measurements shown on these plans are in … · measurements shown on these plans metric are in...
TRANSCRIPT
MEASUREMENTS SHOWN ON THESE PLANS
METRIC
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
K.A.
TORONTO WATER METER REPLACEMENT AND UPGRADES
N.K.
G05
DETAILS
16ECS-LU-03TT
308M-2016-6NOV. 2016
11/23/16 K.A.95% DESIGN SUBMISSION
Water
ENGINEERING 1
2 12/09/16 ISSUED FOR TENDER K.A.
JOHN P. KELLY, P. ENG.
Linear Underground Infrastructure
DIRECTOR, DESIGN & CONSTRUCTION
Z.Q.
N.T.S.
No. DATE REVISIONS INITIAL SIGNED
DRAWING
NUMBER:
CHECK:DESIGN:
DATE:
SCALE:
DRAFTING: CONTRACT No.
WILLIAM FERNANDES, P. ENG.
Water Treatment and Supply
DIRECTOR,
ENGINEERING & CONSTRUCTION SERVICES
RESTORATION DETAILS
3 K.A.ADDENDUM No.502/14/17
3
38
mm
N.T.S.
NOTES:
ACTUAL TRENCH
WIDTH
EXISTING ASPHALT
TRENCH WIDTH
N.T.S.
EX. GRADE
N.T.S.
EX. ASPHALT
TRENCH WIDTH
40mm HL 3
N.T.S.
SUMP PUMP SCHEMATIC
LINK-SEAL & GROUT
WATER CHAMBER WALL
COUPLING
DISCHARGE LINE
63.5mm SCH. 80 PVC
BALL VALVE
63.5mm S.S. FULL PORT
FLEX CHECK VALVE
63.5mm VALMATIC SWING
VALVE CHAMBER
REDUCER
63.5-38mm CONCENTRIC
REINSTATEMENT DETAIL
ASPHALT DRIVEWAY
PLANS FOR DETAILS.SEWER / MH. SEE SITE
(0.4MPa CONCRETE)
UNSHRINKABLE FILL
(0.4MPa CONCRETE)
UNSHRINKABLE FILL
EXISTING (50mm MIN.)
DEPTH TO MATCH
HL 8 HS ASPHALT,
250mm CONCRETE BASE
SEE IC DRAWINGS RE PUMP CONTROLS AND SCHEMATICS
3. 120 VAC, 1 PHASE, 60 Hz
2. RUNNING AND ALARM INDICATOR LIGHTS (WITH PTT)
1. START, STOP PUSHBUTTONS
-CORRESPONDING T.D.H. OF 5.0m
-DESIGN FLOW RATE=2.5L/S WITH A
-SUPPLY MOTOR AND MOTOR PROTECTION DEVICES
PUMP TO BE SUBMERSIBLE WITH IP68 PROTECTION
SUMP PUMP SYSTEM REQUIREMENTS:
300mm LIFTS
PROCTOR DENSITY, IN MIN.
COMPACTED TO 95% STD
SELECT NATIVE BACKFILL,
TRENCH WIDTH
N.T.S.
EX. GRADE
REINSTATEMENT DETAIL
BOULEVARD
N.T.S.
NOTES:
ACTUAL TRENCH
WIDTH
EXISTING ASPHALT
(0.4MPa CONCRETE)
UNSHRINKABLE FILL
FOR CHAMBERS 1, 2, 4, 5, 7, 8, 11, 14,15,16.BOULEVARD REINSTATMENT DETAIL IS APPLCABLE
REINSTATEMENT DETAIL
STATION SITES
GREEN AREAS WITHIN PUMPING
DETAIL IS APPLCABLE FOR CHAMBERS 3,6,9,10GREEN AREAS WITHIN PUMPING STATION SITES REINSTATMENT
NOTES:
NOTES:
FOR CHAMBERS 4 AND 5.
PERMANENT ROAD SURFACE REINSTATEMENT DETAIL IS APPLICABLE
O.D.+600 MAX.
CAUTION TAPE
150
MIN.
EX. GRADEC/L P
VC W
M
BEDDING AND COVER GRANULAR 'A' MATERIAL
VERTICAL SHORING
UNDISTURBED
SEE REINSTATEMENT DETAIL
300 (T
YP)
100% STD PROCTOR DENSITYGROUND COMPACTED TO GRAN 'B' TO UNDISTURBED UNDISTURBED GROUND OR
N.T.S.
TYPICAL PVC PIPE TRENCH
DIAMETERPLANS FOR PVC PIPE. SEE
(0.4MPa CONCRETE)
UNSHRINKABLE FILL
GROUND
(0.4 MPa CONCRETE)
UNSHRINKABLE FILL
SOD
MIN. 300mm TOPSOIL AND SOD
MIN. 300mm TOPSOIL AND
PER TS 4.60.07.04)
(GRINDING AREAS AS
40mm HL 1 ASPHALT
SAW CUT FULL DEPTH
TRENCH IN LOCAL ROADS
PERMANENT ROAD REINSTATEMENT DETAIL FOR
SAW CUT FULL DEPTH
AS PER TS 4.60.07.04)
(GRINDING AREA
40mm HL 3 ASPHALT
(MIN.) OR MATCH EXISTING
150mm HL 8 HS ASPHALT
VERTICAL SHORING
FOR CHAMBERS 2,7,8 AND 16.
PERMANENT ROAD REINSTATEMENT DETAIL IS APPLICABLE
TRENCH IN MAJOR ARTERIAL ROADS
PERMANENT ROAD REINSTATEMENT DETAIL FOR
VERTICAL SHORING VERTICAL SHORING
VERTICAL SHORING
VERTICAL SHORING
OR MATCH EXISTING150mm HL 8 (MIN.)
SAW CUT ASPH.
FULL DEPTH
PAVEMENT TO
RAT
OI
N
AL
E
ER
ENI
G
N
P
VO
R
IOFEC O
CIL
NE
OSEF OIS
S
RP
DE
N
N
K. AFZAL
100052014
Feb. 14, 2017
16ECS-LU-03TTK.A.
OCTOBER 2015
TORONTO WATER METER REPLACEMENT AND UPGRADES
N
N.K.
C01
SITE PLAN
ARE IN METERS UNLESS OTHERWISE NOTED
MEASUREMENTS SHOWN ON THESE PLANS
METRIC
1
BA
YVIE
W A
VE.
PROPERTY LINE (TYP.)
CHAMBER No.1 - BAYVIEW PS
8171 BAYVIEW AVE.
CIVIL
N
KEY PLANN.T.S.
ROMFIELD CR.
SYCAMORE RD.
BA
YVIE
W A
VE.
WILLOWBROOK RD.
BAYVIEW PS
HWY 407
EX. CHAIN LINK FENCE
MARKING (TYP.)EX. PAVEMENT
EX. CURB
K.A.
EX. MEDIAN
EX. CURB
100% PRE-DESIGN SUBMISSION03/24/16
EX. O/H UTILITY
LEGEND:
TREE PROTECTION FENCE
3.50m
(UTM COORDINATE SYSTEM)N 4854496.13E 628294.17WTR-PBV-RPU-0001NEW TORONTO RPU PANEL
Water
K.A.07/26/162 50% DESIGN SUBMISSION
(BY OTHERS)FUTURE CURB
EX. CURB
(BY OTHERS)FUTURE CURB
(BY OTHERS)EXPANSION LIMIT FUTURE BUILDING
EX. BUS SHELTER
CONSTRUCTION SEQUENCE:
NOTES:
SILT FENCE
3 09/30/16 70% DESIGN SUBMISSION
ESTABLISHED IN CBCONTROL TO BE SEDIMENTATION EROSION AND
K.A.
WATERMAIN VALVES
LOCATION OF EXISITNG
N.T.S.
ENGINEERING
RPU ENCLOSURECONCRETE PAD FOR NEW 1.2x1.5m
0.30m
CONSTRUCTIONEX. HPT DURING SUPPORT AND PROTECT
PBV-2016-1
C
EXISTING HANDWELL
11/09/164 95% DESIGN SUBMISSION K.A.
NO. NAME SPECIES(CM)DBH CONDITIONS
1.227 8.3
(M)TPZ
28 8.3
GOOD
1.2
29 30.9
GOOD
2.4
30 14.3 1.8
31 14.3 1.8
APPLE
ACER PLATANOIDES
TRIACANTHOSGLEDITSIA
HONEY LOCUSTTRIACANTHOS
GLEDITSIA
APPLE
MALUS SP.
MALUS SP.
GOOD
GOOD
GOOD
No.27
No.28
No.29
No.30
E
(BY OTHERS)PROP. HANDWELL
HONEY LOCUST
MAPLENORWAY
No.31
TREE INVENTORY:
REINSTATEREMOVED AND FENCE TO BE EX. CHAIN LINK
WATER SERVICESUPPORT EX. PROTECT AND
FUTURE SAN (BY OTHERS)
FUTURE SAN MH (BY OTHERS)
EX. STM. SEE NOTE 3DR35 DRAIN. CONNECT TO PROP. 8.0m-150mm PVC
13.3
0m
EX. DUCTPROTECT
5
PROPERTY LINE
NHFS-04 (TYP.)PER YORK REGION DETAIL TREE PROTECTION FENCE AS
V12 CLOSED
V15 CLOSED
V13 CLOSED
V16 OPEN
VENTURI METER (#1)
V10 CLOSED
V8 CLOSED
V7 CLOSED
STATIONPUMPING
TR
UN
K)
(RIC
HM
ON
D HIL
L
1050
mm W
ATE
RM
AIN
PHONE: (905) 830-4444 EXT. 75277.
FOR INSPECTION.
CONTACT YORK REGION NHF PRIOR TO CONSTRUCTION
NOTE: CONTRACTOR TO INSTALL TREE PROTECTION AND
CONTRACTOR IS RESPONSIBLE FOR THE FOLLOWING:
STREET).- CITY OF TORONTO WILL ARRANGE FOR CLOSING OF VALVE V6 (JOHN - YORK REGION WILL ARRANGE FOR CLOSING OF VALVES V12 & V13.CELL #1 TO EL. 204.20m (670').OF VALVE V5 BETWEEN RESERVOIR CELLS #1 AND #2 AND EMPTYING - YORK REGION AND CITY OF TORONTO WILL ARRANGE FOR CLOSING - CYCLE ALL VALVES AND WILL HANDLE ALL MOE NOTIFICATIONS.
YORK REGION IS RESPONSIBLE FOR THE FOLLOWING:
GENERAL REQUIREMENTS:
N
BA
YVIE
W A
VE.
THIS SHEET
SEQUENCE NOTES IN
DEWATERING
NOTE: SEE WM
STATIONBAYVIEW PUMPING
ISSUED FOR PUCC REVIEW12/08/16
6 12/09/16 ISSUED FOR TENDER
K.A.
K.A.
Water Treatment and Supply
DIRECTOR,
WILLIAM FERNANDES, P. ENG.
Z.Q.
1:100
No. DATE REVISIONS INITIAL SIGNED
DRAWING
NUMBER:
CHECK:DESIGN:
DATE:
SCALE:
DRAFTING: CONTRACT No.
