    Project Information

    Project : THE STUDY OF REINFORCED CONCRETE FOUNDATIONS DESIGN AND ANA LYSIS USING MATHCAD

    Footing Name : Ex-2 F-422 Winit Ex 11.6

    Owner : KU

    Location : KU

    Summary Analysys and Design

    1.) Footing Data

    Number of Piles Npile 4

    Dead Load Factor DF 1.4

    Live Load Factor LF 1.7

    Dead Loads on Footing P0zD 50 tons

    Live Loads on Footing P0zL 25 tons

    Total Axial Load Excluding

    Weight of Soil and Footing

    (W=WSD , U=USD)

    Pzw 75 tons

    Pzu 112.5 tons

    Dead Load Moment X-Axis MxD 0 tons m

    ? Foundation Detials(Click for Large Picture)Live Load Moment X-Axis MxL 0 tons

    Total Moment X-Axis

    (W=WSD , U=USD)Mxw 0 tons Mxu 0 tons

    Dead Load Moment Y-Axis MyD 10 tons m

    Live Load Moment Y-Axis MyL 5 m tons

    Total Moment X-Axis

    (W=WSD , U=USD) Myw 15m tons

    Myu 22.5 m tons

    Size of column X-Axis Cx 0.4m Co-ordinate of column X-Axis xc 0

    Size of column Y-Axis Cy 0.4m Co-ordinate of column Y-Axis yc 0

    Thickness Footing : Bz 0.5m Minimum Size of Footing X-Axis Bx2min 1.5m

    Height of Footing Hz 1.5m Minimum Size of Footing Y-Axis By2min 1.5m

    Pile Diameter Dp 0.22 m Spacing of pile spc 0.9m

    Critical Diameter

    (For Pile Load Reduction Factor)Dcr 0.3m Spacing Factor csx 1 csy 1

    Minimum Clearances from Center

    of pile to Edge of Footing ax 0.3m X-Axis

    ay 0.3m Y-Axis

    WSD Allowable Pile Capacity USD Allowable Pile Capacity

    Allowable Compression Pile Capacity Pw.plus.allow 30 tons Pu.plus.allow 60 tons

    Allowable Tension Pile Capacity Pw.neg.allow 10 tons Pu.neg.allow 20 tons

    2.) Design Data

    Dead Load Factor DF 1.4

    Live Load Factor LF 1.7

    Cylindical Concrete Strength fc 250 ksc

    Yield Strength of Steel fy 3 103 ksc fs 1500 ksc

    Select BarType : Deform / Round Bar BarType 1 ( Deform Bar DB 1 , Round Bar RB 0 )

    Concrete Covering of Footing Cov 75 mm

  • 8/13/2019 Mathcad 65 Summary USD=EX 3 F422 Winit 11.6

    2/17

    3.)Plot Foot ing

    Footing Symbows

    1 0.5 0 0.5 1

    1

    0.5

    0.5

    1

    Plot Footing Plan Compare First x1 ,y1 ,Bx By x2 y2 Bx2 By2

    ax 0.3m ay 0.3m

    Cx 0.4m Cy 0.4m

    xc 0 yc 0? Footing Symbows (Click for Large Picture)

    Bx 1.5m By 1.5m

    Bx2min 1.5m By2min 1.5m

    1 0.5 0 0.5 1

    1

    0.5

    0.5

    1

    Pile

    cg. Pile Group

    Edge of Footing

    Centroid of Pile Group

    xc.pile 0 m

    yc.pile 0 m

    Pz

    w.v

    10.417

    10.417

    27.083

    27.083

    tons

    Pzu.v15.625

    15.625

    40.625

    40.625

    tons

  • 8/13/2019 Mathcad 65 Summary USD=EX 3 F422 Winit 11.6

    3/17

    4.) Pile Data

    4.1 Pile Co-ordinate Data , Weight , Reduction Factor Punching, Reaction on each Pile

    Pile Co-ordinate Data Weight Reduction Factor Punching Reaction on each Pile

    Pile No Pile Co-ordinate Pile Deviate Distance Weight Reduction Reaction on each Pile

