ReMCoDS Discussion Request / Market Change Request 06/05/2015 Page 1 of 4 Discussion Request 1165 Discussion Request 1165 Market Design Process Diagrams & Messages conversion from ARIS to Document format Status Issued to Market Priority High Status Date 06/05/2015 Date Version Reason for Change Version Status 06/01/2015 1.0 DR for the conversion of the Market Design from ARIS. This DR is the third (3 of 3) and final DR to approve the last remaining 11 of the 41 MPDs. Issued to Market. Final Part 1 DETAIL OF DISCUSSION REQUEST / MARKET CHANGE REQUEST Requesting Organisation(s) RMDS Originating Jurisdiction RoI Request Originator Name Jessica Gregory Date Raised 06/05/2015 Classification of Request Jurisdictional Applicability RoI Jurisdictional Implementation RoI Specific If jurisdictional implementation is for one jurisdiction only is the other jurisdiction required to effect any changes? N/A Co-Ordinated Baseline Version No. TBC Change Type Non-Schema Impacting Detail of Request Reason for Request The RoI Retail Market currently uses ARIS, a Business Process Modelling tool, to display the Market Design (Market Process Diagrams, Market Messages, Market Segments and Codes and other documents relevant to the Market Design). In 2013 further to discussions with Market Participants and approval from CER, a decision was made to exit from ARIS. This aligns with the format in use by NIE and Gaslink. Due to the volume of MPDs and Market Messages to be converted multiple DR/MCRs are required:- At the IGG on 26 th March 2014 DR 1145 was approved. The MCR was subsequently approved at the IGG on 28 th May 2015 which covered 21 of the 41 MPDs and these are available on the RMDS website. At the IGG on 14 th January 2015 DR&MCR 1155 were approved. The MCR covered 9 of the 41 MPDs and these are available on the RMDS website. This DR&MCR is intended to cover the final 11MPDs to be converted as well as documenting where all the documentation held in ARIS is now located on the RMDS website. This brings to a close the full transfer of all information held in ARIS to document format.

Upload: others

Post on 26-Aug-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

  • ReMCoDS Discussion Request / Market Change Request

    06/05/2015 Page 1 of 4 Discussion Request 1165

    Discussion Request 1165

    Market Design Process Diagrams &

    Messages – conversion from ARIS to Document format

    Status Issued to Market Priority High Status Date 06/05/2015

    Date Version Reason for Change Version Status

    06/01/2015 1.0 DR for the conversion of the Market Design from ARIS. This DR is the third (3 of 3) and final DR to approve the last remaining 11 of the 41 MPDs. Issued to Market.

    Final

    Part 1 DETAIL OF DISCUSSION REQUEST / MARKET CHANGE REQUEST

    Requesting Organisation(s) RMDS Originating

    Jurisdiction RoI

    Request Originator Name Jessica Gregory Date Raised 06/05/2015

    Classification of Request

    Jurisdictional Applicability RoI Jurisdictional

    Implementation RoI Specific

    If jurisdictional implementation is for one jurisdiction only – is the

    other jurisdiction required to effect any changes?

    N/A Co-Ordinated Baseline

    Version No. TBC

    Change Type Non-Schema Impacting

    Detail of Request Reason for Request

    The RoI Retail Market currently uses ARIS, a Business Process Modelling tool, to display the Market Design (Market Process Diagrams, Market Messages, Market Segments and Codes and other documents relevant to the Market Design). In 2013 further to discussions with Market Participants and approval from CER, a decision was made to exit from ARIS. This aligns with the format in use by NIE and Gaslink. Due to the volume of MPDs and Market Messages to be converted multiple DR/MCRs are required:-

    At the IGG on 26th

    March 2014 DR 1145 was approved. The MCR was subsequently approved at the IGG on 28

    th May 2015 which covered 21 of the 41 MPDs and these are available on the RMDS website.

    At the IGG on 14

    th January 2015 DR&MCR 1155 were approved. The MCR covered 9 of the 41 MPDs and

    these are available on the RMDS website. This DR&MCR is intended to cover the final 11MPDs to be converted as well as documenting where all the documentation held in ARIS is now located on the RMDS website. This brings to a close the full transfer of all information held in ARIS to document format.

  • ReMCoDS Discussion Request / Market Change Request

    06/05/2015 Page 2 of 4 Discussion Request 1165

    Proposed Solution

    This solution will be delivered by generating MPD documents and Market Messages using Visio diagrams incorporated into MSWord documents They will be generated into PDF format and published to the RMDS website for access by Market Participants. Market Messages will be drafted in Visio format as per their current structure in ARIS but generating the HTML from Visio and publishing to the web. These would facilitate the ability to drill down to Segments and Data Codes. This project will be delivered in three stages (this being the final DR) and a new DR/MCR will be drafted for each stage. As these MPDs were being drafted and converted there were some corrections identified that are also recorded in the History of Changes for each converted MPD. As this is the final DR/MCR related to the ARIS conversion it is necessary to summarise the overall changes in a project close-out document for future reference. This close-out document is embedded in this DR/MCR here and can also be found on the RMDS Website under the ARIS tab in the Retail Market Design main tab. The above document ensures that all items contained within ARIS were converted where necessary and located on the Retail Market Design section of the RMDS website. The ARIS conversion project required:-

    ages for the Briefing Documents, Working Practices, Un-metered template. Market Message MPD Matrix,

    The final 11 MPDs to be converted are listed below:-

    MPD No. Name & File Material Changes from ARIS End to End PDF

    01 Change of Supplier NQH MIC replaced with Connection Voltage

    02 Change of Supplier QH Metered No

    04 SoLR – Process Design Document SMO Changed to SEMO

    07.1.1 New Distribution Connected Non-Participant Generator

    No

    08.1.1 Changes to Connection Characteristics SMO changed to TSO

    08.1.2 Replace Export Arrangements with Submetering SEMO incorrectly referenced as a role in the swimlane in ARIS.

    16.2.1 Data Aggregation SMO changed to SEMO. Changes to step 24. Changes documented in MCR0178 reflected in MPD.

    21 MPD 21 – De-Registration SEMO incorrectly referenced as a role in the swimlane in ARIS, changed to TSO

    28.1.2 New Unmetered Single Point Connection No

    36.1.1 Change of Group MPRN CoS No

    36.1.2 Change of Group No MPRN CoS No

    Scope of Change

    Jurisdiction Design

    Documentation Business Process

    DSO Backend System Change

    MP Backend System Change

    Tibco

    Sup

    plie

    r

    EM

    MA

    Sch

    ema

    Web

    form

    s

    Ext

    rane

    t/NI

    Mar

    ket

    Web

    site

    ROI ☐ ☒ ☐ ☐ ☐ ☐ ☐

    ☐ ☐ NI ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐

  • MARKET PROCESS DESIGN

    MPD 01 – CoS NQH

  • MPD 01 CoS NQH Market Design Version 10.5

    Page 2 of 23

    TABLE OF CONTENTS

    1. INTRODUCTION .......................................................................................................................................................................................................................... 3

    1.1 SCOPE ............................................................................................................................................................................................................................... 3

    1.2 HISTORY OF CHANGES ........................................................................................................................................................................................................ 3

    2. PROCESS MAP ........................................................................................................................................................................................................................... 7

    2.1 PROCESS DESCRIPTION .................................................................................................................................................................................................... 13

    3. SUPPLEMENTARY INFORMATION .................................................................................................................................................................................... 19

  • MPD 01 CoS NQH Market Design Version 10.5

    Page 3 of 23

    1. Introduction

    1.1 Scope

    This Procedure describes the Change of Supplier (CoS) process.

    1.2 History of Changes

    This Procedure includes the following changes:-

    Version in which last

    change Implemented

    Source of Change Description of Change Date of Version Release

    Draft 235 Changes to Provisional Acceptance criteria for change of legal entity

    Draft B14 Restriction on MCC Changes

    Draft B21 CoS validation checks prior to sending 110 old Supplier notification

    Draft B031 Implicit energisation during Registration process

    Draft B039 Customer read may be provided as part of, or following, Registration

    Draft B066 Read Date Management

    Draft B067 Changes to validation rules and use of readings

    Draft B093 Identification of CoS and withdrawn meter readings

    Draft B097 Rejection of Customer Reads

    Draft Removal of 103 flow to New Supplier to inform of delay in processing due to

    need for additional information

    Draft Further Changes since version 3.1

    Draft B099 Energisation and meter works, where requested, will not be performed by

    DSO till the objection period has expired

  • MPD 01 CoS NQH Market Design Version 10.5

    Page 4 of 23

    Version in which last

    change Implemented

    Source of Change Description of Change Date of Version Release

    Draft B099 Updated to include Time-out rules

    Draft

    B110

    Updated to include token meters

    Draft MIG 3/9/03 Standardised on use of QH/NQH terminology

    Draft Design Modified text to show that 252 MM is used to request a binding estimate

    rather than 208 MM

    Draft B138 Updated MPD to include processing of CoS requests mid way through meter

    works.

    Draft Updates arising from Supplier clarifications

    Draft Proposed

    Modification 3

    Clarify diagram to show the route by which a request for a binding estimate is

    processed

    Draft B168 / Proposed

    Modifications 1 & 2

    Changes to handling of Customer Own Reads

    Draft B193 – MIG

    19/11/03

    Updated text in section 3.1 to handle CoS at sites where QH metering is

    required

    Draft B204 / Written

    Supplier Clarification

    (MPD 14) 10

    Updated to clarify that a Customer read received whilst a Scheduled Meter

    Read Order is open will be used for DUoS Billing (Section 3.2)

    Draft B192- MIG 28/11/03 Process updated to remove delay on meter works for expiry of objection

    period.

