Master Plan Class
Environmental Assessment for
Downtown Mississauga Road Improvements
Public Information Centre # 2
Thursday September 25, 2014 5:30 p.m. to 8:00 p.m.
Mississauga Civic Centre Great Hall
Welcome to Public Information Centre # 2 for the
Master Plan Class Environmental Assessment for Downtown Mississauga Road
Improvements
• Please Sign In
• Meet with Study Team Members
• Review the display materials and discuss
your questions and ideas with the Study Team
• Please fill out a comment sheet and return
it to the Study Team in person, by email or fax by October 9, 2014
Project Descriptions The overall study area is bounded by Rathburn Road West to the north, Burnhamthorpe Road West to the south, City Centre Drive/Kariya Gate to the east and Duke of York Boulevard to the west. Within the study area, there are four potential road improvement projects: • Project 1 - Square One Drive from Duke of York Boulevard to Hammerson Drive. • Project 2 - Extension of Princess Royal Drive from Duke of York Boulevard to the proposed “Mercer
Street”. • Project 3 - Proposed “The Exchange” from City Centre Drive to the proposed private extension of
Princess Royal Drive. • Project 4 - Proposed “Mercer Street” from City Centre Drive to the proposed extension of Princess
Royal Drive. Project 1 is a section of Square One Drive which currently serves as a private road access to the Square One Shopping Centre. The City's Official Plan and moreover, the Downtown21 Master Plan proposes that Square One Drive ultimately be a two-way minor collector street, continuous from Hurontario Street to Rathburn Road West. The proposed road improvements will focus on creating a more multi-modal street that will suit all users, including pedestrians, cyclists, transit riders and drivers. Project 2, Project 3 and Project 4 are newly planned city roads that will facilitate a significantly improved pedestrian, cyclist and traffic environment in the southwest corner of the Square One Shopping Centre property as shown in the study area. Study Area Map
Study Purpose PIC #1 was held on June 25, 2014 to introduce the project and study scope, discuss issues to be addressed by the Class EA Study, and allow opportunity for public participation. The information presented included: • Existing and future conditions within the
study area (traffic, social, environmental). • Overview of Master Plan and Class
Environmental Assessment Study process. • Problem/opportunity statement. • Identification and evaluation of alternative
solutions and evaluation criteria. • Assessment of preliminary preferred
alternative solution. • Next steps in the process.
The City is studying the opportunity to reconstruct Square One Drive from Duke of York Boulevard to Hammerson Drive and the construction of new roads including the extension of Princess Royal Drive east of Duke of York Boulevard and two new roads “The Exchange” and “Mercer Street”.
Please note: Main Street has been formally renamed to “The Exchange” and North-South
Road to “Mercer Street”. Some correspondence below may refer to the old names.
Background
Purpose of Public Information Centre # 2
• The purpose of today’s PIC is to: • Provide stakeholders the opportunity to meet with the Project
Team and participate and provide input in the decision making process.
• Present various design concepts and how they have been evaluated by the study team.
• Present the preliminary preferred design concept to address the preferred master plan solution.
• Identify next steps in the process.
• We will present information and request input on the following: • Study background and Master Plan and Class Environmental
Assessment Study process. • Results of environmental and technical studies completed to date. • Feedback from PIC#1. • Existing and future traffic volumes. • Alternative design concepts evaluated. • Preliminary preferred design concepts for all four projects to
address the preferred master plan solution. • Mitigation measures for preliminary preferred design. • Next steps to completion of EA process.
Municipal Class EA Process A Municipal Class Environmental Assessment (EA) is a five phase study that identifies potential positive and negative effects of projects such as road improvements, facility expansions or to facilitate a new service.
The study is being carried out in accordance with the Master Plan Process (Approach #3) as outlined in the Municipal Class Environmental Assessment (October 2000, as amended in 2007 and 2011), which is approved under the Ontario Environmental Assessment Act. Approach #3 follows Phases 1 to 4 of the Class EA process.
The process includes an extensive evaluation of impacts on the natural and social environment, which includes the impacts to plants and animals, soils, traffic patterns, and to residents and businesses in the community.
Phase 1 Problem /Opportunity
Spring 2014
Phase 2 Alternative Solutions
Summer 2014
Phase 3 Alternative Design Concepts
Fall 2014
Phase 4 Master Plan Environmental Report
Winter 2014/2015
Phase 5 Implementation
2015/2016
Notice of Commencement
and PIC # 1
Conduct PIC # 1
We are here PIC # 2
Notice of Completion
30 Day Public Review Period
Class EA Project Classification Municipal Class EA Definition for Classifications Construction of a new roads or other linear paved facilities are considered a: • Schedule B Class EA project if the project’s construction cost is anticipated to be under 2.4 million
dollars. • Schedule C Class EA project if the project’s construction cost is anticipated to be equal or exceed
2.4 million dollars. Project 1 Square One Drive from Duke of York Boulevard to Hammerson Drive is currently operating as a 2 lane private roadway facilitating access to the shopping centre. The construction cost to bring Square One Drive to a municipal standard is anticipated to exceed 2.4 million dollars, and as such, this project is considered a Schedule C Class EA Project under the Municipal Class EA process. Project 2 Construction cost for the extension of Princess Royal Drive from Duke of York Boulevard to the proposed "Mercer Street" is anticipated to be less than 2.4 million dollars, and as such, this project is considered a Schedule B Class EA Project under the Municipal Class EA process. Project 3 Construction cost for the proposed "The Exchange" from City Centre Drive to the proposed private extension of Princess Royal Drive is anticipated to be less than 2.4 million dollars, and as such, this project is considered a Schedule B Class EA Project under the Municipal Class EA process. Project 4 Construction cost for the proposed "Mercer Street" from City Centre Drive to the proposed extension of Princess Royal Drive is anticipated to be less that 2.4 million dollars, and as such, this project is considered a Schedule B Class EA Project under the Municipal Class EA process.
This Master Plan Class EA process will follow Approach #3 of the Municipal Class Environmental Assessment Process and complete all 4 Phases of the Class EA process.
PHASE 1 PHASE 2 PHASE 3 PHASE 4 PHASE 5
Problem or Opportunity
Alternative Solutions
Alternative Design Concepts
For Preferred Solution
Master Plan Class EA Study
Report
Implementation (Will Be Conducted
as separate projects)
Tree Inventory • Tree inventory conducted in August 2014. • Existing trees are represented by 7 species located along the driveways within the parking areas. • No naturally occurring (i.e. self-seeded) trees are present. • Condition of the trees range from good to poor, and range in size from 3 cm to 18 cm Diameter at
Breast Height (DBH). • Existing trees in landscaped areas could be removed to construct a new road, as trees are
generally not suitable for transplanting.
Wildlife Review • Bird species observed mainly consist of those that are adapted to urban environments, such as
red-winged blackbirds, northern cardinal, and the song sparrow. • There are no designated natural areas within the study area and no Species at Risk.
Aquatic Environment Review • Located within the Mary Fix Creek and Cooksville Creek (CC) Watersheds (creeks do not run
directly through study area). • Quantity and quality of storm water run-off impacts a large portion of Mississauga, extending to
the waterfront and Lake Ontario. • Cooksville Creek in fair to poor condition as a result of garbage, vandalism, and erosion. • No fish were observed during the site visit; likely only tolerant, warmwater species inhabit CC.
Archaeological Assessment • A Stage 1 Archaeological Assessment was completed by Archaeological Services Inc. (ASI) in
September 2014. ASI determined that there is no potential for archaeological resources within study area since the lands are completely disturbed.
Heritage Review • A Cultural Heritage Resource Assessment was completed by ASI in September 2014. The Square
One Shopping Centre has been identified as a Built Heritage Resource (BHR) since this complex is historically and contextually associated with mid-twentieth-century settlement patterns, commercial processes, and suburban planning in the City of Mississauga. However, no negative impacts are anticipated to this BHR.
Environmental Studies
Existing Land Use Surrounding Area Land Use • Land use within the Study area designated as mixed use and open space. • Sheridan College Hazel McCallion Campus is located between Prince of
Wales Drive and Rathburn Road West and Duke of York Boulevard and Living Arts Drive.
• Parkland is located west of the Sheridan College buildings between Prince of Wales Drive and Rathburn Road West.
• Various other commercial and residential developments are located on the streets surrounding the study area:
– Retail uses along Rathburn Road West. – Office uses in 151 and 201 City Centre Drive. – Civic uses include the Living Art Centre, Central Library, City Hall
and Mississauga Celebration Square on the west side of Duke of York Boulevard.
2014 Existing Traffic Volumes
Centre View
City Centre
Rathburn
Square One
Robert Speck
Princess Royal
Burnhamthorpe
250
375
675
2075 2000
1350
650
100
2400
25
00
2150
2150
24
00
1875
1650
Conf
ered
erat
ion
900
1350
Livi
ng A
rts
Duke
of Y
ork
City
Cen
tre
625
625
1350
550
400
Weekday PM peak hour traffic volumes by direction
425
575
325
300
550
575
Study Background Downtown 21 Master Plan – Main Street (renamed to “The Exchange”) The Main Street District is envisioned as the heart of the Downtown Core, with a broad mix of active street level retail, restaurants, cafes, patios and entertainment facilities with a mix of uses above. The District will be a vibrant, walkable place that is active at all times of the day. The Main Street District is intended to bring together the commercial activity of the north, the Civic Centre district to the west, with the residential developments to the south. The District straddles Burnhamthorpe Road West, extending southward to Kariya Drive and northward to Square One Shopping Centre. The Civic District and Duke of York are the western boundary with Kariya Drive and the Office District being the eastern boundary. The vision for this District is to create an active lively pedestrian oriented urban place in the heart of the emerging “downtown” that would serve as a model, catalyst and attractor for ongoing investment in the larger area. Some of the key objectives include: creating a “main street” district that connects from Square One Shopping Centre across Burnhamthorpe Road West to the larger residential communities to the south of Burnhamthorpe Road West; and to incorporate a broad mix of uses and users that would contribute to making this a vibrant part of the city fabric.
Study Background
City of Mississauga Strategic Plan A key goal of the City’s Strategic Plan is to Create a Vibrant Downtown that will be the civic and cultural soul of the city as well as a strong economic centre. Downtown 21 Master Plan – Framework Plan The basis for the Downtown Core Local Area Plan is the Downtown21 Master Plan, which was received by Council in April 2010. The Downtown21 Master Plan sets the direction for transforming the Downtown Core from a suburban model to an urban mixed use centre. The objective is to create a high quality, pedestrian friendly, human scaled environment that is a meaningful place for all citizens and also continues to attract lasting public and private investment in the Downtown to support existing and planned infrastructure, particularly higher order transit. With the ongoing commitment to public transit infrastructure combined with transit supportive developments this area will develop as a key mobility hub within the Greater Toronto Area. The existing road pattern is made up of super blocks. An expanded road network is proposed that will create an urban pattern of development blocks that are walkable in scale and well connected. The new road network will result in urban scaled blocks, providing routing options for vehicular, servicing and goods movement, pedestrian and cycling movement within the Core. The scale of the streets is to be narrower with special attention paid to the public realm and elements within the boulevard to ensure a comfortable, enjoyable and safe pedestrian environment.
