1 Market Square Construction and Design Update 13 January 2017 This communication is being released to provide an update on the Market Square design and construction. Despite best efforts by the City of Stratford and the BIA, we understand there has been some uncertainty regarding a number of design and construction details. We trust this information will provide clarification for everyone who is interested in and affected by this project. The Market Square redevelopment project represents a very important community renewal project. It creates a new opportunity for our citizens to gather and to support downtown businesses, and will also be enjoyed by the 500,000 tourists who visit Stratford every year. Stratford City Council is excited to achieve this renewal during Canada's Sesquicentennial celebrations as a recommitment of a public asset to be enjoyed by countless Canadians and international visitors, including our residents. Design Aspects: The design selection and refinement process took place throughout 2016. Fundamentally, the conceptual design originally proposed by GSP Group in February 2016 and then refined and approved by Council on 27 June 2016 is in keeping with the finalized site plan that was issued for tender. On 27 June 2016, Council approved the proposed design with the following changes: Brick pavers have been extended to the parking area to create a complete project; Pedestrian bump-outs and crosswalks have been added on Downie and Wellington Streets to improve pedestrian safety; The ice pad infrastructure has been removed from the proposed design; The buses can be located at the side of City Hall as per the RFP submission. During the refinement process that followed, the following changes were made to the site plan that was issued for tender: The staircase has been removed from the center of the square to improve accessibility. Once the decision was made to remove the skating rink, we were able to grade the site and eliminate the need for the staircase; The crosswalks have been changed from coloured asphalt to painted asphalt as a cost saving measure;

Upload: others

Post on 04-Jul-2020

8 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Market Square Construction and Design Update ... - Stratford · 1/13/2017  · – The Market Square design selection committee met to evaluate the three designs and recommended GSP

1

Market Square Construction and Design Update

13 January 2017

This communication is being released to provide an update on the Market Square design and construction. Despite best efforts by the City of Stratford and the BIA, we understand there has been some uncertainty regarding a number of design and construction details. We trust this information will provide clarification for everyone who is interested in and affected by this project.

The Market Square redevelopment project represents a very important community renewal project. It creates a new opportunity for our citizens to gather and to support downtown businesses, and will also be enjoyed by the 500,000 tourists who visit Stratford every year. Stratford City Council is excited to achieve this renewal during Canada's Sesquicentennial celebrations as a recommitment of a public asset to be enjoyed by countless Canadians and international visitors, including our residents.

Design Aspects:

The design selection and refinement process took place throughout 2016. Fundamentally, the conceptual design originally proposed by GSP Group in February 2016 and then refined and approved by Council on 27 June 2016 is in keeping with the finalized site plan that was issued for tender.

On 27 June 2016, Council approved the proposed design with the following changes:

Brick pavers have been extended to the parking area to create a completeproject;

Pedestrian bump-outs and crosswalks have been added on Downie andWellington Streets to improve pedestrian safety;

The ice pad infrastructure has been removed from the proposed design; The buses can be located at the side of City Hall as per the RFP submission.

During the refinement process that followed, the following changes were made to the site plan that was issued for tender:

The staircase has been removed from the center of the square to improveaccessibility. Once the decision was made to remove the skating rink, we wereable to grade the site and eliminate the need for the staircase;

The crosswalks have been changed from coloured asphalt to painted asphalt as acost saving measure;

Page 2: Market Square Construction and Design Update ... - Stratford · 1/13/2017  · – The Market Square design selection committee met to evaluate the three designs and recommended GSP

2

There are 10 trees included in the current site plan. The design presented on 1June 2016 showed 12 trees. 2 trees were removed from the Wellington Streetside owing to space constraints;

There has always been and continues to be parallel and perpendicular parking inthe south end of Market Square. The number of spaces has changed as follows:

o Plans from 1 June 2016 show 32 parking spaces in the south end ofMarket Square (30 regular and 2 accessible);

o The latest site plan dated 1 December 2016 shows 28 regular parkingspaces and 4 accessible spaces in the south end of Market Square.However, the configuration is the same as it was on 27 June when Councilapproved the design (23 perpendicular and 9 parallel). Note that allaccessible parking spaces are perpendicular.

