Master Plan Options Board of Education
April 25, 2016
Commi&eeMembers
ChrisValen1ne-BoardofEduca1onMemberBrionDeitsch-ChiefOpera1ngOfficerSteveOsborne-Treasurer/CFOMikeUlring-DublinCoffmanPrincipalCorrineEvans-GrizzellMiddleSchoolPrincipalJenniferSchwanke-IndianRunElementaryPrincipalStaciLutz-RiversideElementaryPrincipalWayneColman-GarmannandMillerTracyHealy-FutureThink
PublicInput
Publicmee1ngdatesMarch16,March29andMarch31
SpoketodifferentstakeholdergroupssuchasBAC,SeniorCouncil,KeyCommunicators,PTOPresidents,homeownersassocia1onsandmore.
Surveyresults:1,400plusrespondents,64%to36%favornon-tradi1onalhighschooloverfourthhighschool
FactorsinDeterminingFacilityNeeds•10-yearstudentenrollmentprojec1ons• OhioSchoolsConstruc1onCommission• (formerlytheOhioSchoolsFacilityCommission)•Studentcapacitystudyofexis1ngfacili1es•Facili1esassessments•Nonewmillagebondissue
10-yearenrollmentprojec1onsaccordingtoFutureThink
Red=highestgrowthratescenarioGreen=lowestgrowthratescenario
Elementary 2015-16 2025-26 Delta 6,526 7,685 1,159 7,353 827
MiddleSchool 2015-16 2025-26 Delta 3,573 4,574 1,001 4,099 531HighSchool 2015-16 2025-26 Delta 4,754 5,865 1,111 5,194454
*Fallof2015
TheOhioSchoolsConstruc1onCommissionMatrixHighSchool(grades9-12) 160sq.k./studentMiddleSchool(grades6-8) 140sq.k./studentElementary(gradesPK-5) 120sq.k./studentRespec1vebuildingssq.k.isdividedbythenumberofstudentstodeterminecapacity.Ex:60,000sq.k.elementarybuildingwouldhaveastudentcapacityof500.
CurrentElementarySq.Footagevs.ProjectedNeeds
CurrentMiddleSchoolSq.Footagevs.ProjectedNeeds
CurrentHighSchoolSq.Footagevs.ProjectedNeeds
Concurrentvariablesnotaddressedinthiswork:
• Abnormalhighgrowthinspecificareas
• Abnormalhighgrowthinspecificagegroups
• Na1onal,stateandlocaleconomiccondi1ons
• Schoolfundingissues
• Statemandates
• Educa1onaldeliverymodels
• Redistric1ngneeds
Construc1on1meframes
Construc1ontoopen=30months+/-fromthepassageofaballotissue• Designwork
• Planapproval
• SiteDevelopment
• Construc1on
• Addi1ons/Renova1onscanrun24to30monthsdependingonsize,sitecondi1onsandconstruc1onlimits.
Poten1alnewbuilding1meframes
TBD-Nontradi1onalHighSchoolFacility
Nolaterthan2021-Elementary13/preschoolopens-PK-Gr.5Building
Nolaterthan2022-firsthighschooladdi1onsopen-JeromeHSand/orSciotoHS
Nolaterthan2023-MiddleSchool5opens-Gr.6-8ofaK-8configura1on
AdvantagesofNon-Tradi1onalHighSchoolSpace
• Seekingcentralizedlocaletoserveall3highschools– HousevariousacademiescurrentlyinHSbuildings– WestBridge
• Offeraddi1onaleduca1onalopportuni1es– Colleges/Universi1espartnerships– CareerandTechnicaltypeofferings– Helpseasefutureovercrowdingatgrowinghighschools– Muchmorecosteffec1ve(Seenextslide)
Es1matedcostsassociatedwithHighSchoolFour
Landacquisi1on-70+acresneededat$5,000-$25,000peracreormore.
Construc1on-$70,000,000plus
WaterandSanitarySewer?-$$$
Est.Opera1onal(Fixed)Costs(JustStaff)-Approx$9.5million-annually
MaintenanceNeedsProjec1ons
(Basedona2016assessmentbySchorrArchitects)
• CoffmanHSChillersandAirHandlers
• CoffmanHSexteriordoors,storefrontsandcurtainwalls
• CoffmanHStoencapsulateexteriorwalls
20-yearoldchilleratThomas LeakingissuesatCoffman
MaintenanceNeedsProjec1ons(BasedonGarmann&Millerstudy-fall2015)
• SciotoHSHVACupdates
• Updateligh1ngandLifeSafetysystems
• Parkinglotsandsitework
OriginalcoldwaterpumpingsystematScoqshCorners.Morethan25yearsoldandpartsnolongeravailable.
Es1matedRenova1onCostsatExis1ngFacili1es
ElementarySchools-$10,238,710 MiddleSchool-$25,800,000
HighSchool-$36,500,000AssessmentscompletedbyGarmann/MillerandSchorrArchitecturalFirms.Theiden1fiedworkincludes,butisnotlimitedto:- ReplaceagingHVACequipment- Bringiden1fiedareasuptocodeincluding,butnotlimitedtolifesafetyandADA.- Increaseopera1onefficienciesandreducecosts- Insureeachbuildingenvelopeissecure- Theworkisbrokendownintoshorttermandlongtermplanningforbudgetpurposes
- Dedicatedfundingstreamfortheseitemsisparamount
Recommenda<on:Op1onD
Facili<es Loca<onCost•Elementary13 BrightRoad $32,625,000(Preschool/Elementarycombina1on)
•Elementary14(K-8configura1on) JeromeVillage $20,312,500
•MiddleSchool5(K-8configura1on) JeromeVillage $37,500,000
•Non-tradi1onalhighschoolspace $15,000,000
•Addi1onstoJeromeand/orScioto $46,312,500* *=both Total:$151,750,000
Recommenda<on:NoNewMillageBondisneededforaddi1onalschools
• In2019millagebeginstorolloffaspreviousbondcommitmentsarepaidoff.
• Thisdynamicwilloccurfor3years(2019-2021)
• Themillagerolloffallowsthedistrictanopportunitytoaddressfacilityneedswitha“nonewmillage”levyiftheysodesire.
• Thecapacitycreatedbyanonewmillagelevywouldgoalongwaytowardsaddressingthedistrict'sfuturenewfacilityneeds.
• TheDistrictwoulds1llbelookingatameanstoaddressthemaintenanceneedsofourexis1ngfacili1esthatareagingandbeingaddedonto.
Recommenda<on:PermanentImprovement(PI)Levy
isneededtomaintainexis1ngschoolsTheDistrictneedsawaytoaddressthemaintenanceneedsofourexis1ngfacili1esthatareagingandbeingaddedontonotcoveredbyanonewmillagebondissue.
Es1matedRenova1onCostsatExis1ngFacili1es
ElementarySchools-$10,238,710
MiddleSchool-$25,800,000
HighSchool-$36,500,000
AssessmentscompletedbyGarmann/MillerandTonySchorrArchitecturalFirms.Iden1fiedworkincludes,butisnotlimitedto:- ReplaceagingHVACequipment- Bringiden1fiedareasuptocodeincluding,butnotlimitedtolifesafetyandADA.- Increaseopera1onefficienciesandreducecosts- Insureeachbuildingenvelopeissecure- Theworkisbrokendownintoshorttermandlongtermplanningforbudgetpurposes - Dedicatedfundingstreamfortheseitemsisparamount
Ques1ons?