S E C T I O N 1 : E X E C U T I V E S U M M A R Y 1 0
Framework Plan
Existing Commercial
Existing Institutional
Existing Office
Parks & Open Space
Existing Residential Tower
Future Development
Highway 403
Burnhamthorpe Road
Rathburn Road
Hur
onta
rio
Stre
et
Conf
eder
ation
Par
kway
City Centre Drive
Princess Royal Drive
Prince of Wales Drive
Livi
ng A
rts
Dri
ve
Centre View Drive
Webb Drive
Gra
nd P
ark
Dri
ve
Duk
e of
Yor
k Bl
vd
Square One Drive
Shipp Drive
Robert Speck Parkway
Kari
ya D
rive
Mai
n St
reet
Mississauga Valley Road
Elm Street
Framework PlanBuilding massing represents conceptual frontage priority conditions and is not intended to represent full block build-out. The details will be examined through comprehensive precinct planning as development proceeds.
Study Background Transit Plan The long-term urban intensification of Downtown Mississauga is tied to the ability to serve it with both conventional and higher order transit. Downtown Mississauga is already a central hub for local and inter-regional transit services with the City Centre Transit Terminal (CCTT) on Rathburn Road West providing a key transfer location for transit service throughout the city and region (GO Transit). The Mississauga Transitway and the Hurontario-Main Light Rail Transit will provide east-west and north-south higher order transit services connecting between the region and Downtown Mississauga. The Hurontario-Main Light Rail Transit (LRT) Project The Hurontario-Main LRT Project is a new 23.2 kilometer dedicated Light Rail Transit system from Port Credit GO Station in Mississauga to the GO Station in downtown Brampton. Subject to funding, the objective would be to have the system built and operational by 2021. The LRT alignment in downtown Mississisauga includes segments of Burnhamthorpe Road West, Duke of York Boulevard, Rathburn Road and Hurontario Street. The Master Plan Class EA study ahs considered the LRT along with future traffic conditions and roadway design already completed under the approved LRT project. Mississauga Transitway The Mississauga Transitway is currently being constructed by the City of Mississauga and GO Transit (a division of Metrolinx). When fully complete in 2016/2017, the 18 kilometre transitway will have 12 stations beginning at Winston Churchill Boulevard in the west and ending at Renforth Drive in the east. In the downtown, The Mississauga Transitway will run along Rathburn Road West providing connections to the existing City Centre Transit Terminal (CCTT), Go Bus Terminal and Brampton Transit. MiWay Transit Service Square One Drive is in the middle of the City’s Transit hub. Currently the study section of Square One Drive operates as a 2 lane private roadway that supports the CCTT and interconnecting GO Transit and Brampton Transit buses. The full reconstruction of Square One Drive to City municipal road standards will enhance and support both local and Regional transit services and the Hurontario-Main LRT (Light Rail Transit) projects.
Mississauga Cycling Master Plan The Mississauga Cycling Master Plan (approved by Council in 2010) is a long term plan to foster a culture where cycling is an everyday activity, build a comprehensive cycling network, and adopt a safety-first approach to cycling.
Needs and Opportunity • Review road and access options in the vicinity of Square One Shopping
Centre. • Plan City roads that will facilitate an improved pedestrian, cyclist and
vehicle traffic environment in connection with the anticipated mixed use context.
• Provide additional network to improve connectivity movement and access to existing and planned land use.
• Enhance the character of the Downtown Core, providing a high quality public realm.
• Create the urban and pedestrian environment in a manner that aligns with the strategic directions of the City.
The Preferred Solution to meet the anticipated needs and opportunities in the study area is to complete road improvements for all four project area while providing improvements to transit (e.g. LRT) and transportation demand management. This recommendation was presented at PIC#1 and has formed the basis for the alternative design concepts presented at PIC#2.
PIC#1 Feedback Category Comments Study Team Response Development Plans Why is Main Street South not included in EA study area? We have a very aggressive timeline on this EA to accommodate the
current expansion of Square One Shopping Mall. EA approvals and design for Main Street South could take more time. However, since this EA is being completed as a Master Plan approach, which is inclusive of all project areas, the City could issue an addendum to this EA to cover other road improvement projects in the study area, which could include Main Street South.
Is the Main Street North alignment as shown on drawing coordinated with the future Main Street South alignment?
The study team is aware of Main Street South alignment and this alignment has been coordinated with Main Street North (“The Exchange”).
Region of Peel will be undertaking a twinning of the watermain along Burnhamthorpe (construction 2016). Region will be commencing the EA shortly. Region would like to keep in touch with the City to understand what information sharing could be made between projects. Agreement to send plan illustrating the proposed upgrades.
Study team will stay in contact with the Region regarding the watermain project.
What level of development is being assumed and land use assumptions?
Appropriate future development plan to determine traffic conditions has been considered.
Project Schedule When is the EA planned to be complete?
We are aiming for filing the ESR by end of 2014, so a 6-month schedule.
Category Comments Study Team Response Cycling/ Multi-Use Path
In support of on-board bike lines compared to MUTs, in general. Comment noted.
Generally happy to see the proposed road improvements. Will the multi-use path would continue east along Rathburn from Station Gate? Pleased to hear that it would be extended.
The design of Rathburne Road is not part of this project. Study team advised that the multi-use trail would be extended along Rathburn Road, subject to further review.
Suggested Design and Operational Improvements
Concern that stone retaining wall along Cooksville Creek is being undermined due to damage caused by rats. Section of the wall is falling into the creek. Concern that there has not been adequate resolution to this issue. Public transit service along Hurontario, especially during the weekends, should be improved. More buses at less frequency. Difficulty boarding the bus due to bus capacity maxed out.
Study team encouraged respondent to provide more details of concerns on the comment form so that the issue can be appropriately responded to. City staff will follow regarding the status of this investigation. City Transit staff will review written stakeholder comments to understand which bus route needs operational improvements.
Access Issues Reference was made to Morguard’s recent letter, which was sent to the LRT project team concerning an access issue to 201 City Centre Drive.
The study team is aware of this issue raised by Morguard; however this is outside the scope of this Master Plan Class EA Study.
Concerns of truck access to the area and limitation of turn along LRT corridor and effects on access to Square One and concerns regarding Morguard’s access.
We are in the early stages of the study and we will be looking at land use and traffic projections. Truck access will be addressed along the four projects. A traffic report is being compiled addressing these issues, which will be included with the final Master Plan EA Report.
PIC#1 Feedback
Alternative Design Concepts Project # 1 – Square One Drive Option A: 2 Lanes. Option B: 2 Lanes and Parking Lanes. Option C: 2 Lanes, Bus Bays and Modified Parking Lanes.
Project # 2 – Princess Royal Drive Option A: 3 Lanes with Parking Lay-bys. Option B: 4 Lanes. Option C: 4 Lanes with dedicated left turn lane at Duke of York. Option D: 5 Lanes at Duke of York and 4 Lanes at Mercer Street. Project # 3 – "The Exchange“ Option A: 2 Lanes. Option B: 2 Lanes with Parking Lay-bys.
Project # 4 – "Mercer Street" Option A: 2 Lanes with Parking Lay-bys. Option B: 3 Lanes with Parking Lay-bys. Option C: 4 Lanes with on-street parking.
EXISTINGTARGET
FFE=158.81
IB(MISS)CP
CP
CC
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WWWWWWWWWWW
ST ST ST ST ST ST
E
E
E
E
E
E
E
IB(MISS)CP
CP
CC
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WWWWWWWWWWW
ST ST ST ST ST ST
E
E
E
E
E
E
E
3.253.25
3.253.25
3.25
EXISTING SOUTH CURB TO REMAINBETWEEN STA. 3+220 ANDHAMMERSON DRIVE INTERSECTION
3.25
3.25
3.25
R8.5
26.3m ROW
R8.5R3.3
R3.3
2+98
0
3+00
0
3+02
0
3+04
0
3+06
0
3+08
0
3+10
0
3+12
0
3+14
0
3+16
0
3+18
0
3+20
0
3+22
0
3+24
0
3+26
0
24 PARKINGSPACES REMOVED
12 PARKING SPACESREMOVED
3 PARKING SPACESREMOVEDDRIVEWAY TO
BE CLOSED
25.35m ROW
A2
A2
A1
A1
3.25LANE
5.90BOULEVARD(EXISTING)
3.25LANE
11.95BOULEVARD
2% 2%2%
25.35RIGHT-OF-WAY
PROW
L PROW
L
CSQUARE ONE DRIVE
L0.50
CURB0.50
CURB (EXISTING)
SECTION A2-A2
0.75SPLASH PAD
3.25LANE
3.40SIDEWALK
2.00STREETSCAPE
3.25LANE
2.90SIDEWALK
2.00STREETSCAPE
26.30RIGHT-OF-WAY
2% 2%2% 2%
CSQUARE ONE DRIVE
LP
ROWL P
ROWL
3.50LANE
3.50LANE
0.50CURB
0.75SPLASH PAD
0.50CURB
SECTION A1-A1
0.75SPLASH PAD
3.25LANE
3.40SIDEWALK
2.00STREETSCAPE
3.25LANE
2.90SIDEWALK
2.00STREETSCAPE
26.30RIGHT-OF-WAY
2% 2%2% 2%
CSQUARE ONE DRIVE
LP
ROWL P
ROWL
3.50LANE
3.50LANE
0.50CURB
0.75SPLASH PAD
0.50CURB
SECTION B1-B1
3.25LANE
3.25LANE
7.75BOULEVARD
25.35RIGHT-OF-WAY
2% 2%2%
PROW
L PROW
L
2.10PARKING
2.10PARKING
CSQUARE ONE DRIVE
L
5.90BOULEVARD(EXISTING)
0.50CURB
0.50CURB (EXISTING)
SECTION B2-B2
EXISTINGTARGET
FFE=158.81
IB(MISS)CP
CP
CC
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WWWWWWWWWWW
ST ST ST ST ST ST
E
E
E
E
E
E
E
IB(MISS)CP
CP
CC
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WWWWWWWWWWW
ST ST ST ST ST ST
E
E
E
E
E
E
E
3.253.25
3.253.25
3.25
EXISTING SOUTH CURB TO REMAINBETWEEN STA. 3+232 ANDHAMMERSON DRIVE INTERSECTION
3.25
3.25
3.25
R8.5
26.3m ROW
2.10
2.10
2.10
2.10
PARKING
PARKING
2+98
0
3+00
0
3+02
0
3+04
0
3+06
0
3+08
0
3+10
0
3+12
0
3+14
0
3+16
0
3+18
0
3+20
0
3+22
0
3+24
0
3+26
0
R8.5
R3.3
R3.3
24 PARKINGSPACES REMOVED
12 PARKING SPACESREMOVED
DRIVEWAY TOBE CLOSED
25.35m ROW
3 PARKING SPACESREMOVED
B2
B2
B1
B1
0.75SPLASH PAD
3.25LANE
3.40SIDEWALK
2.00STREETSCAPE
3.25LANE
2.90SIDEWALK
2.00STREETSCAPE
26.30RIGHT-OF-WAY
2% 2%2% 2%
CSQUARE ONE DRIVE
LP
ROWL P
ROWL
3.50LANE
3.50LANE
0.50CURB
0.75SPLASH PAD
0.50CURB
SECTION C1-C1
3.50LANE
3.50LANE
7.25BOULEVARD
25.35RIGHT-OF-WAY
2% 2%2%
PROW
L PROW
L
2.10PARKING
2.10PARKING
CSQUARE ONE DRIVE
L
5.90BOULEVARD(EXISTING)
0.50CURB
0.50CURB (EXISTING)
SECTION C2-C2
EXISTINGTARGET
FFE=158.81
IB(MISS)CP
CP
CC
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WWWWWWWWWWW
ST ST ST ST ST ST
E
E
E
E
E
E
E
IB(MISS)CP
CP
CC
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WWWWWWWWWWW
ST ST ST ST ST ST
E
E
E
E
E
E
E
3.253.50
3.253.50
EXISTING SOUTH CURB TO REMAINBETWEEN STA. 3+242 AND
HAMMERSON DRIVE INTERSECTION
3.50
3.50
R8.5R8.5
30.0m
30.0m
BUS BAY PER CITYSTANDARD 2270.020
BUS BAY PER CITYSTANDARD 2270.010
2.10
BUSES ONLY
BUSES ONLY
3.253.50
3.253.50
2.10
PICK UP / DROP -OFF
2+98
0
3+00
0
3+02
0
3+04
0
3+06
0
3+08
0
3+10
0
3+12
0
3+14
0
3+16
0
3+18
0
3+20
0
3+22
0
3+24
0
3+26
0
SHELTER
SHELTER
R3.3
R3.3
26.3m ROW
24 PARKINGSPACES REMOVED
12 PARKING SPACESREMOVED
DRIVEWAY TOBE CLOSED
25.35m ROW
2.10
2.10PICK UP /
DROP -OFF
PICK UP /DROP -OFF
3 PARKING SPACESREMOVED
C2
C2
C1
C1
File
Nam
e: 0
3534
4_S
OD
Opt
ions
- S
OD
-1 &
2.d
wg
Dat
e P
lotte
d: S
epte
mbe
r 23,
201
4 - 2
:02p
m
SCALE: N.T.S.
