maryland transportation authority (mdta). mdta established in 1971 purpose –construct, manage,...

22
Maryland Transportation Authority (MDTA)

Upload: agatha-cameron

Post on 26-Dec-2015

222 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Maryland Transportation Authority (MDTA). MDTA Established in 1971 Purpose –Construct, manage, operate, and improve toll facilities Funded by toll revenues,

Maryland Transportation

Authority(MDTA)

Page 2: Maryland Transportation Authority (MDTA). MDTA Established in 1971 Purpose –Construct, manage, operate, and improve toll facilities Funded by toll revenues,

MDTA

• Established in 1971

• Purpose

– Construct, manage, operate, and improve toll facilities

• Funded by toll revenues, not tax dollars

• Headquarters - Point Breeze Office Complex, Baltimore

• 9 Facilities

Page 3: Maryland Transportation Authority (MDTA). MDTA Established in 1971 Purpose –Construct, manage, operate, and improve toll facilities Funded by toll revenues,

MDTA FacilitiesToll facilities consist of high-volume signature bridges, tunnels and highways that are major interstate and U.S. routes

Toll Plaza

Travel Plaza

*

MDTA Facility

* Note: the ICC uses All Electronic Tolling (No Toll Plazas)

I-95 ETLs

Page 4: Maryland Transportation Authority (MDTA). MDTA Established in 1971 Purpose –Construct, manage, operate, and improve toll facilities Funded by toll revenues,

Mega Projects

Maryland Transportation Authority6-Year Planned Budget

($Millions)

FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 TOTAL

$255.03 $74.5 $12.22 $0 $0 $0 $ 341.75

$139.27 $157.30 $63.18 $79.70 $60.20 $10.50 $510.15

$133.5 $190.00 $240.4 $284.50 $273.00 $249.20 $1,370.5

--------- --------- --------- --------- --------- --------- ---------

$527.8 $421.8 $315.8 $364.1 $333.2 $259.7

$2,222.50

All Other Major Projects

System Preservation and D&E

TOTAL

Page 5: Maryland Transportation Authority (MDTA). MDTA Established in 1971 Purpose –Construct, manage, operate, and improve toll facilities Funded by toll revenues,

I-95 Improvement ProjectI-95 Improvement Project

Page 6: Maryland Transportation Authority (MDTA). MDTA Established in 1971 Purpose –Construct, manage, operate, and improve toll facilities Funded by toll revenues,

Hatem and Tydings Bridge Underwater Repairs

Page 7: Maryland Transportation Authority (MDTA). MDTA Established in 1971 Purpose –Construct, manage, operate, and improve toll facilities Funded by toll revenues,

Bay Bridge Paint Projects

Page 8: Maryland Transportation Authority (MDTA). MDTA Established in 1971 Purpose –Construct, manage, operate, and improve toll facilities Funded by toll revenues,

Bay Bridge Cable Rewrapping and Dehumidification

Page 9: Maryland Transportation Authority (MDTA). MDTA Established in 1971 Purpose –Construct, manage, operate, and improve toll facilities Funded by toll revenues,

Travel Plaza Replacements – P3

Maryland House final rendering

Chesapeake House final rendering

Page 10: Maryland Transportation Authority (MDTA). MDTA Established in 1971 Purpose –Construct, manage, operate, and improve toll facilities Funded by toll revenues,

Chesapeake Bay Bridge• Phase 4 Painting (WB)

• Deck Rehabilitation (EB)

• Modify Lane Use System

• Modify Crossovers and Resurface Approaches

• Seal Deck (WB)

Upcoming Bid Opportunities

Page 11: Maryland Transportation Authority (MDTA). MDTA Established in 1971 Purpose –Construct, manage, operate, and improve toll facilities Funded by toll revenues,

Baltimore Harbor Tunnel• Replace Vent Fans• Rehabilitate K-Truss Spans• Resurface Pavement north of the tunnel• Deck and Superstructure Replacement

over Patapsco Flats • Replace Stand Pipes and Sump Pump

in tunnel

Upcoming Bid Opportunities

Page 12: Maryland Transportation Authority (MDTA). MDTA Established in 1971 Purpose –Construct, manage, operate, and improve toll facilities Funded by toll revenues,