It should be noted that GSP included an option showing no parking in Market Square in their RFP response dependent upon the results of the Parking Study. Public feedback received during the consultation process advocated the inclusion of parking in the south end of Market Square, therefore parking was retained in the final design plan.

Budget:

The budget breakdown for this project is appended to this document. Funding has been allocated to this project from appropriate City reserves based on the work that is being completed. For example, funding has been allocated from the water reserve because we are replacing waterlines beneath Market Square. Similarly, funding has been allocated from the parking reserve to finance the rehabilitation of the 32 parking spots. Other reserves have been utilized to stabilize the 2017 property tax increase as this is a one-time project funding allocation.

Click here to see the attached budget breakdown for further details.

Process Timeline:

This renewal process has been several years in the making. The City has undertaken a design and public consultation processes that were both appropriately inclusive and extensive. In 2015, the City of Stratford retained AtFocus Consulting to facilitate the Market Square visioning and community consultation process. The feedback from this process resulted in the formulation of a Vision and Guiding Principles for Market Square that were adopted by Council in July 2015.1 At this time, Council passed a resolution committing to undertaking the redevelopment of Market Square (R2015-358).

1 AtFocus Market Square Presentation to Council

Page 3: Market Square Construction and Design Update ... - Stratford · 1/13/2017  · – The Market Square design selection committee met to evaluate the three designs and recommended GSP

3

Since that time, this project has proceeded as follows:

October 2015 – The City issued RFPQ15-08, a Request for Prequalification toshortlist architectural and/or landscape design firms interested in designing theredevelopment of Market Square. Three firms were shortlisted – GSP Group,MMM Group, and Janet Rosenberg and Studio;

December 2015 – The City issued RFP15-09, inviting the three shortlisted firmsto submit design proposals;

February 2016 – The three design proposals were received. The City solicitedpublic feedback on these designs at a public open house and online. GSP Groupsubmitted the following proposal:

(View full image here)

AtFocus Market Square Council Meeting - 27 July; Revised 21 September 2015 Stratford Market Square Vision Attachment - 19 May 2015

Page 4: Market Square Construction and Design Update ... - Stratford · 1/13/2017  · – The Market Square design selection committee met to evaluate the three designs and recommended GSP

4

March 2016 – The Market Square design selection committee met to evaluatethe three designs and recommended GSP Group to Council. On 29 March,Stratford City Council retained GSP Group to complete the design work;2

April-May 2016 – GSP refined the conceptual design in consultation with CityStaff and community stakeholders and provided updates to Council;3

1 June 2016 – GSP presented the revised conceptual design based on theconsultations that were held with Council various stakeholders at a public OpenHouse on 1 June. The Master Plan for the finalized redevelopment waspresented as follows4:

(View full image here)

2 20160329 - Report - Market Square Design Selection Process 3 20160517 - Report - Market Square Design Expenses 4 Market Square Conceptual Design - Open House, 1 June 2016

Page 5: Market Square Construction and Design Update ... - Stratford · 1/13/2017  · – The Market Square design selection committee met to evaluate the three designs and recommended GSP

5

June 2016 – After the public open house, the City invited public feedback onthe design and presented comments to GSP and Council. Council considered therevised design and public feedback on 13 June as the Finance and LabourRelations Committee.5 On 27 June, City Council approved the revised design,removing the skating rink infrastructure from Phase I and allocating the savingsto walkways and pavers, and extended the paving treatment to the south side ofMarket Square.6

July-September 2016 – City Staff worked with GSP Group to refine theinfrastructure and engineering requirements and prepare the constructiondocuments for tender. The City issued RFPQ16-11, a request for prequalificationto shortlist construction firms interested in completing the redevelopment ofMarket Square. Four construction firms were shortlisted – Amico, GatemanMilloy, Ro-Buck Contracting, and Sierra Construction. A pre-construction openhouse was held on 20 September to provide information to residents andbusinesses impacted by the construction;

October 2016 – The Market Square construction tender T16-13 closed on 12October, for which we received three bids. The construction bids received werehigher than the specified project budget. Staff worked closely with GSP to findefficiencies and reduce project costs. By eliminating sole-source suppliers andemploying value engineering, significant savings were achieved withoutcompromising the Council-approved design and integrity of the project.