Plotted by:Dvink Paper size: ISO Full Bleed A1 (841.00 X 594.00 MM) Plot table: RJB Full Scale.ctb
CITY FILE #:REFERENCE #:
HORZ. SCALE:
PROJ. NO.:
DRAWING NUMBER
DRAWN BY:
DESIGNED BY:
CHECKED BY:
DATE:DV
1:500
DA
DV
300035344
SEPTEMBER 2014
SQUARE ONE S
HOPPING C
ENTRE
DUKE OF YORK BLV
D
CITY C
ENTRE D
RIVE
RATHBURN R
D WSQUARE O
NE DR.
HAMMERSON DR.
CITY CENTRE D
R.
SITE LOCATION
DU
KE
OF
YO
RK
B
OU
LEV
AR
D
SQUARE ONE DRIVE
MA
TCH
LIN
E -
STA
. 3+2
60.0
SQUARE ONE DRIVEROAD DESIGN OPTIONS
DUKE OF YORK BOULEVARD TO STA 3+260.0
3 Ronell Crescent,Collingwood, Ontario, L9Y 4J6telephone (705) 446-0515fax (705) 446-2399
R.J. Burnside & Associates Limited
web www.rjburnside.com
LEGEND:
EXISTING EASEMENT LIMITS
PROPERTY BOUNDARY
OPTION A2 LANES
DU
KE
OF
YO
RK
B
OU
LEV
AR
D
SQUARE ONE DRIVE
MA
TCH
LIN
E -
STA
. 3+2
60.0
DU
KE
OF
YO
RK
B
OU
LEV
AR
D
SQUARE ONE DRIVE
MA
TCH
LIN
E -
STA
. 3+2
60.0
OPTION B2 LANES AND PARKING LANES
OPTION C - PRELIMINARY PREFERRED2 LANES, BUS BAYS AND MODIFIED PARKING LANES
FUTURE LRT
FUTURE LRT
FUTURE LRT
CONSULTANT
EXISTING SEARSFFE=158.05
IB(MISS)
E E E E E E E E E E E E E E E E E E E E E E E E E E
E
E
E
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EE E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
Ø0.05
Ø0.05 Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05Ø0.05
Ø0.05 Ø0.05
Ø0.05
Ø0.05 Ø0.05 Ø0.05
Ø0.05Ø0.05
EE
EE
EE
EE
EE
EE
EE
W W
WW
WW
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
IB(MISS)
E E E E E E E E E E E E E E E E E E E E E E E E E E
E
E
E
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EE E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
Ø0.05
Ø0.05 Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05Ø0.05
Ø0.05 Ø0.05
Ø0.05
Ø0.05 Ø0.05 Ø0.05
Ø0.05Ø0.05
EE
EE
EE
EE
EE
EE
EE
W W
WW
WW
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
3.25
3.25
EXISTING SOUTH CURB TO REMAINEAST OF HAMMERSON DRIVE
EXISTING NORTH CURB TO REMAINEAST OF HAMMERSON DRIVE
R10.5±(EXISTING)
R8.0±(EXISTING)
R8.0±(EXISTING)
EXISTING SOUTH CURB TO REMAINBETWEEN STA. 3+220 AND
HAMMERSON DRIVE INTERSECTION
3+28
0
3+30
0
3+32
0
3+34
0
3+36
0
3+38
0
3+40
0
3+42
0
3+44
0
3+46
0
3+48
0
3+48
7
10 PARKING SPACESREMOVED
6 PARKING SPACESREMOVED
2 PARKING SPACESREMOVED
A3
A3
EXISTING SEARSFFE=158.05
IB(MISS)
E E E E E E E E E E E E E E E E E E E E E E E E E E
E
E
E
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EE E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
Ø0.05
Ø0.05 Ø0.05
Ø0.05
Ø0.05
Ø0.05Ø0.05
Ø0.05 Ø0.05
Ø0.05
Ø0.05 Ø0.05 Ø0.05
Ø0.05Ø0.05
EE
EE
EE
EE
EE
EE
EE
W W
WW
WW
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
IB(MISS)
E E E E E E E E E E E E E E E E E E E E E E E E E E
E
E
E
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EE E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
Ø0.05
Ø0.05 Ø0.05
Ø0.05
Ø0.05
Ø0.05Ø0.05
Ø0.05 Ø0.05
Ø0.05
Ø0.05 Ø0.05 Ø0.05
Ø0.05Ø0.05
EE
EE
EE
EE
EE
EE
EE
W W
WW
WW
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
EXISTING SOUTH CURB TO REMAINBETWEEN STA. 3+232 AND
HAMMERSON DRIVE INTERSECTION
3.25
3.25
EXISTING SOUTH CURB TO REMAINEAST OF HAMMERSON DRIVE
EXISTING NORTH CURB TO REMAINEAST OF HAMMERSON DRIVE
R10.5±(EXISTING)
R8.0±(EXISTING)
R8.0±(EXISTING)
R8.5
PARKING
2.10
2.10
PARKING
PARKING
3+28
0
3+30
0
3+32
0
3+34
0
3+36
0
3+38
0
3+40
0
3+42
0
3+44
0
3+46
0
3+48
0
3+48
7
10 PARKING SPACESREMOVED
6 PARKING SPACESREMOVED
2 PARKING SPACESREMOVED
B3
B3
EXISTING SEARSFFE=158.05
IB(MISS)
E E E E E E E E E E E E E E E E E E E E E E E E E E
E
E
E
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EE E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
Ø0.05
Ø0.05 Ø0.05
Ø0.05
Ø0.05
Ø0.05Ø0.05
Ø0.05 Ø0.05
Ø0.05
Ø0.05 Ø0.05 Ø0.05
Ø0.05Ø0.05
EE
EE
EE
EE
EE
EE
EE
E
W W
WW
WW
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
IB(MISS)
E E E E E E E E E E E E E E E E E E E E E E E E E E
E
E
E
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EE E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
Ø0.05
Ø0.05 Ø0.05
Ø0.05
Ø0.05
Ø0.05Ø0.05
Ø0.05 Ø0.05
Ø0.05
Ø0.05 Ø0.05 Ø0.05
Ø0.05Ø0.05
EE
EE
EE
EE
EE
EE
EE
E
W W
WW
WW
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
3.50
3.50
EXISTING SOUTH CURB TO REMAINEAST OF HAMMERSON DRIVE
EXISTING NORTH CURB TO REMAINEAST OF HAMMERSON DRIVE
R10.5±(EXISTING)
R8.0±(EXISTING)
R8.0±(EXISTING)
R8.5
PARKING
3.25
3.25 PARKING
PARKING
PICK UP / DROP-OFF
TAXI WAITING AREA
3+28
0
3+30
0
3+32
0
3+34
0
3+36
0
3+38
0
3+40
0
3+42
0
3+44
0
3+46
0
3+48
0
3+49
5
EXISTING SOUTH CURB TO REMAINBETWEEN STA. 3+242 AND
HAMMERSON DRIVE INTERSECTION
10 PARKING SPACESREMOVED
6 PARKING SPACESREMOVED
2 PARKING SPACESREMOVED
EXISTING SOUTH CURB TO REMAINBETWEEN STA. 3+242 ANDHAMMERSON DRIVE INTERSECTION
C3
C3
3.25LANE
3.25LANE
13.29BOULEVARD
26.60RIGHT-OF-WAY
2% 2%2%
PROW
L PROW
L
CSQUARE ONE DRIVE
L
5.82BOULEVARD(EXISTING)
0.50CURB
0.50CURB (EXISTING)
SECTION A3-A3
3.25LANE
3.25LANE
9.08BOULEVARD
26.60RIGHT-OF-WAY
2% 2%2%
PROW
L PROW
L
HAMMERSON DR2.10
PARKING2.10
PARKING
CSQUARE ONE DRIVE
L
5.82BOULEVARD(EXISTING)
0.50CURB
0.50CURB (EXISTING)
SECTION B3-B3
3.50LANE
3.50LANE
6.28BOULEVARD
26.60RIGHT-OF-WAY
2% 2%2%
PROW
L PROW
L
3.25PARKING
3.25PARKING
CSQUARE ONE DRIVE
L
5.82BOULEVARD(EXISTING)
0.50CURB
0.50CURB (EXISTING)
SECTION C3-C3
File
Nam
e: 0
3534
4_S
OD
Opt
ions
- S
OD
-1 &
2.d
wg
Dat
e P
lotte
d: S
epte
mbe
r 23,
201
4 - 2
:05p
m
SCALE: N.T.S.
Plotted by:Dvink Paper size: ISO Full Bleed A1 (841.00 X 594.00 MM) Plot table: RJB Full Scale.ctb
CITY FILE #:REFERENCE #:
HORZ. SCALE:
PROJ. NO.:
DRAWING NUMBER
DRAWN BY:
DESIGNED BY:
CHECKED BY:
DATE:DV
1:500
DA
DV
300035344
SEPTEMBER 2014
SQUARE ONE S
HOPPING C
ENTRE
DUKE OF YORK BLV
D
CITY C
ENTRE D
RIVE
RATHBURN R
D WSQUARE O
NE DR.