JOHN P. KELLY, P. ENG.
Linear Underground Infrastructure
DIRECTOR, DESIGN & CONSTRUCTION
ENGINEERING & CONSTRUCTION SERVICES
SENSING PIPES TO BE REMOVEDALL VENTURI FLOW METER DETAILS.SEE DWG PBV-2016-2 (C02) FOR NEW MAGNETIC FLOW METER.REPLACE EX. VENTURI TUBE WITH
CONDUIT SCHEDULE DETAILS. CONDUIT. REFER TO I&C DWG I06 FOR NEW 2x53mm UNDERGROUND
DETAILS. I06 FOR CONDUIT SCHEDULE CONDUIT. REFER TO I&C DWG NEW 6x53mm UNDERGROUND
I35
I35
7 K.A.
RESTORATION DETAILS REFER TO DWG G05.
CONTROL DETAILS AND NOTES REFER TO DWG G04, FOR PERMANENT
1. FOR GENERAL NOTES REFER TO DWG G03, FOR SEDIMENT AND EROSION
AND PREPARATORY WORKS, CRANE/HOISTS, ETC. PRIOR TO SHUTDOWN.4. TO MINIMIZE SHUT DOWN PERIOD, COMPLETE ALL NECESSARY SETUP
COUPLINGS REQUIRED TO COMPLETE THE WORKS.3. PRE-ORDERING AND STORE ON SITE ALL METER, SPOOL PIECES AND
REPLACED.VALVES, SPOOL PIECES, BOLTS AND COUPLINGS THAT ARE BEING
2. ENTER CHAMBERS TO INVENTORY AND TAKE MEASUREMENTS OF 1. ALL CONFINED SPACE ENTRY AND RESCUE REQUIREMENTS.
PUBLIC TRANSIT NOTE:
ADDENDUM No.5
PERMANENT ASPHALT RESTORATION
CONSTRUCTION AT THIS LOCATION.464-9675, EXT. 75928 FIVE BUSINESS DAYS PRIOR TO COMMENCING THE CONTRACTOR WILL CONTACT RICHARD MONTOYA AT 1 (877) CHAMBER No.1 IS IN THE VICINITY OF AN EXISTING BUS STOP #2808.
7
PERMANENT LANDSCAPE RESTORATION
7
7
REMOVE UPON COMPLETIONPROVIDE TEMPORARY SIDEWALK.
PERMANENT CONC. SIDEWALK RESTORATION
7
OTHERS)HDPE FM (BY FUTURE 50mm
EX. TREE TO BE REMOVED
7
7
02/14/17
4A FOR DETAILS.AND TIGHTEN ALL LEAKS. REFER TO SPECIAL SPECIFICATION CONTRACTOR TO ENSURE WATER TIGHTNESS AND REPAIR CHLORINE SOLUTION AND TORONTO WATER TO FLUSH. METHOD IS NEEDED. SWAB INTERNAL SURFACE WITH 12% DISINFECTION IS NOT REQUIRED, ONLY LOCAL REPAIR CONSTRUCTION SPECIFICATION TS 7.30. FULL MAIN CONDUCTED BY CONTRACTOR AS PER STANDARD FIELD PRESSURE TEST NOT REQUIRED. DISINFECTION TO BE G.
CURBS, DRIVEWAYS, BOULEVARDS AND SODDED AREAS. WITH TS 4.60.07.04 FOR ALL PAVEMENTS, SIDEWALKS, PERMANENT RESTORATION REQUIRED TO BE ACCORDANCE F.
MEANS BY THE CONTRACTOR. ALL THE FIELD WELDINGS SHALL BE TESTED BY ULTRASONIC E.
EXISTING CHAMBER.INSTALL THE NEW FLOW METER AND PIPING WITHIN THE D.
V12, V13, V15. OPEN POSITION: V16.THE CLOSED POSITION DURING CONNECTION: V7, V8, V10, THE CONTROL VALVES OF THE FOLLOWING CHAMBERS BE IN C.
SHUTDOWN.ON OPERATIONAL CIRCUMSTANCES LEADING UP TO THE RESERVES THE RIGHT TO CHANGE THESE DATES DEPENDING IS AFTER OCTOBER 31 AND BEFORE MAY 1. TORONTO WATER THE TIME FOR A SHUT-DOWN OF THE EXISTING WATERMAIN B.
CONTACT [email protected], AND DRAIN THE EXISTING WATERMAIN. COORDINATE WITH TORONTO WATER TO ISOLATE, A.
EXCAVATION LIMITSAPPROXIMATE
OF BAYVIEW PUMPING STATION UPGRADES PROJECT.
6. CONTRACTOR TO COORDINATE WITH THE YORK REGION CONTRACTOR
CONSTRUCTION.
5. PROTECT ALL EXISTING DUCTWORK, CONDUIT AND CABLES DURING
4. FOR DIRECT BURIED DUCT DETAILS REFER TO TYPICAL DWG I35.
CHAMBER DRAIN TO BE FIELD VERIFIED.
EX. STORM SEWER PRIOR TO CONSTRUCTION. DEPTH AND GRADE OF
3. CONTRACTOR TO VERIFY LOCATION, SIZE, DEPTH AND MATERIAL OF
2. REFER TO I&C DRAWINGS FOR INSTALLATION DETAILS.
7
7
PROP. DUCT BANK (BY OTHERS)
OTHERS)BANK (BY PROP. DUCT
1.5m
EX. BELL
EX. 1050
mm W
M
EX. STM
EX. HP
EX. 3
00m
m DI W
M
EX. 150m
m E
SAC S
AN IN 600m
m S
TEEL S
LEEVE
EX. LP
EX. 1050
mm W
M
EX. VC
EX.MH
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
EX. S
TM
EX. S
TM
EX. C
B
EX. HW
EX. TL
EX. HPT
EX.MH
EX. 150m
m ESAC S
AN
EX. 860mm WM
EX. S
TM
EX. 300
mm CI
WM
EX. 25mm WM
EX. 200m
m A
C D
UCT
EX. HP
+
EX. SID
EW
AL
K
EX. SID
EW
AL
K
EX. CONC. ENCASED HYDRO DUCT
EX. 150 CI S
TM
EX. C
B LE
AD
EX. COM.
EX. S
L
K.A.
OCTOBER 2015
TORONTO WATER METER REPLACEMENT AND UPGRADES
N
N.K.
C02
A
1 K.A.
EX. GROUND
EX. 1050mm CPP WM
MEASUREMENTS SHOWN ON THESE PLANS
METRIC
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
CIVIL
208.20m
204.62m
03/24/16 100% PRE-DESIGN SUBMISSION
EX. FLANGED CONNECTION
EX. COUPLING
NOTES:
MARK
No.
EX. FLANGED CONNECTION
PRESSURE TUBESEX. 150mm CONDUIT FOR
REMOVE EX. VENTURI TUBE (±1825)
Water
B
B
EX. GROUND
C6
1:50
1:50
1:20
C6
C6
07/26/162 K.A.50% DESIGN SUBMISSION
PLAN
COVER, ADJUSTABLE UNITSREMOVE EX. FRAME AND
410
C10
1365
C68
EXISTING AND PROPOSED CHAMBER LAYOUT
C68
C92
NON-SHRINK GROUT ON THE EXTERIOR SIDE.PROP. LINK SEAL SIZED TO SUIT PIPES I/C
C13
1:20EXISTING METERING CHAMBER / REMOVALS
200mm DIA. PVC WALL PIECE
SECTION A-A
SECTION B-B
FLOW
FLOW
EX. 1050mm VENTURI TUBE
C79
50mm DIA. DRAIN VALVE ASSEMBLY - C79
C38
M2
C66C72
OPSD 402.030CAST IRON, RECTANGULAR FRAME AS PER
C79
TO CONTROL PANEL
16ECS-LU-03TT
PLAN
PROPOSED UPGRADES
STANDARD ALUMINUM LADDER AND STEPSAS PER OPSD 405.020
C79
C79 50mm DIA. DRAIN VALVE ASSEMBLY
3 09/30/16 70% DESIGN SUBMISSION K.A.
C10
4
450
REMOVE EX. CHAMBER
SHOULDERED1050mm VICTAULIC COUPLING STYLE 44
C65
C55
C40
C44
300
C12
C12
C44
C40
PROOFING NEW WATER
C40
C9
C55
C44
3580
+ -
ENGINEERING
AND STEPS REMOVE EX. LADDER
C5
C5
C65
C65
C55
FLANGE TO VICTAULIC SPACER1050mm NOM. DIA. SS 304L SCH 40
C92
GRADE IN WATER TIGHT ENCLOSURE.SINGLE RECEPTACLE (GFCI) 15A SPECIFICATION
ENCLOSURE. 15A - SPECIFICATION GRADE IN WATER TIGHT DUPLEX RECEPTACLE (GFCI)
LIGHTING FIXTUREWALL-MOUNTED
C17 GRADE IN WATER TIGHT ENCLOSURE.LIGHTING SWITCH - 15A, 1P SPECIFICATION
ELECTRICAL RECEPTACLE
LIGHTING SWITCH
AFF ABOVE FINISHED FLOOR
PBV-2016-2
11/23/164 95% DESIGN SUBMISSION K.A.
C3
C4
C3
LP-48C4
LP-46
LP-50C14
LP-46
C14
CHAMBER WALL BRACKETS OFF THE SUPPORTED WITH S.S. DISCHARGE LINE TO BE C13
C3
LP-48C4
C3
C17 (SEE NOTE 14)
C81
C81C81
STEEL CLIPS,FUSE PROTECTION.ACCESSORIES - WIRE GUARD, STAINLESS VOLTAGE - 120VMODEL - BS100LED-70W-WT40MANUFACTURER - BEGHELLILIGHTING FIXTURE BS-100
DETAIL ON DWG S02NEW LADDER REFER TO
LEGEND:
12/09/16 ISSUED FOR TENDER K.A.5
MARK
No.
C12 C18
C66
50mm STAINLESS STEEL ELBOW
THREADED BOTH ENDS125mm LONG 50mm EXTRA STRONG 304L SS
C38
C72
M2
50mm 304L SS THREADOLET, WELDED TO PIPE
TEFLON SEATS50mm THREADED SS BALL VALVE WITH
MATERIALS SUPPLIED BY CONTRACTOR
MATERIALS SUPPLIED BY CITY
C18
1050mm DIA. STEEL FLANGE, AWWA C207 CLASS E
VICTAUILIC SHOULDERCARBON STEEL FLANGE AND WELD NEW REMOVE EXISTING C18
TO FIT STYLE 44 COUPLING1050mm CARBON STEEL VICTAULIC SHOULDER
VALVES & FITTINGS. SEE DWG G05 FOR DETAILS63.5mm SCH 80 PVC DISCHARGE LINE c/w
SEE DWG G05 FOR DETAILSSUMP PUMP ASSEMBLY.
ABANDON EX. CONDUIT
PLATE 13mm THICKCONCRETE SUPPORT WITH STEEL
ADJUSTABLE STEEL VALVE SUPPORT
150mm DRAIN TYPE 'B'
WILLIAM FERNANDES, P. ENG.
