This communication is being released to provide an update on the Market Square design and construction. Despite best efforts by the City of Stratford and the BIA, we understand there has been some uncertainty regarding a number of design and construction details. We trust this information will provide clarification for everyone who is interested in and affected by this project.
The Market Square redevelopment project represents a very important community renewal project. It creates a new opportunity for our citizens to gather and to support downtown businesses, and will also be enjoyed by the 500,000 tourists who visit Stratford every year. Stratford City Council is excited to achieve this renewal during Canada's Sesquicentennial celebrations as a recommitment of a public asset to be enjoyed by countless Canadians and international visitors, including our residents.
Design Aspects:
The design selection and refinement process took place throughout 2016. Fundamentally, the conceptual design originally proposed by GSP Group in February 2016 and then refined and approved by Council on 27 June 2016 is in keeping with the finalized site plan that was issued for tender.
On 27 June 2016, Council approved the proposed design with the following changes:
Brick pavers have been extended to the parking area to create a completeproject;
Pedestrian bump-outs and crosswalks have been added on Downie andWellington Streets to improve pedestrian safety;
The ice pad infrastructure has been removed from the proposed design; The buses can be located at the side of City Hall as per the RFP submission.
During the refinement process that followed, the following changes were made to the site plan that was issued for tender:
The staircase has been removed from the center of the square to improveaccessibility. Once the decision was made to remove the skating rink, we wereable to grade the site and eliminate the need for the staircase;
The crosswalks have been changed from coloured asphalt to painted asphalt as acost saving measure;
2
There are 10 trees included in the current site plan. The design presented on 1June 2016 showed 12 trees. 2 trees were removed from the Wellington Streetside owing to space constraints;
There has always been and continues to be parallel and perpendicular parking inthe south end of Market Square. The number of spaces has changed as follows:
o Plans from 1 June 2016 show 32 parking spaces in the south end ofMarket Square (30 regular and 2 accessible);
o The latest site plan dated 1 December 2016 shows 28 regular parkingspaces and 4 accessible spaces in the south end of Market Square.However, the configuration is the same as it was on 27 June when Councilapproved the design (23 perpendicular and 9 parallel). Note that allaccessible parking spaces are perpendicular.
It should be noted that GSP included an option showing no parking in Market Square in their RFP response dependent upon the results of the Parking Study. Public feedback received during the consultation process advocated the inclusion of parking in the south end of Market Square, therefore parking was retained in the final design plan.
Budget:
The budget breakdown for this project is appended to this document. Funding has been allocated to this project from appropriate City reserves based on the work that is being completed. For example, funding has been allocated from the water reserve because we are replacing waterlines beneath Market Square. Similarly, funding has been allocated from the parking reserve to finance the rehabilitation of the 32 parking spots. Other reserves have been utilized to stabilize the 2017 property tax increase as this is a one-time project funding allocation.
Click here to see the attached budget breakdown for further details.
Process Timeline:
This renewal process has been several years in the making. The City has undertaken a design and public consultation processes that were both appropriately inclusive and extensive. In 2015, the City of Stratford retained AtFocus Consulting to facilitate the Market Square visioning and community consultation process. The feedback from this process resulted in the formulation of a Vision and Guiding Principles for Market Square that were adopted by Council in July 2015.1 At this time, Council passed a resolution committing to undertaking the redevelopment of Market Square (R2015-358).
