mbr development using offsite mbr team - isa · mbr development using offsite mbr team ... improved...

19
MBR Development Using Offsite MBR Team Brendan Jordan, M.E. & M.I. Systems Support Manager Pfizer Grange Castle.

Upload: ngotuyen

Post on 12-May-2018

264 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: MBR Development Using Offsite MBR Team - ISA · MBR Development Using Offsite MBR Team ... Improved MBR Build Process . ... •Updates post FAT/PPT. •Final testing

MBR Development Using Offsite

MBR Team

Brendan Jordan,

M.E. & M.I. Systems Support Manager

Pfizer Grange Castle.

Page 2: MBR Development Using Offsite MBR Team - ISA · MBR Development Using Offsite MBR Team ... Improved MBR Build Process . ... •Updates post FAT/PPT. •Final testing

Pfizer in Ireland

Over 3,200 people employed.

Six locations around Ireland.

$7 billion in Ireland over the past decade.

Page 3: MBR Development Using Offsite MBR Team - ISA · MBR Development Using Offsite MBR Team ... Improved MBR Build Process . ... •Updates post FAT/PPT. •Final testing

1999-2003: Engineering and building construction

2003: Pfizer Grange Castle opened to colleagues

2005: Grange Castle’s official opening

2009: Grange Castle joins Pfizer

Grange Castle: 2000-Today

Page 4: MBR Development Using Offsite MBR Team - ISA · MBR Development Using Offsite MBR Team ... Improved MBR Build Process . ... •Updates post FAT/PPT. •Final testing

Site Overview

Suite 3: Syringe Fill/

Finish PREVENAR 13

MnB Quality

Control

Labs

Warehouse

Drug Substance (ENBREL

DS)

Development

90-acre site • 1.1 million sq. ft buildings

Utilities Building

Admin

“Grange Castle will lead the world in Biotech

Product Supply through competitiveness,

flexibility and compliance.”

GC Vision

Suite 1 & Suite 2:

Vaccine Conjugation

PREVENAR 13

Suite 4 (Pegylation/Conjugation)

SOMAVERT

& Suite 5

(Multi-purpose Conjugation) (CTM)

Page 5: MBR Development Using Offsite MBR Team - ISA · MBR Development Using Offsite MBR Team ... Improved MBR Build Process . ... •Updates post FAT/PPT. •Final testing

Scope of MES implementation

• Scope of MES implementation at GC

– Objective was to implement fully paperless batch

recording and Review by Exception.

– Integration with other systems:

• SAP for Order Recipes, BOMs, material consumption etc.

• MCS and SCADA controlled Equipment for batch load, GMP

alarm recording & OPC Reads.

• LIMS for recording of QC test results in eBR.

• bench top equipment e.g. Scales, pH meters for reading of

analytical results.

• PDOCS – hyperlinks to SOP’s.

Page 6: MBR Development Using Offsite MBR Team - ISA · MBR Development Using Offsite MBR Team ... Improved MBR Build Process . ... •Updates post FAT/PPT. •Final testing

Timeline of MES at G.C.

Proteins

1st Project (In-house)

Vaccines S2

2nd Project (Out-sourced)

Parenterals

3rd Project (In-House)

Vaccines S1

4th Project

(Out-sourced)

Page 7: MBR Development Using Offsite MBR Team - ISA · MBR Development Using Offsite MBR Team ... Improved MBR Build Process . ... •Updates post FAT/PPT. •Final testing

Initial Deployment of MES

• MES: PMX at GC.

– Wyeth/Pfizer Corporate MES solution

• Scope of first project:

– Infrastructure and Application deployed and qualified.

– pBRs replaced with eMBRs.

– EQO’s to replace primary equipment logbooks.

• Large Project - completed in-house:

– Made use of MES Contract resources from

automation companies.

– Basis for further collaboration.

Page 8: MBR Development Using Offsite MBR Team - ISA · MBR Development Using Offsite MBR Team ... Improved MBR Build Process . ... •Updates post FAT/PPT. •Final testing

1st Out-Sourced Project

• In 2010 Pfizer committed $200m investment to

GC to expand Manufacturing Capacity at the

Site.

– Included construction of a new Vaccines

Manufacturing Suite.

– Transfer of processes from the USA to GC.

– Decision was made to bring the Suite up on MES.