Baltimore Harbor Tunnel – Canton Viaduct Replacement

Upcoming Bid Opportunities

Page 13: Maryland Transportation Authority (MDTA). MDTA Established in 1971 Purpose –Construct, manage, operate, and improve toll facilities Funded by toll revenues,

Fort McHenry Tunnel• Repair Vent Fans

• Replace Tunnel Lighting

• Replace Salt Barn

• Repair/Replace pumps

• Rehabilitate 4 Bridges over Herring Run and CSX

Upcoming Bid Opportunities

Page 14: Maryland Transportation Authority (MDTA). MDTA Established in 1971 Purpose –Construct, manage, operate, and improve toll facilities Funded by toll revenues,

John F. Kennedy Highway• Unbraiding of I-695 at I-95• Zone Paint Tydings Bridge• Resurface Pavement from MD-24 to

Delaware line• Replace Light Poles• Repair Corrugated Pipe Culverts• ETL Wetland Mitigation and Stream

Restoration

Upcoming Bid Opportunities

Page 15: Maryland Transportation Authority (MDTA). MDTA Established in 1971 Purpose –Construct, manage, operate, and improve toll facilities Funded by toll revenues,

Hatem Bridge• Convert facility to All Electric Toll Collection• Replace HVAC

Upcoming Bid Opportunities

Page 16: Maryland Transportation Authority (MDTA). MDTA Established in 1971 Purpose –Construct, manage, operate, and improve toll facilities Funded by toll revenues,

Francis Scott Key Bridge• Resurface Pavement – Facility-wide

• Convert to All Electronic Toll Collection

• Overlay Bridge Decks at Dock Road and CSX

• Repair Median Barrier and Lighting

Projects In Design

Page 17: Maryland Transportation Authority (MDTA). MDTA Established in 1971 Purpose –Construct, manage, operate, and improve toll facilities Funded by toll revenues,

Nice Bridge• Bridge Replacement Project

– Preliminary Engineering

Upcoming Bid Opportunities

Page 18: Maryland Transportation Authority (MDTA). MDTA Established in 1971 Purpose –Construct, manage, operate, and improve toll facilities Funded by toll revenues,

System-Wide Projects• Replace Electronic Toll Collection

and Operating System, 3rd Generation

• Replace Closed Circuit TV (CCTV)

• Upgrade Fire Alarms and Security Systems

• Upgrade/Replace Sign Structures

• Install Virtual Weigh Stations

Upcoming Bid Opportunities

Page 19: Maryland Transportation Authority (MDTA). MDTA Established in 1971 Purpose –Construct, manage, operate, and improve toll facilities Funded by toll revenues,

Facility-Wide Programs for:

• Replacement of underground fuel storage tanks with aboveground storage tanks

• Repair/Replacement/Sealing of Bridge Decks

• Zone and Spot Paint Bridges

Upcoming Bid Opportunities

Page 20: Maryland Transportation Authority (MDTA). MDTA Established in 1971 Purpose –Construct, manage, operate, and improve toll facilities Funded by toll revenues,

Ongoing On Call Contracts• Structure Repairs• Concrete Repairs• Paving• Sign Structures• Electrical Repairs• Facility/Building Repairs• Total Maximum Daily Load (TMDL) –

Environmental

Upcoming Bid Opportunities

Page 21: Maryland Transportation Authority (MDTA). MDTA Established in 1971 Purpose –Construct, manage, operate, and improve toll facilities Funded by toll revenues,

Future Unfunded Capital Projects

I-95 ETL Project – Deferred portions of Section 100

– Section 200 (MD 43 – MD 22)

Replacement of the Harry W. Nice Bridge

Conversion of all Facilities to Open Road Tolling

Bay Bridge Replacement/3rd Crossing

Page 22: Maryland Transportation Authority (MDTA). MDTA Established in 1971 Purpose –Construct, manage, operate, and improve toll facilities Funded by toll revenues,

QUESTIONS???