November 2016 – Once efficiencies were found, the tender was re-issued asT16-13 to the four short listed bidders. T16-13 closed on 14 November, with Ro-buck Contracting coming in as the low bidder. The bids were presented toCouncil on 14 November. Council passed Resolution 2016-417 as follows:

That Council approve the award of the Market Square Redevelopmentcontract to Ro-Buck Contracting at the total tender price of$2,171,509.50 (excluding HST), and the inclusion of the provisionalitems valued at an additional $334,214 (excluding HST) and that theMayor and Clerk are authorized to sign the necessary contractagreement; and that staff review and report on the provisional items ata future meeting.7

The site plan dated 1 December 2016 is as follows:

5 20160613 – Market Square Design Presentation 20160613 – Market Square Cost Estimates, Transit 6 See City of Stratford Regular Council Minutes, 27 June 2016. 7 See City of Stratford Regular Council Minutes, 14 November 2016.

Page 6: Market Square Construction and Design Update ... - Stratford · 1/13/2017  · – The Market Square design selection committee met to evaluate the three designs and recommended GSP

6

(View full image here)

GSP group will be sending 3D colour renderings of this site plan the week of 16January 2017. They will be posted on the City’s website, social media accounts,and circulated to the BIA and Market Square Committee.

For more information please contact:

Stephanie Potter, Policy and Research Associate 519-271-0250 x253 [email protected]

Nancy Roulston, Manager of Engineering 519-271-0250 x226 [email protected]

Page 7: Market Square Construction and Design Update ... - Stratford · 1/13/2017  · – The Market Square design selection committee met to evaluate the three designs and recommended GSP

Market Square Construction Costs

Construction Costs Part A Site Preparation 102,075 Part B Surface and Roadwork Removals 45,308 Part C Environmental Remediation 0 Part D.1 Sanitary Sewers & Appurtenances 0 Part D.2 Storm Sewers & Appurtenances 74,228 Part D.3 Watermain & Appurtenances 150,150 Part E Roadwork and Surface Construction1 1,399,249 Part F Utility Co-ordination, Traffic Control, and Misc. 200,500 Part G Provisional Items2 334,214

Contingency 200,000 Sub Total 2,505,724 Non-Rebatable HST 44,101 TOTAL 2,549,824

Construction Funding: Adjusted 5 December 2016

Water Reserve 191,000 Parking Reserve Fund 105,000 Canada 150 Grant 250,000 Working Capital Reserve 216,000 Walmart Donation 1,113,000 2017 Infrastructure Levy 250,000 Fund Raising 100,000 2017 Tax Levy/Reserve3 190,000 Federal Gas Tax Grant 140,000 Total 2,555,000

Notes: 1Includes Site Furnishings: Café Tables 8 Café Chairs 32 Surface Mounted Benches 8 Bike Racks 5 Bollards (Permanent & Removable) 21 Umbrellas 3 Waste & Recycling Receptacles 8 Wooden Benches 3

2Includes pedestrian bumpouts, crosswalks, extra electrical, plinths, charge station 3Pending budget approval the $190,000 may be funded through the working capital reserve.