    Version 4.2 MCR 0021 Addition of New 105L MM (CoS Confirmation of Loss) sent to the Old

    Supplier

  • MPD 01 CoS NQH Market Design Version 10.5

    Page 5 of 23

    Version in which last

    change Implemented

    Source of Change Description of Change Date of Version Release

    Version 4.2 MCR 0010 Addition to Supplementary Information 3.1 : EAI must be valid and not blank

    for sites over 30KVA

    Version 4.2 MCR 0040 Updated text to Clarify wording around Page 10 (‘Where a Customer read is

    requested then…..”)

    Version 4.2 MCR 0024 Steps 14, 15 updated to clarify that a Registration Request will not be fully

    accepted until all conditions for Provisional Acceptance have been met.

    Version 4.3 DRR 0011 Updated to reflect the treatment of Special Reads used to dispute CoS reads

    Version 5.1 MCR 0050 Addition to Supplementary Information-Modifications to CoS Readings

    Process in CoS Loss Scenario.

    Version 6.0 MCR 0088 Amended validation rules to allow for the New Supplier Unit ID, to satisfy

    requirements of SEM implementation.

    A Supplier Unit entity has been added to the Data Model and will be required

    within CoS Processing and Market Messaging

    Additional validation rules will be required surrounding Trading Site Supplier

    Units.

    This will necessitate changes to:-

    Supplementary Information, Market Message structures, Data Definitions,

    Reject Codes and Reasons.

    Version 8.0 RMDS QA MPD clean-up: objects enlarged to make text readable, swimlane actors

    shifted left, swimlanes tightened.

    Version 8.0 MCR 0169 In Supplementary Info, inserted New text on warning about VC deletion. No

    update to process flow.

    Version 8.0a MCR 0161 Updated to reflect implementation of "MCR 0161 - Increasing the threshold for

    connection agreement return". Changed references of threshold from "100

    kVA" to "MV (Medium Voltage)" in Supplementary Information for this MPD.

    Updated description of the step 'Check if prov. Acceptance is required'.

  • MPD 01 CoS NQH Market Design Version 10.5

    Page 6 of 23

    Version in which last

    change Implemented

    Source of Change Description of Change Date of Version Release

    Version 10.2 MCR 1019 Updated Supplementary Information only to reflect implementation of MCR

    1019. Section Processing of outstanding meter works requests updated to

    include process where initial MRSO check shows an open Service Order for

    De-Energisation and where the 010MM has a CoLE (either Explicit or

    Implicit).

    Version 10.5 MCR 1165 – Conversion of MPDs from ARIS to document format.

    ARIS Process flow converted to Visio format and Step Table included. AIQ 2508- Supplementary Information reference to MIC replaced with Connection Voltage.

    27.05.2015

  • MPD 01 CoS NQH Market Design Version 10.5

    Page 7 of 23

    2. Process Map

    MPD 01 – CoS NQH

    ES

    B N

    etw

    ork

    s O

    ld S

    up

    plie

    rN

    ew

    Su

    pp

    lie

    r

    Request

    registration with

    MRSO

    1

    New Supplier

    requests Registration

    of customer

    Registration

    invalid

    x

    010MM

    2

    Receive CoS request

    Registration valid

    3

    Validate

    Registration

    4

    Send Rejection to

    New Supplier

    102RMM

    5

    Receive Rejection

    Message

    6

    Notify Old Supplier

    V

    110MM

    7

    Receive notification

    of CoS

    8

    Check if Provisional

    Acceptance required

    Provisional

    Acceptance not

    required

    x

    Provisional

    Acceptance

    required

    To step 14

    To step 9

  • MPD 01 CoS NQH Market Design Version 10.5

    Page 8 of 23

    MPD 01 – CoS NQH

    ES

    B N

    etw

    ork

    s O

    ld S

    up

    plie

    rN

    ew

    Su

    pp

    lie

    r

    14

    Update CoS

    Registration as

    Accepted

    V

    9

    Refer Provisional

    Acceptance to

    DSO

    V

    10

    Send notification to

    New Supplier of

    Provisional

    Acceptance

    102PMM

    11

    Receive

    Provisional

    Acceptance

    13

    Re-energise and

    take read if required

    V

    15

    Send Acceptance

    to New Supplier

    102MM

    16

    Receives CoS

    Registration

    Acceptance

    17

    Determine if Meter

    Works required

    Meter works

    not required

    x

    Meter works

    required

    From “Provisional

    acceptance not required”

    From “Provisional acceptance required”

    To step 18

    12Get Connection

    Agreement if required

    To step 22

  • MPD 01 CoS NQH Market Design Version 10.5

    Page 9 of 23

    MPD 01 – CoS NQH

    ES

    B N

    etw

    ork

    s O

    ld S

    up

    plie

    rN

    ew

    Su

    pp

    lie

    r

    Read received

    x

    No read

    received

    19

    Determine Special

    Read requested

    Special Read not

    requested

    x

    Special Read

    requested

    20

    Wait for scheduled

    or customer read

    V

    21

    Take Special

    Read

    New Supplier gets

    Customer Read

    23

    Send Customer

    read to MRSO

    where not already

    sent

    210MM

    24

    Receive and

    validate Customer

    Read

    Customer Read

    not acceptable

    x

    Customer Read

    acceptable

    Take schedule

    read as normal

    25

    Scheduled read

    obtained

    26

    Validates &

    processes

    reading

    x

    To step31

    To step 27

    18

    Determine if CoS

    read received

    22

    Perform Meter

    Works & take

    read

    From step 17

  • MPD 01 CoS NQH Market Design Version 10.5

    Page 10 of 23

    MPD 01 – CoS NQH

    ES

    B N

    etw

    ork

    s O

    ld S

    up

    plie

    rN

    ew

    Su

    pp

    lie

    r

    Valid reading

    Invalid reading

    V

    27

    Determine if

    Estimate allowed

    Estimate allowed

    x

    Estimate not

    allowed

    28

    Create estimate

    29

    Determine if DC

    can obtain read

    DC cannot obtain

    read

    x

    DC can obtain

    read

    30

    Get check read

    Back to Step26

    31

    Register MPRN

    with New Supplier

    V 32Send confirmation of New CoS to New

    Supplier

    33

    Receive confirmation

    34

    Send confirmation

    of CoS to Old

    Supplier

    35

    Receive confirmation

    of CoS

    36

    Send readings to

    New Supplier

    320MM

    37

    Receive Reading

    details and meter

    point details

    38

    Send readings to

    Old Supplier

    39

    Receive Reading

    details and meter

    point details

    To step 26

    From step 26

    From step 26

    310MM

    105LMM

    105MM

  • MPD 01 CoS NQH Market Design Version 10.5

    Page 11 of 23

    MPD 01 – CoS NQH

    ES

    B N

    etw

    ork

    s O

    ld S

    up

    plie

    rN

    ew

    Su

    pp

    lie

    r

    Request Special

    Read or binding

    estimate

    40

    Send request for

    special read/

    estimate

    252MM

    Requests Special

    Read or binding

    estimate

    42

    Sends request for Special Read/estimate

    252MM

    43

    Receives request

    41

    Receives request

    V

    Estimate required

    x

    Estimate not

    required

    44

    Determine if binding

    estimate required

    45

    Provide binding

    estimate

    V 54Receive

    Replacement Read

    46

    Take special read

    V

    49

    Produce Extrapolated

    Estimate

    Agree replacement

    read

    52

    Send replacement

    read

    208MM

    Agree Replacement

    read

    50

    Send replacement

    read

    208MM

    51

    Read received

    53

    Received Read

    Replacement

    47

    Send Special Read to

    New Supplier

    300SMM

    48

    Receive Special Read

    To step 55/57

  • MPD 01 CoS NQH Market Design Version 10.5

    Page 12 of 23

    MPD 01 – CoS NQH

    ES

    B N

    etw

    ork

    s O

    ld S

    up

    plie

    rN

    ew

    Su

    pp

    lie

    r

    V

    55

    Advise final CoS read

    to Old Supplier

    310MM

    310WMM

    56

    Receive final CoS read

    57

    Advise final CoS read

    to New Supplier

    320MM

    320WMM

    58

    Receive final CoS read

    From step 54

    V

    V

  • MPD 01 CoS NQH Market Design Version 10.5

    Page 13 of 23

    2.1 Process Description

    Process Step Role Process Step Description Interface

    1 New Supplier requests Registration of

    Customer

    New Supplier The New Supplier provides a Registration Application, completed in accordance with the applicable rules, to Meter Registration System Operator (MRSO). The New

    Supplier may provide a Customer reading to MRSO dated at, and as part of, the Registration Request. The Supplier is responsible for the validity of all information provided for the purposes of registering a Meter Point.

    010 MM

    2 Receive CoS request ESBN ESB Networks Ltd (ESBN) Receive Change of Supplier (CoS) Registration Request.

    3 Validate Registration ESBN MRSO will validate the Registration in accordance with the applicable validation rules (see Supplementary Information).

    Registration Invalid - Next Step 4

    Registration Valid - Next Step 6

    4 Send Rejection to New Supplier

    ESBN Where Registration is rejected the requesting Supplier is informed of the Rejection with the reasons.

    102R MM

    5 Receive Rejection Message

    New Supplier Supplier receives Rejection Message.

    6 Notify Old Supplier ESBN If the Registration is not automatically rejected then MRSO will notify the old Supplier that a Registration has been received.

    110 MM

    7 Receive notification of CoS

    Old Supplier Old Supplier receives notification of CoS.