1 AtFocus Market Square Presentation to Council
3
Since that time, this project has proceeded as follows:
October 2015 – The City issued RFPQ15-08, a Request for Prequalification toshortlist architectural and/or landscape design firms interested in designing theredevelopment of Market Square. Three firms were shortlisted – GSP Group,MMM Group, and Janet Rosenberg and Studio;
December 2015 – The City issued RFP15-09, inviting the three shortlisted firmsto submit design proposals;
February 2016 – The three design proposals were received. The City solicitedpublic feedback on these designs at a public open house and online. GSP Groupsubmitted the following proposal:
(View full image here)
AtFocus Market Square Council Meeting - 27 July; Revised 21 September 2015 Stratford Market Square Vision Attachment - 19 May 2015
4
March 2016 – The Market Square design selection committee met to evaluatethe three designs and recommended GSP Group to Council. On 29 March,Stratford City Council retained GSP Group to complete the design work;2
April-May 2016 – GSP refined the conceptual design in consultation with CityStaff and community stakeholders and provided updates to Council;3
1 June 2016 – GSP presented the revised conceptual design based on theconsultations that were held with Council various stakeholders at a public OpenHouse on 1 June. The Master Plan for the finalized redevelopment waspresented as follows4:
(View full image here)
2 20160329 - Report - Market Square Design Selection Process 3 20160517 - Report - Market Square Design Expenses 4 Market Square Conceptual Design - Open House, 1 June 2016
5
June 2016 – After the public open house, the City invited public feedback onthe design and presented comments to GSP and Council. Council considered therevised design and public feedback on 13 June as the Finance and LabourRelations Committee.5 On 27 June, City Council approved the revised design,removing the skating rink infrastructure from Phase I and allocating the savingsto walkways and pavers, and extended the paving treatment to the south side ofMarket Square.6
July-September 2016 – City Staff worked with GSP Group to refine theinfrastructure and engineering requirements and prepare the constructiondocuments for tender. The City issued RFPQ16-11, a request for prequalificationto shortlist construction firms interested in completing the redevelopment ofMarket Square. Four construction firms were shortlisted – Amico, GatemanMilloy, Ro-Buck Contracting, and Sierra Construction. A pre-construction openhouse was held on 20 September to provide information to residents andbusinesses impacted by the construction;
October 2016 – The Market Square construction tender T16-13 closed on 12October, for which we received three bids. The construction bids received werehigher than the specified project budget. Staff worked closely with GSP to findefficiencies and reduce project costs. By eliminating sole-source suppliers andemploying value engineering, significant savings were achieved withoutcompromising the Council-approved design and integrity of the project.
November 2016 – Once efficiencies were found, the tender was re-issued asT16-13 to the four short listed bidders. T16-13 closed on 14 November, with Ro-buck Contracting coming in as the low bidder. The bids were presented toCouncil on 14 November. Council passed Resolution 2016-417 as follows:
That Council approve the award of the Market Square Redevelopmentcontract to Ro-Buck Contracting at the total tender price of$2,171,509.50 (excluding HST), and the inclusion of the provisionalitems valued at an additional $334,214 (excluding HST) and that theMayor and Clerk are authorized to sign the necessary contractagreement; and that staff review and report on the provisional items ata future meeting.7
The site plan dated 1 December 2016 is as follows:
5 20160613 – Market Square Design Presentation 20160613 – Market Square Cost Estimates, Transit 6 See City of Stratford Regular Council Minutes, 27 June 2016. 7 See City of Stratford Regular Council Minutes, 14 November 2016.
6
(View full image here)
GSP group will be sending 3D colour renderings of this site plan the week of 16January 2017. They will be posted on the City’s website, social media accounts,and circulated to the BIA and Market Square Committee.
For more information please contact:
Stephanie Potter, Policy and Research Associate 519-271-0250 x253 [email protected]
Nancy Roulston, Manager of Engineering 519-271-0250 x226 [email protected]
Market Square Construction Costs
Construction Costs Part A Site Preparation 102,075 Part B Surface and Roadwork Removals 45,308 Part C Environmental Remediation 0 Part D.1 Sanitary Sewers & Appurtenances 0 Part D.2 Storm Sewers & Appurtenances 74,228 Part D.3 Watermain & Appurtenances 150,150 Part E Roadwork and Surface Construction1 1,399,249 Part F Utility Co-ordination, Traffic Control, and Misc. 200,500 Part G Provisional Items2 334,214
Contingency 200,000 Sub Total 2,505,724 Non-Rebatable HST 44,101 TOTAL 2,549,824
Construction Funding: Adjusted 5 December 2016
Water Reserve 191,000 Parking Reserve Fund 105,000 Canada 150 Grant 250,000 Working Capital Reserve 216,000 Walmart Donation 1,113,000 2017 Infrastructure Levy 250,000 Fund Raising 100,000 2017 Tax Levy/Reserve3 190,000 Federal Gas Tax Grant 140,000 Total 2,555,000
Notes: 1Includes Site Furnishings: Café Tables 8 Café Chairs 32 Surface Mounted Benches 8 Bike Racks 5 Bollards (Permanent & Removable) 21 Umbrellas 3 Waste & Recycling Receptacles 8 Wooden Benches 3
2Includes pedestrian bumpouts, crosswalks, extra electrical, plinths, charge station 3Pending budget approval the $190,000 may be funded through the working capital reserve.
