master-bilt rack installation manual

27
PS SERIES PARALLEL RACK SYSTEM INSTALLATION & OPERATIONS MANUAL 1 st Revision (5-11-2010)

Upload: ray-johnson

Post on 15-Aug-2015

34 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Master-Bilt Rack Installation Manual

PS SERIES PARALLEL RACK SYSTEM

INSTALLATION & OPERATIONS MANUAL 1st Revision (5-11-2010)

Page 2: Master-Bilt Rack Installation Manual

2

TABLE OF CONTENTS

INTRODUCTION……………………………………………………………………………………………..3

WARNING LABES AND SAFETY INSTRUCTIONS………………………………… ………………….4

PS SERIES FEATURES…………………………………………..………………………………………...5

PS SYSTEM NOMENCLATURE……………….…………………………………………………………..6

PRE-INSTALLATION INSTRUCTIONS…………………………………………… ……………….……..7 General Information…………………………………………………………………………………….…………7 Delivery Inspection………………………………………………………………………………………….….…7

INSTALLATION INSTRUCTIONS………………………………… ………………………….………...…7 Handling and Placement of Multiple Rack System…………………………………………………………....7 Handling and Placement of Walk-In Evap(s)………………………………………………………………...…7 Electrical Specifications………………………………………………………………………………………. …8 Refrigerant Piping……………………………………………………………………………………………..…..9 Suction and Liquid Line Sizes………………………………………………………………………..…………10 Leak Check…………………………………………………………………………………………………….….11 Evacuation, Dehydration, and Start-Up………………………………………………………………….....….11 Evacuation Procedure……………………………………………………………………………..……11 Finishing Charging Procedure…………………………………………………………………......….12 Low Ambient Charging (Example)……………………………………………………………...….....13

STARTUP………………………………………………………..………………………………..….........15

SALE AND DISPOSAL……………………………………………………… ……………………..….…17

LABOR WARRANTY…………………………………………………… ………………………………..17

TYPICAL PIPING SCHEMATIC……………… …………………………………………………...........18

PHYSICAL DIMENSIONS………………………..……………………………………………. .......19-22

OTHER SPECIFICATIONS & DIAGRAMS……..……………………........ .................................23-27

Page 3: Master-Bilt Rack Installation Manual

3

INTRODUCTION Thank you for purchasing Master-Bilt refrigeration equipment. This manual contains important instructions for installation, use and service. Read this entire manual carefully before installing or servicing your Master-Bilt equipment.

NOTICE

Installation and service of the refrigeration and e lectrical components must be performed by a refrige ration mechanic or licensed electrician.

DANGER

Equipment MUST be properly grounded. Improper or faulty hook-up of electrical components of the refrigeration units can result in severe in jury or death. All electrical wiring hook-ups must be done in accordance with all applicable local, regional o r national standards.

NOTICE

Read this manual before installing your refrigerati on equipment. Keep the manual and refer to it befor e doing any service. Failure to do so could result in perso nal injury or equipment damage. The portions of this manual covering refrigeration and electrical components contain technical instructions intended only for persons qualified to perform refrigeration and electrical work. This manual cannot cover every installation, use, or service situation. If you need additional information, call or write us:

Parts and Technical Service Department Master-Bilt Products

908 Highway 15 North New Albany, MS 38652 Phone (800) 684-8988

Email: [email protected]

Page 4: Master-Bilt Rack Installation Manual

4

WARNING LABELS AND SAFETY INSTRUCTIONS This is the safety-alert symbol. When you see this symbol, be alert to the potential for personal injury or damage to your equipment. Be sure you understand all safety messages and always follow recommended precautions and safe operating practices.

NOTICE TO EMPLOYERS

You must make sure that everyone who installs, uses , or services your refrigeration equipment is thoro ughly familiar with all safety information and procedures . Important safety information is presented in this section and throughout the manual. The following signal words are used in the warnings and safety messages: DANGER: Severe injury or death WILL occur if you ignore the message. WARNING: Severe injury or death CAN occur if you ignore the message. CAUTION: Minor injury or damage to your refrigeration can occur if you ignore the message. NOTICE: This is important installation, operation or service information. If you ignore the message, you may damage your refrigeration. The warning and safety labels shown throughout this manual are placed on your Master-Bilt Products refrigeration at the factory. Follow all warning l abel instructions. If any warning or safety labels become lost or damaged, call your customer service department at ( 800) 684-8988 for replacements.