    8 Check if Provisional Acceptance required

    ESBN MRSO checks to see if Provisional Acceptance is needed to progress the CoS. (See Supplementary Information for more details of validation checks.)

    Provisional Acceptance not required - Next Step 14

    Provisional Acceptance required - Next Step 9

    9 Refer Provisional Acceptance to DSO

    ESBN If the Registration is Provisionally accepted then MRSO will make available the Registration details to Distribution System Operator (DSO).

    10 Send notification to New Supplier of Provisional Acceptance

    ESBN If the Registration is Provisionally accepted the New Supplier will be informed of the Provisional Acceptance, with reasons.

    102P

    11 Receive Provisional Acceptance

    New Supplier New Supplier Receives Provisional Acceptance.

  • MPD 01 CoS NQH Market Design Version 10.5

    Page 14 of 23

    Process Step Role Process Step Description Interface

    12 Get Connection Agreement if required

    ESBN ESBN receive Connection Agreement if required. DSO will obtain a connection agreement where a Registration has been accepted pending receipt of a connection agreement.

    13 Re-energise and take read if required

    ESBN DSO will provide changeover readings to MRSO as follows:-

    A re-energisation reading if the meter point was de-energised.

    A meter installation reading if no meters were previously installed.

    Meter works reading associated with permitted MCC Changes in accordance with instructions from the Supplier.

    Meter works reading associated with removal of token meter.

    14 Update CoS Registration as Accepted

    ESBN If the Registration is accepted, the New Supplier will be informed of the Acceptance. The Registration Request will not be fully accepted until all conditions for Provisional Acceptance have been met.

    15 Send Acceptance to New Supplier

    ESBN ESBN send Acceptance of Registration to New Supplier. 102 MM

    16 Receive CoS Registration Acceptance

    New Supplier New Supplier will receive CoS Registration Acceptance message.

    17 Determine if Meter Works required

    ESBN ESBN will Determine if Meter works required:-

    If Meter Works not required - Next Step 18

    If Meter Works required - Next Step 22

    18 Determine if CoS read received

    ESBN ESBN determine if CoS read received:-

    If CoS read received - Next Step 26

    If CoS read not received - Next Step 19

    19

    Determine Special Read requested

    ESBN ESBN determine if Special Read Requested:-

    If Special Read not requested - Next Step 20

    If Special Read requested - Next Step 21

    20 Wait for scheduled or

    Customer read ESBN ESBN wait for Scheduled or Customer Read.

    21

    Take Special Read ESBN The Data Collector (DC) will collect Special Read in accordance with instructions

    from the Supplier and make these available to MRSO.

    Special Read obtained - Next Step 26

    22 Perform Meter Works & take read

    ESBN The DC will Perform Meter Works & take read and make these available to MRSO.

  • MPD 01 CoS NQH Market Design Version 10.5

    Page 15 of 23

    Process Step Role Process Step Description Interface

    23 Send Customer read to MRSO where not already sent

    ESBN The New Supplier may also provide a Customer reading to MRSO at any time subsequent to the Registration Request before the completion of the CoS.

    210 MM

    24

    Receive and validate Customer Read

    ESBN MRSO will reject the readings where Customer reads fail the following validation: - Readings cannot be matched to meters at the Meter Point.

    Meter Point is a Maximum Demand site.

    A complete set of readings is not provided.

    Customer Read acceptable - Next Step 26

    25 Scheduled read obtained

    ESBN Scheduled Read obtained and passed to MRSO.

    26

    Validates & processes reading

    ESBN MRSO will select and validate in accordance with the instructions provided by the

    New Supplier meter change, Special, scheduled, re-energisation or Customer read for use as the CoS reading. This selection shall not be made before the required date (or scheduled date if a scheduled read was requested). Rules are described in the Supplementary Information.

    If read is Valid - Next Step 31

    If read is Invalid - Next Step 27

    27

    Determine if Estimate allowed

    ESBN MRSO Determine if Estimate Allowed.

    If Estimate is Allowed - Next Step 28

    If Estimate is not Allowed - Next Step 29

    28 Create estimate ESBN ESBN will generate Estimate Read - Next Step 31

    29

    Determine if DC can obtain read

    ESBN ESBN will Determine if Data Collection (DC) can obtain Read.

    DC can obtain read - Next Step 30

    30

    Get check read ESBN Where a scheduled read could not be obtained and an estimate is not allowable the DC will arrange for the provision of the non-chargeable Special Read to MRSO. The

    DC may, at their option, (but not for MD sites) provide a Customer read.

    Reading obtained - Back to Step 26

  • MPD 01 CoS NQH Market Design Version 10.5

    Page 16 of 23

    Process Step Role Process Step Description Interface

    31

    Register MPRN with New Supplier

    ESBN

    MRSO will complete the CoS, within the permitted period**, when the following are complete: -

    Five days have elapsed after the notification to the old Supplier.

    Any reasons for Provisional Acceptance have been resolved.

    Any outstanding objection expires or is withdrawn.

    A full set of valid CoS readings is available:- The CoS is completed using the effective reading date (The effective

    reading date is the date that DSO collects the reading or, for a Customer read provided by the Supplier, the date specified by the Supplier) to determine the CoS date. The CoS will be effected at 00h00 on the CoS

    date (The changeover date is, for a Customer, Special or scheduled read, the day following the read and for a meter exchange, the day of the meter exchange), meaning that consumption on that date will be provided to and settled by the New Supplier.

    ** The permitted period for a CoS is:- Where a scheduled read was requested, twenty days after the date of the

    next scheduled reading date.

    Where meter works or energisation has been requested and remains outstanding, an unlimited period is allowed for completion.

    Forty days after the Registration Acceptance in all other cases where a CoS has not been completed five days prior to the permitted period then a warning report will be sent to the New Supplier.

    32 Send confirmation of New CoS to New Supplier

    ESBN MRSO will confirm the completion of the CoS to the New Supplier. 105 MM

    33 Receive confirmation New Supplier New Supplier will receive confirmation of the CoS.

    34 Send confirmation of CoS to old Supplier

    ESBN MRSO will confirm the completion of the CoS to the Old Supplier. 105L MM

    35 Receive confirmation of CoS

    Old Supplier Old Supplier will receive confirmation of CoS.

    36 Send readings to New Supplier

    ESBN MRSO will send CoS Readings to New Supplier. 320 MM

    37 Receive Reading details and Meter Point details

    New Supplier New Supplier will receive reading details and meter details.

  • MPD 01 CoS NQH Market Design Version 10.5

    Page 17 of 23

    Process Step Role Process Step Description Interface

    38 Send readings to Old Supplier

    ESBN MRSO will send CoS readings to Old Supplier. 310 MM

    39 Receive Reading details and Meter Point details

    Old Supplier Old Supplier will receive reading and meter details.

    40

    Request for Special Read estimate

    Old Supplier Either Supplier has the option to dispute a CoS reading by requesting a Special Read. This will be chargeable to the requesting Supplier if the original read proves to be valid. Alternatively, either Supplier may request a binding estimate as at the CoS date. Old Supplier sends request for Special Read to ESBN.

    252 MM

    41 Receives request ESBN ESBN receives Special Read request from Old Supplier.

    42

    Request for Special Read estimate

    New Supplier Either Supplier has the option to dispute a CoS reading by requesting a Special Read. This will be chargeable to the requesting Supplier if the original read proves to be valid. Alternatively, either Supplier may request a binding estimate as at the CoS date. New Supplier sends request for Special Read to ESBN.

    252 MM

    43 Receives request ESBN ESBN receives Special read request from New Supplier.

    44

    Determine if binding estimate required

    ESBN MRSO determine if binding estimate is required.

    If Estimate is required - Next Step 45

    If Estimate is not required - Next Step 46

    45 Provide binding estimate

    ESBN Where requested, MRSO will provide a binding estimate for use as the Replacement Read.

    46 Take Special Read ESBN Where requested, the DC will arrange for the provision of a Special Read to MRSO.

    47 Send Special Read to New Supplier

    ESBN Where a Special Read has been provided by the DC for the purposes of a CoS read dispute MRSO will provide the Special Read to the new Supplier.

    300S MM

    48 Receive Special Read New Supplier New Supplier receives Special Read.

  • MPD 01 CoS NQH Market Design Version 10.5

    Page 18 of 23

    Process Step Role Process Step Description Interface

    49

    Produce Extrapolated Estimate

    ESBN Where a Special Read has been provided by the DC for the purposes of a CoS read dispute then MRSO will use this Special Read to extrapolate an estimate as at the original read date.

    50 Send Replacement Read

    New Supplier Either Supplier has the option to dispute a CoS reading by providing a Replacement Read. New Supplier sends a Replacement Read.

    208 MM

    51 Read received ESBN ESBN receive Replacement Read from New Supplier.

    52 Send Replacement Read

    Old Supplier Either Supplier has the option to dispute a CoS reading by providing a Replacement Read. Old Supplier sends a Replacement Read.

    208 MM

    53 Receives Replacement Read

    ESBN ESBN receives Replacement Read from Old Supplier.

    54

    Receives all Replacement Read

    ESBN MRSO will replace the change of supplier read, in accordance with Supplier instructions, with:-

    • An estimate as at the CoS date calculated from the Special Read • An estimate as at the CoS date, provided this is agreed by both Suppliers • A Replacement Read provided by an Old or New Supplier provided this is agreed by both Suppliers • A dispute concerning a CoS meter reading does not affect the CoS date. The original readings are withdrawn and Replacement Reads will be provided to the Old and New Suppliers.

    55 Advise final CoS read to Old Supplier

    ESBN Market Message 310 issues with the Replacement Read. Market Message 310W withdraws original CoS reading.