Page 8: Market Square Construction and Design Update ... - Stratford · 1/13/2017  · – The Market Square design selection committee met to evaluate the three designs and recommended GSP

City of Stratford - Design for Redevelopment of Market Square: RFP15-09 Page 11

1

2

3

4

5

6

Market Square

The Grove

Digital Room

Sesquicentennial Plaza

Lloyd Robertson Garden

5 4

32

1

Avon Fountain

6

7

8

Market Place Promenade

Conversation Corner

7

8

Market Square Master Plan

Page 9: Market Square Construction and Design Update ... - Stratford · 1/13/2017  · – The Market Square design selection committee met to evaluate the three designs and recommended GSP

MASTER PLAN

Page 10: Market Square Construction and Design Update ... - Stratford · 1/13/2017  · – The Market Square design selection committee met to evaluate the three designs and recommended GSP

REF

ER T

O S

HEE

T L4

.0FO

R P

LAN

TIN

G P

LAN

REF

ER T

O S

HEE

T L4

.0FO

R P

LAN

TIN

G P

LAN

REL

OC

ATED

PLA

QU

E

NEW

CEN

TRE

LIN

E O

F R

OAD

6L5

.2LI

MIT

OF

RO

OT

SOIL

CEL

LS,

TYP.

- 2

CO

UR

SES

DEE

P

7L5

.2D

ECID

UO

US

TREE

PLA

NTI

NG

WIT

H L

IMES

TON

E ED

GE,

TYP

.

5 L5.1

LIM

ESTO

NE

AND

CO

NC

RET

EPL

INTH

S

LIM

IT O

F SU

BG

RA

DE

CO

NC

RET

EPA

D F

OR

SPR

AY

JET

AR

EA P

AVI

NG

- REF

ER T

O S

HEE

T L2

.0

PAY

AND

DIS

PLAY

PAR

KIN

GM

ETER

, REF

ER T

OEL

ECTR

ICAL

DR

AWIN

GS

REL

OC

ATED

HIS

TOR

IC S

IGN

, TYP

.- H

ISTO

RIC

IMAG

E SI

DE

TO F

ACE

TOW

ARD

S PL

AZA

WR

WR

W R

W

R

UN

IT P

AVIN

G B

- REF

ER T

O S

HEE

T L2

.0 F

OR

MAT

ERIA

LS A

ND

LAY

OU

T

UN

IT P

AVIN

G C

- REF

ER T

O S

HEE

T L2

.0 F

OR

MAT

ERIA

LS A

ND

LAY

OU

T

UN

IT P

AVIN

G C

- REF

ER T

O S

HEE

T L2

.0 F

OR

MAT

ERIA

LS A

ND

LAY

OU

T

VEH

ICU

LAR

GR

ADE

CO

NC

RET

E PA

VIN

G- R

EFER

TO

SH

EET

L2.0

FO

R M

ATER

IALS

AND

LAY

OU

T

PRO

POSE

D L

IGH

T ST

AND

ARD

,TY

P. -

REF

ER T

O E

LEC

TRIC

AL

REF

ER T

O C

IVIL

FO

R A

LLSE

RVI

CIN

G IN

FOR

MAT

ION

.EL

ECTR

IC C

AR C

HAR

GIN

GST

ATIO

N U

NIT

, BY

OTH

ERS.

REF

ER T

O E

LEC

TRIC

ALD

RAW

ING

S FO

R C

ON

DU

ITLO

CAT

ION

S.

ASPH

ALT

CR

OSS

WAL

KS, T

YP.