Water Treatment and Supply
DIRECTOR,
Z.Q.
AS SHOWN
No. DATE REVISIONS INITIAL SIGNED
DRAWING
NUMBER:
CHECK:DESIGN:
DATE:
SCALE:
DRAFTING: CONTRACT No.
JOHN P. KELLY, P. ENG.
Linear Underground Infrastructure
DIRECTOR, DESIGN & CONSTRUCTION
ENGINEERING & CONSTRUCTION SERVICES
TYPICAL I&C DWG. I32.DETAILS REFER TO FOR INSTALLATION
SCHEDULE.REFER TO I&C DWG I06 FOR CONDUIT INSTALL NEW ELECRICAL CONDUITS.
14. LOCATION NEAR LADDER AT LOCAL ENTRY POINT.
13. PROVIDE ALL EXPOSED CONDUIT.
12. REFER TO I&C DRAWINGS FOR ADDITIONAL DEMOLITION WORKS.
STATION BUILDING.
TRANSMITTER SENSING LINES RUNNING FROM CHAMBER TO PUMPING
11. CONTRACTOR SHALL NOT DAMAGE OR DISRUPT EXISTING PRESSURE
PUMP SUPPLIER.
10. RECEPTACLE FOR SUMP PUMP CO-ORDINATE RATING WITH SUMP
REFER TO DRAWING C01.
9. FOR CONDUIT LAYOUT BETWEEN CONTROL PANEL AND CHAMBER
8. RECEPTACLE MOUNTING HEIGHT 1.5m ABOVE FLOOR.
7. SCRAPE RUSTED PIPE AND FLANGES AND APPLY EPOXY COATING.
REMOVABLE SLAB.
6. CONTRACTOR SHALL NOT RUN CONDUIT ALONG THE UNDERSIDE OF
PANEL DETAILS.
5. REFER TO I&C DWG I06 FOR ELECTRICAL CONDUIT AND LIGHTING
COVER, WITH CEMENT PROTECTION BOARD.
50mm THICK EXTRUDED STYROFOAM HI40 INSULATION OR EQUAL
4. WHERE EXISTING INSULATION IS DAMAGED OR REMOVED, PROVIDE
FIELD VERIFIED BY THE CONTRACTOR PRIOR TO FABRICATION.
3. ALL DIMENSIONS, INCLUDING SS304L SPOOL PIECE DIMENSIONS TO BE
CONNECTIONS PRIOR TO CONSTRUCTION/FABRICATION.
MEASUREMENTS TO VERIFY SIZE AND TYPE OF EXISTING PIPE/FLANGE
2. CONTRACTOR TO ENTER CHAMBER TO INVENTORY AND TAKE
1. FOR GENERAL CHAMBER NOTES SEE DWG G03.
CHAMBER No.1 - BAYVIEW PUMPING STATION
FIXTURE U/S 2100mm AFFWALL-MOUNTED LIGHTING
ADDENDUM No.5 K.A.
DETAILS.PBV-2016-1 (C01) FOR EX. STM. SEE DWG DRAIN @ MIN. 2% SLOPE TO 150mm PVC DR35 RAISED
75mm CONCRETE MUD SLAB
TO WM PIPE AND FACING LOCAL ENTRY POINT.
NOTE: BOTTOM DRAIN VALVE ASSEMBLY TO BE PERPENDICULAR
NEW CARBON STEEL FLANGEREMOVE EX. FLANGE AND WELD C9
METER, 5W4CV0, FLANGED, CS, AWWA C207 CLASS E 1050mm ENDRESS + HAUSER PROMAG W 400 FLOW
01/14/17
6
6
1000
SE
E D
WG S
02 F
OR D
ET
AIL
S1500 R
EM
OV
AB
LE R
OO
F S
LA
B.
INSTALL DETAILS. DWG I34 FOR REFER TO TYPICAL FLOOD MONITORING FLOAT SWITCH FOR
AND DISPOSED OFF-SITEEX. CHAMBER TO BE REMOVED
INSTALLATION DETAILS. DWG I33 FOR REFER TO TYPICAL GAUGE. TRANSMITTER AND PRESSURE LOCATION FOR SAMPLE PORT
C301 (L) WMEX. 1050mm CPP AWWA
650
FOR DETAILSSEE DWG. S02 (TYP.)
ADJUSTABLE UNITS150mm THICK
DETAIL ON DWG S01REFER TO TYP. SUMP PROP. SUMP PIT.
AWWA C301 (L) WMEX. 1050mm CPP
3730
TYPE 'B'NEW 150mm DRAIN
CARBON STEEL FLANGEFLANGE AND WELD NEW C9 - REMOVE EXISTING
CHAMBER # 1
16ECS-LU-03TTK.A.
OCTOBER 2015
TORONTO WATER METER REPLACEMENT AND UPGRADES
N
N.K.
NOTES:
C01
ARE IN METERS UNLESS OTHERWISE NOTED
MEASUREMENTS SHOWN ON THESE PLANS
METRIC
1 DRAFT PRE-DESIGN SUBMISSION T.B.
CHAMBER No.2 - WOODBINE AVE./STEELCASE RD. W.
EX. PROPERTY LINE
SITE PLAN
EX. C
ON
C. SID
EW
AL
K
EX. C
ON
C. SID
EW
AL
K
EX. PAVEMENT MARKING (TYP.) N
HW
Y 4
04
JOHN ST.
WO
OD
BIN
E A
VE.
ESNA PARK DR.
DENISON ST.
STEELCASE RD. W.
IDEMA RD.
VIC
TO
RIA P
AR
K A
VE.
STEELES AVE. E.
KEY PLANN.T.S.
EX. PARKING LOT
CIVIL
01/15/16
WO
OD
BIN
E A
VE.
(WTR-269-CH-0004)EX. METERING CHAMBER
2 K.A.
EX. MEDIAN
EX. CURB
EX. CURB
03/02/16 ISSUED FOR ROAD CORRIDOR CONTROL APPROVAL
3 K.A.03/23/16 100% PRE-DESIGN SUBMISSION
LEGEND:
TREE PROTECTION FENCE
DURING CONSTRUCTIONPROTECT EX. STM SEWER
REINSTATE EXISTING CURB AND GUTTER
(UTM COORDINATE SYSTEM)N 4853180.85E 632704.39WTR-269-RPU-0401NEW TORONTO RPU PANEL
Water
MAGNETIC FLOW METERTUBE WITH NEW REPLACE EX. VENTURI
4 07/26/16 K.A.50% DESIGN SUBMISSION
STEELCASE RD. E.
SILT FENCE
TO BE SALVAGED AND RETURNED TO THE CITY YARD.
ALL INSTRUMENTATION, CONTROL PANELS AND EQUIPMENT
IN THE EXISTING UNDERGROUND RECORDING CHAMBER.
3. REMOVE ALL EXISTING ELECTRICAL AND CONTROL PANELS
N
STEELCASE RD.W.
WO
OD
BIN
E A
VE.
IDEMA RD.
DENISON ST.
EX. 9
00m
m W
M
269-02
300 D.V. & M.H.
269-03
100 A.V. & M.H.
269-04
VENTURI
269-05
RECORDER
269-06
300 D.V. & M.H.269-07
100 A.V.269-08
300 D.V. & M.H.
269-09
400 G.V.
900
mm M
AIN 2
69
WATERMAIN VALVES
LOCATION OF EXISITNG
N.T.S.
5 09/30/16 70% DESIGN SUBMISSION K.A.
BE ABANDONEDEX. DUCT BANK TO
B
P33220
EX. POLE
ENGINEERING
DURING CONSTRUCTIONPOLE. PROTECT EX. POLE EX. UTILITY METER ON HYDRO
I35
235-10
269-11
750 B.V.
0.3m
4. REFER TO I&C DRAWINGS FOR DETAILS.
269-01
100 A.V. & M.H.
& 40 A.V.750 B.V.
STEELES AVE. E.
900mm MAIN 235
269-10
M.H.
ESNA PARK DR.
269-12
100 A.V.
900mm MAIN 337
OF THE DRAIN PIPE. REPAIR DRAIN PIPE AS REQUIRED.
IS FUNCTIONING PROPERLY. CONDUCT CCTV INSPECTION
5. CLEAN, FLUSH AND VERIFY THAT EXISTING CHAMBER DRAIN
DWG I02 FOR DETAILS. CONDUIT REFER TO UNDERGROUND NEW 1x53mm
140M-2016-1
ISOLATIONFOR WM TO BE CLOSED
8. FOR UTILITY CO-ORDINATION REFER TO DWG I02.
6 95% DESIGN SUBMISSION K.A.
CONDUIT AND CABLES DURING CONSTRUCTION.
6. PROTECT ALL EXISTING UNDERGROUND DUCTWORK,
11/23/16
No.41
No.40
NO. NAME SPECIES (CM)DBH
CONDITIONS
3.640 50.4
(M)TPZ
NOTE
MAPLENORWAY
PLATANOIDESACER
3.047.7PLATANOIDESACER
MAPLENORWAY
41
FAIR
FAIR(TREE ON PRIVATE PROPERTY)
WORK WITHIN TPZ
(TREE ON PRIVATE PROPERTY)WORK WITHIN TPZ
TREE INVENTORY:
ABANDONED (SEE NOTE 2)CHAMBER TO BE EX. ELECTRIC/RECORDING
ELECTRICAL ENCLOSURE PAD FOR NEW NEW 2.1mx1.5m CONCRETE
17.50m
CABLES (TYP.)EX. COGECO AND FO PROTECT AND SUPPORT
7 K.A.
CONSTRUCTIONPROTECT EX. GAS DURING
BELL CONDUITPROTECT & SUPPORT EX.
ISOLATIONFOR WM TO BE CLOSED
NHFS-04 (TYP.)REGION DETAIL FENCE AS PER YORK TREE PROTECTION
VERIFIED.
DEPTH AND GRADE OF CHAMBER DRAIN TO BE FIELD
MATERIAL OF EX. STORM SEWER PRIOR TO CONSTRUCTION.
9. CONTRACTOR TO VERIFY LOCATION, SIZE, DEPTH AND
EX. 150mm DRAINABANDON/GROUT
PHONE: (905) 830-4444 EXT. 75277.
YORK REGION NHF PRIOR TO CONSTRUCTION FOR INSPECTION.
NOTE: CONTRACTOR TO INSTALL TREE PROTECTION AND CONTACT
RETURNED TO THE CITY YARD.
RESTORED. FRAMES AND COVER ARE TO BE SALVAGED AND
SUBGRADE. THE AFFECTED AREA TO BE COMPLETELY
GRADE AND BACKFILLED WITH UNSHRINKABLE FILL TO
2. EXISTING RECORDING CHAMBER TO BE BROKEN 1m BELOW
CONSTRUCTION. REMOVE UPON COMPLETION.
10. PROVIDE TEMPORARY ASPHALT SIDEWALK DURING
12/08/16 ISSUED FOR PUCC REVIEW
8 12/09/16 K.A.ISSUED FOR TENDER
WILLIAM FERNANDES, P. ENG.