HAMMERSON DR.
CITY CENTRE D
R.
SITE LOCATION
HAM
MER
SON
DR
IVEMA
TCH
LINE
- STA
. 3+260.0
SQUARE ONE DRIVE
SQUARE ONE DRIVEROAD DESIGN OPTIONS
STA 3+260.0 TO HAMMERSON DRIVE
3 Ronell Crescent,Collingwood, Ontario, L9Y 4J6telephone (705) 446-0515fax (705) 446-2399
R.J. Burnside & Associates Limited
web www.rjburnside.com
LEGEND:
EXISTING EASEMENT LIMITS
PROPERTY BOUNDARY
OPTION A2 LANES
OPTION B2 LANES AND PARKING LANES
OPTION C - PRELIMINARY PREFERRED2 LANES, BUS BAYS AND MODIFIED PARKING LANES
MA
TCH
LINE
- STA
. 3+260.0
SQUARE ONE DRIVE
MA
TCH
LINE
- STA
. 3+260.0
SQUARE ONE DRIVE
CONSULTANT
HAM
MER
SON
DR
IVEH
AMM
ERSO
N
DR
IVE
DCB 87
CB 88 MH 65
DCB 89
DCB 87
CB 92
CB 88 MH 65
SL
SL
E
E
E
E
E
E
E
E
E
E
E
UNABLE TO TONE PAST THIS POINT
DCB 87
CB 88 MH 65
DCB 89
DCB 87
CB 92
CB 88 MH 65
SL
SL
E
E
E
E
E
E
E
E
E
E
E
UNABLE TO TONE PAST THIS POINT
1+100
1+1201+120
-0+0
20
-0+0
00
0+02
0
0+04
0
0+06
0
0+08
0
0+10
0
0+12
0
0+14
0
3.00
3.25
3.25
CURB & GUTTER
PARALLEL PARKINGSPACE (TYP.)
6.70
3.00
26m ROW
R8.5R8.5
R3.0
R3.0
R8.5R8.5
A
A
3.25LANE
2%
6.00BOULEVARD
2%
3.25LANE
26.00RIGHT-OF-WAY
4 LANES THROUGH SECTION
3.25LANE
2%
6.00BOULEVARD
2%
3.25LANE
0.50CURB
0.50CURB
PROW
L PROW
LC
PRINCES ROYAL DRIVEL
SECTION B-B
3.25LANE
2%
2.75PARKING /PLANTER
5.50BOULEVARD
2%
2%
PROW
L
3.00LANE
PROW
L26.00
RIGHT-OF-WAY3.25
LANE
2%
2.75PARKING /PLANTER
5.50BOULEVARD
2%
2%
CPRINCES ROYAL DRIVE
L
SECTION A-A
DCB 87
CB 88 MH 65
DCB 89
DCB 87
CB 92
CB 88 MH 65
SL
SL
E
E
E
E
E
E
E
E
E
E
E
UNABLE TO TONE PAST THIS POINT
DCB 87
CB 88 MH 65
DCB 89
DCB 87
CB 92
CB 88 MH 65
SL
SL
E
E
E
E
E
E
E
E
E
E
E
UNABLE TO TONE PAST THIS POINT
1+100
1+1201+120
-0+0
20
-0+0
00
0+02
0
0+04
0
0+06
0
0+08
0
0+10
0
0+12
0
0+14
0
CURB & GUTTER
26m ROW
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
R8.5
R8.5
R3.0
R3.0
R8.5
R8.5
B
B
DCB 87
CB 88 MH 65
DCB 89
DCB 87
CB 92
CB 88 MH 65
SL
SL
E
E
E
E
E
E
E
E
E
E
E
UNABLE TO TONE PAST THIS POINT
DCB 87
CB 88 MH 65
DCB 89
DCB 87
CB 92
CB 88 MH 65
SL
SL
E
E
E
E
E
E
E
E
E
E
E
UNABLE TO TONE PAST THIS POINT
1+100
1+1201+120
-0+0
20
-0+0
00
0+02
0
0+04
0
0+06
0
0+08
0
0+10
0
0+12
0
0+14
0
R3.0
26m ROW
3.25
3.25
3.25
3.25
3.25
3.25
4.50
3.00
R8.5 R8.5
R8.5
R3.0
R8.5
C
C
DCB 87
CB 88 MH 65
DCB 89
DCB 87
CB 92
CB 88 MH 65
SL
SL
E
E
E
E
E
E
E
E
E
E
E
UNABLE TO TONE PAST THIS POINT
DCB 87
CB 88 MH 65
DCB 89
DCB 87
CB 92
CB 88 MH 65
SL
SL
E
E
E
E
E
E
E
E
E
E
E
UNABLE TO TONE PAST THIS POINT
1+100
1+1201+120
-0+0
20
-0+0
00
0+02
0
0+04
0
0+06
0
0+08
0
0+10
0
0+12
0
0+14
0
26m ROW
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.00
R=50.14m
R3.0
R3.0
R8.5
R8.5
D
D
3.25LANE
2%
6.00BOULEVARD
2%
3.25LANE
26.00RIGHT-OF-WAY
4 LANES THROUGH SECTION
3.25LANE
2%
6.00BOULEVARD
2%
3.25LANE
0.50CURB
0.50CURB
PROW
L PROW
LC
PRINCES ROYAL DRIVEL
SECTION C-C
3.25LANE
2%
6.00BOULEVARD
2%
3.25LANE
26.00RIGHT-OF-WAY
4 LANES THROUGH SECTION
3.25LANE
2%
6.00BOULEVARD
2%
3.25LANE
0.50CURB
0.50CURB
PROW
L PROW
LC
PRINCES ROYAL DRIVEL
SECTION D-D
File
Nam
e: 0
3534
4_P
R O
ptio
ns -
PR
D-1
.dw
g D
ate
Plo
tted:
Sep
tem
ber 2
2, 2
014
- 2:5
5pm
SCALE: N.T.S.
Plotted by:Dvink Paper size: ISO Full Bleed A1 (841.00 X 594.00 MM) Plot table: RJB Full Scale.ctb
CITY FILE #:REFERENCE #:
HORZ. SCALE:
PROJ. NO.:
DRAWING NUMBER
DRAWN BY:
DESIGNED BY:
CHECKED BY:
DATE:DV
1:500
DA
DV
300035344
SEPTEMBER 2014
DU
KE
OF
YO
RK
BO
ULE
VA
RD
SQUARE ONE S
HOPPING C
ENTRE
DUKE OF YORK BLV
D
CITY C
ENTRE D
RIVE
RATHBURN R
D W
SQUARE ONE D
R.
HAMMERSON DR.
CITY CENTRE D
R.
SITE LOCATION
PRINCESS ROYAL
DRIVE
PRINCESS ROYAL DRIVEROAD DESIGN OPTIONS
CONSULTANT
3 Ronell Crescent,Collingwood, Ontario, L9Y 4J6telephone (705) 446-0515fax (705) 446-2399
R.J. Burnside & Associates Limited
web www.rjburnside.com
LEGEND:
EXISTING EASEMENT LIMITS
PROPERTY BOUNDARY
OPTION A3 LANES WITH PARKING LAY-BYS
PRINCESS
ROYALDRIVE
OPTION B4 LANES
PRINCESS
ROYALDRIVE
OPTION C4 LANES WITH DEDICATED LEFT TURN LANE MODIFIED AT DUKE OF YORK BOULEVARD
PRINCESS
ROYALDRIVE
OPTION D - PRELIMINARY PREFERRED5 LANES AT DUKE OF YORK BOULEVARD AND 4 LANES AT MERCER STREET
DU
KE
OF
YO
RK
BO
ULE
VA
RD
DU
KE
OF
YO
RK
BO
ULE
VA
RD
ME
RC
ER
STR
EE
T
ME
RC
ER
STR
EE
TM
ER
CE
RS
TRE
ET
ME
RC
ER
STR
EE
T
PARALLEL PARKINGSPACE (TYP.)
FUTURE LRT FUTURE LRT
FUTURE LRT FUTURE LRT
NOTES:1. LANE WIDTHS TO BE FINALIZED DURING THE DETAILED
DESIGN PHASE.
DCB 103CB 107
CB 101
DCB 103DCB 104CB 106CB 107 CB 105
CB 101
DCB 103CB 107
CB 101
DCB 103DCB 104CB 106CB 107 CB 105
CB 101
2+000
2+020
2+040
2+060
2+080
2+1000+20
0
0+22
0
0+24
0
0+26
0
0+28
0
23m ROW
R8.5 R8.5
R8.5 R8.5
A A
SECTION A-A
3.25LANE
2%
7.75BOULEVARD
2%
PROW
LPROW
L23.00
RIGHT-OF-WAY3.25
LANE
2%
7.75BOULEVARD
2%
CMAIN STREET
L0.50CURB
0.50CURB
SECTION B-B
3.25LANE
2%
2.75PARKING /PLANTER
5.50BOULEVARD
2%
2%
PROW
LPROW
L23.00
RIGHT-OF-WAY3.25
LANE
2%
2.75PARKING /PLANTER
5.50BOULEVARD
2%
2%
CTHE EXCHANGE
L
DCB 103CB 107
CB 101
DCB 103DCB 104CB 106CB 107 CB 105
CB 101
DCB 103CB 107
CB 101
DCB 103DCB 104CB 106CB 107 CB 105
CB 101
2+000
2+020
2+040
2+060
2+080
2+1000+20
0
0+22
0
0+24
0
0+26
0
0+28
0
R8.5 R8.5
6.70
PARALLEL PARKINGSPACE (TYP.)
23m ROW
R8.5R8.5
B B
File
Nam
e: 0
3534
4_Th
e E
xcha
nge
Opt
ions
- TE
-1.d
wg
Dat
e P
lotte
d: S
epte
mbe
r 24,
201
4 - 9
:20a
m
SCALE: N.T.S.
Plotted by:Dvink Paper size: ISO Full Bleed A1 (841.00 X 594.00 MM) Plot table: RJB Full Scale.ctb
CITY FILE #:REFERENCE #:
HORZ. SCALE:
PROJ. NO.:
DRAWING NUMBER
DRAWN BY:
DESIGNED BY:
CHECKED BY:
DATE:DV
1:500
DA
DV
300035344
SEPTEMBER 2014
CITY CENTRE DRIVE
SQUARE ONE S
HOPPING C
ENTRE
DUKE OF YORK BLV
D
CITY C
ENTRE D
RIVE
RATHBURN R
D W
SQUARE ONE D
R.
HAMMERSON DR.
CITY CENTRE D
R.