- REF

ER T

O C

IVIL

DR

AWIN

GS

PED

ESTR

IAN

GR

ADE

CO

NC

RET

E PA

VIN

G- R

EFER

TO

SH

EET

L2.0

FO

R M

ATER

IALS

AN

DLA

YOU

T

EXIS

TIN

G W

ALK

TO R

EMAI

N -

CO

NTR

ACTO

R T

O T

IE IN

TO E

XIST

ING

FIN

ISH

ED G

RAD

E W

ITH

NEW

CO

NC

RET

EPA

VIN

G

EXIS

TIN

G W

ALK

TO R

EMAI

N- C

ON

TRAC

TOR

TO

TIE

INTO

EXI

STIN

GFI

NIS

HED

GR

ADE

WIT

H N

EW C

ON

CR

ETE

PAVI

NG

EXIS

TIN

G W

ALK

TO R

EMAI

N- C

ON

TRAC

TOR

TO

TIE

INTO

EXI

STIN

GFI

NIS

HED

GR

ADE

WIT

H N

EW C

ON

CR

ETE

PAVI

NG

EXIS

TIN

G W

ALK

TO R

EMAI

N- C

ON

TRAC

TOR

TO

TIE

INTO

EXI

STIN

GFI

NIS

HED

GR

ADE

WIT

H N

EW C

ON

CR

ETE

PAVI

NG

EXIS

TIN

G W

ALK

TO R

EMAI

N- C

ON

TRAC

TOR

TO

TIE

INTO

EXI

STIN

GFI

NIS

HED

GR

ADE

WIT

H N

EW C

ON

CR

ETE

PAVI

NG

EXIS

TIN

G W

ALK

TO R

EMAI

N- C

ON

TRAC

TOR

TO

TIE

INTO

EXIS

TIN

G F

INIS

HED

GR

ADE

WIT

HN

EW C

ON

CR

ETE

PAVI

NG

EXIS

TIN

G W

ALK

TO R

EMAI

N- C

ON

TRAC

TOR

TO

TIE

INTO

EXI

STIN

GFI

NIS

HED

GR

ADE

WIT

H N

EW C

ON

CR

ETE

PAVI

NG

LIM

IT O

F N

EW A

SPH

ALT

- CO

NTR

ACTO

R T

O T

IE IN

TO E

XIST

ING

GR

ADE

WIT

H N

EW A

SPH

ALT

LIMIT OF WORK

LIMIT OF WORK

LIM

IT O

F W

OR

K

LIM

IT O

F

WO

RK

LIM

IT O

F N

EW A

SPH

ALT

- CO

NTR

ACTO

R T

O T

IE IN

TO E

XIST

ING

GR

ADE

WIT

H N

EW A

SPH

ALT,

REF

ER T

OC

IVIL

DR

AWIN

GS

FOR

DET

AILS

WH

ITE

PAIN

TED

LIN

ES F

OR

LO

ADIN

GAN

D U

NLO

ADIN

G S

PAC

E - R

EFER

TO

CIV

IL D

RAW

ING

S

3L5

.2TA

CTI

LE W

ARN

ING

STR

IPS,

TYP.

WAY

-FIN

DIN

G E

LEM

ENT

WIT

HM

ESSA

GE

BOAR

D1 L5.1

WAY

-FIN

DIN

GEL

EMEN

T1 L5.1

WAY

-FIN

DIN

G E

LEM

ENT

*

*

*

MET

AL E

DG

ER, T

YP.

- REF

ER T

O P

AVIN

G P

LAN

L2.

0

REL

OC

ATED

EXI

STIN

G G

RO

UN

DPL

AQU

ES (5

TO

TAL)

2 L5.1

CH

RIS

TMAS

TR

EE A

NC

HO

RSL

EEVE

AN

D C

OLL

AR

CO

NC

RET

E C

UR

B, T

YP.

- REF

ER T

O C

IVIL

DR

AWIN

GS

CO

NC

RET

E C

UR

B, T

YP.

- REF

ER T

O C

IVIL

DR

AWIN

GS

WH

ITE

PAIN

TED

LIN

ES, T

YP.

- REF

ER T

O C

IVIL

DR

AWIN

GS

WH

ITE

PAIN

TED

LIN

ES, T

YP.

- R

EFER

TO

CIV

IL D

RAW

ING

S

ELEC

TRIC

CAR

PAR

KIN

G S

IGN

BY O

THER

S

SPR

AY J

ETS,

TO

BE

PRO

VID

ED A

ND

INST

ALLE

D B

Y W

ATER

PLAY

AS

SPEC

IFIE

D O

R A

PPR

OVE

D E

QU

AL

WH

ITE

PAIN

TED

LIN

ES, T

YP.