Water Treatment and Supply
DIRECTOR,
Z.Q.
1:100
No. DATE REVISIONS INITIAL SIGNED
DRAWING
NUMBER:
CHECK:DESIGN:
DATE:
SCALE:
DRAFTING: CONTRACT No.
JOHN P. KELLY, P. ENG.
Linear Underground Infrastructure
DIRECTOR, DESIGN & CONSTRUCTION
ENGINEERING & CONSTRUCTION SERVICES
SCHEDULE DETAILSDRAWING I07 FOR CONDUIT CONDUIT. REFER TO TYPICAL I&C NEW 8x53mm UNDERGROUND
I35.
7. FOR DIRECT BURIED DUCT DETAILS REFER TO TYPICAL DWG
EX. STM (SEE NOTE 9) DR35 DRAIN. CONNECT TO
PROP. 3.0m - 150mm PVC
(SEE NOTE 5) TO EX. 600mm STM
CHAMBER DRAIN CONNECTED
BELL/FO CONDUITSPROTECT & SUPPORT EX.
9 02/14/17 ADDENDUM No.5 K.A.
TO DWG G05.
DWG G04, FOR PERMANENT RESTORATION DETAILS REFER
AND EROSION CONTROL DETAILS AND NOTES REFER TO
1. FOR GENERAL NOTES REFER TO DWG G03, FOR SEDIMENT
PERMANENT CONC. SIDEWALK RESTORATION
PERMANENT ASPHALT RESTORATION
PERMANENT LANDSCAPE RESTORATION
9
9
9
LIMITSASPHALT RESTORATION PERMANANT 40mm HL1
CONSTRUCTION SEQUENCE:
FOR DETAILS.TIGHTNESS AND REPAIR AND TIGHTEN ALL LEAKS. REFER TO SPECIAL SPECIFICATION 4A CHLORINE SOLUTION AND TORONTO WATER TO FLUSH. CONTRACTOR TO ENSURE WATER REQUIRED, ONLY LOCAL REPAIR METHOD IS NEEDED. SWAB INTERNAL SURFACE WITH 12% AS PER STANDARD CONSTRUCTION SPECIFICATION TS 7.30. FULL MAIN DISINFECTION IS NOT FIELD PRESSURE TEST NOT REQUIRED. DISINFECTION TO BE CONDUCTED BY CONTRACTOR G.
PAVEMENT, SIDEWALKS, CURBS, DRIVEWAYS, BOULEVARDS AND SODDED AREAS. PERMANENT RESTORATION REQUIRED IN ACCORDANCE WITH TS.4.60.07.04 FOR ALL F.
ALL THE FIELD WELDINGS SHALL BE TESTED BY ULTRASONIC MEANS BY THE CONTRACTOR. E.
INSTALL THE NEW FLOW METER AND PIPING WITHIN THE EXISTING CHAMBER.D.
CONNECTION: 269-11, 269-09, 235-10. OPEN DRAIN IN 269-06 AND 269-02.THE CONTROL VALVES OF THE FOLLOWING CHAMBERS BE IN THE CLOSED POSITION DURING C.
DEPENDING ON OPERATIONAL CIRCUMSTANCES LEADING UP TO THE SHUTDOWN.BEFORE MAY 1. TORONTO WATER RESERVES THE RIGHT TO CHANGE THESE DATES THE TIME FOR A SHUT-DOWN OF THE EXISTING WATERMAIN IS AFTER OCTOBER 31 AND B.
EXISTING WATERMAIN. CONTACT [email protected] WITH TORONTO WATER TO ISOLATE, DEPRESSURIZE, AND DRAIN THE A.
9
DETAILS. REFER TO I&C DWG. I02 FOR
GROUNDING ROD SYSTEM
EXCAVATION LIMITAPPROXIMATE
9
5.0
m
5.0
m
RAT
OI
N
AL
E
ER
ENI
G
N
P
VO
R
IOFEC O
CIL
NE
OSEF OIS
S
RP
DE
N
N
K. AFZAL
100052014
Feb. 14, 2017
EX. 750
mm W
M
EX. S
TM
EX.
WM
EX.
HY
D.
EX. TL/PL
EX. TRANSFORMER
EX. TL
EX. HP
EX.
GAS
NPS 2 SC HPEX. GAS
EX. B
ELL
EX. 750
mm W
M
EX. PROPERTY LINE
EX. WM
EX. 525
mm S
AN
EX. 1500
mm S
TM
EX. 300
mm W
M
EX. 600
mm S
TM
+
EX. BP
EX. 900
mm W
M
EX. 900
mm W
M
HPEX.
EX. F
O
EX. B
ELL
EX. S
L
EX. F
O
EX.
GAS
EX. F
O
K.A.
OCTOBER 2015
TORONTO WATER METER REPLACEMENT AND UPGRADES
N.K.
NOTES:
C021 DRAFT PRE-DESIGN SUBMISSION T.B.
CHAMBER No.2 - WOODBINE AVE./STEELCASE RD. W.
CHAMBER DETAILS
01/15/16
A
A
B
SECTION A-A
CHAMBEREX. 4000mmx1800mm
NMEASUREMENTS SHOWN ON THESE PLANS
METRIC
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
CIVIL
EX. 750mm x 450mm REDUCER
EX. PAVEMENT
EX. 750x450mm REDUCER
177.00m
2 100% PRE-DESIGN SUBMISSION K.A.
REMOVE EX. CONC. SUPPORT
03/23/16
COUPLING (TYP.)EX. VICTAULIC
EX. 750x450mm REDUCER
EX. REMOVABLE SLABEX. FRAME AND COVER
EX. FRAME AND COVER
EX. REMOVABLE SLAB
MARK
No.
C6
Water
B
SECTION B-B
EX. PAVEMENT
1:50
1:50
1:20
1:20
EX. AC CONDUITSABANDON/GROUT
C6
EX. ADJUSTMENT UNITSREMOVE AND REPLACE ALL
FROM 900mm WM)STEEL WM (REDUCED EX. 750mm CONC. ENCASED
FROM 900mm WM) STEEL WM (REDUCED
EX. 750mm CONC. ENCASED
1080
3 50% DESIGN SUBMISSION K.A.
PLAN
EXISTING METERING CHAMBER/REMOVALS
VENTURI TUBEREMOVE EX. 450mm
COUPLING (TYP.)VICTAULIC REMOVE EX.
FLOW
FLOW
4
07/26/16
C38
M2
C66C72
OPSD 402.030CAST IRON, RECTANGULAR FRAME AS PER
C79
C79
C6
RECORDING CHAMBER150mm AND 100mm CONDUITS TO EX. CONC. ENCASED ASBESTOS CEMENT
TO EX. 600mm STM EX. 150mm DRAIN (TYPE C)
ON SITE)EX. SUMP (NOT LOCATED
TO BE FIELD VERIFIEDEX. SUMP DIMENSION
C3 C3
C3C3
LP-3
LP-3
LP-3LP-3
LP-5
C3
TO CONTROL PANEL
C3C3
16ECS-LU-03TT
PLAN
PROPOSED UPGRADES
FUNCTIONING PROPERLY THAT EX. DRAIN PIPE IS CLEAN, FLUSH AND VERIFY
C79
4 09/30/16 70% DESIGN SUBMISSION
C79 50mm DIA. DRAIN VALVE ASSEMBLY
ENGINEERING
C12
C44
C40
C55
FLANGE TO VICTAULIC SPACER450mm NOM. DIA. SS 304L SCH 40
C40 C12
C44
C44
C40 C12
C55
410
C55
C9
C9
426
50mm DIA. DRAIN VALVE ASSEMBLY - C79
SCHEDULE.REFER TO I&C DRAWINGS FOR CONDUIT NEW ELECTRICAL CONDUITS.CORE DRILL INTO EX. CONC. WALL TO INSTALL
ELECTRICAL RECEPTACLE
ENCLOSURE15A - SPECIFICATION GRADE IN WATER TIGHT DUPLEX RECEPTACLE (GFCI)
LP-11
LIGHTING FIXTUREWALL-MOUNTED
LIGHTING SWITCH
AFF ABOVE FINISHED FLOOR
C17
140M-2016-2
5 95% DESIGN SUBMISSION
K.A.
K.A.
C14
C14
(SEE NOTE 13)C17
C83
LIGHTING FIXTUREWALL-MOUNTED
C83
C83C4
C83
LP-5C4
C4
C83
C81 C81
C81
U/S 2400mm AFFLIGHTING FIXTUREWALL-MOUNTED
U/S 2400mm AFFLIGHTING FIXTUREWALL-MOUNTED
11/23/16
SEE DWG S02 FOR DETAILSAPPLY NEW WATERPROOFING.
LEGEND:
6 12/09/16 ISSUED FOR TENDER K.A.
C66
50mm STAINLESS STEEL ELBOW
THREADED BOTH ENDS125mm LONG 50mm EXTRA STRONG 304L SS
C38
C72
M2
50mm 304L SS THREADOLET, WELDED TO PIPE
TEFLON SEATS50mm THREADED SS BALL VALVE WITH
MATERIALS SUPPLIED BY CONTRACTOR
TUBE (+1080)REMOVE EX. VENTURI
650
EX. REMOVABLE SLAB
STANDARD ALUMINUM LADDER AND STEPS
AS PER OPSD 405.020C68
C68
SHOULDERED450mm VICTAULIC COUPLING STYLE 44
450mm DIA. STEEL FLANGE, ANSI CL 150
S02LADDER. SEE DETAIL ON REMOVE & REPLACE EX.
MEMBRANE.WATERPROOFING INSTALLATION OF COMPOUND PRIOR TO ASPHALTIC ROOFING SLAB TO BE CAULKED WITH REMOVABLE CONCRETE
ADJUSTABLE STEEL VALVE SUPPORT
PLATE 13mm THICKCONCRETE SUPPORT WITH STEEL
SLOPE TO EX. STMCHAMBER DRAIN @ 2% PROP. 150mm RAISED
C65
C65
C5
TYP. SUMP DETAIL ON DWG S01PROP. SUMP PIT. REFER TO
75mm CONCRETE MUD SLAB
C5 SUMP PUMP. SEE DWG G05 FOR DETAILS
C65(ALLUMINUM FRAME AND GRATING)400x400x400 DEEP SUMP
STEEL CLIPS,FUSE PROTECTION.ACCESSORIES - WIRE GUARD, STAINLESS VOLTAGE - 120VMODEL - BS100LED-70W-WT40MANUFACTURER - BEGHELLILIGHTING FIXTURE BS-100
EXISTING WALL MOUNTED LIGHT FIXTURE
GRADE IN WATER TIGHT ENCLOSURELIGHTING SWITCH - 15A, 1P SPECIFICATION
ENCLOSURESPECIFICATION GRADE IN WATER TIGHT SINGLE RECEPTACLE (GFCI) 15A -
200mm DIA. PVC WALL PIECEC92
C10NON-SHRINK GROUT ON THE EXTERIOR SIDE.PROP. LINK SEAL SIZED TO SUIT PIPES I/C
2
ENTRY POINT.