    310 MM 310W MM

    56 Receive final CoS read

    Old Supplier Old Supplier receives withdrawal of agreement CoS and Replacement final Read.

    57 Advise final CoS read to New Supplier

    ESBN Market Message 320 issues with the Replacement Read. Market Message 320W withdraws original CoS reading.

    320 MM 320W MM

    58 Receive final CoS read

    New Supplier New Supplier receives final CoS read.

  • MPD 01 CoS NQH Market Design Version 10.5

    Page 19 of 23

    3. Supplementary Information

    Registration Validation Rules for a CoS (NQH Settled)

    Failure of the following validations will cause the Registration to be rejected:-

    The Supplier must have provided all mandatory information.

    The MPRN must have been assigned and not terminated.

    The Supplier ID is a valid one and the Supplier has a DUoS agreement.

    The Supplier must be entitled to register a Meter Point under the legislation and in accordance with the Trading and Settlement Code.

    The Supplier must warrant that a supply agreement exists with the Customer at the Meter Point being registered. The Supplier must provide a Supplier Unit that is valid for the Supplier.

    The Supplier Unit must not be a Trading Site Supplier Unit.

    The Supplier must provide a sub-aggregation code (SSAC) that is valid for the Supplier Unit and for the class of metering.

    A separate CoS may not be in progress for this meter point.

    A CoS was completed with an effective date less than twenty days before the required date for the requested Change of Supply. This rule does not apply if the CoS includes a change of tenancy or legal entity.

    Any Meter Configuration change request must be from the list of permitted Meter Configuration code changes. In cases where the change requires a wiring certificate, connection agreement or quotation then the Meter Configuration change is not permitted. If a Meter Configuration change is not permitted then the CoS must be completed before the Meter Configuration change can be considered. The

    New Supplier will be required to submit a separate meter works request.

    The read arrangements for the CoS are valid.

    A Customer read is not allowable for a Maximum Demand site. Required date must be no more than forty days after the Registration receipt (required date is not required for a scheduled read).

    Required date is mandatory if a Customer read is to be used and may not be more than three days prior to receipt date. Required date must provide at least five days notice for a Special Read or meter works site visit.

    Meter point is listed as eligible to change Supplier only if QH metering is installed and QH metering and communications have not yet been installed. In this instance DSO will be requested to prioritise QH meter and communications installation and, following this, the Supplier will be asked to re-submit the Registration as a QH Metered Registration.

    EAI must be valid & not blank for sites over 30Kva.

    Failure of the following validations will cause the Registration to be rejected unless the DSO agrees that the exception is allowable:-

    Meter Point Address advised by Supplier is materially inconsistent with Meter Point Address known to MRSO. DSO may accept or reject the New address submitted by the Supplier.

    Failure of the following validations will cause the Registration to be Provisionally accepted, unless rejected above, pending approval by the DSO:-

    The Meter Point is de-energised. In this case the CoS will be effected using the re-energisation reading.

  • MPD 01 CoS NQH Market Design Version 10.5

    Page 20 of 23

    The Connection Voltage is equal to or exceeds MV (Medium Voltage) and there is no Connection Agreement in place or there is a change of Customer name or registered company number. In this case the DSO must confirm the existence of a signed Connection Agreement before the Registration is accepted.

    A token meter is installed. In this case the DSO is requested to remove the token meter and the CoS is effected using the readings taken at removal.

    Requests for the use of a scheduled, Customer or Special Read will be cancelled.

    Treatment of Requests for Estimates

    An estimate is not allowable for Maximum Demand sites or where there has been no actual read in the previous twelve months. In these circumstances

    MRSO will disregard a request for an estimate but shall not reject the Registration.

    CoS Read Selection

    MRSO will endeavour to select a CoS reading in accordance with the instructions of the New Supplier.

    However, the following situations can occur:-

    Where a Customer Read is requested then:-

    If a meter works, re-energisation or Special Read becomes available in the five days following the required date then this will be selected and used in preference to a Customer reading.

    If a Customer reading is requested but not provided & validated with the Registration Request then if no valid reading becomes available in the five days following the required date the MRSO will estimate a reading, dated at the required date, if an estimate is allowable and the New Supplier has indicated an estimate is acceptable.

    A Customer reading provided by a Supplier may not be dated more than three days prior to the DSO receipt date.

    An estimate shall not be used in preference to a Customer reading.

    Where a Special Read is requested but does not become available within five days of the required date, then:-

    If a meter works, re-energisation or scheduled read is available in the five days following the required date then this will be selected and used.

    If no valid reading becomes available in the five days following the required date the MRSO will estimate a reading, dated at the required date, if an estimate is allowable and the New Supplier has indicated an estimate is acceptable.

  • MPD 01 CoS NQH Market Design Version 10.5

    Page 21 of 23

    Where a Scheduled Read is requested the following should be noted:-

    If a scheduled read which is usable for a CoS is collected during the five day objection period, MRSO will not issue a 300 MM for this reading and then withdraw it when the CoS is completed subsequently.

    Similarly where an estimate is used the 305 MM is not sent and subsequently withdrawn. These CoS readings are sent only on the 310 MM / 320 MM.

    If the New Supplier indicates 'No' to an estimate, and the read is an estimate, a 305 MM will issue to the Old Supplier and then be withdrawn if the New Supplier subsequently agrees to use the estimate for the CoS. (The estimate could result from a planned estimated read, or an implausible Scheduled Read or Customer Read which is subsequently adjusted to an estimate.)

    If the site is Provisionally accepted, and a read is received while awaiting for conditions to be met, the 300 MM / 305 MM will issue to the existing Supplier (Old Supplier) and when the conditions are met and complete the COS back to the read - we will withdraw the 300 MM / 305 MM and issue 310 MM to the old Supplier.

    The issue of 300 MM / 305 MM is suppressed by means of a billing block. The billing block can be removed manually by a user. Where a user

    does remove the billing block while the CoS is still in progress, a 300 MM / 305 MM will issue and then subsequently be withdrawn if used for

    the CoS.

    Where a Scheduled Read is requested then while the meter reading order is open:-

    If a meter works, re-energisation or Special Read becomes available then this will be used for the CoS.

    If a Customer read becomes available and is allowable then the Customer read will be used for the CoS.

    Where a Scheduled Read is requested, but the meter reading order is closed and no reading has been obtained then:-

    If a Customer read becomes available and is allowable then the Customer read will be used for the CoS.

    If an estimate is not allowable because the site is a Maximum Demand site MRSO will request a non-chargeable Special Read.

    If an estimate is allowable MRSO will estimate a reading, dated at the scheduled read date, for use as the CoS reading.

    Where no reading becomes available or can be estimated under the above rules then MRSO will inform the New Supplier of the situation.

    If an estimate is not allowable because there has been no read in the previous twelve months, then the Supplier may either:- o Provide a Customer read. o Provide an access arrangement to allow DSO to collect a non-chargeable Special Read.

    In other circumstances the Supplier should contact MRSO to determine an alternative read arrangement.

  • MPD 01 CoS NQH Market Design Version 10.5

    Page 22 of 23

    An estimate is not allowable for Maximum Demand sites or where there has been no actual read in the previous twelve months.

    Change of Read Arrangements

    If a Supplier opts to alter the read arrangements for a CoS read then, provided a valid read has not already been obtained and the New

    arrangements are valid the MRSO will instruct DSO accordingly.

    Processing of outstanding Meter Works requests

    When a CoS request is received by MRSO a check will be made for any open service orders. Where such orders exist, MRSO will manually

    notify both the old and New Supplier of any outstanding Meter Works or de-energisation request. As a result of this notification then:-

    The Old Supplier may cancel the work order subject to the applicable DSO/MO rules. In this case the New Supplier will be informed of the cancellation of the work order.

    The New Supplier may cancel the Registration Request.

    In the event that neither Supplier cancels their request, both the meter work and CoS proceed as normal then the Old Supplier will remain

    liable for any charges arising from the work they have requested.

    Treatment of Medical Equipment Special Needs

    Special arrangements are in place for the management of Medical Equipment Special Needs (MESN) flags during COS operations which are

    not also COLE. These arrangements include the restoration of previous MESN flags in cases where completed COS operations are

    subsequently cancelled and MESN details could otherwise have been lost. These arrangements relate only to the two Medical Equipment

    Special Needs (MESN) flags of Life Support (0003) and Non-Life Support (0004) and do not affect Customer Service Special Needs (CSSN)

    flags.

    Specifically:-

    1. Where there is an MESN associated with an existing Customer and the 010 MM submitted includes an MESN, the existing MESN will be deleted and replaced with the submitted MESN value and VCAttributeDeleted=”false” will appear on the 102 MM.

    2. Where there is an MESN associated with an existing Customer and the 010 MM submitted does not include an MESN, the existing MESN will be deleted and VCAttributeDelete=”true” will appear on the 102 MM.

  • MPD 01 CoS NQH Market Design Version 10.5

    Page 23 of 23

    3. The presence or absence of CSSN flags, either associated with an existing Customer or submitted on the 010 MM, will not impact in any way on the processing of MESNs above. For example, if an MESN is associated with an existing Customer and only CSSN flags are submitted on the 010, then a warning message will issue as in point 2 above.

    In summary,

    The deletion of an MESN will always be flagged where no Replacement MESN has been submitted on the 010 MM.

    The deletion of CSSNs is done without warning.

