mattishall forge, kensington strategy development drainage

25
Proposed Housing Development – Kensington Forge, Mattishall Drainage Strategy

Upload: others

Post on 06-Apr-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

 

Proposed Housing Development – Kensington Forge, M

attishall 

Drainage Strategy  

 

 

PROPOSED HOUSING DEVELOPMENT  

KENSINGTON FORGE, MATTISHALL  

Drainage Strategy   

 

 

 

 

 

 

 

 

 

 

 

Client:  Mr & Mrs Plummer 

 

Engineer:  Create Consulting Engineers Limited 

15 Princes Street 

Norwich 

Norfolk 

NR3 1AF 

 

Tel:   0845 450 7908 

Email:   [email protected]  

Web:   www.createconsultingengineers.co.uk  

 

Report By:  Philip Porter, IEng, MCIHT, AMICE 

 

Checked By:  Gordon Hodgkinson  

 

Reference:   PP/CS/P12‐381/01 

 

Date:  April 2014 

Proposed Housing Development – Kensington Forge, M

attishall 

Drainage Strategy  

Proposed Housing Development – Kensington Forge, Mattishall   Drainage Strategy   

 

Ref: PP/CS/P12‐381/01    Page 1 

 

 

PROPOSED HOUSING DEVELOPMENT  

KENSINGTON FORGE, MATTISHALL  

 

Drainage Strategy  

 

 

 

Contents 

 

1.0 Introduction 

2.0 The Site History  

3.0 The Site Proposals 

4.0 Existing Surface Water Drainage  

5.0 Proposed Surface Water Drainage Strategy  

6.0 Proposed Foul Water Drainage Strategy 

7.0 Guidance and Policies 

8.0 Discussion and Recommendation  

9.0 Disclaimer 

 

 

Appendices 

 

A. Proposed Masterplan for Site  

B. Drainage Strategy Drawing  

C. Windes (Microdrainage) Calculations  

D. Anglian Water Asset Plan  

 

 

Registration of Amendments  

 

Revision  Amendment Details Revision 

Prepared By 

Revision 

Approved 

By 

       

Proposed Housing Development – Kensington Forge, Mattishall   Drainage Strategy   

 

Ref: PP/CS/P12‐381/01    Page 2 

1.0 INTRODUCTION 

 

1.1 Mr  and Mrs  Plummer  of  Kensington  Forge,  Dereham  Road, Mattishall,  have  applied  to 

Breckland District Council for a change of use on an area of land that they own from mixed 

residential and light industrial to residential.  This report describes the strategy for draining 

the land. 

 

1.2 The Strategy Statement demonstrates that: 

 

a. It is possible to drain the site to outfall in the ditch along the sides of the property. 

b. Connections to the foul water sewer are available. 

 

1.3 The  surface water management proposals demonstrate  that  there  is no  increased  risk of 

flooding within the site or onto adjacent areas of land. 

 

1.4 This  Statement  is  prepared  in  support  of  and  as  an  explanation  to  the  calculations  and 

drawings included as appendices to this report. 

 

1.5 The development is contained within Zone 1 which is defined by the Environment Agency as 

‘land  having  less  than  1  in  1,000  annual  probability  of  river  or  sea  flooding’.    The 

Environment Agency  identifies  that all uses of  land are appropriate  in  this zone.    It  is also 

identified  that  flood  risk  assessments  or  drainage  strategies  are  only  appropriate within 

Zone 1 for sites of 1 Hectare or above.   The site reviewed herein  is 0.947 Hectares  in area 

but a drainage strategy has been called for by the local planning authority. 

 

 

Proposed Housing Development – Kensington Forge, Mattishall   Drainage Strategy   

 

Ref: PP/CS/P12‐381/01    Page 3 

2.0 THE SITE HISTORY  

 

2.1 The  Site  is  located  to  the  south  of Dereham  Road  on  the western  side  of  the  village  of 

Mattishall, as shown below in Figure 2.1. 

 

 Contains Ordnance Survey data © Crown copyright and database rights 2013.