PERPENDICULAR TO WM PIPE AND FACING LOCAL
NOTE: BOTTOM DRAIN VALVE ASSEMBLY TO BE
WILLIAM FERNANDES, P. ENG.
Water Treatment and Supply
DIRECTOR,
Z.Q.
AS SHOWN
No. DATE REVISIONS INITIAL SIGNED
DRAWING
NUMBER:
CHECK:DESIGN:
DATE:
SCALE:
DRAFTING: CONTRACT No.
JOHN P. KELLY, P. ENG.
Linear Underground Infrastructure
DIRECTOR, DESIGN & CONSTRUCTION
ENGINEERING & CONSTRUCTION SERVICES
STEEL FLANGESHOULDER AND WELD NEW REMOVED EX. VICTAULIC C9
DETAILS. TYPICAL DWG. I34 FOR INSTALL MONITORING. REFER TO FLOAT SWITCH FOR FLOOD
DWG. I33 FOR INSTALL DETAILS. AND GAUGE. REFER TO TYPICAL FOR PRESSURE TRANSMITTERSAMPLE PORT LOCATION
TYPICAL I&C DWG I32.DETAILS REFER TO FOR INSTALLATION
17. FOR GENERAL CHAMBER NOTES SEE DWG G03.
16. ASSUME 2m OF TOTAL CRACK INJECTION.
15. ASSUME 5m OF TOTAL CONCRETE REPAIRS.
14. REFER TO I&C DRAWINGS FOR ADDITIONAL DEMOLITION WORKS.
13. LOCATION NEAR LADDER AT LOCAL ENTRY POINT.
12. PROVIDE ALL EXPOSED CONDUIT.
11. RECEPTACLE FOR SUMP PUMP COORDINATE RATING WITH SUMP PUMP SUPPLIER.
10. SCRAPE RUSTED PIPE AND FLANGES AND APPLY EPOXY COATING.
DRAWING C01.
9. FOR CONDUIT LAYOUT BETWEEN CONTROL PANEL AND CHAMBER REFER TO
8. RECEPTACLE MOUNTING HEIGHT SHALL BE 1.5m ABOVE FLOOR.
7. CONTRACTOR SHALL NOT RUN CONDUIT ON UNDERSIDE OF REMOVABLE SLAB.
BE REMOVED.
6. EXISTING ELECTRICAL FIXTURES AND ASSOCIATED CONDUIT AND WIRING SHALL
PANEL DETAILS.
5. SEE TYPICAL I&C DRAWINGS I07 & I06 FOR ELECTRICAL CONDUITS AND LIGHTING
STYROFOAM HI40 INSULATION OR EQUAL, WITH CEMENT PROTECTION BOARD.
4. WHERE EXISTING INSULATION IS DAMAGED, PROVIDE 50mm THICK EXTRUDED
CHAMBER.
3. ELECTRICAL SERVICE TO BE DISCONNECTED FROM THE EXISTING ELECTRICAL
VERIFIED BY THE CONTRACTOR PRIOR TO FABRICATION.
2. ALL DIMENSIONS, INCLUDING SS304L SPOOL PIECE DIMENSIONS TO BE FIELD
CONSTRUCTION/FABRICATION.
VERIFY SIZE AND TYPE OF EXISTING PIPE/FLANGE CONNECTIONS PRIOR TO
1. CONTRACTOR TO ENTER CHAMBER TO INVENTORY AND TAKE MEASUREMENTS TO
7 ADDENDUM No. 502/14/17
7
K.A.
CS, ANSI CL 150450mm MAGNETIC FLOW METER FLANGED,
RAT
OI
N
AL
E
ER
ENI
G
N
P
VO
R
IOFEC O
CIL
NE
OSEF OIS
S
RP
DE
N
N
K. AFZAL
100052014
Feb. 14, 2017
16ECS-LU-03TTK.A.
OCTOBER 2015
TORONTO WATER METER REPLACEMENT AND UPGRADES
N
N.K.
C01
SITE PLAN
ARE IN METERS UNLESS OTHERWISE NOTED
MEASUREMENTS SHOWN ON THESE PLANS
METRIC
1
KEELE ST.
CHAMBER No.3 - KEELE ST./STEELES AVE. W.
HWY 407407
407
KE
ELE S
T.
SNIDERCROFT RD.
N
KEY PLANN.T.S.
CIVIL
EX. CONC. SIDEWALK
EX. GATE
EX. CURB
STEELES AVE. W.
(TYP.)EX. PAVEMENT MARKING
CHAMBER (WTR-317-FIT-0004B)EX. VENTURI FLOW METER
K.A.100% PRE-DESIGN SUBMISSION03/24/16
Water
K.A.07/26/162 50% DESIGN SUBMISSION
& PSRESERVOIR
KEELE
NOTES:
(SEE NOTE 3) CHAMBER DRAIN
EX. 100mm
TO BE ESTABLISHED IN CBSEDIMENTATION CONTROLS EROSION AND
3 09/30/16 70% DESIGN SUBMISSION K.A.
317-07
900 B.V. ,50 A.V.
& 100 D.V.
300 D.V. & M.H.
317-06
317-05
50 A.V.
317-04
VENTURI
317-03
50 A.V. & M.H.
RES
194-03
194-02
194-01
400 GV
600 BV
400 G.V.
W.M.400mm ACM
600 B.V. &100 A.V.
450
mm
DIP
YO
RK R
EGIO
N400 G.V. & 50 A.V.
M.H.
317-08
900
mm
CP
PY
OR
K R
EGIO
N
N
METERMAG
317-3A
194-05
194-06
317-09
KE
ELE S
T.
P.S.RESERVOIR & KEELE
STEELES AVE. W.
N.T.S.
ENGINEERING
B
2. REFER TO I&C DRAWINGS FOR DETAILS.
CONDUIT SCHEDULE DETAILS. REFER TO I&C DWG. I03 FOR CONDUITNEW 8x53mm UNDERGROUND
WM ISOLATIONTO BE CLOSED FOR
95% DESIGN SUBMISSION4 11/23/16
229M-2016-1
ISOLATIONFOR WM TO BE CLOSED
K.A.
CONDUIT AND CABLES DURING CONSTRUCTION.
4. PROTECT ALL EXISTING UNDERGROUND DUCTWORK,
NO. NAME SPECIES(CM)DBH CONDITIONS
2.44 35.4 GOOD
(M)TPZ
MAPLENORWAY
PLATANOIDESACER
No.4
THE FIELD.LOCATE SEPTIC BED EXTENTS IN SEPTIC BED. CONTRACTOR TO ALLOWED WITHIN 2.0m OF THE NO MACHINERY OR STORAGE
TREE INVENTORY:
TMC317 CP01NEW PAC PANEL YORK REGION
PAC ENCLOSURENEW 1.5mx1.2m CONC. PAD FOR
REINSTATED (TYP.) TO BE REMOVED AND
EX. ARMOUR STONE
CONSTRUCTION (TYP.)PROTECT EX. HYDRO DURING
CABLE DURING CONSTRUCTIONPROTECT EX. COMMUNICATION
5 K.A.
REQUIRED.
INSPECTION OF THE DRAIN PIPE. REPAIR DRAIN PIPE AS
DRAIN IS FUNCTIONING PROPERLY. CONDUCT CCTV
3. CLEAN, FLUSH AND VERIFY THAT EXISTING CHAMBER
1.5
5m
NOTES:
PHONE: (905) 830-4444 EXT. 75277.
YORK REGION NHF PRIOR TO CONSTRUCTION FOR INSPECTION.
1. CONTRACTOR TO INSTALL TREE PROTECTION AND CONTACT
WATERMAIN VALVES
LOCATION OF EXISTING PD6
AS PER CoT DETAIL TP-1TREE PROTECTION ZONE
12/08/16 ISSUED FOR PUCC REVIEW
12/09/16 ISSUED FOR TENDER WILLIAM FERNANDES, P. ENG.
Water Treatment and Supply
DIRECTOR,
Z.Q.
1:100
No. DATE REVISIONS INITIAL SIGNED
DRAWING
NUMBER:
CHECK:DESIGN:
DATE:
SCALE:
DRAFTING: CONTRACT No.
JOHN P. KELLY, P. ENG.
Linear Underground Infrastructure
DIRECTOR, DESIGN & CONSTRUCTION
ENGINEERING & CONSTRUCTION SERVICES
PIPES SHALL BE REMOVED ALL VENTURI FLOW METER SENSINGSEE DWG 229M-2016-2 FOR DETAILS. WITH NEW MAGNETIC FLOW METER.
REPLACE EX. VENTURI FLOW TUBE
I35.
5. FOR DIRECT BURIED DUCT DETAILS REFER TO TYPICAL DWG
I35
(MTM COORDINATE SYSTEM)N 4848569.23E 305268.36
DETAILS REFER TO DWG G05.
REFER TO DWG G04, FOR PERMANENT RESTORATION
SEDIMENT AND EROSION CONTROL DETAILS AND NOTES
1. FOR GENERAL NOTES REFER TO DWG G03, FOR
6 K.A.
K.A.ADDENDUM No.5
7
7 02/14/17
LEGEND:
CONSTRUCTION SEQUENCE:
LEAKS. REFER TO SPECIAL SPECIFICATION 4A FOR DETAILS.ENSURE WATER TIGHTNESS AND REPAIR AND TIGHTEN ALL SOLUTION AND TORONTO WATER TO FLUSH. CONTRACTOR TO IS NEEDED. SWAB INTERNAL SURFACE WITH 12% CHLORINE DISINFECTION IS NOT REQUIRED, ONLY LOCAL REPAIR METHOD CONSTRUCTION SPECIFICATION TS 7.30. FULL MAIN CONDUCTED BY CONTRACTOR AS PER STANDARD FIELD PRESSURE TEST NOT REQUIRED. DISINFECTION TO BE G.
BOULEVARDS AND SODDED AREAS.4.60.07.04 FOR ALL PAVEMENT, SIDEWALKS, CURBS, DRIVEWAYS,
F. PERMANENT RESTORATION REQUIRED IN ACCORDANCE WITH TS
MEANS BY THE CONTRACTOR. ALL THE FIELD WELDINGS SHALL BE TESTED BY ULTRASONIC E.
EXISTING CHAMBER.INSTALL THE NEW FLOW METER AND PIPING WITHIN THE D.
RES. OPEN DRAIN IN 317-06.THE CLOSED POSITION DURING CONNECTION: 317-07, 194-01 & THE CONTROL VALVES OF THE FOLLOWING CHAMBERS BE IN C.
SHUTDOWN.ON OPERATIONAL CIRCUMSTANCES LEADING UP TO THE RESERVES THE RIGHT TO CHANGE THESE DATES DEPENDING AFTER OCTOBER 31 AND BEFORE MAY 1. TORONTO WATER THE TIME FOR A SHUT-DOWN OF THE EXISTING WATERMAIN IS B.
CONTACT [email protected], AND DRAIN THE EXISTING WATERMAIN. COORDINATE WITH TORONTO WATER TO ISOLATE, A.