    The deletion of MESN flags is effective only when the CoS completes. If the CoS is subsequently cancelled after completion, the previous

    MESN value, if any, is restored.

    walshe_dFile AttachmentMPD 01 CoS NQH.pdf

  • MPD 01 – CoS NQH E

    SB

    Ne

    two

    rks

    Old

    Su

    pp

    lie

    rN

    ew

    Su

    pp

    lie

    r

    Request

    registration with

    MRSO

    1

    New Supplier

    requests Registration

    of customer

    Registration

    invalid

    x

    010MM

    2

    Receive CoS request

    Registration valid

    3

    Validate

    Registration

    4

    Send Rejection to

    New Supplier

    102RMM

    5

    Receive Rejection

    Message

    6

    Notify Old Supplier

    V

    110MM

    7

    Receive notification

    of CoS

    8

    Check if Provisional

    Acceptance required

    Provisional

    Acceptance not

    required

    x

    Provisional

    Acceptance

    required

    14

    Update CoS

    Registration as

    Accepted

    V

    9

    Refer Provisional

    Acceptance to

    DSO

    V

    10

    Send notification to

    New Supplier of

    Provisional

    Acceptance

    102PMM

    11

    Receive

    Provisional

    Acceptance

    13

    Re-energise and

    take read if required

    V

    15

    Send Acceptance

    to New Supplier

    102MM

    16

    Receives CoS

    Registration

    Acceptance

    17

    Determine if Meter

    Works required

    Meter works

    not required

    x

    Meter works

    required

    12Get Connection

    Agreement if required

    Read received

    x

    No read

    received

    19

    Determine Special

    Read requested

    Special Read not

    requested

    x

    Special Read

    requested

    20

    Wait for scheduled

    or customer read

    V

    21

    Take Special

    Read

    New Supplier gets

    Customer Read

    23

    Send Customer

    read to MRSO

    where not already

    sent

    210MM

    24

    Receive and

    validate Customer

    Read

    Customer Read

    not acceptable

    x

    Customer Read

    acceptable

    Take schedule

    read as normal

    25

    Scheduled read

    obtained

    26

    Validates &

    processes

    reading

    x

    18

    Determine if CoS

    read received

    22

    Perform Meter

    Works & take

    read

    Valid reading

    Invalid reading

    V

    27

    Determine if

    Estimate allowed

    Estimate allowed

    x

    Estimate not

    allowed

    28

    Create estimate

    29

    Determine if DC

    can obtain read

    DC cannot obtain

    read

    x

    DC can obtain

    read

    30

    Get check read

    Back to Step26

    31

    Register MPRN

    with New Supplier

    V 32Send confirmation of New CoS to New

    Supplier

    33

    Receive confirmation

    34

    Send confirmation

    of CoS to Old

    Supplier

    35

    Receive confirmation

    of CoS

    36

    Send readings to

    New Supplier

    320MM

    37

    Receive Reading

    details and meter

    point details

    38

    Send readings to

    Old Supplier

    39

    Receive Reading

    details and meter

    point details

    310MM

    105LMM

    105MM

    Request Special

    Read or binding

    estimate

    40

    Send request for

    special read/

    estimate

    252MM

    Requests Special

    Read or binding

    estimate

    42

    Sends request for Special Read/estimate

    252MM

    43

    Receives request

    41

    Receives request

    V

    Estimate required

    x

    Estimate not

    required

    44

    Determine if binding

    estimate required

    45

    Provide binding

    estimate

    V 54Receive

    Replacement Read

    46

    Take special read

    V

    49

    Produce Extrapolated

    Estimate

    Agree replacement

    read

    52

    Send replacement

    read

    208MM

    Agree Replacement

    read

    50

    Send replacement

    read

    208MM

    51

    Read received

    53

    Received Read

    Replacement

    47

    Send Special Read to

    New Supplier

    300SMM

    48

    Receive Special Read

    V

    55

    Advise final CoS read

    to Old Supplier

    310MM

    310WMM

    56

    Receive final CoS read

    57

    Advise final CoS read

    to New Supplier

    320MM

    320WMM

    58

    Receive final CoS read

    V

    V

    Last change made at Version 10.5

    On 27th

    May 2015

    MPD 01 CoS NQH End to End.vsd

    Page-1

    walshe_dFile AttachmentMPD 01 CoS NQH End to End.pdf

  • MARKET PROCESS DESIGN

    MPD 02 – Change of Supplier QH

  • MPD 02 CoS QH Market Design Version 10.5

    Page 2 of 12

    TABLE OF CONTENTS

    1. INTRODUCTION .......................................................................................................................................................................................................................... 3

    1.1 SCOPE ............................................................................................................................................................................................................................... 3

    1.2 HISTORY OF CHANGES ........................................................................................................................................................................................................ 3

    2. PROCESS MAP ........................................................................................................................................................................................................................... 6

    2.1 PROCESS DESCRIPTION ...................................................................................................................................................................................................... 8

    3. SUPPLEMENTARY INFORMATION ........................................................................................................................................................................................ 11

  • MPD 02 CoS QH Market Design Version 10.5

    Page 3 of 12

    1. Introduction

    1.1 Scope

    2 This Procedure describes the Change of Supplier QH.

    2.1 History of Changes

    This Procedure includes the following changes:-

    Version in which last change

    Implemented

    Source of Change Description of Change Date of Version Release

    Draft 235 Changes to Provisional Acceptance criteria for Change of legal entity

    Draft B037 Message 010 is used for Registrations

    Draft B041 Removal of customer type

    Draft B041 Removal of 103 flow to New Supplier to inform of delay in processing

    due to need for additional information

    Further Changes since version 3.1

    Draft MIG September 3rd Standardisation of use of QH/NQH Terminology

    Draft Written Supplier

    Clarifications 4

    Updated text on page 6 to Provisionally Accepted rather than

    Registration

    Draft Written Supplier

    Clarifications 2

    Updated section on MPRN assignment (Page 4)

    Changes applied after version 4.1

    Version 4.2 MCR 0010 Update to include business rules re: provision of EAI code. The

    validation of EAI on 010 Message is included

  • MPD 02 CoS QH Market Design Version 10.5

    Page 4 of 12

    Version in which last change

    Implemented

    Source of Change Description of Change Date of Version Release

    Version 6.0 MCR 0094 Amendments to MDP2 to satisfy new requirements of SEM

    implementation regarding the Supplier Unit ID and additional

    validation rules and processing required surrounding Trading Sites.

    This will necessitate changes to :-

    ARIS Process Flow Diagram (ARIS screenshot)

    ARIS Process Flow Diagram – Supporting Text

    Supplementary Information

    Market Messages

    Web-Form

    Version 6.1 MCR 0145 Update to the validation rules within MPD 2 – QH CoS

    Supplementary Information

    Version 8.0 RMDS QA No business changes applied. MPD clean-up: objects enlarged to

    make text readable, swimlane actors shifted left, swimlanes tightened.

    Version 8.0a MCR 0161 Updated to reflect implementation of "MCR 0161 - Increasing the

    threshold for connection agreement return". Changed references of

    threshold from "100 kVA" to "MV (Medium Voltage)" in Supplementary

    Information for this MPD. Updated description of the step 'Check if

    prov. Acceptance is required'.

    Version 10.2 MCR 1019 Supplementary Information only updated with section for Processing

    of outstanding Meter Works Requests. This section has been

    updated to include process where initial MRSO check shows an open

    Service Order for De-Energisation and where the 010MM has a CoLE

    (either Explicit or Implicit).

  • MPD 02 CoS QH Market Design Version 10.5

    Page 5 of 12

    Version in which last change

    Implemented

    Source of Change Description of Change Date of Version Release

    Version 10.5 MCR 1165 – Conversion

    of MPDs from ARIS to

    document format.

    ARIS Process flow converted to Visio format and Step Table included.

    AIQ 2930 - Supplementary Information reference to MIC replaced with

    Connection Voltage

    27.05.2015

  • MPD 02 CoS QH Market Design Version 10.5

    Page 6 of 12

    2. Process Map

    MPD 02 – CoS QH E

    SB

    Ne

    two

    rks

    Old

    Su

    pp

    lie

    rN

    ew

    Su

    pp

    lie

    rT

    SO

    SE

    MO

    Request MPRN

    registration with

    MRSO

    1

    New Supplier

    requests

    Registration of

    Customer

    Registration

    invalid

    x

    010MM

    2

    Receive CoS

    request

    Registration

    valid

    5

    Validate

    Registration

    6

    Send rejection to

    New Supplier

    7

    Receive 102R

    Rejection

    8

    Notify Old Supplier

    V

    110MM

    9

    Receive notification

    of CoS

    10

    Check if Provisional

    Acceptance

    required

    x

    V

    Agreed Procedure 1

    3

    Inform MRSO of

    updated Wholesale

    Market Registration

    details

    Provisional

    Acceptance not

    required

    Provisional

    Acceptance

    required

    11

    Refer Provisional

    Acceptance to

    DSO

    V

    12

    Send notification to

    New Supplier of

    provisional

    acceptance

    Notify new

    Supplier

    102PMM

    13

    Receive

    Provisional

    Acceptance

    Refer Provisional

    Acceptance to

    DSO

    14

    Get Connection

    Agreement if

    required

    To step 15

    To step 16

    4

    Receive Updated

    Wholesale Market

    Registration details

    102RMM

  • MPD 02 CoS QH Market Design Version 10.5

    Page 7 of 12

    MPD 02 – CoS QH

    ES

    B N

    etw

    ork

    s O

    ld

    Su

    pp

    lie

    rN

    ew

    Su

    pp

    lie

    rT

    SO

    SE

    MO

    15

    Re-energise if

    required

    16

    Update CoS

    Registration as

    Accepted

    17

    Send Acceptance

    to Supplier

    V

    102MM

    18

    Receives CoS

    Registration

    Acceptance

    19

    Register MPRN with

    New Supplier as per

    required exchange

    date

    20

    Determine if CoS

    was for a Trading

    Site

    CoS was not for

    Trading Site

    x

    CoS was for

    Trading Site

    V

    V

    105LMM

    22

    Receives CoS

    Confirmation

    25

    Send Confirmation

    of new CoS to New

    Supplier

    23

    Send Meter

    Technical details to

    New Supplier

    331MM

    24

    Receive Meter

    details

    26

    Receives CoS

    Confirmation

    27

    Send Confirmation

    of CoS to TSO

    105MM

    28

    Receives CoS

    Confirmation

    29

    Send Confirmation

    of CoS to SeMO

    email

    30

    Receive CoS

    Confirmation

    From step 14

    105MM

    21

    Send Confirmation

    of CoS to Old

    Supplier

    From step 10

  • MPD 02 CoS QH Market Design Version 10.5

    Page 8 of 12

    3. Process Description

    Process Step Role Process Step Description Interface

    1 New Supplier requests Registration of Customer

    New Supplier The new Supplier provides a Registration application, completed in accordance with the applicable rules, to Meter Registration System Operator (MRSO). The Supplier is responsible for the validity of all information provided for the purposes of registering a Meter Point.