THE
EX
CH
AN
GE
PRINCESS ROYAL DRIVE
THE EXCHANGEROAD DESIGN OPTIONS
CONSULTANT
3 Ronell Crescent,Collingwood, Ontario, L9Y 4J6telephone (705) 446-0515fax (705) 446-2399
R.J. Burnside & Associates Limited
web www.rjburnside.com
OPTION A2 LANES
LEGEND:
EXISTING EASEMENT LIMITS
PROPERTY BOUNDARY
CITY CENTRE DRIVE
THE
EX
CH
AN
GE
PRINCESS ROYAL DRIVE
OPTION B - PRELIMINARY PREFERRED2 LANES WITH PARKING LAY-BYS
APPROPRIATE LOCATION FOR TRAFFICSIGNAL IS TO BE DETERMINED
(1517)
DCB 96
CB 94
CB 95
MH 71
MH 72
MH 70
DCB 96
CB 93
CB 92
MH 71
MH 72
CB97
EE
EE
EE
E
EE
EE
EE
E E E E E E E E E E E E E E E E E E E E E E E E
E
E
E
MH 70
CB 94
CB 95
DCB 108
(1517)
DCB 96
CB 94
CB 95
MH 71
MH 72
MH 70
DCB 96
CB 93
CB 92
MH 71
MH 72
CB97
EE
EE
EE
E
EE
EE
EE
E E E E E E E E E E E E E E E E E E E E E E E E
E
E
E
MH 70
CB 94
CB 95
DCB 108
1+000
1+020
1+040
1+060
1+080
1+100
1+1201+120
0+08
0
0+10
0
0+12
0
0+14
0
0+16
0
3.25 3.25
6.70 PARALLEL PARKING
SPACE (TYP.)
CURB & GUTTER
6.70
3.00
26m ROW
R8.5
R8.5 R8.5
R8.5
R8.5R8.5
A A
SECTION A-A
3.25LANE
2%
2.75PARKING /PLANTER
7.00BOULEVARD
2%
2%
PROW
LPROW
L26.00
RIGHT-OF-WAY3.25
LANE
2%
2.75PARKING /PLANTER
7.00BOULEVARD
2%
2%
CMERCER STREET
L
SECTION B-B
3.25LANE
2%
2.75PARKING /PLANTER
5.50BOULEVARD
2%
2%
PROW
L
3.00LANE
PROW
L26.00
RIGHT-OF-WAY3.25
LANE
2%
2.75PARKING /PLANTER
5.50BOULEVARD
2%
2%
CMERCER STREET
L
(1517)
DCB 96
CB 94
CB 95
MH 71
MH 72
MH 70
DCB 96
CB 93
CB 92
MH 71
MH 72
CB97
EE
EE
EE
E
EE
EE
EE
E E E E E E E E E E E E E E E E E E E E E E E E
E
E
E
MH 70
CB 94
CB 95
DCB 108
(1517)
DCB 96
CB 94
CB 95
MH 71
MH 72
MH 70
DCB 96
CB 93
CB 92
MH 71
MH 72
CB97
EE
EE
EE
E
EE
EE
EE
E E E E E E E E E E E E E E E E E E E E E E E E
E
E
E
MH 70
CB 94
CB 95
DCB 108
1+000
1+020
1+040
1+060
1+080
1+100
1+1201+120
0+08
0
0+10
0
0+12
0
0+14
0
0+16
0
3.25 3.00 3.25
6.70
R8.5 R8.5
3.25
3.25
3.25
3.25
R8.5
R8.5
PARALLEL PARKINGSPACE (TYP.)
R8.5
R8.5
B B
3.25LANE
2%
6.00BOULEVARD
2%
3.25LANE
26.00RIGHT-OF-WAY
3.25LANE
2%
6.00BOULEVARD
2%
3.25LANE
0.50CURB
0.50CURB
PROW
L PROW
L
SECTION C-C
CMERCER STREET
L
(1517)
DCB 96
CB 94
CB 95
MH 71
MH 72
MH 70
DCB 96
CB 93
CB 92
MH 71
MH 72
CB97
EE
EE
EE
E
EE
EE
EE
E E E E E E E E E E E E E E E E E E E E E E E E
E
E
E
MH 70
CB 94
CB 95
DCB 108
(1517)
DCB 96
CB 94
CB 95
MH 71
MH 72
MH 70
DCB 96
CB 93
CB 92
MH 71
MH 72
CB97
EE
EE
EE
E
EE
EE
EE
E E E E E E E E E E E E E E E E E E E E E E E E
E
E
E
MH 70
CB 94
CB 95
DCB 108
1+000
1+020
1+040
1+060
1+080
1+100
1+1201+120
0+08
0
0+10
0
0+12
0
0+14
0
0+16
0
3.25
3.25
3.25
3.25
R=50.14m
3.25 3.25
R8.5
3.25 3.25
R76.0R8.5
BOTH CURB LANES TO BE USED FORON-STREET PARKING DURING
OFF-PEAK HOURS
R8.5
C C
File
Nam
e: 0
3534
4_M
erce
r Opt
ions
- M
S-1
.dw
g D
ate
Plo
tted:
Sep
tem
ber 2
4, 2
014
- 9:2
2am
SCALE: N.T.S.
Plotted by:Dvink Paper size: ISO Full Bleed A1 (841.00 X 594.00 MM) Plot table: RJB Full Scale.ctb
CITY FILE #:REFERENCE #:
HORZ. SCALE:
PROJ. NO.:
DRAWING NUMBER
DRAWN BY:
DESIGNED BY:
CHECKED BY:
DATE:DV
1:500
DA
DV
300035344
SEPTEMBER 2014
CITY CENTRE DRIVE
SQUARE ONE S
HOPPING C
ENTRE
DUKE OF YORK BLV
D
CITY C
ENTRE D
RIVE
RATHBURN R
D W
SQUARE ONE D
R.
HAMMERSON DR.
CITY CENTRE D
R.
SITE LOCATION
ME
RC
ER
STR
EE
T
MERCER STREETROAD DESIGN OPTIONS
CONSULTANT
3 Ronell Crescent,Collingwood, Ontario, L9Y 4J6telephone (705) 446-0515fax (705) 446-2399
R.J. Burnside & Associates Limited
web www.rjburnside.com
OPTION A2 LANES WITH PARKING LAY-BYS
LEGEND:
EXISTING EASEMENT LIMITS
PROPERTY BOUNDARY
CITY CENTRE DRIVE
OPTION B3 LANES WITH PARKING LAY-BYS
CITY CENTRE DRIVE
OPTION C - PRELIMINARY PREFERRED4 LANES
ME
RC
ER
STR
EE
T
ME
RC
ER
STR
EE
T
PRINCESSROYAL DRIVE
PRINCESSROYAL DRIVE
PRINCESSROYAL DRIVE
APPROPRIATE LOCATION FOR TRAFFICSIGNAL IS TO BE DETERMINED
2031 Traffic Volumes
Centre View
City Centre
Rathburn
Square One
Robert Speck
Princess Royal
Burnhamthorpe
575
390
760
1800 1875
1560 900
100
2000
2300
18
25 18
50
1900
15
75
1675
Conf
ered
erat
ion 1
050
1350
Livi
ng A
rts
Duke
of Y
ork
City
Cen
tre
700 70
0
1550
620
600
Weekday PM peak hour traffic volumes by direction
Mer
cer
The
Exch
ange
740
625
700
525 350
700 575
350
325
250
• Traffic forecasts generated using Hurontario LRT model. • The model considers future population/employment growth both in the City and the GTHA. • The model considers future planned transportation network improvements in the GTHA
including LRT along Hurontario Street and Downtown Mississauga.
Evaluation Criteria Transportation and Transit Management • Balancing of all travel modes • Facilitating active transportation • Traffic management • Existing and future transit routing • Impacts to vehicular level of service • Impacts and reliability of transit • Impacts on modal choice • Impacts to transit level of service Natural Environment • Impacts to the natural environment • Landscaping • Required mitigation for trees • Terrestrial assessment • Impact to existing vegetation • Number of species impacted Socio – Economic Environment • Provision for a safe and comfortable pedestrian
and cycling environment • Routing, walkability and short-trips • Pedestrian quality of street sections,
streetscape amenity and urban design elements
• Promoting development of downtown as envisioned
• Impacts to existing and planned development • Interface with streets to support adjacent land
use • Commercial land use
Cultural Environment • Impacts to archaeological and heritage
features
City Building • Strategic Priorities
• Promoting balanced mobility • Multi-purpose public right-of-way
• Supports Downtown Local Area Plan • Downtown 21 Master Plan Objectives • Light Rail Transit (LRT) and Transitway • Downtown Parks Provision Strategy
Land Use • Supports existing and planned land use context • Create development blocks with potential for
active street frontage • Relationship to mixed-use urban vision for
downtown core and Main Street District • Property acquisition
Implementation • Impacts to existing utilities • Street tree conflicts with utilities • Ability to phase implementation of works • Construction timing Financial • Cost of construction and implementation • Ongoing maintenance (roads and streetscape
costs) • Cost of utility (relocation of existing and new
utilities) • Property acquisition cost
Evaluation of Alternative Design Concepts Project #1 – Square One Drive Project #2 – Princess Royal Drive
Criteria Option A 2 Lanes
Option B 2 Lanes and
Parking Lanes
Option C 2 Lanes, Bus Bays
and Modified Parking Lanes
Option A 3 Lanes with
Parking Lay-bys
Option B 4 Lanes
Option C 4 Lanes with
Dedicated Left Turn Lane Modified at
Duke of York Blvd.
Option D 5 Lanes at Duke of York Blvd. and 4
Lanes at Mercer St.
Transportation & Transit Management
Natural Environment
Socio-Economic Environment
Cultural Environment
City Building
Land Use
Implementation
Financial
Recommendation Not Preferred Not Preferred Preferred Not Preferred
Not Preferred
Not Preferred
Preferred
Least Preferred Most Preferred
Evaluation of Alternative Design Concepts Project #3 – The Exchange Project #4 – Mercer Street
Criteria Option A 2 Lanes
Option B 2 Lanes with
Parking Lay-bys
Option A 2 Lanes with
Parking Lay-bys
Option B 3 Lanes with
Parking Lay-bys
Option C 4 Lanes with
on-street parking
Transportation & Transit Management
Natural Environment
Socio-Economic Environment
Cultural Environment
City Building
Land Use
Implementation
Financial
Recommendation Not Preferred Preferred Not Preferred Not Preferred Preferred
Least Preferred Most Preferred
Impact and Mitigation of the Preliminary Preferred Design
Area of Impact Potential Impact Mitigation Measures Terrestrial Environment
• Loss of trees. • Construction impacts (e.g. damage to
rootzone). • No significant species or Species at Risk
present.
• Transplant trees where feasible. • Replace trees to replace lost benefits of trees (shade,
air pollution reduction, etc.) . • Greater variety of tree species and provision
conditions to encourage tree vitality (i.e. adequate soil volume and drainage).
• Preservation of retained trees using tree protection measures.
• Restore vegetation as soon as possible. • Provide restorative landscape plan.
Construction: Dust / Noise / Traffic
• Increased dust and noise during construction period.
• Increased traffic resulting from contractor vehicles and reduced access to area.
• Dust suppression measures (e.g. water truck) to be implemented as needed.
• Noise to be limited by Noise Control By-law (360-79) restrictions and hours.
• Implement traffic control plan during construction. • Stage construction activities to minimize periods of
disruption in proximity of adjacent land uses. • Prepare emergency program to ensure quick
resolution of servicing problems.