    # x2 y2 DelX DelY Capacity Punching Pzw Pzu Pzw.x Pzw.y Pzu.x Pzu.y

    cm. cm. cm. cm. W fpv tons tons tons tons tons tons

    1.00 -45.00 45.00 0.00 0.00 1.00 0.64 10.42 15.63 10.42 18.75 15.63 28.13

    2.00 45.00 45.00 0.00 0.00 1.00 0.64 27.08 40.63 27.08 18.75 40.63 28.133.00 -45.00 -45.00 0.00 0.00 1.00 0.64 10.42 15.63 10.42 18.75 15.63 28.13

    4.00 45.00 -45.00 0.00 0.00 1.00 0.64 27.08 40.63 27.08 18.75 40.63 28.13

    Pzwuxy

    Notes

    Pz = Total Axial Load Excluding Weight of Soil and Footing (W=WSD , U=USD)

    Pzw.x = Total Axial Load Excluding Weight of Soil and Footing (W=WSD) Include My only

    Pzu.x = Total Axial Load Excluding Weight of Soil and Footing (U=USD) Include My only

    Pzw.y = Total Axial Load Excluding Weight of Soil and Footing (W=WSD) Include Mx only

    Pzu.y = Total Axial Load Excluding Weight of Soil and Footing (U=USD) Include Mx only

    4.2 ) Check of Pile Reaction (Bi-Axial)

    WSD

    Maximum Compressive Load on 1 Pile Al lowable Compressive Load on 1 Pi le Result

    P1w.plus 27.083 tons Pw.plus.allow 30 tons Check P1w.plus Pw.plus.allow "OK"

    Maximum Tension Load on 1 Pile Allowable Tension Load on 1 Pile Result

    P1w.neg 0 tons Pw.neg.allow 10 tons Check P1w.neg Pw.neg.allow "OK"Maximum Load on 1 Piles

    P1w.max.all 27.083 tons

    ...............................................................................................................................................................

    USD

    Maximum Compressive Load on 1 Pile Al lowable Compressive Load on 1 Pi le Result

    P1u.plus 40.625 tons Pu.plus.allow 60 tons Check P1u.plus Pu.plus.allow "OK"

    Maximum Tension Load on 1 Pile Allowable Tension Load on 1 Pile Result

    P1u.neg 0 tons Pu.neg.allow 20 tons Check P1u.neg Pu.neg.allow "OK"Maximum Load on 1 Piles

    P1u.max.all 40.625 tons

    ...............................................................................................................................................................

  • 8/13/2019 Mathcad 65 Summary USD=EX 3 F422 Winit 11.6

    4/17

    5.) Design of Footing

    5.1 WSD

    5.1.1 Chech Punching Shear

    Check for Punching Shear from Column

    Punching Shear from Column Allowable punching shear stress Result

    vp.w 5.009 ksc vcp 8.38 ksc Check vp.w vcp "OK"

    Check for Punching Shear from Maximum Pile Load

    Punching Shear from Maximum Pile Load Allowable punching shear stress Result

    vp.w.pile 5.284 ksc vcp 8.38 ksc Check vp.w.pile vcp "OK"

    5.1.2 Check Beam Shear Stress

    Beam Shear Stress Beam Shear Stress Result

    x y x y1

    vb.w

    0

    4.566 10 15

    0

    0

    ksc vcb 4.617 ksc 12 Check vb.w vcb "OK"

    "OK"

    "OK"

    "OK"

    5.1.3 Check Reinforcement

    Moment and Number of Bar Used WSD

    X1 X2 Y1 Y2

    Moment Mw tons.m 5.21 13.54 9.38 9.38

    Ac (Compression) cm2 0.00 0.00 0.00 0.00

    At (Tension) cm2 12.82 29.26 23.07 23.07

    As top cm2 0.00 0.00 0.00 0.00

    As bottom cm2 12.82 29.26 23.07 23.07

    Bar Diameter (top) mm 20 20 20 20

    Bar Diameter (bot) mm 20 20 20 20

    Bar Cross-Section Area (top) cm2 3.14 3.14 3.14 3.14

    Bar Cross-Section Area (bot) cm2 3.14 3.14 3.14 3.14

    Num Bar required (top) 0.00 0.00 0.00 0.00

    Num Bar required (bottom) 4.08 9.31 7.34 7.34Num Bar Used (top) 0 0 0 0

    Num Bar Used (bottom) 10 10 8 8

    MAsNw

    WSD Section of Footing

    xc 0 Cx 0.4m Cz 1 m Bx2 1.5m DepthFtg 1.5m

    yc 0 Cy 0.4m Hz 1.5m By2 1.5m Bz 0.5m

    200 100 0 100 200

    50

    100

    150 Ground_Level

    200 100 0 100 200

    50

    100

    150 Ground_Level

    T 0.5m

    Section 1 Parallel Y-Axis Section 2 Parallel X-Axis

    By2 1.5mBx2 1.5m

    toptopBar_yw""