City of Stratford - Design for Redevelopment of Market Square: RFP15-09 Page 11
1
2
3
4
5
6
Market Square
The Grove
Digital Room
Sesquicentennial Plaza
Lloyd Robertson Garden
5 4
32
1
Avon Fountain
6
7
8
Market Place Promenade
Conversation Corner
7
8
Market Square Master Plan
MASTER PLAN
REF
ER T
O S
HEE
T L4
.0FO
R P
LAN
TIN
G P
LAN
REF
ER T
O S
HEE
T L4
.0FO
R P
LAN
TIN
G P
LAN
REL
OC
ATED
PLA
QU
E
NEW
CEN
TRE
LIN
E O
F R
OAD
6L5
.2LI
MIT
OF
RO
OT
SOIL
CEL
LS,
TYP.
- 2
CO
UR
SES
DEE
P
7L5
.2D
ECID
UO
US
TREE
PLA
NTI
NG
WIT
H L
IMES
TON
E ED
GE,
TYP
.
5 L5.1
LIM
ESTO
NE
AND
CO
NC
RET
EPL
INTH
S
LIM
IT O
F SU
BG
RA
DE
CO
NC
RET
EPA
D F
OR
SPR
AY
JET
AR
EA P
AVI
NG
- REF
ER T
O S
HEE
T L2
.0
PAY
AND
DIS
PLAY
PAR
KIN
GM
ETER
, REF
ER T
OEL
ECTR
ICAL
DR
AWIN
GS
REL
OC
ATED
HIS
TOR
IC S
IGN
, TYP
.- H
ISTO
RIC
IMAG
E SI
DE
TO F
ACE
TOW
ARD
S PL
AZA
WR
WR
W R
W
R
UN
IT P
AVIN
G B
- REF
ER T
O S
HEE
T L2
.0 F
OR
MAT
ERIA
LS A
ND
LAY
OU
T
UN
IT P
AVIN
G C
- REF
ER T
O S
HEE
T L2
.0 F
OR
MAT
ERIA
LS A
ND
LAY
OU
T
UN
IT P
AVIN
G C
- REF
ER T
O S
HEE
T L2
.0 F
OR
MAT
ERIA
LS A
ND
LAY
OU
T
VEH
ICU
LAR
GR
ADE
CO
NC
RET
E PA
VIN
G- R
EFER
TO
SH
EET
L2.0
FO
R M
ATER
IALS
AND
LAY
OU
T
PRO
POSE
D L
IGH
T ST
AND
ARD
,TY
P. -
REF
ER T
O E
LEC
TRIC
AL
REF
ER T
O C
IVIL
FO
R A
LLSE
RVI
CIN
G IN
FOR
MAT
ION
.EL
ECTR
IC C
AR C
HAR
GIN
GST
ATIO
N U
NIT
, BY
OTH
ERS.
REF
ER T
O E
LEC
TRIC
ALD
RAW
ING
S FO
R C
ON
DU
ITLO
CAT
ION
S.
ASPH
ALT
CR
OSS
WAL
KS, T
YP.