Figure 2.1: Site Location   

2.2 The  site has had  a number of uses over  the  years,  commencing  as  agricultural  land with 

various parts of the site being designated for residential, light industrial and wood recycling 

over the years. 

 

2.3 Currently, the front part of the site adjacent to Dereham Road contains a workshop building 

used as a welding shop and office and an incomplete storage building.  Towards the rear of 

the site and on  the eastern boundary, a mobile home and garden are sited and  the south 

west of  the site  is currently an area of grassland and outside storage  that enjoys planning 

approval for use as a wood recycling facility. 

 

Site Location

Proposed Housing Development – Kensington Forge, Mattishall   Drainage Strategy   

 

Ref: PP/CS/P12‐381/01    Page 4 

3.0 THE SITE PROPOSALS  

 

3.1 As stated previously, the site currently has the benefit of a mixture of residential and  light 

industrial planning approval. 

 

3.2 The proposal, subject to planning approval, is to clear the site of the existing uses and erect 

eleven  dwellings  constructed  to  Passivhaus  standards.    Of  these  eleven  dwellings,  four 

would be offered as affordable housing. 

 

3.3 The  site would be accessed via a new  junction with  the Dereham Road  located along  the 

northern boundary of the site.  This access road would be constructed to adoptable highway 

standards (ie have an impermeable paved area) with the driveways servicing the properties 

along its length, being constructed of permeable paving materials. 

 

3.4 Drawing 3098.06.D enclosed in Appendix A shows the proposed layout of the site. 

 

Proposed Housing Development – Kensington Forge, Mattishall   Drainage Strategy   

 

Ref: PP/CS/P12‐381/01    Page 5 

4.0 EXISTING SURFACE WATER DRAINAGE  

 

4.1 The site is currently drained by a combination of very small soakaways and overland flow to 

outfall in the existing ditch. 

 

4.2 The existing forge and mobile home are served by soakaways.  The ground conditions on the 

site consist mainly of Boulder Clay with some Alluvial Fan along the eastern boundary of the 

site.   Neither of  these materials  is particularly  free draining and  therefore  the  soakaways 

used are relatively large in relation to the flow of water they cater for. 

 

4.3 The workshop and mobile home are serviced by soakaways with the remainder of the site 

draining  to  the  ditch  by  means  of  overland  flow.    In  the  area  of  the  workshop  and 

incomplete  storage building,  there  is  a  small  yard  area paved with  compacted  stone  and 

gravel and a small area of grass land.  To the rear of the site lies the residential area which is 

mainly surrounded by grassland.   Whilst the residential units are served by soakaways, the 

remainder of the area relies upon overland flow to the ditches along the western boundary 

of the property. 

 

4.4 The open  storage  land  to  the  south of  the property  is  served wholly by overland  flow.    It 

consists of an overgrown grassed area with a few spoil heaps from previous building works 

spread around.  The area is currently used for the external storage of wood and vehicles.  

 

4.5 The  run  off  from  this  area  flows  overland  to  the  ditch  along  the  western  edge  of  the 

property. 

 

4.6 The ditch along the western edge of the property is approximately 1.2m deep throughout its 

length.  The top and lip of the ditch sides are well covered with vegetation and the bottom 

has a layer of rotting leaves but is generally clear. 

 

4.7 The ditch falls from the south west corner of the site along the western boundary towards 

Dereham Road.   As  it approaches the road,  it flows to the west to become a ditch parallel 

with the south channel of Dereham Road.  The depth of the ditch along this section is slightly 

less than that along the boundary of the property.   Despite a period of heavy rain prior to 

the site  inspection, there was no sign of the ditch overtopping the banks and flowing onto 

either the road or the fields. 

 

Proposed Housing Development – Kensington Forge, Mattishall   Drainage Strategy   

 

Ref: PP/CS/P12‐381/01    Page 6 

5.0 PROPOSED SURFACE WATER DRAINAGE STRATEGY  

 

5.1 In  formulating  this  drainage  strategy,  due  recognition  has  been  taken  of  the  ground 

conditions indicated by the BGS mapping.  The ground strata of either the Alluvial Fan or the 

Boulder  Clay would  indicate  that  soakage  rates would  be  very  poor.    For  this  reason,  a 

prudent  approach has been  taken  to  assume  that  stormwater  from  roofs  and  the  access 

road can be put to a soakaway but should be taken to a positive outfall. 