    "8DB20mm @19cm Rft. // Y-Axis at Bottom"

    Bar_xw""

    "10DB20mm @14.78cm Rft. // X-Axis at Bottom"

    botbot

  • 8/13/2019 Mathcad 65 Summary USD=EX 3 F422 Winit 11.6

    5/17

    5.2 USD

    5.2.1 Chech Punch ing Shear

    Check for Punching Shear from Column

    Punching Shear from Column Allowable punching shear stress Result

    vp.u 7.514 ksc vcp 14.246 ksc Check vp.u vcp "OK"

    Check for Punching Shear from Maximum Pile Load

    Punching Shear from Maximum Pile Load Allowable punching shear stress Result

    vp.w.pile 5.284 ksc vcp 8.38 ksc Check vp.w.pile vcp "OK"

    5.2.2 Check Beam Shear Stress

    Beam Shear Stress Beam Shear Stress Result

    x y x y1

    vb.w

    0

    4.566 10 15

    0

    0

    ksc vcb 4.617 ksc 12 Check vb.w vcb "OK"

    "OK"

    "OK"

    "OK"

    5.2.3 Check Reinforcement

    Moment and Number of Bar Used USD

    X1 X2 Y1 Y2

    Moment Mu tons.m 7.81 20.31 14.06 14.06

    Ac (Compression) cm2 0.00 0.00 0.00 0.00

    At (Tension) cm2 9.37 24.69 16.98 16.98

    As (top) cm2 0.00 0.00 0.00 0.00

    As (bottom) cm2 9.37 24.69 16.98 16.98

    Bar Diameter (top) mm 20 20 20 20

    Bar Diameter (bot) mm 20 20 20 20

    Bar Cross-Section Area (top) cm2 3.14 3.14 3.14 3.14

    Bar Cross-Section Area (bot) cm2 3.14 3.14 3.14 3.14

    Num Bar Required (top) 0.00 0.00 0.00 0.00

    Nuim Bar Required (bot) 2.98 7.86 5.40 5.40Num Bar Used (top) 0 0 0 0

    Num Bar Used (bot) 8 8 6 6

    MAsNu

    USD Section of Footing

    xc 0 Cx 0.4m Cz 1 m Bx2 1.5m DepthFtg 1.5m

    yc 0 Cy 0.4m Hz 1.5m By2 1.5m Bz 0.5m

    200 100 0 100 200

    50

    100

    150 Ground_Level

    200 100 0 100 200

    50

    100

    150 Ground_Level

    T 0.5m

    Section 1 Parallel Y-Axis Section 2 Parallel X-Axis

    By2 1.5mBx2 1.5m

    toptopBar_yu""

    "6DB20mm @26.6cm Rft. // Y-Axis at Bottom"

    Bar_xu""

    "8DB20mm @19cm Rft. // X-Axis at Bottom"

    botbot

  • 8/13/2019 Mathcad 65 Summary USD=EX 3 F422 Winit 11.6

    6/17

    6.) Plot Shear , Moment and As Require of Footing

    6.1) WSD

    6.1.1 ) WSD X-Direction

    0.8 0.64 0.48 0.32 0.16 0 0.16 0.32 0.48 0.64 0.8

    60

    49

    38

    27

    16

    5

    6

    17

    28

    39

    50

    SFD (With Factor Reduction ) X-Direction

    Cx1 Cx2

    WSD

    0.8

    0.64

    0.48

    0.32

    0.16

    0 0.16 0.32 0.48 0.64 0.8

    60

    49

    38

    27

    16

    5

    6

    17

    28

    39

    50

    SFD (tons) :Rft. in X- Direction

    Cx1 Cx2

    WSD

  • 8/13/2019 Mathcad 65 Summary USD=EX 3 F422 Winit 11.6

    7/17

    0.8 0.64 0.48 0.32 0.16 0 0.16 0.32 0.48 0.64 0.8

    1.6

    3.2

    4.8

    6.4

    8

    9.6

    11.2

    12.8

    14.4

    16

    Not Include Moment Mx

    Include Moments Mx, My

    BMD (tons.m) for : Rft. in X- Direction

    Cx1 Cx2

    WSD

    0.8 0.64 0.48 0.32 0.16 0 0.16 0.32 0.48 0.64 0.8

    3

    6

    9

    12

    15

    18

    21

    24

    27

    30

    Ac ( cm^2 )

