Seattle Public Schools McGilvra Elementary School MASTER PLAN DEVELOPMENT: McGILVRA ELEMENTARY SCHOOL January 21 st , 2016

Upload: vonga

Post on 03-Jul-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Seattle Public Schools McGilvra Elementary School

MASTER PLAN DEVELOPMENT:

McGILVRA ELEMENTARY SCHOOL

January 21st , 2016

Introduction

Seattle Public Schools McGilvra Elementary School

Evolution of Master Planning Need 

Capacity and Growth

Resource Stewardship and Sustainable Design

SDAT Process

Seattle Public Schools McGilvra Elementary School

Case Study: McGilvra Elementary School

Original Scope

2015 BTA Project Emergency Lighting, Sprinkler & Seismic Upgrades $605,000

2016 BTA Project Mechanical Upgrades $1,700,000 Est.

Seismic Upgrades

McDonald International School

2017/18 BEX IV Cafeteria Addition $3,195,388 Est.

TOTAL MACC ALL PHASES: $5,500,388 Est. Cafeteria Addition

Seattle Public Schools McGilvra Elementary School

Case Study: McGilvra Elementary School

Schedule

Seattle Public Schools McGilvra Elementary School

Case Study: McGilvra Elementary School

Seattle Public Schools McGilvra Elementary School

Evolution of Master Planning 

Vehicular circulation

Playfield

Existing building

Gym BR

Play area

Buildable Area

Where can we build?

Buildable area given the existing conditions:

• Preserve vehicle and pedestrian access points access, including service assess

• Not on existing field, preserve the “field of dreams”

• Existing school building is landmarked

• Gym will remain in existing condition

• Boiler Room will remain in existing condition

• Covered Play – potentially relocate to use that area of the site

• The portables – potentially can move or be removed

• Existing trees - ???

• 10’ Set back from property line

Seattle Public Schools McGilvra Elementary School

Evolution of Master Planning 

SDAT: Design Design Charrette

Seattle Public Schools McGilvra Elementary School

Evolution of Master Planning 

SDAT: Original Ed Spec:

5 SCHEMES

Seattle Public Schools McGilvra Elementary School

Evolution of Master Planning 

SDAT: Original Ed Spec

Scheme 2 – highest score

Seattle Public Schools McGilvra Elementary School

Case Study: McGilvra Elementary School

MASTER PLAN GOALS • Expand enrollment capacity to 490 students in accordance with the Generic Educational Specifications for Elementary Schools, dated

March 2013. This would be accomplished through a renovation of the existing landmarked historic building, as well as a new multistory addition.

• 21st century educational facility that will serve the District and the McGilvra community for over 50 years.

• New addition that is in context with landmark historic facility.

• Ultimate thorough modernization and integration of building systems, providing a road map to coordinate current planned BEXIV and BTA III seismic, mechanical and electrical upgrades with a future more comprehensive facility renovation.

• Consider impact of the future masterplan addition on planning, design and construction of current BEXIII cafeteria addition.

• Sustainability

Seattle Public Schools McGilvra Elementary School

Case Study: McGilvra Elementary School

Master Plan: Ed Spec 400 students

Seattle Public Schools McGilvra Elementary School

Case Study: McGilvra Elementary School

Master Plan: Ed Spec 500 students

In accordance with updated elementary ed specs for 500 students:

• 27 classrooms + 6 Learning Commons: • Kindergarten 5 • 1st grade 5 • 2nd grade 5 • 3rd grade 5 • 4th grade 3 • 5th grade 3 • Flex 1

• Childcare 2 • Special Ed 2 + Resource + Access • Art 1 • Music / Stage 1 • Library 2,750 sf • Gym 6,200 sf • Commons 4,620 sf • Administration Full program