- REF
ER T
O C
IVIL
DR
AWIN
GS
PED
ESTR
IAN
GR
ADE
CO
NC
RET
E PA
VIN
G- R
EFER
TO
SH
EET
L2.0
FO
R M
ATER
IALS
AN
DLA
YOU
T
EXIS
TIN
G W
ALK
TO R
EMAI
N -
CO
NTR
ACTO
R T
O T
IE IN
TO E
XIST
ING
FIN
ISH
ED G
RAD
E W
ITH
NEW
CO
NC
RET
EPA
VIN
G
EXIS
TIN
G W
ALK
TO R
EMAI
N- C
ON
TRAC
TOR
TO
TIE
INTO
EXI
STIN
GFI
NIS
HED
GR
ADE
WIT
H N
EW C
ON
CR
ETE
PAVI
NG
EXIS
TIN
G W
ALK
TO R
EMAI
N- C
ON
TRAC
TOR
TO
TIE
INTO
EXI
STIN
GFI
NIS
HED
GR
ADE
WIT
H N
EW C
ON
CR
ETE
PAVI
NG
EXIS
TIN
G W
ALK
TO R
EMAI
N- C
ON
TRAC
TOR
TO
TIE
INTO
EXI
STIN
GFI
NIS
HED
GR
ADE
WIT
H N
EW C
ON
CR
ETE
PAVI
NG
EXIS
TIN
G W
ALK
TO R
EMAI
N- C
ON
TRAC
TOR
TO
TIE
INTO
EXI
STIN
GFI
NIS
HED
GR
ADE
WIT
H N
EW C
ON
CR
ETE
PAVI
NG
EXIS
TIN
G W
ALK
TO R
EMAI
N- C
ON
TRAC
TOR
TO
TIE
INTO
EXIS
TIN
G F
INIS
HED
GR
ADE
WIT
HN
EW C
ON
CR
ETE
PAVI
NG
EXIS
TIN
G W
ALK
TO R
EMAI
N- C
ON
TRAC
TOR
TO
TIE
INTO
EXI
STIN
GFI
NIS
HED
GR
ADE
WIT
H N
EW C
ON
CR
ETE
PAVI
NG
LIM
IT O
F N
EW A
SPH
ALT
- CO
NTR
ACTO
R T
O T
IE IN
TO E
XIST
ING
GR
ADE
WIT
H N
EW A
SPH
ALT
LIMIT OF WORK
LIMIT OF WORK
LIM
IT O
F W
OR
K
LIM
IT O
F
WO
RK
LIM
IT O
F N
EW A
SPH
ALT
- CO
NTR
ACTO
R T
O T
IE IN
TO E
XIST
ING
GR
ADE
WIT
H N
EW A
SPH
ALT,
REF
ER T
OC
IVIL
DR
AWIN
GS
FOR
DET
AILS
WH
ITE
PAIN
TED
LIN
ES F
OR
LO
ADIN
GAN
D U
NLO
ADIN
G S
PAC
E - R
EFER
TO
CIV
IL D
RAW
ING
S
3L5
.2TA
CTI
LE W
ARN
ING
STR
IPS,
TYP.
WAY
-FIN
DIN
G E
LEM
ENT
WIT
HM
ESSA
GE
BOAR
D1 L5.1
WAY
-FIN
DIN
GEL
EMEN
T1 L5.1
WAY
-FIN
DIN
G E
LEM
ENT
*
*
*
MET
AL E
DG
ER, T
YP.
- REF
ER T
O P
AVIN
G P
LAN
L2.
0
REL
OC
ATED
EXI
STIN
G G
RO
UN
DPL
AQU
ES (5
TO
TAL)
2 L5.1
CH
RIS
TMAS
TR
EE A
NC
HO
RSL
EEVE
AN
D C
OLL
AR
CO
NC
RET
E C
UR
B, T
YP.
- REF
ER T
O C
IVIL
DR
AWIN
GS
CO
NC
RET
E C
UR
B, T
YP.
- REF
ER T
O C
IVIL
DR
AWIN
GS
WH
ITE
PAIN
TED
LIN
ES, T
YP.
- REF
ER T
O C
IVIL
DR
AWIN
GS
WH
ITE
PAIN
TED
LIN
ES, T
YP.
- R
EFER
TO
CIV
IL D
RAW
ING
S
ELEC
TRIC
CAR
PAR
KIN
G S
IGN
BY O
THER
S
SPR
AY J
ETS,
TO
BE
PRO
VID
ED A
ND
INST
ALLE
D B
Y W
ATER
PLAY
AS
SPEC
IFIE
D O
R A
PPR
OVE
D E
QU
AL
WH
ITE
PAIN
TED
LIN
ES, T
YP.