- REF

ER T

O C

IVIL

DR

AWIN

GS

BLU

E PA

INTE

D L

INES

FO

RAC

CES

SIBL

E SP

ACES

, TYP

.- R

EFER

TO

CIV

IL D

RAW

ING

S

PLA

NTE

D T

REE

PIT

, TYP

.- R

EFER

TO

SH

EET

L4.0

FO

RPL

AN

TIN

G P

LAN

1 L5.1

DE-

CH

OR

LIN

ATI

ON

UN

IT F

OR

SPR

AY

JETS

- R

EFER

TO

CIV

IL A

ND

AS

SPEC

IFIE

D B

Y W

ATE

RPL

AY

PED

ESTR

IAN

GR

ADE

CO

NC

RET

E PA

VIN

G- R

EFER

TO

SH

EET

L2.0

FO

R M

ATER

IALS

AND

LAY

OU

T

LIM

IT O

F N

EW A

SPH

ALT

- CO

NTR

ACTO

R T

O T

IE IN

TO E

XIST

ING

GR

ADE

WIT

H N

EW A

SPH

ALT,

REF

ERTO

CIV

IL D

RAW

ING

S FO

R D

ETAI

LS

MAR

KET

PLAC

E SO

UTH

TO

BE

ON

E -W

AYTR

AFFI

C H

EAD

ING

EAS

T. O

NE

WAY

TRAF

FIC

SIG

N T

O B

E IN

STAL

LED

AT

MO

UTH

OF

PAR

KIN

G L

ANE

BLU

E PA

INTE

D L

INES

FO

R A

CC

ESSI

BLE

SPAC

ES, T

YP.

- REF

ER T

O C

IVIL

DR

AWIN

GS

ASPH

ALT

CR

OSS

WAL

KS, T

YP.

- REF

ER T

O C

IVIL

DR

AWIN

GS

PED

ESTR

IAN

GR

ADE

CO

NC

RET

E PA

VIN

G -

REF

ER T

O S

HEE

T L2

.0 F

OR

MAT

ERIA

LS A

ND

LAYO

UT

REL

OC

ATED

STO

NE

MO

NU

MEN

T/TI

ME

CAP

SULE

ON

CO

NC

RET

E FO

OTI

NG

- R

EMO

VAL

TO B

E H

AND

DU

G

ASPH

ALT

CR

OSS

WAL

KS, T

YP.

- REF

ER T

O C

IVIL

DR

AWIN

GS

PAY

AND

DIS

PLAY

PAR

KIN

GM

ETER

, REF

ER T

OEL

ECTR

ICAL

DR

AWIN

GS

L1.0

DAT

E: 2

9 JU

NE

2016

SCAL

E: 1

: 300

M

DR

AWN

BY:

JH

PRO

JEC

T N

O.:

1600

6.65

DAT

E

DAT

E

REV

ISIO

NS

ISSU

E

BYBY

STR

ATFO

RD

, ON

TAR

IOST

RAT

FOR

D M

ARKE

T SQ

UAR

E

KEY

PLAN

N.T

.S.

LAN

DSC

APE

SITE

PLA

N

Lege

nd

22 J

ULY

201

610

0% D

ESIG

N D

EVEL

OPM

ENT

CM

GEN

ERA

L N

OTE

S:1.

DR

AWIN

GS

NO

T TO

BE

USE

D F

OR

CO

NST

RU

CTI

ON

UN

LESS

AU

THO

RIZ

ED B

Y T

HE

LAN

DSC

APE

ARC

HIT

ECT

2. C

ON

TRAC

TOR

SH

ALL

REP

OR

T AN

Y D

ISC

REP

ANC

IES

BETW

EEN

TH

E D

RAW

ING

S AN

D S

ITE

CO

ND

ITIO

NS

PRIO

R T

O C

OM

MEN

CEM

ENT

OF

THE

WO

RK

3. A

LL U

TILI

TY L

OC

ATES

AR

E TH

E R

ESPO

NSI

BILI

TY O

F TH

E C

ON

TRAC

TOR

. H

AND

DIG

WIT

HIN

THE

LIM

ITS

REC

OM

MEN

DED

BY

THE

SER

VIC

E U

TILI

TY.