Impact and Mitigation of the Preliminary Preferred Design
Area of Impact Potential Impact Mitigation Measures Pedestrian and Cyclist Safety
• Use of certain sidewalks to be eliminated or restricted during the construction process.
• No existing bicycle lanes and none planned.
• Signage identifying pedestrian safe passage will be provided.
• Cyclists to be subject to same road restrictions as vehicles; however, Square One Drive will have wider lanes between Transit Terminal and Hammerson Drive for improved cyclist comfort.
• Maintain continuity of pedestrian walkway system as much as possible.
Property / Land Use
• Traffic flow / access disruptions. • Additional easement beyond road right-of-way to be determined through development process.
• Signage to provide advance notice of disruption and detours during the construction period.
• Preserve existing amenities as much as possible. • Consult with public agency and/or adjacent land
owners / tenants regarding temporary access routes.
Surface Water Quality • Increased possibility of sedimentation of stormwater during the construction period.
• Maintain and monitor Erosion & Sediment Control (ESC) measures.
EXISTINGTARGET
FFE=158.81
IB(MISS)CP
CP
CC
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
WW
W
W
W
W
W
W
W
W
W
WW
W
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WWWWWWWWWWW
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
ST ST ST ST ST ST
E
E
E
E
E
E
E
DCB 64
DCB 59
DCB 58
DCB 52
CB 57 CB 53
CB 54
CB 65
62
CB 63
CB 61
CB 60
MH109
MH108
MH111 MH110
MH112
MH 40
MH 39
MH 36 MH 35 MH 34
MH 38
CB
CB130
CB131
MH114
SL
SL
SL
MH113
UNABLE TO TONE PAST THIS POINT
CB129
IB(MISS)CP
CP
CC
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
WW
W
W
W
W
W
W
W
W
W
WW
W
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WWWWWWWWWWW
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
ST ST ST ST ST ST
E
E
E
E
E
E
E
DCB 64
DCB 59
DCB 58
DCB 52
CB 57 CB 53
CB 54
CB 65
62
CB 63
CB 61
CB 60
MH109
MH108
MH111 MH110
MH112
MH 40
MH 39
MH 36 MH 35 MH 34
MH 38
CB
CB130
CB131
MH114
SL
SL
SL
MH113
UNABLE TO TONE PAST THIS POINT
CB129
R8.5R8.5
30.0m
30.0m
BUS BAY PER CITYSTANDARD 2270.020
BUS BAY PER CITYSTANDARD 2270.010
26.3m ROW 25.35m ROW
2.10
2.10
BUSES ONLY
BUSES ONLY
3.253.50
3.253.502+
960
2+98
0
3+00
0
3+02
0
3+04
0
3+06
0
3+08
0
3+10
0
3+12
0
3+14
0
3+16
0
3+18
0
3+20
0
3+22
0
3+24
0
3+26
0
SHELTER
SHELTER
24 PARKING SPACES REMOVED
12 PARKING SPACESREMOVED
MATCH EXISTING CURB
MATCH EXISTING CURB
MATCHEXISTING CURB
DRIVEWAY TOBE CLOSED
EXISTING SOUTH CURB TO REMAINBETWEEN STA. 3+242 AND
HAMMERSON DRIVE INTERSECTION
3.50
3.50
2.10
TAXI WAITING AREA
2.10
PICK UP / DROP -OFF
PICK UP /DROP -OFF
PICK UP /DROP -OFF
3 PARKING SPACESREMOVED
H
H
EXISTING SEARSFFE=158.05
IB(MISS)
EEEEEEEEEE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E E E E E E E E E E E E E E E E E E E E E E E E E E
E
E
E
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
Ø0.05 Ø0.05 Ø0.05 Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05Ø0.05
Ø0.05 Ø0.05
Ø0.05
Ø0.05 Ø0.05 Ø0.05
Ø0.05Ø0.05 Ø0.05
Ø0.05Ø0.05
WW
WW
WW
WW
WW
WW
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WW
WW
WW
WW
WW
WW
WW
WW
W
W
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
E
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
WW
WW
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
W W W W W W W W W
WW
WW
WW
WW
WW
WW
WW
WW
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WW
W
W
W
W
W
ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST
WW
WW
ST
W W
WW
WW
ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
EE
EE
EE
E
E
E
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EE
EE
E
E
E
E
E
E
DCB 34
DCB 35
DCB 44DCB 37
DCB 33
DCB 36
DCB 46DCB 51
43
CB 31
MH 37
MH 24
MH 21
MH 22
MH 23
MH 20
MH 25
CB
CB 43A
CB 32
DCB 29
MH 31IB(MISS)
EEEEEEEEEE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E E E E E E E E E E E E E E E E E E E E E E E E E E
E
E
E
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
Ø0.05 Ø0.05 Ø0.05 Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05Ø0.05
Ø0.05 Ø0.05
Ø0.05
Ø0.05 Ø0.05 Ø0.05
Ø0.05Ø0.05 Ø0.05
Ø0.05Ø0.05
WW
WW
WW
WW
WW
WW
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WW
WW
WW
WW
WW
WW
WW
WW
W
W
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
E
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
WW
WW
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
W W W W W W W W W
WW
WW
WW
WW
WW
WW
WW
WW
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WW
W
W
W
W
W
ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST
WW
WW
ST
W W
WW
WW
ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
EE
EE
EE
E
E
E
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EE
EE
E
E
E
E
E
E
DCB 34
DCB 35
DCB 44DCB 37
DCB 33
DCB 36
DCB 46DCB 51
43
CB 31
MH 37
MH 24
MH 21
MH 22
MH 23
MH 20
MH 25
CB
CB 43A
CB 32
DCB 29
MH 31
3.50
3.50
EXISTING SOUTH CURB TO REMAINEAST OF HAMMERSON DRIVE
EXISTING NORTH CURB TO REMAINEAST OF HAMMERSON DRIVE
R10.5±(EXISTING)
R8.0±(EXISTING)
R8.0±(EXISTING)
R8.5
PARKING
3.25
3.25 PARKING
PARKING
PICK UP / DROP-OFF
TAXI WAITING AREA
3+26
0
3+28
0
3+30
0
3+32
0
3+34
0
3+36
0
3+38
0
3+40
0
3+42
0
3+44
0
3+46
0
3+48
0
3+49
5
10 PARKING SPACESREMOVED
6 PARKING SPACESREMOVED
2 PARKING SPACESREMOVED
MATCH EXISTING CURB
EXISTING SOUTH CURB TO REMAINBETWEEN STA. 3+242 AND
HAMMERSON DRIVE INTERSECTION
EXISTING SOUTH CURB TO REMAINBETWEEN STA. 3+242 ANDHAMMERSON DRIVE INTERSECTION
I
I
DRIVEWAY CONSOLIDATED
3.50LANE
3.50LANE
7.25BOULEVARD
25.35RIGHT-OF-WAY
2% 2%2%
PROW
L PROW
L
0.50CURB
2.10PARKING
2.10PARKING
CSQUARE ONE
DRIVE
L
5.90BOULEVARD(EXISTING)
0.50CURB (EXISTING)2 LANE @ PINCH
WITH PARKING3.50
LANE3.50
LANE6.28
BOULEVARD
26.60RIGHT-OF-WAY
2% 2%2%
PROW
L PROW
L
2 LANE WITH 3.25mWIDE PARKING
3.25PARKING
3.25PARKING
CSQUARE ONE DRIVE
L
5.82BOULEVARD(EXISTING)
0.50CURB
0.50CURB (EXISTING)
File
Nam
e: 0
3534
4_P
refe
rred
Int -
PIO
-2.d
wg
Dat
e P
lotte
d: S
epte
mbe
r 23,
201
4 - 1
:43p
m
SCALE: N.T.S.
Plotted by:Dvink Paper size: ISO Full Bleed A1 (841.00 X 594.00 MM) Plot table: RJB Full Scale.ctb
PRELIMINARY PREFERRED DESIGN:OPENING DAY SCENARIO
SQUARE ONE DRIVE
CITY FILE #:REFERENCE #:
HORZ. SCALE:
PROJ. NO.:
DRAWING NUMBER
DRAWN BY:
DESIGNED BY:
CHECKED BY:
DATE:DV
1:500
JV
DV
300035344
SEPTEMBER 2014
SQUARE ONE S
HOPPING C
ENTRE
DUKE OF YORK BLV
D
CITY C
ENTRE D
RIVE
RATHBURN R
D WSQUARE O
NE DR.
HAMMERSON DR.
CITY CENTRE D
R.
SITE LOCATION
DU
KE
OF
YO
RK
BO
ULE
VA
RD
HAM
MER
SON
DR
IVE
SQUARE ONE DRIVE
MA
TCH
LIN
E -
STA
. 3+2
60.0
MA
TCH
LINE
- STA
. 3+260.0
SQUARE ONE DRIVE
SECTION H-H
3 Ronell Crescent,Collingwood, Ontario, L9Y 4J6telephone (705) 446-0515fax (705) 446-2399
R.J. Burnside & Associates Limited
web www.rjburnside.com
LEGEND:
EXISTING EASEMENT LIMITS
PROPERTY BOUNDARY
CONSULTANT
SECTION I-I
(1517)
(1517)
WIT 0.13W
DCB 96
DCB 87
DCB 103
CB 94
CB 88
CB 84
CB 86
CB 95
CB 107
CB 101
MH 71
MH 72
MH 70
MH 65
DCB 96
DCB 89
DCB 87DCB 85
DCB 103DCB 104
CB 93
CB 92
CB 88
CB 84
CB 86
CB 106CB 107 CB 105
CB 101
MH 71
MH 72
MH 65
CB97
WW
WW
WW
WW
EE
EE
EE
E
EE
EE
EE
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EE
E
ADDITIONAL TOPOAPPROXIMATE LOCATION
ADDITIONAL TOPOAPPROXIMATE LOCATION
ADDITIONAL TOPOAPPROXIMATE LOCATION
EE
EE
EE
E
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
SL
SL
SL
SL
SL
SL
E
E
E
E
E
E
E
E
E
E
E
SL
SL
E
E
E
E
EE
EE
E
E
E
E
E
E
UNABLE TO TONE HYDRO SERVICE,NO ACCESS TO HYDRO ROOM
UNABLE TO TONE PAST THIS POINT
UNABLE TO TONE PAST THIS POINTADDITIONAL TOPO ELEMENTAPPROXIMATE LOCATION OFSTREET LIGHT
UNABLE TO TONE PAST THIS POINT
UNABLE TO TONE GAS MAINDUE TO FROZEN VALVES
UNABLE TO TONE PAST THIS POINT
UNABLE TO TONE PAST THIS POINT
MH 70
CB 94
CB 95
DCB 108
PARKING LOTENTRANCE CONC. SIDEWALK
(1517)
(1517)
WIT 0.13W
DCB 96
DCB 87
DCB 103
CB 94
CB 88
CB 84
CB 86
CB 95
CB 107
CB 101
MH 71
MH 72
MH 70
MH 65
DCB 96
DCB 89
DCB 87DCB 85
DCB 103DCB 104
CB 93
CB 92
CB 88
CB 84
CB 86
CB 106CB 107 CB 105
CB 101
MH 71
MH 72
MH 65
CB97
WW
WW
WW
WW
EE
EE
EE
E
EE
EE
EE
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EE
E
ADDITIONAL TOPOAPPROXIMATE LOCATION
ADDITIONAL TOPOAPPROXIMATE LOCATION
ADDITIONAL TOPOAPPROXIMATE LOCATION
EE
EE
EE
E
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
SL
SL
SL
SL
SL
SL
E
E
E
E
E
E
E
E
E
E
E
SL
SL
E
E
E
E
EE
EE
E
E
E
E
E
E
UNABLE TO TONE HYDRO SERVICE,NO ACCESS TO HYDRO ROOM
UNABLE TO TONE PAST THIS POINT
UNABLE TO TONE PAST THIS POINTADDITIONAL TOPO ELEMENTAPPROXIMATE LOCATION OFSTREET LIGHT
UNABLE TO TONE PAST THIS POINT
UNABLE TO TONE GAS MAINDUE TO FROZEN VALVES
UNABLE TO TONE PAST THIS POINT
UNABLE TO TONE PAST THIS POINT
MH 70
CB 94
CB 95
DCB 108
PARKING LOTENTRANCE CONC. SIDEWALK
2+000
2+020
2+040
2+060
2+080
2+100
1+000
1+020
1+040
1+060
1+080
1+100
1+1201+120
-0+0
20
-0+0
00
0+02
0
0+04
0
0+06
0
0+08
0
0+10
0
0+12
0
0+14
0
0+16
0
0+18
0
0+20
0
0+22
0
0+24
0
0+26
0
0+28
0
0+29
8
6.70
PARALLEL PARKINGSPACE (TYP.)
