material in the east treatment cell, and improve flow in
TRANSCRIPT
Project LocationSection 36
T-2S, R-8W andSection 1
T-3S, R8WLat: 38°17'28"Lon: 87°15'00"
AML Site BoundarySite No. 898
NPDES Discharge Point 001Lat: 38°17'31"Lon: 87°14'53"
AML SiteBoundary
Site No.978
AML Site BoundarySite No. 979
ENOS WETLANDSITE NO.
898
CONTRACT NO.
DEL2115208087/E008-317
PIKE COUNTY
STATE OF INDIANAINDIANA DEPARTMENT OF NATURAL RESOURCES
DIVISION OF RECLAMATION
ABANDONED COAL MINERESTORATION
ENOS WETLANDSITE 898
CONTRACT DEL2115208087/E008-317PIKE COUNTY
APPROVEDFOR LETTING:
DIVISION OF RECLAMATION DATE
Remove and replace substrate material in the west treatment cell, stir the substratematerial in the east treatment cell, and improve flow in the sediment pond.
SCALE
SITE
SHEET
PROJECT
AS NOTED
E008-317
1 OF 5
898
GENERAL NOTES
Plans developed from topographic mapping survey flown in 2008by Williams Aerial & Mapping, Inc. in NAD 83, Indiana State PlaneWest, Feet.
INDEXSHEET TITLESHEET NO.
1 TITLE, INDEX, & LOCATION MAP
2
3-4 SITE PLANS
SITE MAP
2010 AML Standard Specifications to be used with these plans.
UTILITIES
ELECTRIC:Duke Energy, Inc.390 N Main StreetMartinsville, IN 46151(317) 776 - 5341
NATURAL GAS:Vectren (South)1800 W. 26th St.Muncie, IN 47302(765) 287 - 2119
TELECOM:Frontier8001 West Jefferson BlvdFort Wayne, IN 46804(260) 461 - 3324
WATER/SANITARY:Pike-Gibson Water, Inc.300 N Jackson St.Oakland City, IN 47660(812) 749 - 4916
Spurgeon Water Corporation11440 S State Road 61Spurgeon, IN 47584(812) 721 - 2043
Call Before You Dig. Indiana Underground Plant ProtectionService (IUPPS) 1-800-382-5544 or 811 from your mobile phone.
The facilities of the following utilities exist near the project sitebut are not expected to be affected by the proposed construction.If questions arise, the utility may be contacted using theinformation below.
PLANSPREPARED BY: (812) 665-2207
PHONE NUMBER
Project Location MapAugusta and Oakland City US TOPO Series Maps (USGS, 2019)
CERTIFIED BY:DATE
INDIANA DEPARTMENT OF NATURAL RESOURCESDIVISION OF RECLAMATION
0 2,000 4,000
5 DETAILS
An NPDES permit is required for this project.
Sheet 3
Sheet 4
Staging and Mixing AreaAML Site 979
AML Site 898
AML Site 978
Project LimitsN:1,
107,6
20.63
E:2,90
4,622
.64
N:1,10
8,575
.90
E:2,90
5,598
.06
N:1,10
9,088
.27
E:2,90
5,058
.67
N:1,10
8,368
.27
E:2,90
4,397
.29
N:1,105,762.80E:2,903,234.85
N:1,104,387.25E:2,903,247.98
N:1,104,468.49E:2,904,025.66N:1,105,439.34
E:2,904,012.50
SITE MAP
STATE OF INDIANA
DEPARTMENT OF NATURAL RESOURCESDIVISION OF RECLAMATION
DATE MADE
DRAWN BYDESIGNED BY DATE REVISED
5/13/2020
C.J.H. C.J.H. 7/15/2020 11:34:34 AM
SCALE
SITE
SHEET
PROJECT
1" = 300'
E008-317
2 OF 5
898
RECOMMENDEDFOR APPROVAL:
DATE
LegendAML Site Boundary
Site AccessStaging Area
Project Limits
Sheet Index
0 300 600
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SFSF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
West Treatment Cell,remove substrate materialdown to top of limestone
(approx. 437.0' elev.),disposal at stockpile locationas shown on Sheet 4, placenew organic substrate (see
Detial 3, Sheet 5 for organicsubstrate mixture
percentages)
Excavate 3' below waterelev. and 12' wide,dispose in areas onopposite side of berm
Excavationdisposal areas
East Treatment Cell,stir substratematerial down to topof dolomite (approx.437.0' elev.)