This Label is located on the condensing unit

Page 5: Master-Bilt Rack Installation Manual

5

PS SERIES PARALLEL RACK FEATURES • Generously sized condenser for high efficiency. Sized to operate efficiently in high ambient conditions. • Hermetic, semi-hermetic, and Scroll compressors in any combination the customer chooses • Generously sized receivers with isolation valves and liquid level indicator • Compressor Suction Service Valves with Access Ports, and Discharge Line Service Valves with Access Ports • Pre-wired and mounted high and low pressure controls with each compressor • Units leak tested • U.L. listed • Easy accessibility for service • Pre-wired for easy installation with Single Point Electrical Connection with individual Circuit Breakers for each

Compressor and Through Door Main Disconnect Switch and Circuit Breaker Installed • Crankcase Heater Installed for each Compressor • Refrigeration lines pre-piped to edge of unit • Pre-piped and mounted refrigerant sight glass • Flooded Head Pressure Controls standard on each system. Other options available • Galvanized steel housing is standard, Stainless Steel Housing optional • Engineered Refrigeration Drawing Available for Specified Projects, or with Purchase Order (Contact Factory for

Additional Details) • Master-Controller Electronic Refrigeration Controls for Maximum Energy Efficiency are available for use with

parallel racks. • Replaceable core suction and liquid filter driers. • Oil return system complete with oil separator, oil level controls and oil filter are standard. • Two tiered frame/cabinet typically contains up to 12 compressors. Compressors are numbered starting from

the upper left. If a split suction system is used, low temperature compressors are typically on the top tier. • Up to 3 suction groups can be controlled within a single frame/cabinet. • Hot gas defrost, electric defrost, off cycle defrost • Heat reclaim available • Split condenser available • Floating head pressure control available • EVI compressors with sub cooled liquid available • Various alarms available including compressor failure, liquid level, etc are available. Standard alarms include

phase loss and oil failure.

Page 6: Master-Bilt Rack Installation Manual

6

-

C = 208-230/3/60E = 460/3/60

Z = R404A

1 to 3

2 to 8

R = RemoteC = Mounted on Common Frame

A = Air CooledW = Water Cooled

I = InteriorE = Exterior

PS E C 5 2 Z CA

Parallel Rack

Frame

Condenser Location

Number of Compressors

Condensing Method

Number of Suction Groups

Refrigerant

Voltage

XXXXX

Quote Number

Parallel Rack Nomenclature

Page 7: Master-Bilt Rack Installation Manual

7

PRE-INSTALLATION INSTRUCTIONS I. GENERAL INFORMATION

Please read this manual prior to installing your Master-Bilt equipment. This information is based on good refrigeration practice and should be used as a guide for installation and operation.

II. DELIVERY INSPECTION

You are responsible for filling all freight claims with the delivering truck line. Inspect all cartons and crates for damage as soon as they arrive. If damage is noted to shipping crates or cartons or a shortage is found, note this on the bill of lading (all copies) prior to signing. If damage is discovered when the cabinet arrives, immediately call the delivering truck line and follow up the call with a written report indicating concealed damaged to your shipment. Ask for an immediate inspection of your concealed item. Crating material MUST be retained (if applicable) to show the inspector representing the truck line. INSTALLATION INSTRUCTIONS I. HANDLING AND PLACEMENT OF PARALLEL RACK SYSTEM There should be a minimum of 3 feet around the peri meter of the Rack System that should be unobstructe d. This allows for proper servicing of the equipment. Please refer to local and state codes as well at t he NEC for additional clearance requirements.

Holes are provided in the base supports for mounting bolts and for bridle lift rods. For indoor mounting, motor rooms should be provided with fans designed to move 100 CFM of air per one ton of refrigeration capacity.

