marubeni gpsc thailand

Upload: skohli2000

Post on 03-Jun-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/12/2019 Marubeni GPSC Thailand

    1/2

    Our Business Our Company News To Investors CSR & Environment

    News 2013

    Jun. 14. 2013

    Marubeni Corporation

    On June 13th 2013, Marubeni Corporation (hereinafter Marubeni) executed a Memorandum of Understanding

    (MOU) with PTT Group subsidiary Global Power Synergy Company Limited (GPSC), to jointly develop new

    IPP projects in Thailand and neighboring countries such as Laos, Myanmar and Cambodia (Target Countries).

    GPSC is one of the strategic subsidiary companies of PTT Public Company Limited (PTT) which is

    the largest oil and gas company listed in Security Exchange Thailand and mainly owned by PTT

    (30.1%) and PTT Global Chemical Public Company Limited (30.3%). It was established in January

    2013, for the purpose of consolidating the power business of PTT Group, and increasing

    competitiveness of its power business. It currently owns approximately 1,040MW of IPP and

    cogeneration plants, and aims to increase that number to 6,000MW by 2022, mainly in Target

    Countries, as a steady economic and power demand growth is expected in the area.

    Marubeni has built a close business relationship with PTT Group, mainly through trading of

    petrochemical products, gas and various equipment. In power business, Marubeni was awarded as

    EPC contractor for IRPC Public Companys Cogeneration project, and successfully supplied the plant

    in 2011. Based on these close business relationships, and also expected synergy between the two

    companies, stemming from GPSCs vast experience in Target Countries and Marubenis vast

    knowledge of IPP development, both companies agreed to execute the MOU.

    From now on, Marubeni and GPSC will cooperate to identify and develop good quality IPP projects,

    and expand its business in the region.

    Under the Global Challenge 2015 mid-term management plan, Marubeni designates IPP business

    as one of the most focused businesses, and aims to increase more IPP assets by good quality

    projects.

    Name: Global Power Synergy Company Limited

    Location:555/2 Energy Complex Building B, 14th Floor, Vibhvadi

    Rangsit Road, Kwaeng Chatuchak, Khet Chatuchak, Bangkok 10900

    Shareholders:

    PTT Public Company Limited 30.10%

    PTT Global Chemical Public Company Limited 30.31%

    Thai Oil Power Company Limited 27.71%

    Thai Oil Public Company Limited 11.88%

    Total: 100%

    Date of Establishment: January 2013

    Category of Business: Power/Steam/Water Generation

    Management: Mr. Jakchai Barlee(President)

    2014

    2013

    2012

    2011

    2010

    2009

    2008

    2007

    2006

    2005

    2004

    2003

    Related content

    Project Story

    Contact Us

    HOME News 2013 News Release

    Text Size A A AContact Us Marubeni Global Site

    Pr int

    Memorandum of Understanding between Marubeni and Global Power

    Synergy Company for Joint Development of IPP Projects

    Page 1 of 2Memorandum of Understanding between Marubeni and Global Power Synergy Comp...

    03-05-2014https://www.marubeni.com/news/2013/release/00043.html

  • 8/12/2019 Marubeni GPSC Thailand

    2/2

    - Sitemap - Contact Us - Privacy Policy - Terms of use Copyright 2014 Marubeni Corporation All Rights Reserved.

    Top of Page

    Page 2 of 2Memorandum of Understanding between Marubeni and Global Power Synergy Comp...

    03-05-2014https://www.marubeni.com/news/2013/release/00043.html