- REF
ER T
O C
IVIL
DR
AWIN
GS
BLU
E PA
INTE
D L
INES
FO
RAC
CES
SIBL
E SP
ACES
, TYP
.- R
EFER
TO
CIV
IL D
RAW
ING
S
PLA
NTE
D T
REE
PIT
, TYP
.- R
EFER
TO
SH
EET
L4.0
FO
RPL
AN
TIN
G P
LAN
1 L5.1
DE-
CH
OR
LIN
ATI
ON
UN
IT F
OR
SPR
AY
JETS
- R
EFER
TO
CIV
IL A
ND
AS
SPEC
IFIE
D B
Y W
ATE
RPL
AY
PED
ESTR
IAN
GR
ADE
CO
NC
RET
E PA
VIN
G- R
EFER
TO
SH
EET
L2.0
FO
R M
ATER
IALS
AND
LAY
OU
T
LIM
IT O
F N
EW A
SPH
ALT
- CO
NTR
ACTO
R T
O T
IE IN
TO E
XIST
ING
GR
ADE
WIT
H N
EW A
SPH
ALT,
REF
ERTO
CIV
IL D
RAW
ING
S FO
R D
ETAI
LS
MAR
KET
PLAC
E SO
UTH
TO
BE
ON
E -W
AYTR
AFFI
C H
EAD
ING
EAS
T. O
NE
WAY
TRAF
FIC
SIG
N T
O B
E IN
STAL
LED
AT
MO
UTH
OF
PAR
KIN
G L
ANE
BLU
E PA
INTE
D L
INES
FO
R A
CC
ESSI
BLE
SPAC
ES, T
YP.
- REF
ER T
O C
IVIL
DR
AWIN
GS
ASPH
ALT
CR
OSS
WAL
KS, T
YP.
- REF
ER T
O C
IVIL
DR
AWIN
GS
PED
ESTR
IAN
GR
ADE
CO
NC
RET
E PA
VIN
G -
REF
ER T
O S
HEE
T L2
.0 F
OR
MAT
ERIA
LS A
ND
LAYO
UT
REL
OC
ATED
STO
NE
MO
NU
MEN
T/TI
ME
CAP
SULE
ON
CO
NC
RET
E FO
OTI
NG
- R
EMO
VAL
TO B
E H
AND
DU
G
ASPH
ALT
CR
OSS
WAL
KS, T
YP.
- REF
ER T
O C
IVIL
DR
AWIN
GS
PAY
AND
DIS
PLAY
PAR
KIN
GM
ETER
, REF
ER T
OEL
ECTR
ICAL
DR
AWIN
GS
L1.0
DAT
E: 2
9 JU
NE
2016
SCAL
E: 1
: 300
M
DR
AWN
BY:
JH
PRO
JEC
T N
O.:
1600
6.65
DAT
E
DAT
E
REV
ISIO
NS
ISSU
E
BYBY
STR
ATFO
RD
, ON
TAR
IOST
RAT
FOR
D M
ARKE
T SQ
UAR
E
KEY
PLAN
N.T
.S.
LAN
DSC
APE
SITE
PLA
N
Lege
nd
22 J
ULY
201
610
0% D
ESIG
N D
EVEL
OPM
ENT
CM
GEN
ERA
L N
OTE
S:1.
DR
AWIN
GS
NO
T TO
BE
USE
D F
OR
CO
NST
RU
CTI
ON
UN
LESS
AU
THO
RIZ
ED B
Y T
HE
LAN
DSC
APE
ARC
HIT
ECT
2. C
ON
TRAC
TOR
SH
ALL
REP
OR
T AN
Y D
ISC
REP
ANC
IES
BETW
EEN
TH
E D
RAW
ING
S AN
D S
ITE
CO
ND
ITIO
NS
PRIO
R T
O C
OM
MEN
CEM
ENT
OF
THE
WO
RK
3. A
LL U
TILI
TY L
OC
ATES
AR
E TH
E R
ESPO
NSI
BILI
TY O
F TH
E C
ON
TRAC
TOR
. H
AND
DIG
WIT
HIN
THE
LIM
ITS
REC
OM
MEN
DED
BY
THE
SER
VIC
E U
TILI
TY.