    At ( cm2 )

    Steel Area (cm2) for Rft in X-Direction

    Cx1 Cx2

    WSD

  • 8/13/2019 Mathcad 65 Summary USD=EX 3 F422 Winit 11.6

    8/17

    0.8 0.64 0.48 0.32 0.16 0 0.16 0.32 0.48 0.64 0.8

    30

    27

    24

    21

    18

    15

    12

    9

    6

    3

    As top ( cm^2 )

    As bot ( cm2 )

    Steel Area (cm2) for Rft in X-Direction

    Cx1 Cx2Top Bar

    Bottom Bar

    WSD

    0.8 0.64 0.48 0.32 0.16 0 0.16 0.32 0.48 0.64 0.8

    10

    9

    8

    7

    6

    5

    4

    3

    2

    1

    Num Bar - topNum Bar - bot

    Num Bars Top-Bot for Rft in X-Direction

    Cx1 Cx2

    Top Bar

    Bottom Bar

    WSD

  • 8/13/2019 Mathcad 65 Summary USD=EX 3 F422 Winit 11.6

    9/17

    6.1.2 ) WSD Y-Direct ion

    0.8 0.64 0.48 0.32 0.16 0 0.16 0.32 0.48 0.64 0.8

    40

    32

    24

    16

    8

    8

    16

    24

    32

    40

    SFD (With Factor Reduction ) Y-Direction

    Cy1 Cy2

    WSD

    0.8 0.64 0.48 0.32 0.16 0 0.16 0.32 0.48 0.64 0.8

    40

    32

    24

    16

    8

    8

    16

    24

    32

    40

    SFD (tons) :Rft. in Y- Direction

    Cy1 Cy2

    WSD

  • 8/13/2019 Mathcad 65 Summary USD=EX 3 F422 Winit 11.6

    10/17

    0.8 0.64 0.48 0.32 0.16 0 0.16 0.32 0.48 0.64 0.8

    2

    0.4

    1.2

    2.8

    4.4

    6

    7.6

    9.2

    10.8

    12.4

    14

    Not Include Moment My

    Include Moments Mx, My

    BMD (tons.m) for : Rft. in Y- Direction

    Cy1 Cy2

    WSD

    0.8 0.64 0.48 0.32 0.16 0 0.16 0.32 0.48 0.64 0.8

    3

    6

    9

    12

    15

    18

    21

    24

    27

    30

    Ac ( cm2 )

    At ( cm2 )

    Steel Area (cm2) for Rft in Y-Direction

    Cy1 Cy2

    WSD

  • 8/13/2019 Mathcad 65 Summary USD=EX 3 F422 Winit 11.6

    11/17

    0.8 0.64 0.48 0.32 0.16 0 0.16 0.32 0.48 0.64 0.8

    30

    26.5

    23

    19.5

    16

    12.5

    9

    5.5

    2

    1.5

    5

    As top ( cm2 )

    As bot ( cm2 )

    Steel Area (cm2) for Rft in Y-Direction

    Cy1 Cy2

    Top Bar

    Bottom Bar

    WSD

    0.8 0.64 0.48 0.32 0.16 0 0.16 0.32 0.48 0.64 0.8

    10

    8.9

    7.8

    6.7

    5.6

    4.5

    3.4

    2.3

    1.2

    0.1

    1

    Num Bar - top

    Num Bar - bot

    Num Bars Top-Bot for Rft in Y-Direction

    Cy1 Cy2

    Top Bar

    Bottom Bar

    WSD

    ------------------------------------------------------------End WSD Plotting-------------------------------------------------------------------------

