Desy workshop Desy workshop 20.04.2004 20.04.2004
April 2004
Mats Wilhelmsson CERN
Water Cooling for the LHCWater Cooling for the LHC
Desy workshop Desy workshop 20.04.2004 20.04.2004
Content :
CERN- The Large Hadron Collider
THE Recovery/transformation of LEP
LHC-Users for water cooling
Water cooling systems for the LHC-Raw- and primary water systems-Demineralised water systems-Chilled- and mixed water systems
Reject water
Controls
Desy workshop Desy workshop 20.04.2004 20.04.2004
The LEP tunnelThe LEP tunnel
P1
SPS
P2
P3
P4 P5
P6
P7
P8
Desy workshop Desy workshop 20.04.2004 20.04.2004
The LHC tunnelThe LHC tunnel
P3
SPS
CMS
LHC-B
ATLAS
ALICE
P4P5
P6
P7
P8P1
P2
Desy workshop Desy workshop 20.04.2004 20.04.2004
LHC Experimental site (point 8) LHC Experimental site (point 8)
Desy workshop Desy workshop 20.04.2004 20.04.2004
Consumers of water coolingConsumers of water cooling
Desy workshop Desy workshop 20.04.2004 20.04.2004
Cooling the LHCCooling the LHCMain consumersMain consumers
Cryogenic installationsCryogenic installations
Desy workshop Desy workshop 20.04.2004 20.04.2004
Cooling the LHC:Cooling the LHC: Cryogenic installationsCryogenic installations
Desy workshop Desy workshop 20.04.2004 20.04.2004
Electric power supplies (power converters)Electric power supplies (power converters)
Cooling at LHCCooling at LHCMain consumersMain consumers
Desy workshop Desy workshop 20.04.2004 20.04.2004
Cooling at LHC Cooling at LHC consumersconsumers
Air treatmentAir treatment
Desy workshop Desy workshop 20.04.2004 20.04.2004
Cooling at LHCCooling at LHCMain consumersMain consumers
The LHCThe LHCDetectorsDetectors
Desy workshop Desy workshop 20.04.2004 20.04.2004
Heat recovery
Cooling towers
Water chillers
SurfaceUnderground
Raw waterRaw water
LHC Raw water cycleLHC Raw water cycle Rejects
Desy workshop Desy workshop 20.04.2004 20.04.2004
Heat recovery
Cooling towers
Water chillers
SurfaceUnderground
The LHC cooling chainThe LHC cooling chain
Compressed air
Desy workshop Desy workshop 20.04.2004 20.04.2004
Primary water circuit
MAIN CHARACTERISTICS
Temperature at the cooling towerOutlet
24°CInlet
34°CSet point 23°CTolerance ± 1°C
Available pressure difference for each user 3 bar
Desy workshop Desy workshop 20.04.2004 20.04.2004
LHC Cooling towersLHC Cooling towers
CaracteristicsWater T 24/34°C
Wet bulb T 20°C
DESSIN
Desy workshop Desy workshop 20.04.2004 20.04.2004
Cooling tower at LHC point 4Cooling tower at LHC point 4
Desy workshop Desy workshop 20.04.2004 20.04.2004
Heat Heat exchangerexchanger
primary primary system system point 4point 4
Desy workshop Desy workshop 20.04.2004 20.04.2004
Demineralised waterDemineralised water
LHC CoolingLHC Cooling
Water resistivity
1) Production resisitivity = 10-20 MΩ*cm (Corresponding to conductivity 0.1 -0.05 µS/cm)2) Operational resistivity = between 3 and 1 MΩ*cm3) Alarm resistivity lower than 0.8 MΩ*cm
Desy workshop Desy workshop 20.04.2004 20.04.2004