Page 8: Master-Bilt Rack Installation Manual

8

II. ELECTRICALSPECIFICATIONS Electrical power supply must match the rack power requirements indicated on the unit data plate. A WIRING DIAGRAM IS LOCATED ON THE INSIDE ON THE ELECTRICAL BOX COVER. For best results, it is suggested that power supply for PS Rack systems be applied as illustrated below in Figure 1. All field wiring should be done in a professional manner, in accordance with all governing codes. All wiring (including factory terminals) should be double checked before start-up Wiring diagrams specific to each installation will be provided by Master-Bilt.

Figure 1: Suggested Field Wiring Location for PS U nits.

NOTICE!

Systems with scroll compressors must be checked for proper power phasing. Improper power phasing will result in improper compressor rotation causing compressor to pump incorrectly. A phase monitor is standard on PS systems for this purpose. Three phase scroll compressors are directional dependent, i.e., they will only compress in one rotational direction and will rotate in either direction depending on power phasing. Verification of proper rotational direction is made by observing that suction pressure drops and discharge pressure rises when the compressor is energized. Reverse rotation also results in an elevated sound level over correct rotation, as well as substantially reduced current draw compared to data tag values.

NOTICE!

Check phase alignment on all incoming power.

Page 9: Master-Bilt Rack Installation Manual

9

III. REFRIGERANT PIPING Use only refrigeration grade copper tubing, (ACR), type “L”, bright annealed, dehydrated, and properly sealed against contamination. Soft temper tubing may not be used for field interconnection of refrigeration components. Take extreme care to keep refrigeration tubing clean and dry prior to installation. Use an appropriate size tube cutter. Remove any burring that may occur when cutting the tubing. Use dry nitrogen to purge the system of any foreign objects that may have come about during any pipe cutting. All suction lines will be insulated with not less than ¾” Armaflex or acceptable substitute as determined by Master-Bilt personnel. Armaflex insulation must be properly glued or taped as approved by insulation manufacturer to prevent refrigeration lines from “sweating”. Appropriate oil must be added to systems per Compressor manufacturer specifications. Suction lines should be sloped down ½” for each 10 feet of horizontal run towards the compressor. This will facilitate good oil return to the compressor. Refrigeration lines will be sized appropriately to facilitate proper oil return to the compressor and reduce refrigerant line pressure drop. Table 1 depicts proper line sizing options. Use this as a guideline for your selection. Any fittings used may be accounted for in the Table to the right.

Equivalent Length Allowances for Pipe Fittings (length in feet)

Fitting Tee TeeSize 90º Ell 45º Ell (Line) (Branch)1/2" 0.9 0.4 0.8 25/8" 1 0.5 1 2.57/8" 1.5 0.7 1.5 3.5

1-1/8" 1.8 0.9 1.5 4.51-3/8" 2.4 1.2 1.8 61-5/8" 2.8 1.4 2 72-1/8" 3.9 1.8 3.8 10

Page 10: Master-Bilt Rack Installation Manual

10

Table 1

20F suction temperature 10F suction temperature -15F suction temperature -25F suction temperature -35F suc tion temperature AllSystem 50' 100' 200' 50' 100' 200' 50' 100' 200' 50' 100' 200' 50' 100' 200'Capacity suction line suction line suction line suction line suction line suction line suction line suction line suction line suction line suction line suction line suction line suction line suction line liquid

BTU/Hr. horiz. vert. horiz. vert. horiz. vert. horiz. vert. horiz. vert. horiz. vert. horiz. vert. horiz. vert. horiz. vert. horiz. vert. horiz. vert. horiz. vert. horiz. vert. horiz. vert. horiz. vert. line

1500 3/8 5/16 3/8 5/16 1/2 5/16 3/8 5/16 1/2 5/16 1/2 5/16 1/2 3/8 1/2 3/8 5/8 3/8 1/2 3/8 5/8 3/8 5/8 3/8 1/2 1/2 5/8 1/2 3/4 1/2 1/4

2000 3/8 5/16 1/2 5/16 1/2 5/16 3/8 3/8 1/2 3/8 1/2 3/8 1/2 3/8 5/8 3/8 5/8 3/8 1/2 1/2 5/8 1/2 3/4 1/2 5/8 1/2 5/8 1/2 3/4 1/2 1/4

