meadow drive & charleston road - plan and profile - trench

3
L O M A V E RDE AV E EL V E RANO AV E CHARLE S T ON RD A l m a S t Park Blvd P a r k Bl vd EMERSON ST M E ADO W DR L I DE RO DR TE NNNE S EE L N F E RNE AV E LUNDY LANE G REE NM E ADO W W AY FERNE CT BEN LOMOND DR 0 GRAPHIC SCALE 100 100 200 0 20 40 60 -20 80 MEADOW DR 30 ' 30 ' CHARLESTON RD PRELIMINARY FOR DISCUSSION PURPOSES ONLY NOVEMBER 28, 2018 Cu r t n e r Av e V e n t u r a Av e BAR RON CREE K ADO BE CREE K Meadow Drive & Charleston Road - Plan and Profile - Trench ELEVATION VIEW (PROFILE) AERIAL VIEW (PLAN) 120+00 115+00 175+00 150+00 155+00 160+00 170+00 165+00 145+00 125+00 140+00 135+00 130+00 -20 0 20 60 40 80 Landmark Creek Influence Area Ground Anchor Groundwater Bridge LEGEND: ELEVA TI ON (f t ) Profile Trench Track Right Of Way Caltrain Ground Level Existing Track (Shoofly) Temporary Track New Permanent Outlet Grocery Robles Park Barron Creek Adobe Creek 2.0% 0.3% INFLUENCE AREA GROUND ANCHOR STATION PUMP EMERGENCY ACCESS STAIRS TEMPORARY TRACK LIFT STATION LIFT STATION GROUNDWATER ELEVATION (2%) TRENCH PROFILE ELEV. 9.9 TOP OF RAIL ELEV. 6.1 TOP OF RAIL NEW PERMANENT TRACK CONSTRUCTION BEGIN CONSTRUCTION END MEADOW DR STAIRS AT EMERGENCY ACCESS POTENTIAL LIFT STATION LOCATION POTENTIAL LIFT STATION LOCATION AT CHARLESTON ROAD PUMP STATION BRIDGE OVERCROSSING BRIDGE OVERCROSSING Church Methodist United St Andrew's CALTRAIN RIGHT OF WAY (WEST) CALTRAIN RIGHT OF WAY (EAST) PALO ALTO CITY LIMIT

Upload: others

Post on 18-Dec-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Meadow Drive & Charleston Road - Plan and Profile - Trench

LO

MA V

ER

DE A

VE

EL V

ER

AN

O A

VE

CH

AR

LE

ST

ON R

D

Alma St

Park BlvdPark Blv

d

EMERSON ST

ME

AD

OW D

R

LID

ER

O D

R

TE

NN

NE

SE

E L

N

FE

RN

E A

VE

LUNDY LANE

GR

EE

NM

EA

DO

W W

AY

FERNE CTBEN LOMOND DR

0

GRAPHIC SCALE

100 100 200

REVERSE CONSTRUCTION ENVELOPE

0

20

40

60

-20

80

MEADOW DR

30'

30'

CHARLESTON RD

PRELIMINARYFOR DISCUSSION PURPOSES ONLY

NOVEMBER 28, 2018

Curtn

er A

ve

Ventura A

ve

BA

RR

ON C

RE

EK

AD

OBE C

REE

K

Meadow Drive & Charleston Road - Plan and Profile - Trench

ELEVATION VIEW (PROFILE)

AERIAL VIEW (PLAN)

120+00115+00 175+00150+00 155+00 160+00 170+00165+00145+00125+00 140+00135+00130+00

-20

0

20

60

40

80

Landmark

Creek

Influence AreaGround Anchor

Groundwater

Bridge

LEGEND:

EL

EV

ATIO

N (ft)

ProfileTrench Track

Right Of WayCaltrain

Ground LevelExisting

Track (Shoofly)Temporary

TrackNew Permanent

Outlet

Grocery

Robles Park

Barron Creek

Adobe Creek2.0%

0.3%

INFLUENCE AREAGROUND ANCHOR

STATIONPUMP

EMERGENCY ACCESS STAIRS

TEMPORARY TRACK

LIFT STATION

LIFT STATION GROUNDWATERELEVATION

(2%)

TRENCH PROFILE

ELEV. 9.9

TOP OF RAIL

ELEV. 6.1

TOP OF RAIL

NEW PERMANENT TRACK

CONSTRUCTIONBEGIN

CONSTRUCTIONEND

MEADOW DRSTAIRS ATEMERGENCY ACCESS

POTENTIALLIFTSTATIONLOCATION

POTENTIALLIFTSTATIONLOCATION

AT CHARLESTON ROAD

PUMP STATION

BRIDGEOVERCROSSING

BRIDGEOVERCROSSING

Church

Methodist

United

St Andrew's

CALTRAINRIGHT OF WAY(WEST)

CALTRAINRIGHT OF WAY(EAST)

PALO ALTOCITY LIMIT

Page 2: Meadow Drive & Charleston Road - Plan and Profile - Trench

Trench

Railroad Grade Separation Sections & Renderings

(Typical Between Meadow Dr & Charleston Rd)

Example Section - Trench - Looking North

Meadow Drive Intersection

Proposed Trench Solution Overview - Looking South West

Charleston intersection

Ground Level View - Looking South West

Typical Property West of the Trench

Backyard View - Looking East

(Roadway At Grade, Railroad Fully Lowered)

PRELIMINARYFOR DISCUSSION PURPOSES ONLY

Page 3: Meadow Drive & Charleston Road - Plan and Profile - Trench

Trench

Railroad Grade Separation Examples

E Compton Blvd, Compton, CA

Alameda Trench Corridor - Completed 2002

E Compton Blvd & Alameda Street, Compton, CA

Alameda Trench Corridor - Completed 2002

Mission Road and Ramona St, San Gabriel, CA

Alameda Corridor East

Mission Road - San Gabriel, CA

Alameda Corridor East

(Roadway At Grade, Railroad Fully Lowered)

PRELIMINARYFOR DISCUSSION PURPOSES ONLY