Seattle Public Schools McGilvra Elementary School

Case Study: McGilvra Elementary School

Master Plan: Program Area Required for 500 Student Ed Spec

classrooms physical education

dining commons spec ed music / stage

kitchen / service

child careadministration

library

circulation art

walls / storage / etc

Seattle Public Schools McGilvra Elementary School

Case Study: McGilvra Elementary School

Master Plan: Site Opportunities / Constraints

significant treeshistoric structure

historic view play field corridor

zoning setback

Seattle Public Schools McGilvra Elementary School

Case Study: McGilvra Elementary School

Master Plan: Scheme 1 Site Opportunities:

- Maintain Recent Turf Field

- Maintain Impact on Significant Trees

Seattle Public Schools McGilvra Elementary School

Case Study: McGilvra Elementary School

Master Plan: Scheme 2 Site Opportunities:

- Maintain Recent Turf Field

- Maintain Existing View Cone

Seattle Public Schools McGilvra Elementary School

Case Study: McGilvra Elementary School

Master Plan: Scheme 3 Site Opportunities:

- Maintain Significant Trees

- Maintain Existing View Cone

Seattle Public Schools McGilvra Elementary School

Case Study: McGilvra Elementary School

Master Plan: Scheme 2 Site Opportunities:

Seattle Public Schools McGilvra Elementary School

- Maintain Recent Turf Field

- Maintain Existing View Cone

Case Study: McGilvra Elementary School

lower level 38th Ave E

East Garfield St

East Blaine St

north

gym/stage/ commons relationship

childcare entry/ community access

indoor/outdoor spaces

group childcare

kindergarten on lower level

Master Plan: Development

flexible spaces

Seattle Public Schools McGilvra Elementary School

38th Ave Enorth

Case Study: McGilvra Elementary School

main level

East Garfield St

East Blaine St

flexible spaces

circulation bridges commons

Master Plan: Development

Seattle Public Schools McGilvra Elementary School

38th Ave Enorth

Case Study: McGilvra Elementary School

upper level

East Garfield St

East Blaine St

flexible spaces

Master Plan: Development

Seattle Public Schools McGilvra Elementary School

Case Study: McGilvra Elementary School

Existing Conditions

Seattle Public Schools McGilvra Elementary School

Case Study: McGilvra Elementary School

Current Work – Demolition Plan

Seattle Public Schools McGilvra Elementary School

Case Study: McGilvra Elementary School

Current Work – Cafeteria Addition

Seattle Public Schools McGilvra Elementary School

Case Study: McGilvra Elementary School

Master Plan – Demolition Plan

Seattle Public Schools McGilvra Elementary School

Case Study: McGilvra Elementary School

Master Plan – Cafeteria Addition

Seattle Public Schools McGilvra Elementary School

Case Study: McGilvra Elementary School

Master Plan - Gym/Stage Addition

Seattle Public Schools McGilvra Elementary School

Case Study: McGilvra Elementary School

Master Plan - Lower Level Addition

Seattle Public Schools McGilvra Elementary School

Case Study: McGilvra Elementary School

Master Plan - Main Level Addition

Seattle Public Schools McGilvra Elementary School

Case Study: McGilvra Elementary School

Master Plan - Upper Level Addition

Seattle Public Schools McGilvra Elementary School

Case Study: McGilvra Elementary School

Master Plan – Massing

Seattle Public Schools McGilvra Elementary School

Case Study: McGilvra Elementary School

Master Plan – Section 1

Seattle Public Schools McGilvra Elementary School

Case Study: McGilvra Elementary School

Master Plan – Section 2

Seattle Public Schools McGilvra Elementary School

Case Study: McGilvra Elementary School

SD Cafeteria Addition: Site Plan

Seattle Public Schools McGilvra Elementary School

Case Study: McGilvra Elementary School

SD Cafeteria Addition: Entry View

Seattle Public Schools McGilvra Elementary School

Case Study: McGilvra Elementary School

SD Cafeteria Addition: Plaza View

Seattle Public Schools McGilvra Elementary School

Discussion

Questions?

Seattle Public Schools McGilvra Elementary School