 

5.2 The approach  taken  in  the design of  the  surface water drainage network  for  the  site has 

been to provide attenuation near to the point of collection before discharging into the piped 

network that runs under the access road.  Pipes in the network under the access road have 

been appropriately sized to accommodate flows from the attenuation to the discharge point 

at the ditch to the northeast corner of the Site. 

 

5.3 In undertaking  the preliminary drainage design,  rainfall data has been  identified  from  the 

latest available EA data.  Impermeable areas have been calculated from the latest architect’s 

masterplan drawing number 3098.06.D and the run off input into Microdrainage to calculate 

the  flows  in  each  run  of  the  pipe  network.    Flow  restrictions  to  determine  the  level  of 

attenuation have been built into the model. 

 

5.4 To inform the drainage strategy, the DoH 124 Calculation of Greenfield Runoff Rate has been 

used to establish a rate of runoff for the 1  in 100 year storm (+30% climate change) to the 

ditch outfall.  Based on a proposed impermeable area of development of 0.379 ha, the rate 

for the 1  in 100 year storm (+30% climate change)  is 4.2  l/s.   Owing to the practicalities of 

controlling waterflow rates, a rate of 5 l/s has been used. 

 

5.5 This strategy proposes the use of a vortex control device (HydraBrake or Similar) to control 

the  flow  of  stormwater  to  no more  than  5  l/s  in  the  critical  1  in  100  year  storm  (+30% 

climate change).   Water  is proposed to be attenuated within below ground cellular storage 

creates (Wavin or similar). 

 

5.6 Flows from the roofs of plots 1 to 5 will be stored in cellular storage structure located to the 

rear of the plots with flows to the drainage network controlled by an orifice plate. 

 5.7 Stormwater from the  impermeable access road and the roofs of plots 6‐11 will be directed 

to the drainage network laid under the access road with the ultimate flow to ditch controlled 

by a vortex control device.  Attenuation, again in the form of below ground cellular storage 

structure is proposed to the rear of plots 8‐11. 

 5.8 The indicative drainage network is shown on the attached drawing in Appendix B. 

 

5.9 The detailed design of the drainage system will be undertaken in accordance with Sewers for 

Adoption (6th Edition).  Although it is not known at this time whether or not the sewer would 

Proposed Housing Development – Kensington Forge, Mattishall   Drainage Strategy   

 

Ref: PP/CS/P12‐381/01    Page 7 

be offered for adoption,  it has been decided to design and construct to these standards to 

retain the option of offering it for adoption at a later date. 

 

Alternative Strategies  

 

5.10 The alternative  strategies considered during  the development of  this preferred design are 

discussed below: 

 

Soakaways  

 

5.11 As stated earlier, BGS data has been reviewed and it is noted that the sub‐soils indicated are 

unlikely to offer any real infiltration.  On this basis, the decision was taken to adopt the most 

cautious approach possible direct  roof and access  road water  to a positive outfall.    In  this 

manner,  should  the developer wish  to  consider  soakways  at  a  later date,  these  could be 

added into the system (subject to testing and suitable infiltration rates). 

 

Grass Swales or Basins  

 

5.12 As  can  be  seen  from  the  architect’s  drawing,  neither  the  site  nor  the masterplan  layout 

would be suitable for swales or basins. 

 

Permeable Paving  

 

5.13 Permeable paving has been considered and driveways to all plots are proposed to be gravel.  

Storage beneath  the access  road pavement could be provided by granular  fills.   However, 

permeable paving  is not  considered  to be an adoptable  form of  road  construction by  the 

local highway authority.  This option has therefore been discounted on adoption grounds. 

 

Detention Ponds and Swales  

 

5.14 The site area is restricted and there is little space available for such features and the health 

and  safety  implications  of  deep  water  near  to  residential  property  would  preclude  this 

option. 