REINSTATE EXISTING BARRIER CURB
SILT FENCE
TREE PROTECTION FENCE
PERMANENT LANDSCAPE RESTORATION
7
7
EXCAVATION LIMITSAPPROXIMATE
BOULDER (TYP.) REPLACE EX.REMOVE AND
7
7
EX. BELL CONDUIT
VITAL NPS 30 SC XHP LAM SCAN
EX. H
YD
RO
EX. 600x900mm HYDRO CONDUIT
EX. 1200m
m WM
EX. 6
00
mm CI W
M
EX. 750mm WM
EX. SEPTIC BED
EX. C
ON
DUIT
EX. VALVE HOUSE
EX. VC
EX. CB
TA
NK
EX. S
EPTIC
EX. 1050mm WM
EX. 1050mm WM
EX. GAS
EX. 6
00
mm W
M
EX. VC
EX. VC
EX. S
TM
EX. WM
EX. 100mm DRAIN
4995 KEELE ST.
EX. TORONTO HYDRO
EX. BP
EX. C
ONDUIT
EX. COMEX. H
YDRO
EX. B
ELL
+
RAT
OI
N
AL
E
ER
ENI
G
N
P
VO
R
IOFEC O
CIL
NE
OSEF OIS
S
RP
DE
N
N
K. AFZAL
100052014
Feb. 14, 2017
K.A.
OCTOBER 2015
TORONTO WATER METER REPLACEMENT AND UPGRADES
N
N.K.
C02
A
A
EX. 1050x600mm REDUCER
EX. 1050x600mm REDUCERB
EX. FRAME AND COVER
EX. VENTURI TUBE
ENCASED STEEL WMEX. 1050mm CONC.
EX. GROUND
ENCASED STEEL WMEX. 1050mm CONC.
CIVIL
MEASUREMENTS SHOWN ON THESE PLANS
METRIC
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
203.13m
206.48m
203.98m
CHAMBER DETAILS
100% PRE-DESIGN SUBMISSION1 K.A.
REMOVE EX. CONC. SUPPORT
EX. VICTAULIC COUPLING
EX. VICTAULIC COUPLING
NOTES:
03/24/16
EX. REMOVABLE SLAB
EX. REMOVABLE SLAB
DEPTH TO BE FIELD VARIFIED.HOUSE. EXACT LOCATION AND ENCASED AC CONDUITS TO VALVE EX. 150mm AND 100mm CONC.
MARK
No.
C6
EX. GROUND
Water
B
SECTION B-B
ABANDON/GROUT EX. AC CONDUITS
1:50
1:50
1:20
C6
EX. ADJUSTMENT UNITSREMOVE AND REPLACE ALL
1:20
260
2 50% DESIGN SUBMISSION K.A.07/26/16
FLOW
FLOW
104 4
PLAN
EXISTING METERING CHAMBER / REMOVALS
SECTION A-A
50mm DIA. DRAIN VALVE ASSEMBLY - C79
C38
M2
C66C72
C79
C79
C6
CONC. CHAMBEREX. 2400mmx4600mm
TO EX. STM SEWEREX. 100mm DRAIN CONNECTED
PIPE IS FUNCTIONING PROPERLYCLEAN, FLUSH AND VERIFY IF EX. DRAIN
C7
C3
C4
C4
C3
C3
LP-3C3
C3
TO CONTROL PANEL
16ECS-LU-03TT3 09/30/16 K.A.70% DESIGN SUBMISSION
556
C79
C79 50mm DIA. DRAIN VALVE ASSEMBLY
PROPOSED UPGRADES
780
10
ENGINEERING
C12
C44
C40
SHOULDERED600mm VICTAULIC COUPLING STYLE 44
VICTAULIC SPACER600mm NOM. DIA. SS 304L SCH 40 FLANGE TO
C12
C44
C40 C40
C44
C44
C40 C12 C40
C44
PLAN
CONDUIT SCHEDULE.REFER TO I&C DRAWINGS FOR INSTALL NEW ELECRICAL CONDUITS. CORE DRILL INTO EX. CONC. WALL TO
SEE DWG S01 FOR DETAILSREPAIR LEAKING CRACK.
SEE DWG S01 FOR DETAILSCONDUIT PENETRATION WITH WALL REPAIR DELAMINATED CONCRETE AROUND
401.020CAST IRON, CIRCULAR FRAME AS PER OPSD
LP-21
LP-23
LP-21
GRADE IN WATER TIGHT ENCLOSURE. SINGLE RECEPTACLE (GFCI) 15A - SPECIFICATION
LIGHTING FIXTURECEILING MOUNTED
LP-3
LP-3 LP-3C3
ELECTRICAL RECEPTACLE
LIGHTING SWITCH
AFF ABOVE FINISHED FLOOR
229M-2016-2
4 11/23/16 95% DESIGN SUBMISSION K.A.
LIGHTING FIXTURECEILING MOUNTED
U/S 2400 mm AFFLIGHTING FIXTUREWALL-MOUNTED
C14
(SEE NOTE 11)C17
C55
C55
C55
ENCLOSURE. 15A - SPECIFICATION GRADE IN WATER TIGHT DUPLEX RECEPTACLE (GFCI)
C4
C17
GRADE IN WATER TIGHT ENCLOSURE.LIGHTING SWITCH - 15A, 1P SPECIFICATION C17
C14
C81 C81
C81
STEEL CLIPS,FUSE PROTECTION.ACCESSORIES - WIRE GUARD, STAINLESS VOLTAGE - 120VMODEL - BS100LED-70W-WT40MANUFACTURER - BEGHELLILIGHTING FIXTURE BS-100
LIGHTING FIXTURECEILING MOUNTED
SEE DWG S02 FOR DETAILSAPPLY NEW WATERPROOFING
LEGEND:
TYPE 'B'EX. SUMP. ASSUME
5 12/09/16 ISSUED FOR TENDER K.A.
C66
50mm STAINLESS STEEL ELBOW
THREADED BOTH ENDS125mm LONG 50mm EXTRA STRONG 304L SS
C38
C72
M2
50mm 304L SS THREADOLET, WELDED TO PIPE
TEFLON SEATS50mm THREADED SS BALL VALVE WITH
MATERIALS SUPPLIED BY CONTRACTOR
EX. REMOVABLE SLAB
556
C68
C68AS PER OPSD 405.020
STANDARD ALUMINUM LADDER AND STEPS
DETAIL ON S02EX. LADDER. SEE REMOVE & REPLACE
MEMBRANE.WATERPROOFING INSTALLATION OF COMPOUND PRIOR TO ASPHALTIC ROOFING SLAB TO BE CAULKED WITH REMOVABLE CONCRETE
2
(ASSUMED TYPE 'A')EX. DRAIN
ADJUSTABLE STEEL VALVE SUPPORT
PLATE 13mm THICKCONCRETE SUPPORT WITH STEEL
GRATING OF EX. DRAINREPLACE EX. FRAME &
ENTRY POINT.
PERPENDICULAR TO WM PIPE AND FACING LOCAL
NOTE: BOTTOM DRAIN VALVE ASSEMBLY TO BE
WILLIAM FERNANDES, P. ENG.
Water Treatment and Supply
DIRECTOR,
Z.Q.
AS SHOWN
No. DATE REVISIONS INITIAL SIGNED
DRAWING
NUMBER:
CHECK:DESIGN:
DATE:
SCALE:
DRAFTING: CONTRACT No.
JOHN P. KELLY, P. ENG.
Linear Underground Infrastructure
DIRECTOR, DESIGN & CONSTRUCTION
ENGINEERING & CONSTRUCTION SERVICES CHAMBER No.3 - KEELE ST./STEELES AVE. W.
DETAILS.DWG. I34 FOR INSTALL REFER TO TYPICAL I&C FLOOD MONITORING.FLOAT SWITCH FOR
INSTALL DETAILS. TYPICAL DWG I33 FOR GAUGE. REFER TO TRANSMITTER AND FOR PRESSURE SAMPLE PORT LOCATION
TYPICAL I&C DWG. I32.DETAILS REFER TO FOR INSTALLATION
14. FOR GENERAL CHAMBER NOTES SEE DWG G03.
13. ASSUME 2m OF TOTAL CRACK INJECTION.
12. ASSUME 5m OF TOTAL CONCRETE REPAIRS.
11. LOCATION NEAR LADDER AT LOCAL ENTRY POINT.
10. REFER TO I&C DRAWINGS FOR ADDITIONAL DEMOLITION WORKS.
PUMP SUPPLIER.
9. RECEPTACLE FOR SUMP PUMP. CO-ORDINATE RATING WITH SUMP
8. RECEPTACLE MOUNTING HEIGHT TO BE 1.5m ABOVE FLOOR.
REMOVABLE SLAB.
7. CONTRACTOR SHALL NOT RUN CONDUIT ON UNDERSIDE OF
REFER TO DRAWING C01.
6. FOR CONDUIT LAYOUT BETWEEN CONTROL PANEL AND CHAMBER
LIGHTING PANEL DETAILS.
5. REFER TO I&C DRAWING I03 FOR ELECTRICAL CONDUIT AND
PROTECTION BOARD.
EXTRUDED STYROFOAM HI40 INSULATION OR EQUAL, WITH CEMENT
4. WHERE EXISTING INSULATION IS DAMAGED, PROVIDE 50mm THICK
3. PROVIDE ALL EXPOSED CONDUITS.
BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO FABRICATION.
2. ALL DIMENSIONS, INCLUDING SS304L SPOOL PIECE DIMENSIONS TO
CONSTRUCTION/FABRICATION.
PIPE/FLANGE CONNECTIONS PRIOR TO
MEASUREMENTS TO VERIFY SIZE AND TYPE OF EXISTING
1. CONTRACTOR TO ENTER CHAMBER TO INVENTORY AND TAKE
6 ADDENDUM No.5 K.A.
CS, ANSI CL 150600mm MAGNETIC FLOW METER FLANGED,
02/14/17
6
RAT
OI
N
AL
E
ER
ENI
G
N
P
VO
R
IOFEC O
CIL
NE
OSEF OIS
S
RP
DE
N
N
K. AFZAL
100052014
Feb. 14, 2017
K.A.
OCTOBER 2015
TORONTO WATER METER REPLACEMENT AND UPGRADES
N
N.K.
C01
SITE PLAN
1
CHAMBER No.4 - WILLOWDALE BLVD./HIGHLAND PARK BLVD.
ARE IN METERS UNLESS OTHERWISE NOTED
MEASUREMENTS SHOWN ON THESE PLANS
METRIC
WIL
LO
WD
ALE B
LV
D.
N
KEY PLANN.T.S.
STEELES AVE. E
YO
NG
E S
T.
HIGHLAND PARK BLVD.
WOODWARD AVE.
GRANDVIEW AVE.
MEADOWVIEW AVE.
DU
DLE
Y A
VE.
WIL
LO
WD
ALE B
LV
D.