Approx. location of wetlandpipes in limestone/dolomite
layers, do not disturb
Silt fence, 777 LFT(see Detail 2, Sheet 5)
N:1,107,620.63E:2,904,622.64
N:1,108,575.90E:2,905,598.06
N:1,109,088.27E:2,905,058.67
N:1,108,368.27E:2,904,397.29
SITE PLAN - TREATMENT CELLS & SEDIMENT POND
STATE OF INDIANA
DEPARTMENT OF NATURAL RESOURCESDIVISION OF RECLAMATION
DATE MADE
DRAWN BYDESIGNED BY DATE REVISED
5/13/2020
C.J.H. C.J.H. 7/15/2020 11:34:34 AM
SCALE
SITE
SHEET
PROJECT
1" = 100'
E008-317
3 OF 5
898
RECOMMENDEDFOR APPROVAL:
DATE
LegendExisting Contour
Project Limits
Existing Paved Road/Drive
Exist. Unpaved Road/Drive
Existing Water
Existing Tree Line
Existing Guardrail
Existing FenceX X
Utility Pole
Staging AreaDisposal (material as noted)
Existing Spot Elevation
Exist. Bathymetric Contour
Existing Building/Structure
Site Access
0 100' 200'
SF
SFSF
SFSF
SFSF
SFSF
SF SF SF SF SF SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF SF
SFSF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
Staging and Substrate Mixing Area(approx. 1.5 ac)
Substrate Disposal Area (approx. 0.5 ac), placesubstrate in 12" lifts and apply agricultural lime
at a rate of 50 tons/acre on each lift
Silt fence, 803 LFT(see Detail 2, Sheet 5)
Silt fence, 1,148 LFT(see Detail 2, Sheet 5)
N:1,105,762.80E:2,903,234.85
N:1,104,387.25E:2,903,247.98
N:1,104,468.49E:2,904,025.66N:1,105,439.34
E:2,904,012.50
SITE PLAN - STAGING, MIXING, & DISPOSAL AREAS
STATE OF INDIANA
DEPARTMENT OF NATURAL RESOURCESDIVISION OF RECLAMATION
DATE MADE
DRAWN BYDESIGNED BY DATE REVISED
5/13/2020
C.J.H. C.J.H. 7/15/2020 11:34:34 AM
SCALE
SITE
SHEET
PROJECT
1" = 100'
E008-317
4 OF 5
898
RECOMMENDEDFOR APPROVAL:
DATE
LegendExisting Contour
Project Limits
Existing Paved Road/Drive
Exist. Unpaved Road/Drive
Existing Water
Existing Tree Line
Existing Guardrail
Existing FenceX X
Utility Pole
Staging AreaDisposal (material as noted)
Existing Spot Elevation
Exist. Bathymetric Contour
Existing Building/Structure
Site Access
0 100' 200'
DETAILS
STATE OF INDIANA
DEPARTMENT OF NATURAL RESOURCESDIVISION OF RECLAMATION
DATE MADE
DRAWN BYDESIGNED BY DATE REVISED
5/13/2020
C.J.H. C.J.H. 7/15/2020 11:34:34 AM
SCALE
SITE
SHEET
PROJECT
AS NOTED
E008-317
5 OF 5
898
RECOMMENDEDFOR APPROVAL:
DATE
Flow
4" min.
Not to Scale
Temporary Check Dam, Straw Bale1
Stakes to be driventoward next balemin. 12" into ground
1" x 2" woodstakes (typ.)
Straw balesw/ wire ornylon binding
Note:Ends of individual rolls of fabric shallbe securely fastened to a commonpost and overlapped 3 in. min.
Not to Scale
Silt Fence2
SedimentPond
Existing limestoneand/or dolomite layer
Normal pool, approx. 3' above organic substrate
Organic substrate
2'
3'
Standpipe
Not to Scale
Typical Existing Treatment Cell (from As-builts)3
Notes:New organic substrate materialin the west treatment cell shallconsist of a mix by volume ofthe following materials: 60%wood chips, 10% agriculturallime, 20% straw/hay, and 10%compost.
Piping System, Do Not Disturb