    010MM

    2 Receive CoS request ESBN MRSO receive Change of Supplier (CoS) Registration request.

    3 Inform MRSO of updated Wholesale Market Registration details

    SEMO Single Electricity Market Operator (SEMO) informs MRSO of updated Wholesale Market Registration details per Agreed Procedure 1.

    4 Receive Updated

    Wholesale Market

    Registration details

    ESBN ESB Networks Ltd (ESBN) receives updated Wholesale Market Registration Details from SEMO.

    5 Validate Registration ESBN MRSO will validate the Registration in accordance with the applicable validation rules (see section Supplementary Information).

    If Registration Invalid - Next Step 6

    If Registration is Valid - Next Step 8 & 10

    6 Send rejection to New Supplier

    ESBN Where the Registration is rejected the requesting Supplier is informed of the Rejection with the reasons.

    102R MM

    7 Receive rejection Message

    New Supplier New Supplier receives Rejection Message.

    8 Notify Old Supplier ESBN If the Registration is not automatically rejected then MRSO will notify the old Supplier that a Registration has been received.

    110 MM

    9 Receive notification of CoS

    Old Supplier Old Supplier receives notification of CoS.

    10 Check if Provisional Acceptance required

    ESBN MRSO will check to see if Provisional Acceptance is needed to progress the CoS. (See Supplementary Information for more details of validation checks).

    If Provisional Acceptance is not required - Next Step 16

    If Provisional Acceptance is required - Next Step 11

  • MPD 02 CoS QH Market Design Version 10.5

    Page 9 of 12

    Process Step Role Process Step Description Interface

    11 Refer Provisional Acceptance to DSO

    ESBN If the Registration is Provisionally Accepted then MRSO will make available the Registration details to Distribution System Operator (DSO) and notify New Supplier.

    Notify New Supplier - Next Step 12

    Refer Provisional Acceptance to DSO - Next Step 14

    12 Send notification to New Supplier of Provisional Acceptance

    ESBN If the Registration is Provisionally Accepted the New Supplier will be informed of the Provisional Acceptance, with reasons.

    102P MM

    13 Receive Provisional Acceptance

    New Supplier New Suppler receives Provisional Acceptance Notification.

    14 Get Connection Agreement if required

    ESBN DSO will get Connection Agreement if required.

    15 Re-energise if required ESBN Where a Registration is Provisionally Accepted pending energisation, and providing a Connection Agreement has been agreed, then DSO will energise the site.

    16 Update CoS Registration as Accepted

    ESBN MRSO will update CoS Registration as Accepted.

    17 Send Acceptance to Supplier

    ESBN If the Registration is accepted the New Supplier will be informed of the Acceptance. The Registration request will not be fully accepted until all conditions for Provisional Acceptance have been met.

    102 MM

    18 Receives CoS Registration Acceptance

    New Supplier New Supplier receives CoS Registration Acceptance.

    19 Register MPRN with New Supplier as per required exchange date

    ESBN MRSO will complete the CoS, within the permitted period, when all the following are satisfied:-

    Five days have elapsed after the notification to the old Supplier.

    Metering and communications are in place and the details are recorded sufficient to allow QH data processing and aggregation to take place

    Any necessary connection agreement is in place.

    20 Determine if CoS was for a Trading Site

    ESBN MRSO will determine if CoS was for a Trading Site.

    If CoS is not for a Trading Site - Next Step 21, 23, 25 & 27

    If CoS is for a Trading Site - Next Step 29

  • MPD 02 CoS QH Market Design Version 10.5

    Page 10 of 12

    Process Step Role Process Step Description Interface

    21 Send Confirmation of CoS to Old Supplier

    ESBN MRSO will confirm the completion of the CoS to the Old Supplier and New Supplier. 105L MM

    22 Receives CoS confirmation

    Old Supplier Old Supplier receives CoS Confirmation.

    23 Send Meter Technical details to New Supplier

    ESBN MRSO will send Meter Technical details to New Supplier. 331 MM

    24 Receive Meter details New Supplier New Supplier receives meter details.

    25 Send Confirmation of new CoS to New Supplier

    ESBN MRSO will send confirmation of new CoS to New Supplier. 105 MM

    26 Receives CoS Confirmation

    New Supplier New Supplier receives confirmation of new CoS.

    27 Send Confirmation of CoS to TSO

    ESBN MRSO will send Confirmation of CoS to TSO. 105 MM

    28 Receives CoS Confirmation

    ESBN TSO receives confirmation of CoS.

    29 Send Confirmation of CoS to SEMO

    ESBN MRSO send Confirmation of CoS, via email, to SEMO. Email

    30 Receive CoS confirmation

    ESBN SEMO will receive an email Confirmation of new CoS.

  • MPD 02 CoS QH Market Design Version 10.5

    Page 11 of 12

    4.0 Supplementary Information

    Registration Validation Rules for a Change of Supplier (QH Metered)

    Failure of the following validations will cause the Registration to be rejected.

    The Supplier must have provided all mandatory information.

    The MPRN must have been assigned and not terminated.

    The Supplier Id is a valid one and the Supplier has a DUoS agreement.

    The Supplier must be entitled to register a Meter Point under the legislation and in accordance with the Trading and Settlement Code.

    The Supplier must warrant that a supply agreement exists with the customer at the Meter Point being registered.

    The Supplier must provide a Supplier Unit that is valid for the Supplier.

    The Supplier must provide a sub-aggregation code (SSAC) that is valid for the Supplier Unit and for the class of metering.

    Where the CoS contains a Trading Site the Registration Request must be consistent with the Wholesale Market Registration details.

    The required date must be no less than five and no more than forty days after the Registration receipt date.

    The Supplier may not provide a read arrangement.

    A separate Change of Supplier may not be in progress for this meter point.

    A Change of Supplier was completed with an effective date less than 20 days before the required date for the requested Change of Supply. This rule does not apply if the Change of Supplier includes a change of tenancy or legal entity.

    Meter point is listed as eligible to change Supplier only if QH metering is installed and QH metering and communications have not yet been installed. In this instance DSO will be requested to prioritise QH meter and communications installation and, following this, the Supplier will be asked to re-submit the Registration as a QH Metered Registration.

    EAI must be valid and not blank for sites over 30kVA.

    Failure of the following validations will cause the Registration to be rejected unless the new information is approved by the Distribution

    System Operator:-

    Meter Point Address advised by Supplier is materially inconsistent with Meter Point Address known to MRSO. DSO may accept or reject the new address submitted by the Supplier.

  • MPD 02 CoS QH Market Design Version 10.5

    Page 12 of 12

    Failure of the following validations will cause the Registration to be Provisionally Accepted, unless rejected above, pending approval by the

    DSO:-

    The Meter Point is de-energised. In this case the Change of Supplier will be effected upon re-energisation.

    The MIC is equal to or exceeds MV (Medium Voltage) and there is no Connection Agreement in place or there is a change of customer name or registered company number. In this case the DSO must confirm the existence of a signed Connection Agreement before the Registration is accepted.