CIVIL
66 HIGHLAND PARK BLVD.62 WILLOWDALE BLVD.
EX. CURBEX. CURB
K.A.03/02/16 ISSUED FOR ROAD CORRIDOR CONTROL APPROVAL
K.A.3
NEW ELECTRICAL ENCLOSURENEW 2.1mx1.5m CONC. PAD FOR
07/26/16
LEGEND:
TREE PROTECTION FENCE
CONSTRUCTION DUCT DURING
PROTECT EX. PVC 7.0
0m
(WTR-359-CH-0004) CHAMBER
EX. METERING
Water
100% PRE-DESIGN SUBMISSION K.A.2 03/28/16
50% DESIGN SUBMISSION
NEW MAGNETIC FLOW METERREPLACE EX. VENTURI TUBE WITH
SILT FENCE
NOTES:
STM. SEE NOTE 5 CONNECTED TO EX.
EX. DRAIN
N
100 A.V. & M.H.
400 V.G.V.
300 D.V. & M.H.
750 H.B.V.
100 A.V. & M.H.
300 D.V. & M.H.VENTURI
METER100 A.V. & M.H.
359-05
359-03
355-23
355-21
359-04
359-02
359-01
355-22
355-20
STEELES AVE. E.
HIGHLAND PARK BLVD.
WIL
LO
WD
ALE B
LV
D.
900
mm M
AIN 3
55
900
mm M
AIN 3
59
16ECS-LU-03TT
4 09/30/16 70% DESIGN SUBMISSION
K.A.
CONSTRUCTION SEQUENCE:
SCALE: N.T.S.
WATERMAIN VALVES LOCATION OF EXISTING
-P63
ENGINEERING
SEE DETAIL SHEET G04DURATION OF CONSTRUCTION. UTILIZE SILT SACK FOR
B
750 V.G.V.
359-16
4. REFER TO I&C DRAWINGS FOR DETAILS.
COMPLETED.ELECTRICAL WORKS HAVE BEEN PULL ALL EX. CABLES WHEN ABANDON EX. PVC CONDUIT AND
(UTM COORDINATE SYSTEM)N 4850956.46E 627536.57WTR-359-RPU-0401NEW TORONTO RPU PANEL
SEE NOTE 2.CHAMBER TO BE ABANDONED. EX. ELECTRIC/RECORDING
359-15
M.H.
359-14
M.H.
300 D.V. & M.H.
359-13
100 A.V. & M.H.
359.12
300 D.V. & M.H.
359-11
400 V.G.V.
359-18
359-10
M.H.
359-09
M.H.
359-08
M.H.
359-07
M.H.
359-06
M.H.
900
mm M
AIN 3
59
DONCASTER AVE.
HE
ND
ER
SO
N A
VE.
MEADOWVIEW AVE.
BE REMOVED.AND CONCRETE PAD TO EX. HYDRO METER BOX
264M-2016-1
5 95% DESIGN SUBMISSION
WM ISOLATIONTO BE CLOSED FOR
& 2-50 A.V.
WM ISOLATIONTO BE CLOSED FOR
K.A.
8. FOR UTILITY CO-ORDINATION REFER TO DWG I02.
CONDUIT AND CABLES DURING CONSTRUCTION.
6. PROTECT ALL EXISTING UNDERGROUND DUCTWORK,
NO. NAME SPECIES(CM)DBH CONDITIONS
1.219 9.5 GOOD
(M)TPZ NOTE
20 38.2
GOOD
2.4
21 46.2
GOOD
3.0
WORK IN TPZ
22 9.9
FAIR
1.2
23 16.6 1.9
24 32.1 FAIR 2.4
OCCIDENTALISTHUJA
25 33.7 GOOD 2.4
26 23.9 GOOD 1.8
CEDAR
CEDAR OCCIDENTALIS
THUJA
JACK PINE
MAPLENORWAY
MAPLENORWAY
TRIACANTHOSGLEDITSIA
No.24
No.25
No.26
No.19
No.21
No.23
No.20
No.22
1.70m
LINE (TYP.)PROPERTY
11/23/16
MAPLESILVER
MAPLESUGAR
LOCUSTHONEY
SACCHARINUMACER
SACCHARUMACER
BANKSIANAPINUS
PLATANOIDESACER
PLATANOIDESACER
TREE INVENTORY:
FAIR
PROPERTY)(TREE ON PRIVATE
EXISTING TREE TO BE REMOVED
EXISTING TREE TO BE REMOVED
DRAIN PIPE. REPAIR DRAIN PIPE IF REQUIRED.
FUNCTIONING PROPERLY. CONDUCT CCTV INSPECTION OF THE
5. CLEAN, FLUSH AND VERIFY THAT EXISTING CHAMBER DRAIN IS
CABLING AND WIRING IN THE RECORDING CHAMBER.
SALVAGED AND RETURNED TO THE CITY YARD. REMOVE ALL
INSTRUMENTATION, CONTROL PANELS AND EQUIPMENT TO BE
THE EXISTING UNDERGROUND RECORDING CHAMBER. ALL
3. REMOVE ALL EXISTING ELECTRICAL AND CONTROL PANELS IN
6 K.A.
EX. TREE TO BE REMOVED
REINSTATE EXISTING CURB AND GUTTER
TO I&C DWG I02 FOR DETAILS. GROUNDING ROD SYSTEM. REFER
DETAIL NHFS-04 (TYP.)AS PER YORK REGION TREE PROTECTION FENCE
DETAIL NHFS-04 (TYP.)AS PER YORK REGION TREE PROTECTION FENCE
REMOVE
REMOVE
WM ISOLATIONTO BE CLOSED FOR
AND CITY OF MARKHAMWITH YORK REGION ISOLATION OF WM COORDINATE CONTRACTOR TO
PHONE: (905) 830-4444 EXT. 75277.
YORK REGION NHF PRIOR TO CONSTRUCTION FOR INSPECTION.
NOTE: CONTRACTOR TO INSTALL TREE PROTECTION AND CONTACT
REINSTATE FENCE IF DAMAGED.DURING CONSTRUCTION.EX. FENCE TO BE PROTECTED
PROTECTION FENCE (TYP.)EX. FENCE TO ACT AS TREE
ISSUED FOR PUCC REVIEW12/08/16
7 12/09/16 K.A.ISSUED FOR TENDER
WILLIAM FERNANDES, P. ENG.
Water Treatment and Supply
DIRECTOR,
Z.Q.
1:100
No. DATE REVISIONS INITIAL SIGNED
DRAWING
NUMBER:
CHECK:DESIGN:
DATE:
SCALE:
DRAFTING: CONTRACT No.
JOHN P. KELLY, P. ENG.
Linear Underground Infrastructure
DIRECTOR, DESIGN & CONSTRUCTION
ENGINEERING & CONSTRUCTION SERVICES
7. FOR DIRECT BURIED DUCT DETAILS REFER TO TYPICAL DWG I35.
I35REFER TO I&C DWG. I02 FOR DETAILS. CONDUIT.NEW 1x53mm UNDERGROUND
CONDUIT SCHEDULE DETAILS. REFER TO TYPICAL I&C DWG. I07 FOR CONDUIT.NEW 8x53mm UNDERGROUND
K.A.
FOR PERMANENT RESTORATION DETAILS REFER TO DWG G05.
EROSION CONTROL DETAILS AND NOTES REFER TO DWG G04,
1. FOR GENERAL NOTES REFER TO DWG G03, FOR SEDIMENT AND
PERMANENT CONC. SIDEWALK RESTORATION
PERMANENT ASPHALT RESTORATION
PERMANENT LANDSCAPE RESTORATION
EX. ROAD C/L8
COVER ARE TO BE SALVAGED AND RETURNED TO THE CITY YARD.
AFFECTED AREA TO BE COMPLETELY RESTORED. FRAMES AND
AND BACKFILLED WITH UNSHRINKABLE FILL TO SUBGRADE. THE
2. EXISTING RECORDING CHAMBER TO BE BROKEN 1 m BELOW GRADE
8 02/14/17
8
ADDENDUM No.5
DETAILS.TIGHTEN ALL LEAKS. REFER TO SPECIAL SPECIFICATION 4A FOR CONTRACTOR TO ENSURE WATER TIGHTNESS AND REPAIR AND WITH 12% CHLORINE SOLUTION AND TORONTO WATER TO FLUSH. ONLY LOCAL REPAIR METHOD IS NEEDED. SWAB INTERNAL SURFACE SPECIFICATION TS 7.30. FULL MAIN DISINFECTION IS NOT REQUIRED, CONDUCTED BY CONTRACTOR AS PER STANDARD CONSTRUCTION
G. FIELD PRESSURE TEST NOT REQUIRED. DISINFECTION TO BE
BOULEVARDS AND SODDED AREAS. 4.60.07.04 FOR ALL PAVEMENT, SIDEWALKS, CURBS, DRIVEWAYS,
F. PERMANENT RESTORATION REQUIRED IN ACCORDANCE WITH TS
BY THE CONTRACTOR. E. ALL THE FIELD WELDINGS SHALL BE TESTED BY ULTRASONIC MEANS
CHAMBER.D. INSTALL THE NEW FLOW METER AND PIPING WITHIN THE EXISTING
OPEN DRAIN IN 359-02.CLOSED POSITION DURING CONNECTION: 355-23, 359-18 & 359-16.
C. THE CONTROL VALVES OF THE FOLLOWING CHAMBERS BE IN THE
CIRCUMSTANCES LEADING UP TO THE SHUTDOWN.RIGHT TO CHANGE THESE DATES DEPENDING ON OPERATIONAL OCTOBER 31 AND BEFORE MAY 1. TORONTO WATER RESERVES THE
B. THE TIME FOR A SHUT-DOWN OF THE EXISTING WATERMAIN IS AFTER
[email protected] DRAIN THE EXISTING WATERMAIN. CONTACT
A. COORDINATE WITH TORONTO WATER TO ISOLATE, DEPRESSURIZE,
8
LIMITSASPHALT RESTORATION PERMANENT 40mm HL3
EXCAVATION LIMITAPPROXIMATE
88
8
5.0
m
5.0
m
RAT
OI
N
AL
E
ER
ENI
G
N
P
VO
R
IOFEC O
CIL
NE
OSEF OIS
S
RP
DE
N
N
K. AFZAL
100052014
Feb. 14, 2017
EX. LP
EX.
GAS
NPS 2 S
C IP
EX. 900
mm W
M
METERHYDRO EX.
EX. 750
mm S
TM
EX. 250
mm S
AN
EX. 150
mm W
M (
AB
ND.)
EX. BTP
EX. 600
mm W
M
EX. 600
mm W
ME
X. C
B
EX. C
B
+
EX. 150mm DRAIN
EX. BELL
HY
DR
OE
X.
RAT
OI
N
AL
E
ER
ENI
G
N
P
VO
R
IOFEC O
CIL
NE
OSEF OIS
S
RP
DE
N
N
K. AFZAL
100052014
Feb. 14, 2017
K.A.
OCTOBER 2015
TORONTO WATER METER REPLACEMENT AND UPGRADES
N
N.K.
C02
A
A
SECTION A-A
CHAMBER No.4 - WILLOWDALE BLVD./HIGHLAND PARK BLVD.
MEASUREMENTS SHOWN ON THESE PLANS
METRIC
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
193.56m
CIVIL
100% PRE-DESIGN SUBMISSION K.A.1
NOTES:
03/28/16
MARK
No.