UTI

LITY

CO

NFL

ICTS

WIT

H P

RO

POSE

DTR

EE L

OC

ATIO

NS

MU

ST B

E R

EPO

RTE

D IM

MED

IATE

LY T

O T

HE

LAN

DSC

APE

ARC

HIT

ECT

4. B

ASE

DR

AWIN

G P

RO

VID

ED B

Y C

ITY

OF

STR

ATFO

RD

.

5. F

OR

GR

ADIN

G IN

FOR

MAT

ION

REF

ER T

O D

RAW

ING

BY

MTE

CO

NSU

LTAN

TS IN

C.

FOR

SER

VIC

ING

INFO

RM

ATIO

N R

EFER

TO

DR

AWIN

GS

BY M

TE C

ON

SULT

ANTS

INC

.

6. L

AND

SCAP

E D

RAW

ING

S SH

OW

EN

GIN

EER

ING

INFO

RM

ATIO

N F

OR

DES

IGN

PU

RPO

SES

ON

LY.

DO

NO

T C

ON

STR

UC

T EN

GIN

EER

ING

WO

RKS

FR

OM

TH

ESE

DR

AWIN

GS.

ww

w.g

spgr

oup.

ca

201-

72 V

ictor

ia St

reet

South

Kitch

ener

, Onta

rio N

2G 4Y

9T F

519 5

69 88

8351

9 569

8643

162 L

ocke

Stre

et So

uth, S

uite 2

00Ha

milto

n, On

tario

L8P

4A9

T90

5 572

7477

04

10

1:300

52

(m)

15

PRO

JEC

TAR

EA

PRO

PER

TY B

OU

ND

ARY

LIM

IT O

F W

OR

K

LIM

IT O

F N

EW A

SPH

ALT

ASPH

ALT

PAVI

NG

CR

OSS

WAL

K - R

EFER

TO

CIV

IL

ASPH

ALT

PAVI

NG

- R

EFER

TO

CIV

IL

STR

EET

LIG

HT,

TYP

. - R

EFER

TO

ELE

CTR

ICAL

EXIS

TIN

G S

POT

ELEV

ATIO

NS

PRO

POSE

D S

POT

ELEV

ATIO

NS

NEW

WAT

ERM

AIN

- R

EFER

TO

CIV

IL

NO

TES:

1.R

EFER

TO

CIV

IL D

RAW

ING

S FO

R A

LL G

RAD

ING

AN

D S

ERVI

CIN

GIN

FOR

MAT

ION

.

2.R

EFER

TO

ELE

CTR

ICAL

DR

AWIN

GS

FOR

ALL

LIG

HTI

NG

AN

D E

LEC

TRIC

ALIN

FOR

MAT

ION

.

3.R

EFER

TO

SH

EET

L1.1

FO

R S

ITE

LAYO

UT

PLAN

.

4.C

ON

TRAC

TOR

TO

PR

OVI

DE

STR

UC

TUR

AL R

ECO

MM

END

ATIO

N A

ND

LET

TER

OF

CER

TIFI

CAT

ION

FO

R M

OD

IFIC

ATIO

NS

TO B

UIL

DIN

G F

OU

ND

ATIO

NS

AS IT

REL

ATES

TO

SPR

AY J

ET F

EATU

RE

INST

ALLA

TIO

N.

16 A

UG

201

675

% C

ON

STR

UC

TIO

N D

OC

UM

ENTS

CM

12 S

EPT

2016

ISSU

ED F

OR

TEN

DER

C

M

CO

NC

RET

E PA

VIN

G (V

EHIC

ULA

R G

RAD

E) -

REF

ER T

O S

HEE

T L2

.0

CO

NC

RET

E PA

VIN

G (P

EDES

TRIA

N G

RAD

E) -

REF

ER T

O S

HEE

T L2

.0

PAVE

RS

- REF

ER T

O S

HEE

T L2

.0

ASPH

ALT

PAVI

NG

CR

OSS

WAL

KS (P

RO

VISI

ON

AL) -

REF

ER T

O C

IVIL

04 N

OV

2016

REI

SSU

ED F

OR

TEN

DER

C

M

01 D

EC 2

016

ISSU

ED F

OR

CO

NST

RU

CTI

ON

JH

/RT