 

Below Ground Attenuation  

 

5.15 The primary advantage of this alternative  is the fact that the storage areas can be covered 

by other uses, such as open space or gardens. 

 

5.16 The proposed storage structures have been sited in garden areas and below a parking court.  

The drawing shows the areas proposed for the construction of the storage features but the 

size and number (ie smaller spaced out structures instead of a large central structure) will be 

determined at the detailed design stage. 

Proposed Housing Development – Kensington Forge, Mattishall   Drainage Strategy   

 

Ref: PP/CS/P12‐381/01    Page 8 

6.0 PROPOSED FOUL WATER DRAINAGE STRATEGY  

 

6.1 As can be seen  from  the attached Anglian Water Asset Plan  located  in Appendix D, a  foul 

sewer serving the site and adjacent properties lies in Dereham Road immediately adjacent to 

the site boundary. 

 

6.2 Foul water runs towards Manhole 3402 outside the site from both directions along Dereham 

Road.  From this manhole, the foul water discharges across the road into a pumping station 

adjacent to the farm track, ultimately discharging to a treatment works via a pumping main. 

 

6.3 This strategy proposes a foul sewer network serving all the proposed properties  laid within 

the  alignment  of  the  proposed  access  road,  discharging  to  Anglian  Water  foul  sewer 

described upstream or at Manhole 3402. 

 

Proposed Housing Development – Kensington Forge, Mattishall   Drainage Strategy   

 

Ref: PP/CS/P12‐381/01    Page 9 

7.0 GUIDANCE AND POLICIES  

 

7.1 Sewers  for  Adoption  6th  Edition  provides  guidance  to  developers  for  the  design  and 

construction  of  both  Surface  and  Foul Water  Sewers  to  be  offered  for  Adoption.    This 

guidance is provided in consultation with the Water Undertakers. 

 

7.2 The guidance in Sewers for Adoption states: 

 

“An appropriate flow simulation method based on the Wallingford Procedure should be used 

for  hydraulic  design  unless  otherwise  greed with  the  undertaker,  eg  in  the  case  of  small 

developments.” 

 

Windes (Microdrainage) has been used for all the calculations herein. 

 

7.3 The Building Regulations 2000, Part H ‘Drainage and Waste Disposal’, gives guidance on the 

design of private sewers.  Part H3 deals specifically with Rainwater Drainage. 

 

7.4 The designs and calculations included herein conform to all of this guidance. 

Proposed Housing Development – Kensington Forge, Mattishall   Drainage Strategy   

 

Ref: PP/CS/P12‐381/01    Page 10 

8.0 DISCUSSION AND RECOMMENDATIONS  

 

8.1 The  Environment  Agency mapping  has  been  consulted  and  has  shown  that  the  site  lies 

within Zone 1 and  is defined as having a  ‘very  low’  risk of  flooding  from  rivers or  surface 

water run off.  Very low is defined by the Environment Agency as having a chance of flooding 

of less than 1 in 1,000 years. 

 

8.2 The  Environment  Agency  guidance  identifies  that  sites  having  a  site  area  of  less  than 

1 Hectare  and  included  within  Zone  1  on  the  flood  maps  do  not  require  a  Flood  Risk 

Assessment.    However,  it  also  advises  that  sites  greater  than  1  Hectare, whilst  still  not 

requiring a full Flood Risk Assessment, should have a defined Drainage Strategy to  identify 

that  the  site  can  be  adequately  drained without  creating  a  risk  of  increased  flooding  to 

properties elsewhere.   The  site examined herein  is approximately 0.947 Hectares  in area.  

However,  in  the  interests of a  robust design,  the Strategy presented herein  is provided  in 

support of the application. 

 

8.3 A review of British Geological Society (BGS) mapping has  indicated that the site  is founded 

upon  impermeable  sub‐soils  that  are  likely  to  have  very  low  soakage  rates.    The  ground 

conditions have been confirmed by inspection on site.  In the interests of a prudent analysis, 

therefore, the use of soakaways has been discounted and the drainage designed to outfall to 

a local watercourse whilst keeping the outfall rates down to the equivalent ‘Greenfield’ run 

off rates of 5 l/s. 