UTI
LITY
CO
NFL
ICTS
WIT
H P
RO
POSE
DTR
EE L
OC
ATIO
NS
MU
ST B
E R
EPO
RTE
D IM
MED
IATE
LY T
O T
HE
LAN
DSC
APE
ARC
HIT
ECT
4. B
ASE
DR
AWIN
G P
RO
VID
ED B
Y C
ITY
OF
STR
ATFO
RD
.
5. F
OR
GR
ADIN
G IN
FOR
MAT
ION
REF
ER T
O D
RAW
ING
BY
MTE
CO
NSU
LTAN
TS IN
C.
FOR
SER
VIC
ING
INFO
RM
ATIO
N R
EFER
TO
DR
AWIN
GS
BY M
TE C
ON
SULT
ANTS
INC
.
6. L
AND
SCAP
E D
RAW
ING
S SH
OW
EN
GIN
EER
ING
INFO
RM
ATIO
N F
OR
DES
IGN
PU
RPO
SES
ON
LY.
DO
NO
T C
ON
STR
UC
T EN
GIN
EER
ING
WO
RKS
FR
OM
TH
ESE
DR
AWIN
GS.
ww
w.g
spgr
oup.
ca
201-
72 V
ictor
ia St
reet
South
Kitch
ener
, Onta
rio N
2G 4Y
9T F
519 5
69 88
8351
9 569
8643
162 L
ocke
Stre
et So
uth, S
uite 2
00Ha
milto
n, On
tario
L8P
4A9
T90
5 572
7477
04
10
1:300
52
(m)
15
PRO
JEC
TAR
EA
PRO
PER
TY B
OU
ND
ARY
LIM
IT O
F W
OR
K
LIM
IT O
F N
EW A
SPH
ALT
ASPH
ALT
PAVI
NG
CR
OSS
WAL
K - R
EFER
TO
CIV
IL
ASPH
ALT
PAVI
NG
- R
EFER
TO
CIV
IL
STR
EET
LIG
HT,
TYP
. - R
EFER
TO
ELE
CTR
ICAL
EXIS
TIN
G S
POT
ELEV
ATIO
NS
PRO
POSE
D S
POT
ELEV
ATIO
NS
NEW
WAT
ERM
AIN
- R
EFER
TO
CIV
IL
NO
TES:
1.R
EFER
TO
CIV
IL D
RAW
ING
S FO
R A
LL G
RAD
ING
AN
D S
ERVI
CIN
GIN
FOR
MAT
ION
.
2.R
EFER
TO
ELE
CTR
ICAL
DR
AWIN
GS
FOR
ALL
LIG
HTI
NG
AN
D E
LEC
TRIC
ALIN
FOR
MAT
ION
.
3.R
EFER
TO
SH
EET
L1.1
FO
R S
ITE
LAYO
UT
PLAN
.
4.C
ON
TRAC
TOR
TO
PR
OVI
DE
STR
UC
TUR
AL R
ECO
MM
END
ATIO
N A
ND
LET
TER
OF
CER
TIFI
CAT
ION
FO
R M
OD
IFIC
ATIO
NS
TO B
UIL
DIN
G F
OU
ND
ATIO
NS
AS IT
REL
ATES
TO
SPR
AY J
ET F
EATU
RE
INST
ALLA
TIO
N.
16 A
UG
201
675
% C
ON
STR
UC
TIO
N D
OC
UM
ENTS
CM
12 S
EPT
2016
ISSU
ED F
OR
TEN
DER
C
M
CO
NC
RET
E PA
VIN
G (V
EHIC
ULA
R G
RAD
E) -
REF
ER T
O S
HEE
T L2
.0
CO
NC
RET
E PA
VIN
G (P
EDES
TRIA
N G
RAD
E) -
REF
ER T
O S
HEE
T L2
.0
PAVE
RS
- REF
ER T
O S
HEE
T L2
.0
ASPH
ALT
PAVI
NG
CR
OSS
WAL
KS (P
RO
VISI
ON
AL) -
REF
ER T
O C
IVIL
04 N
OV
2016
REI
SSU
ED F
OR
TEN
DER
C
M
01 D
EC 2
016
ISSU
ED F
OR
CO
NST
RU
CTI
ON
JH
/RT