Page 9: MBR Development Using Offsite MBR Team - ISA · MBR Development Using Offsite MBR Team ... Improved MBR Build Process . ... •Updates post FAT/PPT. •Final testing

1st Out-Sourced Project

• Three Automation houses were requested to

quote for a Fixed Price contract.

– Requirements based on paper Batch Records

– Bid based on their assessment of the work involved.

– A preferred bidder was selected. Detailed

negotiations led to an award of a contract.

– Selection of bidder based on:

• A good working relationship existed

• Price

• Location

Page 10: MBR Development Using Offsite MBR Team - ISA · MBR Development Using Offsite MBR Team ... Improved MBR Build Process . ... •Updates post FAT/PPT. •Final testing

Project Organisation

Project Manager

EBR Author 1

EBR Author 2

Operations 1

Operations 2

Quality 1

GC Site Based Team

Full-Time

PMX Admin

SAP Admin

Supply Chain

Ops Readiness

Auto- mation

Part-Time Project Manager

EBR Author 1

EBR Author 2

Quality

Vendor Team

EBR Author 3 EBR Author 3

Page 11: MBR Development Using Offsite MBR Team - ISA · MBR Development Using Offsite MBR Team ... Improved MBR Build Process . ... •Updates post FAT/PPT. •Final testing

MBR Build Process

Page 12: MBR Development Using Offsite MBR Team - ISA · MBR Development Using Offsite MBR Team ... Improved MBR Build Process . ... •Updates post FAT/PPT. •Final testing

Outcome

• eMBRs went live in 2012

• Overall a successful project:

– On time

– Within budget

– eMBRs were used for PV Batches for FDA Filing

– Suite underwent a successful IMB Inspection in

January.

• Provided valuable lessons to the Site on the

outsourced model.

Page 13: MBR Development Using Offsite MBR Team - ISA · MBR Development Using Offsite MBR Team ... Improved MBR Build Process . ... •Updates post FAT/PPT. •Final testing

Lessons learned

• GC did not provide Vendor with sufficient

guidelines on Build requirements:

• Managing the iterative Build/Review process:

• Managing Scope Creep.

• Build Environment did not work well.

Page 14: MBR Development Using Offsite MBR Team - ISA · MBR Development Using Offsite MBR Team ... Improved MBR Build Process . ... •Updates post FAT/PPT. •Final testing

2nd Out-Sourced Project.

• In 2011 decision made to replace pBRs in

existing Vaccines Suite with eMBRs.

• Same Vendor was asked to price this work:

– Similar processes to first project.

– First project was successful.

– Possibility to leverage some of the First Build.

– Relationship with Vendor had grown stronger.

Page 15: MBR Development Using Offsite MBR Team - ISA · MBR Development Using Offsite MBR Team ... Improved MBR Build Process . ... •Updates post FAT/PPT. •Final testing

2nd Out-Sourced Project.

• Changes to process made based on lessons

learned from S2 implementation:

– URS + Guideline Document.

– Vendor given remote access to Prod Env.

– Vendor eMBR Authors trained in Site Procedures.

– Agreed the Vendor Authors who would do the Builds.

– Used same team who had worked on first project.

Page 16: MBR Development Using Offsite MBR Team - ISA · MBR Development Using Offsite MBR Team ... Improved MBR Build Process . ... •Updates post FAT/PPT. •Final testing

Improved MBR Build Process

Page 17: MBR Development Using Offsite MBR Team - ISA · MBR Development Using Offsite MBR Team ... Improved MBR Build Process . ... •Updates post FAT/PPT. •Final testing

Outcome

• eMBRs went Live in December 2013.

– Completed in 12 months.

– Most efficient deployment to date.

– Excellent Project.

– Feedback from End Users has been very positive.

Page 18: MBR Development Using Offsite MBR Team - ISA · MBR Development Using Offsite MBR Team ... Improved MBR Build Process . ... •Updates post FAT/PPT. •Final testing

Summary

• Using an Off-Site Team worked well for G.C.

• The Model improved over time:

– Relationship with the Vendor is important.

– Requires trust and co-operation on both sides.

– Significant amount of work still done in-house:

• Review and approval of designs

• Updates post FAT/PPT.

• Final testing (P.T.) and the Go-Live process.

• Further improvements possible.

Page 19: MBR Development Using Offsite MBR Team - ISA · MBR Development Using Offsite MBR Team ... Improved MBR Build Process . ... •Updates post FAT/PPT. •Final testing

Thank You.

THANK YOU!

QUESTIONS