 

8.4 The historical  records  for  the  area have been  reviewed  and  it  is noted  that  there  are no 

records of flooding to adjacent properties or highways within the area. 

 

8.5 The SUDS Strategy therefore utilises a combination of retention features and flow controls 

via a piped system to a positive outfall in a local watercourse.  The provision of this system 

enables the outflow to be constrained to the equivalent outfall of the existing undeveloped 

site area.   It therefore complies with the basic requirement of SUDS systems to reduce the 

impact of the development on flood risk to surrounding properties. 

 

8.6 The cellular structures  intended to be used as attenuation features have been sited within 

the rear gardens and amenity areas of the property.   Whilst the  initial design  indicates the 

use of a central feature serving a number of properties, further detailed design may indicate 

that smaller more separated facilities would be better provided assuming that the capacity 

of the single features is equalled or bettered. 

 

8.7 Storage within the suitable sized pipe network may also be used to control outflows at the 

detailed design stage. 

 

8.8 Foul drainage would be directed to the existing manhole and pumping station  immediately 

adjacent to the existing site entrance. 

Proposed Housing Development – Kensington Forge, Mattishall   Drainage Strategy   

 

Ref: PP/CS/P12‐381/01    Page 11 

8.9 In  keeping with  good  hydraulic  design  practice,  all  drainage  runs  and  structures will  be 

designed  to ensure  that self‐cleaning velocities are achieved  in order  to reduce  the risk of 

blockages. 

 

 

Proposed Housing Development – Kensington Forge, Mattishall   Drainage Strategy   

 

Ref: PP/CS/P12‐381/01    Page 12 

9.0 DISCLAIMER  

 

9.1 Create  Consulting  disclaims  any  responsibility  to  the  Client  and  others  in  respect  of  any 

matters outside the scope of this report.  

 

9.2 The copyright of this report is vested in Create Consulting Engineers Ltd and Paul Plummer.  

The Client, or his appointed representatives, may copy the report for purposes in connection 

with the development described herein.  It shall not be copied by any other party or used for 

any other purposes without the written consent of Create Consulting Engineers Ltd or Paul 

Plummer. 

 

9.3 Create  Consulting  Engineers  Ltd  accepts  no  responsibility whatsoever  to  other  parties  to 

whom this report, or any part thereof, is made known.  Any such other parties rely upon the 

report at their own risk.  

 

 

 

 

 

 

 

 

 

 

 

 

 

APPENDICES  

APPENDIX A

This line measures 200mm in length when printed correctly

Project:

Client:

Title:

Date:Revision Details:

Parsons + Whittley Ltd Architects

1 London Street, Swaffham

Norfolk, PE37 7DD

Phone: 01760 722000

email: [email protected]

web: www.parsonswhittley.co.uk

3098.06 D A

2draw

ing number: rev: size:

Proposed PASSIVHAUS DevelopmentKensington ForgeDereham RoadMattishall

Mr & Mrs P Plummer

Site Plan

07-04-14

1:500 Site Layout

n

1 2 3 45

6

7

11Typical dwellings 1-7 shown @ 2420sq ft/ 225 sqm, excluding garages and car-ports,

plots 8, 10 & 11 shown as 4-person 2-bed affordable homes @ 818 sq ft/ 76sqm

plot 9 shown as 2-person 1-bed affordable home @ 603 sq ft/ 56sqm

8 9 10

plots 7-11 and access road revised

Dereham Road

existing access to be stopped up and landscaped to NCC requirements

existing forge to be demolished

Dereham Road

1:2500 Site Location

n

tree to be removed

existing footpath to village

link development to existing footpath

existing Konect 4 bus stop at entrance to development

existing Leylandii hedge along western boundary to be removed

slab level xx.xx

slab level xx.xx

slab level xx.xx

slab level xx.xx

double garage 2

double garage 3

double garage 1

slab level xx.xx

triple garage 4 triple

garage 5slab level xx.xx

slab level xx.xx

slab level xx.xx

double garage 6

slab level xx.xx

slab level xx.xx

double garage 7

slab level xx.xx

Plots 8-11 slab level xx.xx

refer to arboricultural report for details of root protection areas to existing trees

