Group B Maurizio Truscello (Bonatti) Elie Sawwan (CCC) Mark Rand (Chevron) Waseem Atiah (FMSi) Guido Soffiantini (Sicim) Task: IVMS and New Technologies

Upload: others

Post on 31-Mar-2020

13 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Maurizio Truscello(Bonatti) ElieSawwan(CCC) Mark Rand ...Maurizio Truscello(Bonatti) ElieSawwan(CCC) Mark Rand (Chevron) WaseemAtiah (FMSi) Guido Soffiantini(Sicim) Task: IVMS and

Group BMaurizio Truscello (Bonatti)

Elie Sawwan (CCC)Mark Rand (Chevron)Waseem Atiah (FMSi)

Guido Soffiantini (Sicim)

Task:

IVMS and New Technologies

Page 2: Maurizio Truscello(Bonatti) ElieSawwan(CCC) Mark Rand ...Maurizio Truscello(Bonatti) ElieSawwan(CCC) Mark Rand (Chevron) WaseemAtiah (FMSi) Guido Soffiantini(Sicim) Task: IVMS and

No. Challenges Initiatives1 Benefits awareness  Top Management Support & Commitment

2 Driver Tampering Defining driving / FMS policy including recognition and driver behavior modification.

Companies should look into an integrated FMS management system.

3 Lack of Technologies standard & local suppliers support 

Ensure supplier of IVMS is able to provide local support.

Introducing new technologies:A. Tire pressure MonitoringB. Proximity Sensors / DevicesC. Fatigue monitoring devices

An online system similar to navigation system forimmediate driver performance feedback

Page 3: Maurizio Truscello(Bonatti) ElieSawwan(CCC) Mark Rand ...Maurizio Truscello(Bonatti) ElieSawwan(CCC) Mark Rand (Chevron) WaseemAtiah (FMSi) Guido Soffiantini(Sicim) Task: IVMS and

No. Challenges Initiatives4 Subcontractor Compliance

A. CostsB. Driver 

managementC. Culture 

acceptance

Contract requirements for Subcontractors  / or / baring the cost by company or contractor.

5 Training & Awareness Training program integrated with the driving / FMS policy & system

6 Country telecommunication regulation

Ensure supplier of IVMS is able to work within the framework of any country telecom regulations.

7 Data management; who reporting to who?

Dedicated FMS Data Management Team. Either In‐house or outsourced

8 Man‐Machine interface Proximity Sensors / Devices

Page 4: Maurizio Truscello(Bonatti) ElieSawwan(CCC) Mark Rand ...Maurizio Truscello(Bonatti) ElieSawwan(CCC) Mark Rand (Chevron) WaseemAtiah (FMSi) Guido Soffiantini(Sicim) Task: IVMS and

Innovative Technologies

Page 5: Maurizio Truscello(Bonatti) ElieSawwan(CCC) Mark Rand ...Maurizio Truscello(Bonatti) ElieSawwan(CCC) Mark Rand (Chevron) WaseemAtiah (FMSi) Guido Soffiantini(Sicim) Task: IVMS and

Innovative Technologies

Page 6: Maurizio Truscello(Bonatti) ElieSawwan(CCC) Mark Rand ...Maurizio Truscello(Bonatti) ElieSawwan(CCC) Mark Rand (Chevron) WaseemAtiah (FMSi) Guido Soffiantini(Sicim) Task: IVMS and

Innovative Technologies

Page 7: Maurizio Truscello(Bonatti) ElieSawwan(CCC) Mark Rand ...Maurizio Truscello(Bonatti) ElieSawwan(CCC) Mark Rand (Chevron) WaseemAtiah (FMSi) Guido Soffiantini(Sicim) Task: IVMS and

Training & Awareness

Page 8: Maurizio Truscello(Bonatti) ElieSawwan(CCC) Mark Rand ...Maurizio Truscello(Bonatti) ElieSawwan(CCC) Mark Rand (Chevron) WaseemAtiah (FMSi) Guido Soffiantini(Sicim) Task: IVMS and

Training & Awareness

Page 9: Maurizio Truscello(Bonatti) ElieSawwan(CCC) Mark Rand ...Maurizio Truscello(Bonatti) ElieSawwan(CCC) Mark Rand (Chevron) WaseemAtiah (FMSi) Guido Soffiantini(Sicim) Task: IVMS and

No. Achievements1 Driver performance Improvement

2 Sharp reduction in major driving violations such as over speeding, seatbelt…etc.

3 Improve productivity & driver/vehicles utilization  

4 Reducing the accident rate

5 Fleet cost redaction related to fuel, maintenance.