    CoS for Generators

    The market process as detailed for Change of Supplier Quarter Hourly sites can also be applied to Participant and Non Participant

    Generators.

    walshe_dFile AttachmentMPD 02 CoS QH.pdf

  • MPD 02 – CoS QH E

    SB

    Ne

    two

    rks

    Old

    Su

    pp

    lie

    rN

    ew

    Su

    pp

    lie

    rT

    SO

    SE

    MO

    Request MPRN

    registration with

    MRSO

    1

    New Supplier

    requests

    Registration of

    Customer

    Registration

    invalid

    x

    010MM

    2

    Receive CoS

    request

    Registration

    valid

    5

    Validate

    Registration

    6

    Send rejection to

    New Supplier

    7

    Receive 102R

    rejection

    8

    Notify Old Supplier

    V110MM

    9

    Receive notification

    of CoS

    10

    Check if Provisional

    Acceptance

    required

    x

    V

    Agreed Procedure 1

    3

    Inform MRSO of

    updated Wholesale

    Market Registration

    details

    Provisional

    Acceptance not

    required

    Provisional

    Acceptance

    required

    11

    Refer Provisional

    Acceptance to

    DSO

    V

    12

    Send notification to

    New Supplier of

    Provisional

    Acceptance

    Notify new

    Supplier

    102PMM

    13

    Receive

    Provisional

    Acceptance

    Refer Provisional

    Acceptance to

    DSO

    14

    Get Connection

    Agreement if

    required

    4

    Receive Updated

    Wholesale Market

    Registration details

    102RMM

    15

    Re-energise if

    required

    16

    Update CoS

    Registration as

    Accepted

    17

    Send Acceptance

    to Supplier

    V102MM

    18

    Receives CoS

    Registration

    Acceptance

    19

    Register MPRN with

    New Supplier as per

    required exchange

    date

    20

    Determine if CoS

    was for a Trading

    Site

    CoS was not for

    Trading Site

    x

    CoS was for

    Trading Site

    V

    V

    105LMM

    22

    Receives CoS

    confirmation

    25

    Send Confirmation

    of new CoS to New

    Supplier

    23

    Send Meter

    Technical details to

    New Supplier

    331MM

    24

    Receive Meter

    details

    26

    Receives CoS

    Confirmation

    27

    Send Confirmation

    of CoS to TSO

    105MM

    28

    Receives CoS

    confirmation

    29

    Send Confirmation

    of CoS to SeMO

    email

    30

    Receive CoS

    confirmation

    105MM

    21

    Send Confirmation

    of CoS to Old

    Supplier

    Last change made at Version 10.5

    On 27th

    May 2015

    MPD 02 CoS QH End to End.vsd

    Page-1

    walshe_dFile AttachmentMPD 02 CoS QH End to End.pdf

  • MARKET PROCESS DESIGN

    MPD 04 – Supplier of Last Resort (SoLR)

  • MPD 04 SoLR Market Design Version 10.5

    Page 2 of 14

    TABLE OF CONTENTS

    1. INTRODUCTION .................................................................................................................................................................................................................................... 3

    1.1 SCOPE ..................................................................................................................................................................................................................................................... 3

    1.2 HISTORY OF CHANGES ........................................................................................................................................................................................................................... 3

    2. PROCESS MAP ..................................................................................................................................................................................................................................... 5

    2.1 PROCESS DESCRIPTION ......................................................................................................................................................................................................................... 9

    3. SUPPLEMENTARY INFORMATION ............................................................................................................................................................................................. 13

  • MPD 04 SoLR Market Design Version 10.5

    Page 3 of 14

    1. Introduction

    1.1 Scope

    This Procedure describes the process for the Supplier of Last Resort.

    1.2 History of Changes

    This Procedure includes the following changes:-

    Version in which last change

    Implemented

    Source of Change Description of Change Date of Version Release

    Draft MIG September 17th Standardised on use of QH/NQH Terminology – Change applied

    since Version 3.1

    Draft MIG September 17th Updated diagram to show 210 flow (already included in text)

    Updates arising from Supplier Clarification sessions

    Draft Clarification 1 Update to scope of process.

    Draft Written Supplier

    Clarifications

    All references to Profile/Non profile replaced by QH/NQH

    Version 4.2 MCR 0021 Addition of New Market Message 105L sent to the Old Supplier

    Version 5.0 DRR 0087 Amendments to text to cater for Single Point Unmetered & QH Sites

    Version 6.0 MCR 0116 Amendments to satisfy a new requirement of SEM implementation to

    inform the SEMO where there is a reversion to Supplier of Last

    Resort for a Trading Site.

    This will necessitate changes to:-

    ARIS Process Flow Diagram

    Supplementary Information

    Version 8.0 RMDS QA No business changes applied. MPD clean-up: objects enlarged to

    make text readable, swimlane actors shifted left, swimlanes tightened.

  • MPD 04 SoLR Market Design Version 10.5

    Page 4 of 14

    Version in which last change

    Implemented

    Source of Change Description of Change Date of Version Release

    Version 9.0 Non-Conformance (AIQ-

    1768 - Non-conformities

    relating to MCR 162)

    MPD 04 updated to align with MCR 162 and also to reflect recent

    (March '11) discussions with MRSO on how the process actually

    operates.

    Version 10.5 MCR 1155 – Conversion of MPDs from ARIS to document format.

    ARIS Process flow converted to Visio format and Step Table included. Swimlane name amended from Alternative Supplier to Alternative Suppliers. Changed from SMO to SEMO.

    27.05.2015

  • MPD 04 SoLR Market Design Version 10.5

    Page 5 of 14

    2. Process Map

    MPD 04 – SoLR E

    SB

    Ne

    two

    rks

    So

    LR

    Alt

    ern

    ati

    ve

    Su

    pp

    lie

    rsC

    us

    tom

    er

    TS

    OS

    EM

    OD

    efa

    ult

    ing

    Su

    pp

    lie

    rR

    EG

    AU

    TH

    OR

    ITY

    2

    Suspension order

    is issued by SEMO

    to Defaulting

    Supplier

    Defaulting

    Supplier identified

    V

    1

    SEMO contact

    Regulatory

    Authority about

    Defaulting Supplier

    Regulatory

    Authority informed

    about defaulting

    Supplier

    Suspension order

    issued

    3

    Regulatory Authority

    suspends the

    Defaulting Supplier

    from trading

    4

    Terminates the

    Defaulting

    Supplier

    7

    Receive SoLR

    direction

    5

    Alert MRSO of

    termination

    6

    MRSO updates SAP

    with details of

    Defaulting Supplier

    SoLR workflow to

    be initiated

    V8

    MRSO given 1 day to

    calculate the %

    market share of the

    Defaulting Supplier

    9

    MRSO forward the %

    market share of the

    Defaulting Supplier to

    SoLR

    Details of % of Market

    Share of Defaulting

    Supplier received by

    SoLR

    To step

    10

    SoLR Direction

    issued

  • MPD 04 SoLR Market Design Version 10.5

    Page 6 of 14

    MPD 04 – SoLR

    ES

    B N

    etw

    ork

    sS

    oL

    RA

    lte

    rna

    tiv

    e

    Su

    pp

    lie

    rsC

    us

    tom

    er

    TS

    OS

    EM

    OD

    efa

    ult

    ing

    Su

    pp

    lie

    r

    RE

    G

    AU

    TH

    OR

    IT

    Y

    14

    Request DSO to

    review incomplete

    Service Orders

    16

    Cancel in Progress

    Switches for Defaulting

    Supplier

    17

    Identify and de-

    register De-energised

    sites of the Defaulting

    Supplier

    11

    Alternative Suppliers

    receive the list of

    MPRNs of affected

    Customers

    12

    SoLR receives a list

    of MPRNs affected by

    the MPRN event

    13

    Customer provided

    with relevant SoLR

    information within 5

    working days

    SoLR Notification

    received by

    Customer

    15

    Review and update

    incomplete Service

    Orders

    All incomplete

    Service Orders

    dealt with

    18

    Notify DSO that a

    special read is

    required for MD

    Customers

    In Progress

    Switches for the

    Defaulting Supplier

    cancelled

    De-energised sties

    of the Defaulting

    Supplier de-

    registered

    Notification of

    potential need for

    special read for

    MD sites received

    From step 7

    To step 19

    10

    Send list of affected

    customers to SoLR

    and Alternative

    Suppliers

    V

    V

  • MPD 04 SoLR Market Design Version 10.5

    Page 7 of 14

    MPD 04 – SoLR

    ES

    B N

    etw

    ork

    sS

    oL

    RA

    lte

    rna

    tiv

    e

    Su

    pp

    lie

    rsC

    us

    tom

    er

    TS

    OS

    EM

    OD

    efa

    ult

    ing

    Su

    pp

    lie

    rR

    EG

    AU

    TH

    OR

    ITY

    210MM

    Not MD

    Customer

    Customer wishes

    to register with

    Alternative

    Supplier

    19

    Register Customer

    20

    Register MPRNs and

    provide Customer

    Read where

    appropriate

    010MM

    Daily checks of in-

    progress switches

    from Defaulting

    Supplier

    22

    Check whether QH

    or NQH

    23

    Determine if MD

    Customerx

    QH

    V24Estimate

    Readings

    MD Customer

    x25

    Request DSO to

    take a special

    read

    26

    Take a special

    read for MD sites

    27

    Validate Reading

    (MRSO)

    Reading

    available

    21

    Receive Registration

    and Reading

    Messages from

    Alternative Supplier

    V

    19 days after

    SoRL direction

    28

    Send Non-

    Registered

    MPRNs to SoLR

    29

    Register MPRNs and

    provide customer

    read where

    appropriate

    210MM

    010MM

    30

    Receive

    Registration and

    Reading messages

    from SoLR

    From step 11

    To step 31

    ITERATED PROCESS

    NQH

  • MPD 04 SoLR Market Design Version 10.5

    Page 8 of 14

    MPD 04 – SoLR

    ES

    B N

    etw

    ork

    sS

    oL

    RA

    lte

    rna

    tiv

    e

    Su

    pp

    lie

    rsC

    us

    tom

    er

    TS

    OS

    EM

    OD

    efa

    ult

    ing

    Su

    pp

    lie

    rR

    EG

    AU

    TH

    OR

    ITY

    32

    Send confirmation of

    CoS and readings to

    Defaulting Supplier

    34

    Send Confirmation of

    CoS and readings to

    SoLR

    36

    Send confirmation of

    CoS to TSO if QH

    metered

    38

    Determine if CoS

    was for a Trading

    site

    V

    310MM

    105LMM

    33

    Receive CoS

    confirmation and

    readings

    320MM

    105MM

    35

    Receive CoS

    confirmation and

    readings

    331MM

    700MM

    105MM

    331MM

    37

    Receive CoS

    confirmation

    CoS for

    Trading site

    CoS not for

    Trading site

    x

    39

    Notify SEMO of

    CoSReading available

    ITERATED PROCESS

    31

    Register MPRNs to

    SoLR/alternative

    Supplier

    V

    40

    Receive

    confirmation

  • MPD 04 SoLR Market Design Version 10.5

    Page 9 of 14

    2.1 Process Description

    Process Step Role Process Step Description Interface

    1 SEMO contact Regulatory Authority about Defaulting Supplier

    SEMO Where a Default Supplier is identified the Single Electricity Market Operator (SEMO) contacts the Regulatory Authority regarding the Defaulting Supplier.