  • 8/13/2019 Mathcad 65 Summary USD=EX 3 F422 Winit 11.6

    12/17

    6.2 ) USD

    6.2.1 ) USD X-Direction

    0.8 0.64 0.48 0.32 0.16 0 0.16 0.32 0.48 0.64 0.8

    100

    82

    64

    46

    28

    10

    8

    26

    44

    62

    80

    SFD (With Factor Reduction ) X-Direction

    Cx1 Cx2

    USD

    0.8 0.64 0.48 0.32 0.16 0 0.16 0.32 0.48 0.64 0.8

    100

    82

    64

    46

    28

    10

    8

    26

    44

    62

    80

    SFD (tons) :Rft. in X- Direction

    Cx1 Cx2

    USD

  • 8/13/2019 Mathcad 65 Summary USD=EX 3 F422 Winit 11.6

    13/17

    0.8 0.64 0.48 0.32 0.16 0 0.16 0.32 0.48 0.64 0.8

    5

    2

    1

    4

    7

    10

    13

    16

    19

    22

    25

    Not Include Moment Mx

    Include Moments Mx, My

    BMD (tons.m) for : Rft. in X- Direction

    Cx1 Cx2

    USD

    0.8 0.64 0.48 0.32 0.16 0 0.16 0.32 0.48 0.64 0.8

    3

    6

    9

    12

    15

    18

    21

    24

    27

    30

    Ac (cm2)

    At (cm2)

    Steel Area (cm2) for Rft in X-Direction

    Cx1 Cx2

    USD

  • 8/13/2019 Mathcad 65 Summary USD=EX 3 F422 Winit 11.6

    14/17

    0.8 0.64 0.48 0.32 0.16 0 0.16 0.32 0.48 0.64 0.8

    30

    27

    24

    21

    18

    15

    12

    9

    6

    3

    As top (cm2)

    As bot (cm2)

    Steel Area (cm2) for Rft in X-Direction

    Cx1 Cx2

    Top Bar

    Bottom Bar

    USD

    0.8 0.64 0.48 0.32 0.16 0 0.16 0.32 0.48 0.64 0.8

    10

    9

    8

    7

    6

    5

    4

    3

    2

    1

    Num Bar - top

    Num Bar - bot

    Num Bars Top-Bot for Rft in X-Direction

    Cx1 Cx2

    Top Bar

    Bottom Bar

    USD

  • 8/13/2019 Mathcad 65 Summary USD=EX 3 F422 Winit 11.6

    15/17

    6.2.2 ) USD Y-Direct ion

    0.8 0.64 0.48 0.32 0.16 0 0.16 0.32 0.48 0.64 0.8

    60

    48

    36

    24

    12

    12

    24

    36

    48

    60

    SFD (With Factor Reduction ) Y-Direction

    Cy1 Cy2

    USD

    0.8 0.64 0.48 0.32 0.16 0 0.16 0.32 0.48 0.64 0.8

    60

    48

    36

    24

    12

    12

    24

    36

    48

    60

    SFD (tons) :Rft. in Y- Direction

    Cy1 Cy2

    USD

  • 8/13/2019 Mathcad 65 Summary USD=EX 3 F422 Winit 11.6

    16/17

    0.8 0.64 0.48 0.32 0.16 0 0.16 0.32 0.48 0.64 0.8

    2

    0.2

    2.4

    4.6

    6.8

    9

    11.2

    13.4

    15.6

    17.8

    20

    Not Include Moment My

    Include Moments Mx, My

    BMD (tons.m) for : Rft. in Y- Direction

    Cy1 Cy2

    USD

    0.8 0.64 0.48 0.32 0.16 0 0.16 0.32 0.48 0.64 0.8

    2.5

    5

    7.5

    10

    12.5

    15

    17.5

    20

    22.5

    25

    Ac (cm2)

    At (cn2)

    Steel Area (cm2) for Rft in Y-Direction

    Cy1 Cy2

    USD

  • 8/13/2019 Mathcad 65 Summary USD=EX 3 F422 Winit 11.6

    17/17

    0.8 0.64 0.48 0.32 0.16 0 0.16 0.32 0.48 0.64 0.8

    25

    22

    19

    16

    13

    10

    7

    4

    1

    2

    5

    As top(cm2)

    As bot (cn2)

    Steel Area (cm2) for Rft in Y-Direction

    Cy1 Cy2Top Bar

    Bottom Bar

    USD

    0.8 0.64 0.48 0.32 0.16 0 0.16 0.32 0.48 0.64 0.8

    8

    7.1

    6.2

    5.3

    4.4

    3.5

    2.6

    1.7

    0.8

    0.1

    1

    Num Bar - top

    Num Bar - bot

    Num Bars Top-Bot for Rft in Y-Direction

    Cy1 Cy2Top Bar

    Bottom Bar

    USD