3000 1/2 3/8 1/2 3/8 5/8 3/8 1/2 3/8 1/2 3/8 5/8 3/8 5/8 1/2 5/8 1/2 3/4 1/2 5/8 1/2 3/4 1/2 3/4 1/2 5/8 5/8 3/4 5/8 7/8 5/8 5/16

4000 1/2 3/8 1/2 3/8 5/8 3/8 1/2 3/8 5/8 3/8 5/8 3/8 5/8 1/2 3/4 1/2 3/4 1/2 5/8 5/8 3/4 5/8 7/8 5/8 3/4 3/4 7/8 3/4 7/8 3/4 5/16

5000 1/2 3/8 5/8 3/8 5/8 3/8 5/8 1/2 5/8 1/2 3/4 1/2 5/8 5/8 3/4 5/8 7/8 5/8 3/4 3/4 7/8 3/4 7/8 3/4 3/4 7/8 7/8 7/8 1 1/8 7/8 3/8

6000 5/8 1/2 5/8 1/2 5/8 1/2 5/8 1/2 5/8 1/2 3/4 1/2 3/4 5/8 3/4 5/8 7/8 5/8 3/4 3/4 7/8 3/4 1 1/8 3/4 7/8 7/8 1 1/8 7/8 1 1/8 7/8 3/8

7000 5/8 1/2 5/8 1/2 3/4 1/2 5/8 1/2 3/4 1/2 3/4 1/2 3/4 3/4 7/8 3/4 1 1/8 3/4 7/8 7/8 7/8 7/8 1 1/8 7/8 7/8 7/8 1 1/8 7/8 1 1/8 7/8 3/8

8000 5/8 1/2 3/4 1/2 3/4 1/2 5/8 5/8 3/4 5/8 7/8 5/8 3/4 3/4 7/8 3/4 1 1/8 3/4 7/8 7/8 1 1/8 7/8 1 1/8 7/8 7/8 7/8 1 1/8 7/8 1 1/8 7/8 3/8

9000 5/8 1/2 3/4 1/2 3/4 1/2 5/8 5/8 3/4 5/8 7/8 5/8 7/8 7/8 7/8 7/8 1 1/8 7/8 7/8 7/8 1 1/8 7/8 1 1/8 7/8 1 1/8 1 1/8 1 1/8 1 1/8 1 3/8 1 1/8 3/8

10000 5/8 5/8 3/4 5/8 7/8 5/8 3/4 5/8 3/4 5/8 7/8 5/8 7/8 7/8 1 1/8 7/8 1 1/8 7/8 7/8 7/8 1 1/8 7/8 1 1/8 7/8 1 1/8 1 1/8 1 1/8 1 1/8 1 3/8 1 1/8 3/8

12000 3/4 5/8 3/4 5/8 7/8 5/8 3/4 3/4 7/8 3/4 1 1/8 3/4 7/8 7/8 1 1/8 7/8 1 1/8 7/8 1 1/8 1 1/8 1 1/8 1 1/8 1 3/8 1 1/8 1 1/8 1 1/8 1 3/8 1 1/8 1 3/8 1 1/8 1/2

14000 3/4 3/4 7/8 3/4 7/8 3/4 3/4 3/4 7/8 3/4 1 1/8 3/4 1 1/8 7/8 1 1/8 7/8 1 3/8 7/8 1 1/8 1 1/8 1 1/8 1 1/8 1 3/8 1 1/8 1 1/8 1 1/8 1 3/8 1 3/8 1 3/8 1 3/8 1/2

16000 3/4 3/4 7/8 3/4 1 1/8 3/4 7/8 7/8 7/8 7/8 1 1/8 7/8 1 1/8 1 1/8 1 1/8 1 1/8 1 3/8 1 1/8 1 1/8 1 1/8 1 3/8 1 1/8 1 3/8 1 1/8 1 1/8 1 1/8 1 3/8 1 3/8 1 5/8 1 3/8 1/2

18000 3/4 3/4 7/8 3/4 1 1/8 3/4 7/8 7/8 1 1/8 7/8 1 1/8 7/8 1 1/8 1 1/8 1 1/8 1 1/8 1 3/8 1 1/8 1 1/8 1 1/8 1 3/8 1 3/8 1 5/8 1 3/8 1 3/8 1 3/8 1 3/8 1 3/8 1 5/8 1 3/8 1/2