23m ROW
26m ROW
R8.5
R8.5 R8.5
R8.5
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.00
R=50.14m
3.25 3.25
R8.5
3.25 3.25
R8.5
R76.0R8.5
MATCH EXISTING CURB
MATCH EXISTING CURB
BOTH CURB LANES TO BE USED FORON-STREET PARKING DURING
OFF-PEAK HOURS
R8.5R8.5
PARKING LOTDRIVEWAY
PARKING LOTDRIVEWAY
D
D
E E C C
3.25LANE
2%
6.00BOULEVARD
2%
3.25LANE
26.00RIGHT-OF-WAY
4 LANE
3.25LANE
2%
6.00BOULEVARD
2%
3.25LANE
0.50CURB
0.50CURBP
ROWL P
ROWL
CMERCERSTREET
L
3.25LANE
2%
6.00BOULEVARD
2%
3.25LANE
26.00RIGHT-OF-WAY
4 LANE
3.25LANE
2%
6.00BOULEVARD
2%
3.25LANE
0.50CURB
0.50CURBP
ROWL P
ROWL
CPRINCESS
ROYAL DRIVE
L
CTHE EXCHANGE
LP
ROWL
3.25LANE
2%
2.75PARKING /PLANTER
5.50BOULEVARD
2%
2%
23.00RIGHT-OF-WAY
2 LANE(WITH PARKING)
3.25LANE
2%
2.75PARKING /PLANTER
5.50BOULEVARD
2%
2%
PROW
L
File
Nam
e: 0
3534
4_P
refe
rred
Int -
PIO
-1.d
wg
Dat
e P
lotte
d: S
epte
mbe
r 24,
201
4 - 9
:42a
m
SCALE: N.T.S.
Plotted by:Dvink Paper size: ISO Full Bleed A1 (841.00 X 594.00 MM) Plot table: RJB Full Scale.ctb
CITY FILE #:REFERENCE #:
HORZ. SCALE:
PROJ. NO.:
DRAWING NUMBER
DRAWN BY:
DESIGNED BY:
CHECKED BY:
DATE:
CONSULTANT
DV
1:500
JV
DV
300035344
SEPTEMBER 2014
DU
KE
OF
YO
RK
BO
ULE
VA
RD
CITY CENTRE DRIVE
SQUARE ONE S
HOPPING C
ENTRE
DUKE OF YORK BLV
D
CITY C
ENTRE D
RIVE
RATHBURN R
D W
SQUARE ONE D
R.
HAMMERSON DR.
CITY CENTRE D
R.
SITE LOCATION
PRINCESS
ROYALDRIVE
PRIVATE DRIVEWAY
3 Ronell Crescent,Collingwood, Ontario, L9Y 4J6telephone (705) 446-0515fax (705) 446-2399
R.J. Burnside & Associates Limited
web www.rjburnside.com
SECTION D-D
SECTION E-E
SECTION C-C
LEGEND:
EXISTING EASEMENT LIMITS
PROPERTY BOUNDARY
ME
RC
ER
S
TRE
ET
THE
EX
CH
AN
GE
APPROPRIATE LOCATION FOR TRAFFICSIGNAL IS TO BE DETERMINED
APPROPRIATE LOCATION FOR TRAFFICSIGNAL IS TO BE DETERMINED
PRELIMINARY PREFERRED DESIGN:OPENING DAY SCENARIO
PRINCESS ROYAL DRIVE, MERCER STREET& THE EXCHANGE
NOTES:1. LANE WIDTHS TO BE FINALIZED DURING THE DETAILED
DESIGN PHASE.
EXISTINGTARGET
FFE=158.81
IB(MISS)CP
CP
CC
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
WW
W
W
W
W
W
W
W
W
W
WW
W
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WWWWWWWWWWW
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
ST ST ST ST ST ST
E
E
E
E
E
E
E
DCB 64
DCB 59
DCB 58
DCB 52
CB 57 CB 53
CB 54
CB 65
62
CB 63
CB 61
CB 60
MH109
MH108
MH111 MH110
MH112
MH 40
MH 39
MH 36 MH 35 MH 34
MH 38
CB
CB130
CB131
MH114
SL
SL
SL
MH113
UNABLE TO TONE PAST THIS POINT
CB129
IB(MISS)CP
CP
CC
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
WW
W
W
W
W
W
W
W
W
W
WW
W
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WWWWWWWWWWW
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
ST ST ST ST ST ST
E
E
E
E
E
E
E
DCB 64
DCB 59
DCB 58
DCB 52
CB 57 CB 53
CB 54
CB 65
62
CB 63
CB 61
CB 60
MH109
MH108
MH111 MH110
MH112
MH 40
MH 39
MH 36 MH 35 MH 34
MH 38
CB
CB130
CB131
MH114
SL
SL
SL
MH113
UNABLE TO TONE PAST THIS POINT
CB129
3.253.50
3.253.50
EXISTING SOUTH CURB TO REMAINBETWEEN STA. 3+242 AND
HAMMERSON DRIVE INTERSECTION
3.50
3.50
R8.5R8.5
30.0m
30.0m
BUS BAY PER CITYSTANDARD 2270.020
BUS BAY PER CITYSTANDARD 2270.010
2.10
BUSES ONLY
BUSES ONLY
3.253.50
3.253.50
2.10
PICK UP / DROP -OFF
2+96
0
2+98
0
3+00
0
3+02
0
3+04
0
3+06
0
3+08
0
3+10
0
3+12
0
3+14
0
3+16
0
3+18
0
3+20
0
3+22
0
3+24
0
3+26
0
SHELTER
SHELTER
R3.3
R3.3
26.3m ROW
24 PARKINGSPACES REMOVED
12 PARKING SPACESREMOVED
DRIVEWAY TOBE CLOSED
25.35m ROW
2.10
2.10PICK UP /
DROP -OFF
PICK UP /DROP -OFF
3 PARKING SPACESREMOVED
F
F H
H
EXISTING SEARSFFE=158.05
IB(MISS)
EEEEEEEEEE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E E E E E E E E E E E E E E E E E E E E E E E E E
E
E
E
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
Ø0.05 Ø0.05 Ø0.05 Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05Ø0.05
Ø0.05 Ø0.05
Ø0.05
Ø0.05 Ø0.05 Ø0.05
Ø0.05Ø0.05 Ø0.05
Ø0.05Ø0.05
WW
WW
WW
WW
WW
WW
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WW
WW
WW
WW
WW
WW
WW
WW
W
W
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
E
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
WW
WW
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
W W W W W W W W
WW
WW
WW
WW
WW
WW
WW
WW
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WW
W
W
W
W
W
ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST
WW
WW
ST
W W
WW
WW
ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
EE
EE
EE
E
E
E
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EE
EE
E
E
E
E
E
E
DCB 34
DCB 35
DCB 44DCB 37
DCB 33
DCB 36
DCB 46DCB 51
43
CB 31
MH 37
MH 24
MH 21
MH 22
MH 23
MH 20
MH 25
CB
CB 43A
CB 32
DCB 29
MH 31IB(MISS)
EEEEEEEEEE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E E E E E E E E E E E E E E E E E E E E E E E E E
E
E
E
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
Ø0.05 Ø0.05 Ø0.05 Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05
Ø0.05Ø0.05
Ø0.05 Ø0.05
Ø0.05
Ø0.05 Ø0.05 Ø0.05
Ø0.05Ø0.05 Ø0.05
Ø0.05Ø0.05
WW
WW
WW
WW
WW
WW
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WW
WW
WW
WW
WW
WW
WW
WW
W
W
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
EE
E
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
WW
WW
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
W W W W W W W W
WW
WW
WW
WW
WW
WW
WW
WW
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WW
W
W
W
W
W
ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST
WW
WW
ST
W W
WW
WW
ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST ST
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
EE
EE
EE
E
E
E
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EE
EE
E
E
E
E
E
E
DCB 34
DCB 35
DCB 44DCB 37
DCB 33
DCB 36
DCB 46DCB 51
43
CB 31
MH 37
MH 24
MH 21
MH 22
MH 23
MH 20
MH 25
CB
CB 43A
CB 32
DCB 29
MH 31
3.50
3.50
EXISTING SOUTH CURB TO REMAINEAST OF HAMMERSON DRIVE
EXISTING NORTH CURB TO REMAINEAST OF HAMMERSON DRIVE
R10.5±(EXISTING)
R8.0±(EXISTING)
R8.0±(EXISTING)
R8.5
PARKING
3.25
3.25 PARKING
PARKING
PICK UP / DROP-OFF
TAXI WAITING AREA
3+26
0
3+28
0
3+30
0
3+32
0
3+34
0
3+36
0
3+38
0
3+40
0
3+42
0
3+44
0
3+46
0
3+48
0
3+49
5
EXISTING SOUTH CURB TO REMAINBETWEEN STA. 3+242 AND
HAMMERSON DRIVE INTERSECTION
10 PARKING SPACESREMOVED
6 PARKING SPACESREMOVED
2 PARKING SPACESREMOVED
EXISTING SOUTH CURB TO REMAINBETWEEN STA. 3+242 ANDHAMMERSON DRIVE INTERSECTION
I
I
DRIVEWAY CONSOLIDATED
3.25LANE
3.40SIDEWALK
2.00STREETSCAPE
3.25LANE
2.90SIDEWALK
2.00STREETSCAPE
26.30RIGHT-OF-WAY
2% 2%2% 2%
CSQUARE ONE
DRIVE
L
PROW
L PROW
L
0.75SPLASH PAD 0.50
CURB
0.75SPLASH PAD
0.50CURB
4 LANE 3.50LANE
3.50LANE 3.50
LANE3.50
LANE7.25
BOULEVARD
25.35RIGHT-OF-WAY
2% 2%2%
PROW
L PROW
L
0.50CURB2 LANE @ PINCH
WITH PARKING 2.10PARKING
2.10PARKING
CSQUARE ONE
DRIVE
L
5.90BOULEVARD(EXISTING)
0.50CURB (EXISTING) 3.50
LANE3.50
LANE6.28
BOULEVARD
26.60RIGHT-OF-WAY
2% 2%2%
PROW
L PROW
L
2 LANE WITH 3.25mWIDE PARKING
3.25PARKING
3.25PARKING
CSQUARE ONE DRIVE
L
5.82BOULEVARD(EXISTING)
0.50CURB
0.50CURB (EXISTING)
File
Nam
e: 0
3534
4_P
refe
rred
Fina
l - P
FO-2
.dw
g D
ate
Plo
tted:
Sep
tem
ber 2
3, 2
014
- 12:
05pm
SCALE: N.T.S.