native-species hedge and tree planting to boundaries to form part of a lanscaping scheme to be submitted to, and approved by, local authority

size 3 turning

access road to NCC Norfolk Residential Design Guide adoptable standard, type 6

private drives shown thus

existing Konect 4 bus stop at entrance to development

refer to engineer's drawing xxx for details of new access and visibility splay

slab level xx.xx

existing buildings to be removed shown dotted

PRELIMINARY

APPENDIX B

PLOT 1

FFL: 45.000

PLOT 2

FFL: 45.000

PLOT 3

FFL: 45.000

PLOT 4

FFL: 45.000

PLOT 5

FFL: 45.000

PLOT 6

FFL: 45.500

PLOT 7

FFL: 44.000

PLOT 8, 9, 10

FFL: 44.000

1.002

1

.

0

0

3

1

.0

0

4

1

.0

0

5

1

.0

0

6

1

.

0

0

7

1.001

ORI

GIN

AL

SHEE

T SI

ZE -

A1

Land

scap

eD

O N

OT

SCA

LE

DRAWING No REVISIONCLIENT

JOB No

SCALE(S)

DRAWING STATUSDATE

DESIGNED DRAWN

CHECKED APPROVED

PROJECT

DRAWING TITLE

AMENDMENT DETAILSREV DATE APPROVEDDRAWN

381

02/001 -MR. AND MRS. PLUMMER

KENSINGTON FORGE

PROPOSED DRAINAGE STRATEGY

22.04.14 INFORMATION

1:500GH TH

GH GH

Create Consulting Engineers accept no responsibility for any unauthorised amendments to this drawing. Only figured dimensions are to be worked to. COPYRIGHT © RESERVED

CELLULAR STORM WATER STORAGE

SIZED TO ACCOMMODATE THE 1 IN 100

YEAR (+30% CLIMATE CHANGE) STORM

EVENT WITH A CONTROLLED RATE OF

NO MORE THAN 5+ L/S THE EQUIVALENT

GREEN FIELD RATE INTO THE DITCH

HYDROBRAKE (OR SIMILAR)

FLOW CONTROLLED TO 5 L/S

CELLULAR STORM WATER STORAGE FLOW

CONTROLLED TO 5L/S BY ORIFICE PLATE

DEPTH OF DITCH CIRCA 1.2m

PROPOSED STORM WATER SEWER

PROPOSED FOUL WATER SEWER

PROPOSED STORM WATER MANHOLE

PROPOSED FOUL WATER MANHOLE

CELLULAR STORM WATER STORAGE

KEY:

NOTES:

1. THIS DRAWING IS BASED ON TOPOGRAPHIC SURVEY PROVIDED BY EAST ANGLIANSURVEYS LTD DRAWING NO. "8360-1" DATED 28.06.2013 AND MASTER PLANPROVIDED BY PARSONS + WHITTLEY LTD ARCHITECTS DRAWING "3098 current d - engissue" RECEIVED 01.04.2014.

FOUL SEWER TO

DISCHARGE TO

ADOPTED SEWER

LOCATED IN

DEREHAM ROAD

MH 3402 (IL 39.639)

TOP BANK: 43.37

ASSUMED IL: 42.17

STORMWATER

DISCHARGE TO

EXISTING DITCH

APPENDIX C

Create Consulting Page 1

15 Princes Street Kensington Forge

Norwich Storm Strategy Calcs

NR3 1AF

Date 24/04/2014 16:40 Designed by GH

File net 1 revised layout.mdx Checked by

Causeway Network 2013.1.1

STORM SEWER DESIGN by the Modified Rational Method

Design Criteria for Storm

©1982-2013 Micro Drainage Ltd

Pipe Sizes STANDARD Manhole Sizes STANDARD

FSR Rainfall Model - England and WalesReturn Period (years) 100

M5-60 (mm) 20.000Ratio R 0.401

Maximum Rainfall (mm/hr) 50Maximum Time of Concentration (mins) 30

Foul Sewage (l/s/ha) 0.000Volumetric Runoff Coeff. 0.750

Add Flow / Climate Change (%) 30Minimum Backdrop Height (m) 0.200Maximum Backdrop Height (m) 1.500