20000 7/8 7/8 7/8 7/8 1 1/8 7/8 7/8 7/8 1 1/8 7/8 1 1/8 7/8 1 1/8 1 1/8 1 3/8 1 1/8 1 3/8 1 1/8 1 1/8 1 1/8 1 3/8 1 3/8 1 5/8 1 3/8 1 3/8 1 3/8 1 3/8 1 3/8 1 5/8 1 5/8 1/2

25000 7/8 7/8 1 1/8 7/8 1 1/8 7/8 1 1/8 7/8 1 1/8 7/8 1 3/8 7/8 1 1/8 1 1/8 1 3/8 1 3/8 1 5/8 1 3/8 1 1/8 1 1/8 1 3/8 1 5/8 1 5/8 1 5/8 1 3/8 1 3/8 1 5/8 1 5/8 2 1/8 1 5/8 5/8

30000 7/8 7/8 1 1/8 7/8 1 3/8 7/8 1 1/8 1 1/8 1 1/8 1 1/8 1 3/8 1 1/8 1 3/8 1 3/8 1 3/8 1 3/8 1 5/8 1 3/8 1 3/8 1 3/8 1 5/8 1 5/8 2 1/8 1 5/8 1 3/8 1 3/8 1 5/8 1 5/8 2 1/8 1 5/8 5/8

35000 1 1/8 1 1/8 1 1/8 1 1/8 1 3/8 1 1/8 1 1/8 1 1/8 1 3/8 1 1/8 1 3/8 1 1/8 1 3/8 1 3/8 1 5/8 1 5/8 1 5/8 1 5/8 1 3/8 1 3/8 1 5/8 1 5/8 2 1/8 1 5/8 1 5/8 1 5/8 2 1/8 2 1/8 2 1/8 2 1/8 5/8

40000 1 1/8 1 1/8 1 1/8 1 1/8 1 3/8 1 1/8 1 1/8 1 1/8 1 3/8 1 3/8 1 3/8 1 3/8 1 3/8 1 3/8 1 5/8 1 5/8 2 1/8 1 5/8 1 5/8 1 5/8 1 5/8 1 5/8 2 1/8 1 5/8 1 5/8 1 5/8 2 1/8 2 1/8 2 1/8 2 1/8 3/4

45000 1 1/8 1 1/8 1 3/8 1 1/8 1 3/8 1 1/8 1 3/8 1 3/8 1 3/8 1 3/8 1 5/8 1 3/8 1 3/8 1 3/8 1 5/8 1 5/8 2 1/8 1 5/8 1 5/8 1 5/8 2 1/8 2 1/8 2 1/8 2 1/8 1 5/8 1 5/8 2 1/8 2 1/8 2 1/8 2 1/8 3/4

50000 1 1/8 1 1/8 1 3/8 1 3/8 1 3/8 1 3/8 1 3/8 1 3/8 1 3/8 1 3/8 1 5/8 1 3/8 1 5/8 1 5/8 1 5/8 1 5/8 2 1/8 1 5/8 1 5/8 1 5/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 5/8 2 5/8 3/4

60000 1 1/8 1 1/8 1 3/8 1 3/8 1 5/8 1 3/8 1 3/8 1 3/8 1 5/8 1 5/8 1 5/8 1 5/8 1 5/8 1 5/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 5/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 5/8 2 5/8 7/8

70000 1 3/8 1 3/8 1 3/8 1 5/8 1 5/8 1 5/8 1 3/8 1 3/8 1 5/8 1 5/8 2 1/8 1 5/8 1 5/8 1 5/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 5/8 2 5/8 2 1/8 2 1/8 2 5/8 2 5/8 2 5/8 2 5/8 7/8

80000 1 3/8 1 3/8 1 5/8 1 5/8 1 5/8 1 5/8 1 3/8 1 3/8 1 5/8 1 5/8 2 1/8 1 5/8 2 1/8 2 1/8 2 1/8 2 1/8 2 5/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 5/8 2 5/8 2 1/8 2 1/8 2 5/8 2 5/8 2 5/8 2 5/8 7/8