Plotted by:Dvink Paper size: ISO Full Bleed A1 (841.00 X 594.00 MM) Plot table: RJB Full Scale.ctb
CITY FILE #:REFERENCE #:
HORZ. SCALE:
PROJ. NO.:
DRAWING NUMBER
DRAWN BY:
DESIGNED BY:
CHECKED BY:
DATE:DV
1:500
JV
DV
300035344
SEPTEMBER 2014
SQUARE ONE S
HOPPING C
ENTRE
DUKE OF YORK BLV
D
CITY C
ENTRE D
RIVE
RATHBURN R
D WSQUARE O
NE DR.
HAMMERSON DR.
CITY CENTRE D
R.
SITE LOCATION
DU
KE
OF
YO
RK
BO
ULE
VA
RD
HAM
MER
SON
DR
IVE
SQUARE ONE DRIVE
MA
TCH
LIN
E -
STA
. 3+2
60.0
MA
TCH
LINE
- STA
. 3+260.0
SQUARE ONE DRIVE
SECTION F-F SECTION H-H
CONSULTANT
3 Ronell Crescent,Collingwood, Ontario, L9Y 4J6telephone (705) 446-0515fax (705) 446-2399
R.J. Burnside & Associates Limited
web www.rjburnside.com
LEGEND:
EXISTING EASEMENT LIMITS
PROPERTY BOUNDARY
PRELIMINARY PREFERRED DESIGN:ULTIMATE SCENARIO
SQUARE ONE DRIVE
FUTURE LRT
SECTION I-I
(1517)
(1517)
WIT 0.13W
DCB 96
DCB 87
DCB 103
CB 94
CB 88
CB 84
CB 86
CB 95
CB 107
CB 101
MH 71
MH 72
MH 70
MH 65
DCB 96
DCB 89
DCB 87DCB 85
DCB 103DCB 104
CB 93
CB 92
CB 88
CB 84
CB 86
CB 106CB 107 CB 105
CB 101
MH 71
MH 72
MH 65
CB97
WW
WW
WW
WW
EE
EE
EE
E
EE
EE
EE
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EE
E
ADDITIONAL TOPOAPPROXIMATE LOCATION
ADDITIONAL TOPOAPPROXIMATE LOCATION
ADDITIONAL TOPOAPPROXIMATE LOCATION
EE
EE
EE
E
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
SL
SL
SL
SL
SL
SL
E
E
E
E
E
E
E
E
E
E
E
SL
SL
E
E
E
E
EE
EE
E
E
E
E
E
E
UNABLE TO TONE HYDRO SERVICE,NO ACCESS TO HYDRO ROOM
UNABLE TO TONE PAST THIS POINT
UNABLE TO TONE PAST THIS POINTADDITIONAL TOPO ELEMENTAPPROXIMATE LOCATION OFSTREET LIGHT
UNABLE TO TONE PAST THIS POINT
UNABLE TO TONE GAS MAINDUE TO FROZEN VALVES
UNABLE TO TONE PAST THIS POINT
UNABLE TO TONE PAST THIS POINT
MH 70
CB 94
CB 95
DCB 108
PARKING LOTENTRANCE CONC. SIDEWALK
(1517)
(1517)
WIT 0.13W
DCB 96
DCB 87
DCB 103
CB 94
CB 88
CB 84
CB 86
CB 95
CB 107
CB 101
MH 71
MH 72
MH 70
MH 65
DCB 96
DCB 89
DCB 87DCB 85
DCB 103DCB 104
CB 93
CB 92
CB 88
CB 84
CB 86
CB 106CB 107 CB 105
CB 101
MH 71
MH 72
MH 65
CB97
WW
WW
WW
WW
EE
EE
EE
E
EE
EE
EE
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E EE
E
ADDITIONAL TOPOAPPROXIMATE LOCATION
ADDITIONAL TOPOAPPROXIMATE LOCATION
ADDITIONAL TOPOAPPROXIMATE LOCATION
EE
EE
EE
E
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
WW
SL
SL
SL
SL
SL
SL
E
E
E
E
E
E
E
E
E
E
E
SL
SL
E
E
E
E
EE
EE
E
E
E
E
E
E
UNABLE TO TONE HYDRO SERVICE,NO ACCESS TO HYDRO ROOM
UNABLE TO TONE PAST THIS POINT
UNABLE TO TONE PAST THIS POINTADDITIONAL TOPO ELEMENTAPPROXIMATE LOCATION OFSTREET LIGHT
UNABLE TO TONE PAST THIS POINT
UNABLE TO TONE GAS MAINDUE TO FROZEN VALVES
UNABLE TO TONE PAST THIS POINT
UNABLE TO TONE PAST THIS POINT
MH 70
CB 94
CB 95
DCB 108
PARKING LOTENTRANCE CONC. SIDEWALK
2+000
2+020
2+040
2+060
2+080
2+100
1+000
1+020
1+040
1+060
1+080
1+100
1+1201+120
-0+0
20
-0+0
00
0+02
0
0+04
0
0+06
0
0+08
0
0+10
0
0+12
0
0+14
0
0+16
0
0+18
0
0+20
0
0+22
0
0+24
0
0+26
0
0+28
0
0+29
8
26m ROW
R8.5 R8.5
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.00
R=50.14m
R3.0
R3.0
3.25 3.25
R8.5
3.25 3.25
R76.0R8.5
BOTH CURB LANES TO BE USED FORON-STREET PARKING DURING
OFF-PEAK HOURS
R8.5
6.70
PARALLEL PARKINGSPACE (TYP.)
23m ROW
R8.5R8.5
D
D
E E C C
APPROPRIATE ACCESS POINTS FOR THEFUTURE DEVELOPMENT TO BE DETERMINEDDURING THE DEVELOPMENT PROCESS
APPROPRIATE ACCESS POINTS FOR THEFUTURE DEVELOPMENT TO BE DETERMINEDDURING THE DEVELOPMENT PROCESS
FUTURE PARK
3.25LANE
2%
6.00BOULEVARD
2%
3.25LANE
26.00RIGHT-OF-WAY
4 LANE
3.25LANE
2%
6.00BOULEVARD
2%
3.25LANE
0.50CURB
0.50CURBP
ROWL P
ROWL
CMERCERSTREET
L
3.25LANE
2%
6.00BOULEVARD
2%
3.25LANE
26.00RIGHT-OF-WAY
4 LANE
3.25LANE
2%
6.00BOULEVARD
2%
3.25LANE
0.50CURB
0.50CURBP
ROWL P
ROWL
CPRINCESS
ROYAL DRIVE
L
CTHE EXCHANGE
LP
ROWL
3.25LANE
2%
2.75PARKING /PLANTER
5.50BOULEVARD
2%
2%
23.00RIGHT-OF-WAY
2 LANE(WITH PARKING)
3.25LANE
2%
2.75PARKING /PLANTER
5.50BOULEVARD
2%
2%
PROW
L
File
Nam
e: 0
3534
4_P
refe
rred
Fina
l - P
FO-1
.dw
g D
ate
Plo
tted:
Sep
tem
ber 2
4, 2
014
- 9:3
5am
SCALE: N.T.S.
Plotted by:Dvink Paper size: ISO Full Bleed A1 (841.00 X 594.00 MM) Plot table: RJB Full Scale.ctb
CITY FILE #:REFERENCE #:
HORZ. SCALE:
PROJ. NO.:
DRAWING NUMBER
DRAWN BY:
DESIGNED BY:
CHECKED BY:
DATE:DV
1:500
JV
DV
300035344
SEPTEMBER 2014
DU
KE
OF
YO
RK
BO
ULE
VA
RD
CITY CENTRE DRIVE
SQUARE ONE S
HOPPING C
ENTRE
DUKE OF YORK BLV
D
CITY C
ENTRE D
RIVE
RATHBURN R
D W
SQUARE ONE D
R.
HAMMERSON DR.
CITY CENTRE D
R.
SITE LOCATION
ME
RC
ER
STR
EE
T
THE
EX
CH
AN
GE
PRINCESS
ROYALDRIVE
PRINCESS ROYAL DRIVE
SECTION D-D
SECTION E-E
SECTION C-C
CONSULTANT
3 Ronell Crescent,Collingwood, Ontario, L9Y 4J6telephone (705) 446-0515fax (705) 446-2399
R.J. Burnside & Associates Limited
web www.rjburnside.com
LEGEND:
EXISTING EASEMENT LIMITS
PROPERTY BOUNDARY
PRELIMINARY PREFERRED DESIGN:ULTIMATE SCENARIO
PRINCESS ROYAL DRIVE, MERCER STREET& THE EXCHANGE
NOTES:1. LANE WIDTHS TO BE FINALIZED DURING THE DETAILED
DESIGN PHASE.
FUTURE LRT
APPROPRIATE LOCATION FOR TRAFFICSIGNAL IS TO BE DETERMINED
APPROPRIATE LOCATION FOR TRAFFICSIGNAL IS TO BE DETERMINED
Invitation for Participation • Public input is an important component of the decision-
making process. • You are invited to provide comments by completing the
forms provided and submitting forms to the Study Team members below on or before October 9, 2014.
• We will review all materials presented today and incorporate feedback from public, agencies, property owners, etc.
• We will respond to written questions and comments. • Based on input, confirm preferred design. • Prepare Master Plan Environmental Report. • Place Report on public record for 30-day review period. • Filing of EA tentatively scheduled for December 2014.
THANK-YOU FOR ATTENDING
Abdul W. Shaikh, P. Eng., PMP City Project Manager City of Mississauga 201 City Centre Drive, Suite 800 Mississauga, ON L5B 2T4 Tel: 905-615-3200 ext. 3734 Fax: 905-615-3173 E-mail: [email protected]
Philip A. Rowe, C.E.T. Consultant Project Manager R.J. Burnside & Associates Limited 6990 Creditview Road, Unit 2 Mississauga, ON L5N 8R9 Tel: 905-821-5919 Fax: 905-821-1809 E-mail: [email protected]