    2 Suspension order issued by SEMO to Defaulting Supplier

    SEMO Suspension Order issued by SEMO to Defaulting Supplier.

    3 Regulatory Authority suspends the Defaulting Supplier from trading

    Regulatory Authority

    The Regulatory Authority suspends the Defaulting Supplier from trading and the SoLR direction is issued.

    4 Terminates the Defaulting Supplier

    SEMO SEMO will terminate the Defaulting Supplier.

    5 Alert MRSO of termination

    SEMO SEMO will alert Meter Registration Services Operator (MRSO) of termination.

    6 MRSO updates SAP with details of Defaulting Supplier

    ESBN MRSO will update SAP (SAP application for Utilities business) with details of Defaulting supplier. The SoLR workflow is initiated

    7 Receive SoLR direction

    ESBN MRSO receives SoLR direction from the Regulatory Authority.

    8 MRSO given 1 day to calculate the % market share of the Defaulting Supplier

    ESBN MRSO calculates the % market share of the Defaulting Supplier.

    9 MRSO forward the % market share of the Defaulting Supplier to SoLR

    ESBN MRSO advises the SoLR of the % market share of the Defaulting Supplier.

    10 Send list of affected Customers to SoLR and Alternative Supplier

    ESBN MRSO sends list of affected Customers to the SoLR and Alternative Suppliers.

    11 Alternative Suppliers receives the list of MPRNs of affected Customers

    Alternative Suppliers

    The Alternative Suppliers receives a .CSV file containing a list of MPRN’s of affected Customers

    Register Customer - next step 19

  • MPD 04 SoLR Market Design Version 10.5

    Page 10 of 14

    Process Step Role Process Step Description Interface

    12 SoLR receives a list of MPRNs affected by the MPRN event

    SoLR The SoLR receives a .CSV file containing a list of MPRN’s of affected Customers.

    13 Customer provided with relevant SoLR information within 5 working days

    SoLR The SoLR informs the affected Customers by letter, of the various CoS options (including list of alternative, active Suppliers in the market) within 5 working days of receiving the .CSV file.

    14 Request Meter Operations to review incomplete Service Orders

    ESBN MRSO will request Distribution Service Operator (DSO) to review all incomplete Service Orders for the MPRN’s on the .CSV file.

    15 Review and update incomplete Service Orders

    ESBN DSO will review and update incomplete Service Orders. [See Supplementary Information – Incomplete Service Orders].

    16 Cancel in Progress Switches for Defaulting Supplier

    ESBN MRSO will cancel all In-Progress Change of Supplier (CoS) switches to the Defaulting Supplier.

    17 Identify and de-register de-energised sites of the Defaulting Supplier

    ESBN MRSO will identify and de-register all de-energised sites of the Defaulting Supplier.

    18 Notify DSO that a special read is required for MD Customers

    ESBN MRSO will notify the DSO that special reads will be required for the Maximum Demand sites.

    19 Register Customer Alternative Suppliers

    Customer of Defaulting Supplier wishes to register with Alternative Supplier.

    20 Register MPRNs and provide Customer Read where appropriate

    Alternative Suppliers

    The Alternative Supplier provides a registration application, completed in accordance with the applicable rules, to MRSO . The Alternative Supplier may provide a Customer reading to MRSO. The Supplier is responsible for the validity of all information provided for the purposes of registering a Meter Point.

    210 MM 010 MM

    21 Receive Registration and Reading Messages from Alternative Supplier

    ESBN ESB Networks (ESBN) Receive Change of Supplier (CoS) Registration Requests.

    22 Check whether QH or NQH

    ESBN MRSO will carry out daily checks of In-Progress CoS switches from Defaulting Supplier to determine if they are QH or NQH sites.

  • MPD 04 SoLR Market Design Version 10.5

    Page 11 of 14

    Process Step Role Process Step Description Interface

    23 Determine if MD Customer

    ESBN MRSO will determine if In-Progress CoS is for a MD Customer.

    Not MD Customer - Next Step 24

    MD Customer - Next Step 25

    24 Estimate Readings ESBN MRSO will provide estimate reading for NHQ site if required.

    25 Request DSO to take a special read

    ESBN MRSO will request the DSO to take a special reading for MD sites.

    26 Take a special read for MD sites

    ESBN The DSO arranges for the collection of readings for the affected Maximum Demand Meter Points. In exceptional circumstances, such as a high volume of meter points affected, the DSO may opt to provide estimates.

    27 Validate Reading (MRSO)

    ESBN MRSO will validate readings.

    28 Send Non-Registered MPRNs to SoLR

    ESBN 19 days after the SoLR Direction MRSO will send a .CSV file containing the list of MPRN’s which remain registered to the Defaulting Supplier.

    29 Register MPRN and provide Customer ready where appropriate

    ESBN The SoLR provides a registration application, completed in accordance with the applicable rules, to MRSO. The SoLR may provide a Customer reading to MRSO. The Supplier is responsible for the validity of all information provided for the purposes of registering a Meter Point.

    210 MM 010 MM

    30 Receive registration and reading messages from SoLR

    ESBN ESB Networks (ESBN) Receive Change of Supplier (CoS) Registration Requests.

    31 Register MPRNs to SoLR/Alternative Supplier

    ESBN MRSO will complete the CoS process for both the SoLR and the Alternative Suppliers.

    32 Send confirmation of CoS and readings to Defaulting Supplier

    ESBN MRSO will confirm the Completion of the CoS to the Defaulting Supplier and will send CoS readings.

    105L MM 310 MM

    33 Receive CoS confirmation and readings

    Defaulting Suppliers

    The Defaulting Supplier will receive Confirmation of CoS and readings.

    34 Send Confirmation of CoS and readings to SoLR

    ESBN MRSO will confirm the Completion of the CoS to the SoLR and will send CoS readings.

    105 MM 320 MM 331 MM 700 MM

    35 Receive CoS confirmation and readings

    SoLR The SoLR will receive confirmation of CoS and readings.

    36 Send confirmation of CoS to TSO if QH metered

    ESBN MRSO will send confirmation of CoS to TSO if site is QH metered.

  • MPD 04 SoLR Market Design Version 10.5

    Page 12 of 14

    Process Step Role Process Step Description Interface

    37 Receive CoS confirmation

    ESBN The TSO receive CoS confirmation of QH site. 105 MM 331 MM

    38 Determine if CoS was for a Trading site

    ESBN MRSO will determine if CoS was for a trading site:-

    Not for trading site - no further action

    For Trading site - Next Step 39

    39 Notify SEMO of CoS ESBN Where CoS is for trading site MRSO will notify SEMO.

    40 Receive notification SEMO SEMO receive notification of CoS for trading site.

  • MPD 04 SoLR Market Design Version 10.5

    Page 13 of 14

    3. Supplementary Information

    Supplier of Last Resort Instructions

    The Supplier of Last Resort need not initially provide a registration request to MRSO. After day 19 however, they must send in 010 MMs to register any

    remaining Customers.

    Alternative Supplier Instructions

    An alternative Supplier should provide a registration request to MRSO using the appropriate interface by using the 010 MM. The use of a scheduled read

    should not be requested.

    The alternative Supplier may provide a Customer read using the 210 MM or the 010 MM.

    Non-Participant Generator Export

    This section is being added as a placeholder pending further discussions regarding the treatment of Supplier of Last Resort for the Export Arrangements on a

    Non Participant Generator.

    SoLR Assumptions

    This SoLR process is for a Defaulting Supplier only and cannot be initiated by a Defaulting Supplier Unit.

    On day 1 all MPRNS are to be reviewed by MRSO / ESBN for any outstanding service orders.

    Two .CSV data files are to be issued by MRSO on Day 1. o The first .CSV file is for the SoLR and will consist of the following:

    MPRN Level Details, the Meter Point Address, Customer Name, Customer Contact Details, Notification Address, Technical Contact

    Details, Technical Contract Address, Medical Equipment Special Needs, Customer Service Special Needs where applicable

    o The second .CSV file is for the alternative Suppliers and will consist of the following:- MPRN Level Details, the Meter Point Address, and the Customer Name where applicable.

    o MRSO will issue a revised .CSV data file by close of business on day 19 to the SoLR. This revised file will exclude any MPRNS that have since been registered to alternative Suppliers.

    Existing CoS to the exiting Supplier are to be cancelled and notified by MRSO.

    A letter is to be issued to the Defaulting Supplier’s Customers explaining the various CoS options.

    The designated Supplier of Last Resort is responsible for informing the affected Customers by letter, of the alternative active suppliers1 in the electricity market within 5 working days.

  • MPD 04 SoLR Market Design Version 10.5

    Page 14 of 14

    Existing CoS to alternative Suppliers are processed to the SoLR event date and procedures.

    Alternative Suppliers are obliged to cancel 010 CoS messages for any MPRN on the day 1 .CSV file if the message is submitted after day 19.

    Alternative Suppliers will not receive a Customer Name for domestic MPRNS (which is in line with existing market rules).

    Meter Work service orders should be analysed on case by case basis.

    010 MMs received from alternative Suppliers for SoLR MPRNs are required to contain the new S