90000 1 3/8 1 3/8 1 5/8 1 5/8 2 1/8 1 5/8 1 5/8 1 5/8 1 5/8 1 5/8 2 1/8 1 5/8 2 1/8 2 1/8 2 1/8 2 1/8 2 5/8 2 5/8 2 1/8 2 1/8 2 5/8 2 5/8 2 5/8 2 5/8 2 1/8 2 1/8 2 5/8 2 5/8 3 1/8 3 1/8 7/8

100000 1 3/8 1 3/8 1 5/8 1 5/8 2 1/8 1 5/8 1 5/8 1 5/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 5/8 2 5/8 2 1/8 2 1/8 2 5/8 2 5/8 2 5/8 2 5/8 2 5/8 2 5/8 2 5/8 2 5/8 3 1/8 3 1/8 7/8

110000 1 5/8 1 5/8 1 5/8 1 5/8 2 1/8 1 5/8 1 5/8 1 5/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 5/8 2 5/8 2 1/8 2 1/8 2 5/8 2 5/8 3 1/8 3 1/8 2 5/8 2 5/8 2 5/8 2 5/8 3 1/8 3 1/8 7/8

120000 1 5/8 1 5/8 2 1/8 1 5/8 2 1/8 1 5/8 1 5/8 1 5/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 5/8 2 5/8 2 5/8 2 5/8 2 5/8 2 5/8 2 5/8 2 5/8 3 1/8 3 1/8 2 5/8 2 5/8 2 5/8 2 5/8 3 1/8 3 1/8 1 1/8

130000 1 5/8 1 5/8 2 1/8 2 1/8 2 1/8 2 1/8 1 5/8 1 5/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 5/8 2 5/8 2 5/8 2 5/8 2 5/8 2 5/8 2 5/8 2 5/8 3 1/8 3 1/8 2 5/8 2 5/8 3 1/8 3 1/8 3 5/8 3 5/8 1 1/8

140000 1 5/8 1 5/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 5/8 2 1/8 2 1/8 2 1/8 2 5/8 2 5/8 3 1/8 3 1/8 2 5/8 2 5/8 2 5/8 2 5/8 3 1/8 3 1/8 2 5/8 2 5/8 3 1/8 3 1/8 3 5/8 3 5/8 1 1/8

150000 1 5/8 1 5/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 5/8 2 5/8 2 1/8 2 1/8 2 5/8 2 5/8 3 1/8 3 1/8 2 5/8 2 5/8 3 1/8 3 1/8 3 1/8 3 1/8 2 5/8 2 5/8 3 1/8 3 1/8 3 5/8 3 5/8 1 1/8

160000 1 5/8 1 5/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 1/8 2 5/8 2 5/8 2 5/8 2 5/8 2 5/8 2 5/8 3 1/8 3 1/8 2 5/8 2 5/8 3 1/8 3 1/8 3 1/8 3 1/8 2 5/8 2 5/8 3 1/8 3 1/8 3 5/8 3 5/8 1 1/8

R-404a Suction and Liquid line sizes

Page 11: Master-Bilt Rack Installation Manual

11

All vertical risers will have an appropriate “P” trap at the beginning of the riser and every 20 ft above this point. If the total rise is less distance than can be evenly divided by 20, the P-traps will be located at the beginning and in the center of the distance so that the total distance between any two traps does not exceed 20 ft. Keep the refrigeration lines as short as possible and use as few fittings as practicable, being especially careful not to “kink” the lines. Keep the layout as simple as possible and properly support the piping to absorb vibration and the normal expansion and contraction caused by temperature changes. Add appropriate amount of oil per compressor manufacturer recommendations to compensate for oil return system volume. When brazing, dry nitrogen MUST be passed through the lines at low pressure to prevent scaling and oxidation inside the tubing and fittings. All flux will be removed from the joints when brazing is complete.

MINIMIZE the amount of flux used to prevent internal contamination of the refrigeration system. Silver brazing wire is to be utilized (high temperature alloy of minimum of 5% silver content on all copper connections, and high temperature alloy of 45% silver content on all dissimilar metal connections. The refrigeration contractor will be responsible for providing and installing the liquid line solenoid valve and coil and evaporator pressure regulator for all loop piping systems unless otherwise requested by the customer. Consult the refrigeration schedule for details.