Min Design Depth for Optimisation (m) 1.200Min Vel for Auto Design only (m/s) 1.00

Min Slope for Optimisation (1:X) 500

Designed with Level Soffits

Network Design Table for Storm

PNPNPNPN LengthLengthLengthLength(m)(m)(m)(m)

FallFallFallFall(m)(m)(m)(m)

SlopeSlopeSlopeSlope(1:X)(1:X)(1:X)(1:X)

I.AreaI.AreaI.AreaI.Area(ha)(ha)(ha)(ha)

T.E.T.E.T.E.T.E.(mins)(mins)(mins)(mins)

BaseBaseBaseBaseFlow (l/s)Flow (l/s)Flow (l/s)Flow (l/s)

kkkk(mm)(mm)(mm)(mm)

HYDHYDHYDHYDSECTSECTSECTSECT

DIADIADIADIA(mm)(mm)(mm)(mm)

1.000 5.000 0.030 168.4 0.114 5.00 0.0 0.600 o 2251.001 25.000 0.148 168.9 0.000 0.00 0.0 0.600 o 3001.002 40.000 0.192 208.0 0.028 0.00 0.0 0.600 o 3001.003 10.000 0.130 76.9 0.000 0.00 0.0 0.600 o 3001.004 40.000 0.250 160.0 0.070 0.00 0.0 0.600 o 3001.005 30.000 0.297 101.2 0.055 0.00 0.0 0.600 o 300

2.000 10.000 0.067 149.3 0.017 5.00 0.0 0.600 o 300

1.006 15.000 0.075 200.0 0.000 0.00 0.0 0.600 o 3001.007 43.000 0.215 200.0 0.000 0.00 0.0 0.600 o 300

Network Results Table

PNPNPNPN RainRainRainRain(mm/hr)(mm/hr)(mm/hr)(mm/hr)

T.C.T.C.T.C.T.C.(mins)(mins)(mins)(mins)

US/ILUS/ILUS/ILUS/IL(m)(m)(m)(m)

Σ I.AreaΣ I.AreaΣ I.AreaΣ I.Area(ha)(ha)(ha)(ha)

Σ BaseΣ BaseΣ BaseΣ BaseFlow (l/s)Flow (l/s)Flow (l/s)Flow (l/s)

FoulFoulFoulFoul(l/s)(l/s)(l/s)(l/s)

Add FlowAdd FlowAdd FlowAdd Flow(l/s)(l/s)(l/s)(l/s)

VelVelVelVel(m/s)(m/s)(m/s)(m/s)

CapCapCapCap(l/s)(l/s)(l/s)(l/s)

FlowFlowFlowFlow(l/s)(l/s)(l/s)(l/s)

1.000 50.00 5.08 43.575 0.114 0.0 0.0 4.6 1.00 39.9 20.11.001 50.00 5.43 43.470 0.114 0.0 0.0 4.6 1.21 85.3 20.11.002 50.00 6.04 43.322 0.142 0.0 0.0 5.8 1.09 76.8 25.01.003 50.00 6.13 43.130 0.142 0.0 0.0 5.8 1.79 126.8 25.01.004 50.00 6.67 43.000 0.212 0.0 0.0 8.6 1.24 87.7 37.31.005 50.00 6.99 42.750 0.267 0.0 0.0 10.8 1.56 110.5 47.0

2.000 50.00 5.13 42.520 0.017 0.0 0.0 0.7 1.28 90.8 3.0

1.006 50.00 7.22 42.453 0.284 0.0 0.0 11.5 1.11 78.3 50.01.007 50.00 7.86 42.378 0.284 0.0 0.0 11.5 1.11 78.3 50.0

