulting Supplier
ESBN MRSO will confirm the Completion of the CoS to the Defaulting Supplier and will send CoS readings.
105L MM 310 MM
33 Receive CoS confirmation and readings
Defaulting Suppliers
The Defaulting Supplier will receive Confirmation of CoS and readings.
34 Send Confirmation of CoS and readings to SoLR
ESBN MRSO will confirm the Completion of the CoS to the SoLR and will send CoS readings.
105 MM 320 MM 331 MM 700 MM
35 Receive CoS confirmation and readings
SoLR The SoLR will receive confirmation of CoS and readings.
36 Send confirmation of CoS to TSO if QH metered
ESBN MRSO will send confirmation of CoS to TSO if site is QH metered.
-
MPD 04 SoLR Market Design Version 10.5
Page 12 of 14
Process Step Role Process Step Description Interface
37 Receive CoS confirmation
ESBN The TSO receive CoS confirmation of QH site. 105 MM 331 MM
38 Determine if CoS was for a Trading site
ESBN MRSO will determine if CoS was for a trading site:-
Not for trading site - no further action
For Trading site - Next Step 39
39 Notify SEMO of CoS ESBN Where CoS is for trading site MRSO will notify SEMO.
40 Receive notification SEMO SEMO receive notification of CoS for trading site.
-
MPD 04 SoLR Market Design Version 10.5
Page 13 of 14
3. Supplementary Information
Supplier of Last Resort Instructions
The Supplier of Last Resort need not initially provide a registration request to MRSO. After day 19 however, they must send in 010 MMs to register any
remaining Customers.
Alternative Supplier Instructions
An alternative Supplier should provide a registration request to MRSO using the appropriate interface by using the 010 MM. The use of a scheduled read
should not be requested.
The alternative Supplier may provide a Customer read using the 210 MM or the 010 MM.
Non-Participant Generator Export
This section is being added as a placeholder pending further discussions regarding the treatment of Supplier of Last Resort for the Export Arrangements on a
Non Participant Generator.
SoLR Assumptions
This SoLR process is for a Defaulting Supplier only and cannot be initiated by a Defaulting Supplier Unit.
On day 1 all MPRNS are to be reviewed by MRSO / ESBN for any outstanding service orders.
Two .CSV data files are to be issued by MRSO on Day 1. o The first .CSV file is for the SoLR and will consist of the following:
MPRN Level Details, the Meter Point Address, Customer Name, Customer Contact Details, Notification Address, Technical Contact
Details, Technical Contract Address, Medical Equipment Special Needs, Customer Service Special Needs where applicable
o The second .CSV file is for the alternative Suppliers and will consist of the following:- MPRN Level Details, the Meter Point Address, and the Customer Name where applicable.
o MRSO will issue a revised .CSV data file by close of business on day 19 to the SoLR. This revised file will exclude any MPRNS that have since been registered to alternative Suppliers.
Existing CoS to the exiting Supplier are to be cancelled and notified by MRSO.
A letter is to be issued to the Defaulting Supplier’s Customers explaining the various CoS options.
The designated Supplier of Last Resort is responsible for informing the affected Customers by letter, of the alternative active suppliers1 in the electricity market within 5 working days.
-
MPD 04 SoLR Market Design Version 10.5
Page 14 of 14
Existing CoS to alternative Suppliers are processed to the SoLR event date and procedures.
Alternative Suppliers are obliged to cancel 010 CoS messages for any MPRN on the day 1 .CSV file if the message is submitted after day 19.
Alternative Suppliers will not receive a Customer Name for domestic MPRNS (which is in line with existing market rules).
Meter Work service orders should be analysed on case by case basis.
010 MMs received from alternative Suppliers for SoLR MPRNs are required to contain the new S