V. LEAK CHECK When all refrigeration line connections have been made, the complete system, including factory connections, should be checked. Add the proper refrigerant to 60 psig, and then boost the 150 psig with dry nitrogen. Leak checks should be done on all joints with an electronic leak detector or halide torch. If leaks are found, relieve the pressure and make repairs as necessary and recheck. Verify that all valves have been re-opened and re-pressurize the system to 150 psig as before for at least 12 hours. System pressure should not change during this time. Pressurizing the system above 150 psig may damage the suction pressure transducers. Do not apply pressure above 150 psig to these transducers.

VI. EVACUATION, DEHYDRATION, AND START-UP A vacuum of 500 microns or less must be pulled to properly dehydrate the refrigeration system. Do not use the system compressor as a vacuum pump. Do not operate compressor while system is in a vacu um.

Page 12: Master-Bilt Rack Installation Manual

12

Triple Evacuation Procedure

A. Open all service valves and relieve system pressure. Also, open any line valves installed in the system and energize all solenoid valves and EPR’s to facilitate evacuation. B. Connect the vacuum pump to the high and low sides of the system. Connect a micron vacuum gauge to the system at the point furthest away from the rack and another at the rack. C. Leaks or moisture will be indicated if the system pressure rises when the vacuum line is closed off. Pull a vacuum of 1500 microns, close vacuum line and “break” vacuum to 5 psig, maximum, with refrigerant to be used in the system. D. Install filter/drier cores and repeat step C. E. A final vacuum of 500 microns should be pulled before charging. When 500 microns is reached, close vacuum line and charge system with the proper refrigerant through a high side service valve.

Finishing Charging Procedures A. Preliminary

With the system in a vacuum, liquid charge the system by adding refrigerant into the liquid side of the system at a service valve provided. Add as much refrigerant as the system will take up to the holding capacity of the receiver.

TABLE 5:

Additional lb of Refrigerant for Length o f Ref. Line25 Ft 50 Ft. 100 Ft.

Line (OD) 3/8 1/2 5/8 7/8 1 1/8 1 3/8 3/8 1/2 5/8 7/8 1 1/8 1 3/8 3/8 1/2 5/8 7/8 1 1/8 1 3/8R-22 1.0 1.9 3.0 6.1 10.4 15.9 2.0 3.8 6.0 12.2 20.8 31.8 4.0 7.6 12.0 24.4 41.6 63.6

R-404A 0.9 1.6 2.6 5.3 9.0 13.8 1.8 3.2 5.2 10.6 18.0 27.6 3.6 6.4 10.4 21.2 36.0 55.2

Page 13: Master-Bilt Rack Installation Manual

13

B. Low Ambient Charging Procedure All standard air cooled condensers on the PS Rack System are equipped with a head pressure control valve to maintain proper head pressure during winter conditions. These valves function by reducing the effective condenser area by flooding or “backing up” refrigerant in the condenser to reduce the amount of surface available for condensing. To operate properly, more charge is required during this flooding condition.

To use the chart, multiply the pounds of recommended pre-charge obtained by adding the recommended pre-charge (Table 4) with the additional refrigerant required for line set length (Table 5) by the percent flooding required in Chart A to arrive at the additional charge required.

Typical Head Pressure Control Valve

Page 14: Master-Bilt Rack Installation Manual

14

Chart A:

Page 15: Master-Bilt Rack Installation Manual

15

Example of Low Ambient Charging Determine the additional charge to operate a CHHX03 5C at suction temp +20ºF and the unit is charged at +50ºF. Assume a 100 ft. line set (hor izontal).

1. Capacity for CHHX035C @ +20ºF = 24,800 BTUH

2. Choose the proper refrigeration lines base on capacity from Table 1, suction line = 1 1/8”, liquid line = ½”.

3. Look up the recommended pre-charge from Table 4 for CHHX035C (8.5 lbs of R-22).

4. From Table 5, find the additional refrigerant (R-22 in this case) required for a ½” liquid line of length 100 ft.

(7.6 lb of R-22)

5. Add these two values to get 16.1 lbs of R-22.

6. Look at Chart A to obtain multiplier. The horizontal axis of Chart A yields the ambient charging temperature

(50º). The vertical axis of Chart A yields the multiplier. Notice there are several graphs in this chart. Select

the graph corresponding to your desired suction temperature. In this case, 20ºF. One can now see that the

condenser should be flooded at 32% to operate correctly.