Heat exchanger/primary& Heat exchanger/primary& demineralised circuitdemineralised circuit
Desy workshop Desy workshop 20.04.2004 20.04.2004
Point 32
Point 2
Point 1
Point 4 Point 5
Point 6
Point 7
Point 8
SECTOR 3-4
SECTOR 2-3
SECTOR 1-2 SECTOR 8-1
SECTOR 6-7
SECTOR 5-6
SECTOR 4-5
Point 33
SPS
RE28
RE32
RE38
RE42
RE48 RE52
RE58
RE62
RE68
RE72
RE78
RE82
RE88
RE12
RE18
RE22
STCV- 2001/ 01 1_vue_gen.dsf FOLIO xx
SECTOR 7-8
Machine circuit – demineralised water
Desy workshop Desy workshop 20.04.2004 20.04.2004
Chilled / Mixed waterChilled / Mixed water
Temperatures:
Chilled water: 5/11 °CMixed water : 13/18 °C
Desy workshop Desy workshop 20.04.2004 20.04.2004
Cooling equipmentCooling equipment
Cooling towers 25 50Chilled water plants 9 12Pumping stations 12 42Pipes length (km) 520 1200Pumps 120 540Air compressors 22 50
LHC CERNLHC CERN
Desy workshop Desy workshop 20.04.2004 20.04.2004
ControlControl architecturearchitectureMONITORING - SUPERVISION
CM:/180898/SPVSARCH001.dsf
automate programmableprogrammable controller
PC - superviseurPC - supervisor
PC - portablePC - labtop
onduleursafe current
carte TCP/IPTCP/IP card
prise bus terrainFieldbus socket
connexion bus terrainfieldbus connexion
NiveauLevel
3Meyrin
Ethernet Services
TCP/IP
Eth
erne
t S
ervi
ces
TC
P/IP
SALLE DE CONTROLETECHNICAL CONTROL ROOM
CERN MEYRIN
ARCHIVAGESTORAGE
CERN MEYRIN SUPERVISION CENTRALECERN MEYRIN
NiveauLevel
2SU buildings
NiveauLevel
1LHC buildings
Bus de terrain Soft 1+2
BD
Soft 1+3
soft 3Soft 3+5
BD Soft1+3+4
SUPERVISIONPoint 5
SUPERVISIONPoint 8
SUPERVISIONPoint 1
WebWEB +
TDS
X te
rmin
al BDTDS
BD
armoire électriqueelectrical cubicle
Modbus
7 SUPERVISEURS LOCAUX
Ethernet Bureautique- NOVELL
Ethernet Services
TCP/IP
E therne t S ervices
T C P /IP
Soft1+3+4 Soft
1+3+4
Ethernet Services TCP/IP
téléphoneportable téléphone
portabletéléphoneportable
soft 6
UIAC
Ethernet Services TCP/IP
Ethernet Services TCP/IP
Ethernet Services TCP/IP
Level 3Level 3CENTRALCENTRAL
SUPERVISIONSUPERVISION
Level 2Level 2LOCALLOCAL
SUPERVISIONSUPERVISION
Level 1Level 1PLC/PLC/
instrumentationinstrumentation
Desy workshop Desy workshop 20.04.2004 20.04.2004
Layer 3: TCR remote monitoring
CER
N Ethernet TC
P/IP Technical Netw
ork
Layer 2: Inter-point communication and local process supervision
I/O rack #1 I/O rack #i I/O rack #n
Master (S7 PLC)
Layer 1: Process control
Wizcon local supervision
IM IM IM
PLC #1 PLC #i PLC #n
Profibus
Layer 3: TCR remote monitoring
CER
N Ethernet TC
P/IP Technical Netw
ork
Layer 2: Inter-point communication and local process supervision
I/O rack #1 I/O rack #i I/O rack #n
Master (S7 PLC)
Layer 1: Process control
Wizcon local supervision
IMIM IMIM IMIM
PLC #1 PLC #i PLC #n
Profibus
Desy workshop Desy workshop 20.04.2004 20.04.2004
Level 3Level 3Central supervision Central supervision -- TCR (TCR (MeyrinMeyrin))
24/24h - 365 days per year2 teams, 14 operators30 000 alarms100 000 variables