Free Flowing Outfall Details for Storm

OutfallOutfallOutfallOutfallPipe NumberPipe NumberPipe NumberPipe Number

OutfallOutfallOutfallOutfallNameNameNameName

C. LevelC. LevelC. LevelC. Level(m)(m)(m)(m)

I. LevelI. LevelI. LevelI. Level(m)(m)(m)(m)

MinMinMinMinI. LevelI. LevelI. LevelI. Level

(m)(m)(m)(m)

D,LD,LD,LD,L(mm)(mm)(mm)(mm)

WWWW(mm)(mm)(mm)(mm)

1.007 43.370 42.163 42.170 0 0

Create Consulting Page 2

15 Princes Street Kensington Forge

Norwich Storm Strategy Calcs

NR3 1AF

Date 24/04/2014 16:40 Designed by GH

File net 1 revised layout.mdx Checked by

Causeway Network 2013.1.1

Simulation Criteria for Storm

©1982-2013 Micro Drainage Ltd

Volumetric Runoff Coeff 0.750 Additional Flow - % of Total Flow 0.000Areal Reduction Factor 1.000 MADD Factor * 10m³/ha Storage 2.000

Hot Start (mins) 0 Inlet Coeffiecient 0.800Hot Start Level (mm) 0 Flow per Person per Day (l/per/day) 0.000

Manhole Headloss Coeff (Global) 0.500 Run Time (mins) 60Foul Sewage per hectare (l/s) 0.000 Output Interval (mins) 1

Number of Input Hydrographs 0 Number of Storage Structures 2Number of Online Controls 2 Number of Time/Area Diagrams 0

Number of Offline Controls 0 Number of Real Time Controls 0

Synthetic Rainfall Details

Rainfall Model FSR Profile Type SummerReturn Period (years) 100 Cv (Summer) 0.750

Region England and Wales Cv (Winter) 0.840M5-60 (mm) 20.000 Storm Duration (mins) 30

Ratio R 0.401

APPENDIX D

Pumping Station

Manhole

Inlet

Outfall

Sewage Treatment Works

Foul Sewer

Final Effluent

Decommissioned Sewer

(Colour denotes effluent type)

(Colour denotes effluent type)

Surface SewerCombined Sewer

(Colour denotes effluent type)

(Colour denotes effluent type)

(Colour denotes effluent type)

This plan is provided by Anglian Water pursuant its obligations under the Water Industry Act 1991 sections 198 or 199. It must be used in conjunction with any search results attached. The information on this plan is based on data currently recorded but position must be regarded as approximate. Service pipes, private sewers and drains are generally not shown. Users of this map are strongly advised to commission their own survey of the area shown on the plan before carrying out any works. The actual position of all apparatus MUST be established by trial holes. No liability whatsoever, including liability for negligence, is accepted by Anglian Water for any error or inaccuracy or omission, including the failure to accurately record, or record at all, the location of any water main, discharge pipe, sewer or disposal main or any item of apparatus. This information is valid for the date printed. The plan is produced by Anglian Water Services Limited from Ordnance Survey © Crown Copyright, 100018507. This map is to be used for the purposes of viewing the location of Anglian Water plant only. Any other uses of the map data or further copies is not permitted. This notice is not intended to exclude or restrict liability for death or personal injury resulting from negligence.

Date: 10/10/13 Scale: 1:1250 Data updated: 01/08/13Map Centre: 603348,311399(c) Crown Copyright and database rights 2011 Ordnance Survey 100018507 Wastewater Plan A3Our Ref: 76276 - 1

3098 Plummer

[email protected]

Private Sewer

Rising Main

(Colour denotes effluent type)

Manhole Reference Liquid Type Cover Level Invert Level Depth to Invert

1402 F 42.416 40.666 1.75

1501 F 42.835 41.255 1.58

3401 F 42.459 40.069 2.39

3402 F 42.689 39.639 3.05

3403 F 42.727 39.987 2.74

3404 F - - -

4301 F 42.647 40.337 2.31

4302 F 42.791 40.581 2.21

4303 F 42.824 41.044 1.78

Manhole Reference Liquid Type Cover Level Invert Level Depth to Invert

Manhole Reference Liquid Type Cover Level Invert Level Depth to Invert

Our Ref: 76276 - 1