7. Multiply 16.1 lbs of R-22 by 32% to get 5.15 lbs of additional charge.

8. Again, finish charging until desire superheat settings are obtained.

START UP

1) Set all low-pressure controls.

2) Add refrigerant oil to the oil reservoir until oil is shown in upper glass.

3) Verify all loads are in refrigeration mode

4) Verify the condenser is turned on

5) Verify that all compressor and control breakers and toggle switches are in the off position and apply power to the unit. Check the phase monitor to verify that the green light is illuminated. Verify that the correct voltage is connected to unit.

6) Turn on the control circuit breaker. This will activate the electronic controls. Review the main rack controller setpoints.

7) Verify the actual suction header pressure with an accurate refrigeration gauge. Calibrate as necessary.

8) With the compressor control circuit switches remaining in the off position, turn on the compressor circuit breakers.

Page 16: Master-Bilt Rack Installation Manual

16

9) Making sure refrigeration gauges are connected to the low and high sides of the system, turn on the switch to the lead compressor in the highest suction pressure group. Allow the compressor to pull the suction down to the operating pressure of the system then continue turning on compressors until all are activated. Repeat for the next lower suction pressure group.

10) Set the pressure regulating valves

11) Set and check expansion valve superheat on each case and cooler while the EPR valve is in the position.

12) Set each EPR valve for all loads/lineups. Suction header pressure must be lower than the EPR setting before performing this step.

13) Adjust all EPR valves as necessary to maintain proper fixture temperature. Also check expansion valve superheat.

14) Verify that the condenser is maintaining the head pressure set point and liquid level in receiver.

15) Check refrigerant level in receiver and add as necessary. Minimum level is 20% in the coldest weather for area.

16) Verify defrost settings including defrost times and termination temperatures. No more than 25% of the total load should be in defrost at one time.

17) Check oil reservoir after two (2) days of operation and add oil as necessary.

18) After all adjustments have been made, check all valves for proper stem position and replace valve caps.

19) Recheck all capillary tubes on all pressure controls to be sure that they are properly secured and free of vibration.

Page 17: Master-Bilt Rack Installation Manual

17

SALE AND DISPOSAL If you sell or give away your refrigeration equipment system or components you must make sure that all safety labels and I&O Manuals are included. If you need replacement labels or manuals, contact the parts and technical service department at Master-Bilt at (800) 684-8988 The customer service department at Master-Bilt should be contacted at the time of sale or disposal of your equipment so records may be kept of its new location. If you sell or give away your Master-Bilt cabinet and you evacuate the refrigerant charge before shipping, you must evacuate the refrigerant into an approved recovery and reclaim system in order to satisfy all applicable federal and state regulations regarding release of refrigerant compounds into the atmosphere. The release of refrigerant compounds into the atmos phere is a source of ozone depletion and regulated by state and federal laws . LABOR WARRANTY

A. A 90 day labor warranty will be provided on all installer provided labor and installation. B. A 1 year optional Labor warranty will be quoted separate from the installation. C. Master-Bilt will provide a one year parts warranty on all parts that fail under normal operation conditions.

Page 18: Master-Bilt Rack Installation Manual

18

TYPICAL PS SERIES PIPING SCHEMATIC

Page 19: Master-Bilt Rack Installation Manual

19

PS-1B PHYSICAL DIMENSIONS

Page 20: Master-Bilt Rack Installation Manual

20

PS-2B PHYSICAL DIMENSIONS

Page 21: Master-Bilt Rack Installation Manual

21

PS-3B PHYSICAL DIMENSIONS

Page 22: Master-Bilt Rack Installation Manual

22

PS-4B PHYSICAL DIMENSIONS

Page 23: Master-Bilt Rack Installation Manual

23

Page 24: Master-Bilt Rack Installation Manual

24

Page 25: Master-Bilt Rack Installation Manual

25

.

Page 26: Master-Bilt Rack Installation Manual

26

Page 27: Master-Bilt Rack Installation Manual

27

DI1