C6
EX. VENTURI TUBE
EX. SUMP PUMP
189.10m
188.35m
EX. FRAME AND COVER
SLAB (TYP.)EX. REMOVABLE
Water
1:50
1:50
B
B
SECTION B-B
1:20
1:20
900mm WM)(REDUCED FROM ENCASED STEEL WMEX. 600mm CONC.
EX. REMOVABLE SLAB (TYP.)
EX. 600mm VICTAULIC COUPLING
CONNECTIONEX. FLANGED
EX. RAISED DRAIN TO EX. 750mm STM SEWER
LOCATION TO BE FIELD VERIFIEDRECORDING CHAMBER. EX. DEPTH AND EX. 150/100mm CONC. ENCASED AC PIPE TO
CHAMBEREX. 4800mmx2400mm
EX. ADJUSTMENT UNITSREMOVE AND REPLACE ALL
EX. PAVEMENT
EX. PAVEMENT
C6 C6
2 50% DESIGN SUBMISSION K.A.
PLAN
EXISTING METERING CHAMBER / REMOVALS
410 1044
4
07/26/16
FLOW
FLOW
(REDUCED FROM 900mm WM)ENCASED STEEL WMEX. 600mm CONC.
50mm DIA. DRAIN VALVE ASSEMBLY - C79
C38
M2
C66C72
C79
C79
RECORDING CHAMBER DIRECTLY INTO SUMPEX. 100mm DRAIN FROM ELECTRICAL
EX. 150mm TYPE 'B' DRAIN
(TYP.)CONC. SUPPORT REMOVE EX.
VALVE (TYP.)EX. DRAIN
ELECTRICAL RECORDING CHAMBERABANDON EX. 100mm DRAIN FROM
EX. CAP
CAP EX. DRAIN
LP-5
LP-3
LP-3LP-3
LP-3
C-3C-3
LP-5
TO CONTROL PANEL
C91
C91
C65
PLAN
C65
C79
70% DESIGN SUBMISSION K.A.16ECS-LU-03TT
3
360 965
4
09/30/16
DETAILS(TYP.) SEE DWG S02 FOR CONCRETE PIPE SUPPORT
EX. 2 PIECE FRAME AND COVER
ENGINEERING
SUMP PUMP. SEE DRAWING G05 FOR DETAILS
VICTAULIC TO FLANGE600mm TO 450mm REDUCER SS 304L SCH 40
C42FLANGE TO FLANGE SPACER450mm NOM. DIA. SS 304L SCH 40
C40TO VICTAULIC SPACER450mm NOM. DIA. SS 304L SCH 40 FLANGE
C44
C12
C44
C42C12 C40C40
C44
C44
C42 C12 C40C40
C44
C91
50mm DIA. DRAIN VALVE ASSEMBLYC79
SUMP FRAME AND GRATING
401.020CAST IRON, CIRCULAR FRAME AS PER OPSD
965 425
PIPE IS FUNCTIONING PROPERLY.CLEAN, FLUSH AND VERIFY IF EX. DRAIN
SCHEDULEREFER TO I&C DRAWINGS FOR CONDUIT INSTALL NEW ELECRICAL CONDUITS. CORE DRILL INTO EX. CONC. WALL TO
PROPOSED UPGRADES
LP-11
ELECTRICAL RECEPTACLE
GRADE IN WATER TIGHT ENCLOSURE. DUPLEX RECEPTACLE (GFCI) 15A - SPECIFICATION
GRADE IN WATER TIGHT ENCLOSURE. SINGLE RECEPTACLE (GFCI) 15A - SPECIFICATION
LIGHTING FIXRTUREWALL-MOUNTED
LIGHTING FIXTUREWALL-MOUNTED
264M-2016-2
4 95% DESIGN SUBMISSION K.A.
LIGHTING FIXTURECEILING MOUNTED
LIGHTING FIXTURECEILING MOUNTED
LIGHTING SWITCH
AFF ABOVE FINISHED FLOOR
C14
C14
GRADE IN WATER TIGHT ENCLOSURE.LIGHTING SWITCH - 15A, 1P SPECIFICATION
C17
C90
C55
C3
C4
C5
C55
(SEE NOTE 12)C17
C4 C3C3
C90
C3C3
C4
C55
(SEE NOTE 12)C17
C90
C81 C81
C81
11/23/16
STEEL CLIPS, FUSE PROTECTION.ACCESSORIES - WIRE GUARD, STAINLESS VOLTAGE - 120VMODEL - BS100 LED-70W-WT40MANUFACTURER - BEGHELLILIGHTING FIXTURE BS-100
SEE DWG S02 FOR DETAILS.APPLY NEW WATERPROOFING
DETAILS ON DWG S01WALL REFER TO PENETRATION WITH CONCRETE AROUND REPAIR DELAMINATED
T-1102.01.2)CITY OF TORONTO STD. FRAME/GRATING AS PER DISCHARGE PIPE. REPLACE REPLACE EX. SUMP PUMP,
5 12/09/16 ISSUED FOR TENDER K.A.
C66
50mm STAINLESS STEEL ELBOW
THREADED BOTH ENDS125mm LONG 50mm EXTRA STRONG 304L SS
C38
C72
M2
50mm 304L SS THREADOLET, WELDED TO PIPE
TEFLON SEATS50mm THREADED SS BALL VALVE WITH
MATERIALS SUPPLIED BY CONTRACTOR
STANDARD ALUMINUM LADDER AND STEPS
AS PER OPSD 405.020C68
LEGEND:
EX. REMOVABLE SLAB
SEE NOTE 1 SEE NOTE 1
795 650
C68ON S02EX. LADDER. SEE DETAIL REMOVE AND REPLACE
MEMBRANE.WATERPROOFING INSTALLATION OF COMPOUND PRIOR TO ASPHALTIC ROOFING SLAB TO BE CAULKED WITH REMOVABLE CONCRETE
2
PLATE 13mm THICKCONCRETE SUPPORT WITH STEEL
ADJUSTABLE STEEL VALVE SUPPORT
ENTRY POINT.
PERPENDICULAR TO WM PIPE AND FACING LOCAL
NOTE: BOTTOM DRAIN VALVE ASSEMBLY TO BE
VICTAULIC COUPLING STYLE 44 SHOULDERED
WILLIAM FERNANDES, P. ENG.
Water Treatment and Supply
DIRECTOR,
Z.Q.
AS SHOWN
No. DATE REVISIONS INITIAL SIGNED
DRAWING
NUMBER:
CHECK:DESIGN:
DATE:
SCALE:
DRAFTING: CONTRACT No.
JOHN P. KELLY, P. ENG.
Linear Underground Infrastructure
DIRECTOR, DESIGN & CONSTRUCTION
ENGINEERING & CONSTRUCTION SERVICES
MATCH EXISTING MATING FLANGEFLANGE TO FLANGE TYPE/BOLT - PATTERN TO 600mm TO 450mm REDUCER SS 304L SCH 40
CHAMBER DETAILS
TYPICAL DWG I33 FOR INSTALL DETAILS. TRANSMITTER AND GAUGE. REFER TO SAMPLE PORT LOCATION FOR PRESSURE
FOR INSTALL DETAILS.MONITORING. REFER TO TYPICAL DWG I34 FLOAT SWITCH FOR CHAMBER FLOOD
TYPICAL I&C DWG. I32.DETAILS REFER TO FOR INSTALLATION
15. FOR GENERAL CHAMBER NOTES SEE DWG G03.
14. ASSUME 2m OF TOTAL CRACK INJECTION.
13. ASSUME 5m OF TOTAL CONCRETE REPAIRS.
12. LOCATION NEAR LADDER AT LOCAL ENTRY POINT.
11. PROVIDE ALL EXPOSED CONDUIT.
10. REFER TO I&C DRAWINGS FOR ADDITIONAL DEMOLITION WORKS.
PUMP SUPPLIER.
9. RECEPTACLE FOR SUMP PUMP CO-ORDINATE RATING WITH SUMP
REFER TO DRAWING C01.
8. FOR CONDUIT LAYOUT BETWEEN CONTROL PANEL AND CHAMBER
7. RECEPTACLES MOUNTING HEIGHT 1.5m ABOVE FLOOR.
6. DO NOT RUN CONDUIT ON UNDERSIDE OF REMOVABLE SLAB.
AND LIGHTING PANEL DETAILS.
5. REFER TO TYPICAL I&C DRAWINGS I07 & I06 FOR ELECTRICAL CONDUIT
PROTECTION BOARD.
EXTRUDED STYROFOAM HI40 INSULATION OR EQUAL, WITH CEMENT
4. WHERE EXISTING INSULATION IS DAMAGED, PROVIDE 50mm THICK
3. REPLACE EX. SUMP PUMP DISCHARGE PIPE AND FRAME/GRATING.
FIELD VERIFIED BY THE CONTRACTOR PRIOR TO FABRICATION.
2. ALL DIMENSIONS, INCLUDING SS304L SPACER DIMENSIONS TO BE
CONNECTIONS PRIOR TO CONSTRUCTION/FABRICATION.
MEASUREMENTS TO VERIFY SIZE AND TYPE OF EXISTING PIPE/FLANGE
1. CONTRACTOR TO ENTER CHAMBER TO INVENTORY AND TAKE
ADDENDUM No.502/14/17
CS, ANSI CL150450mm MAGNETIC FLOW METER FLANGED,
K.A.
6
6
6
K.A.
OCTOBER 2015
TORONTO WATER METER REPLACEMENT AND UPGRADES
N
N.K.
C01
SITE PLAN
ARE IN METERS UNLESS OTHERWISE NOTED
MEASUREMENTS SHOWN ON THESE PLANS
METRIC
CHAMBER No.5 - YONGE ST./ ELGIN ST.
ELGIN ST.
DU
DLE
Y A
VE.
ELGIN ST.
ARNOLD AVE.
DU
DLE
Y A
VE.
YO
NG
E S
T.
CLARK AVE.
MORGAN AVE.
N
KEY PLANN.T.S.
CIVIL
NOTE:
27.60m
LEGEND:
REINSTATE EXISTING CURB AND GUTTER
Water
SILT FENCE
1 03/02/16 ISSUED FOR ROAD CORRIDOR CONTROL APPROVAL
100% PRE-DESIGN SUBMISSION K.A.
K.A.
K.A.
2 03/28/16
3 07/26/16 50% DESIGN SUBMISSION
DURING CONSTRUCTION EX. GAS AND WATERMAIN
PROTECT AND SUPPORT
STM (SEE NOTE 4) DRAIN CONNECTED TO EX.
EX. 150mm CHAMBER
EX. CONC. SIDEWALK
LINE (TYP.)PROPERTY
EX. CONC. SIDEWALK
NEW ELECTRICAL ENCLOSURENEW 2.1mx1.2m CONC. PAD FOR
EX. CURB
EX. CURB
(UTM COORDINATE SYSTEM)N 4852154.71E 626949.85WTR-282-RPU-0201TORONTO RPU PANEL
EX. PAVEMENT MARKING (TYP.)
FLOW METERTUBE WITH NEW MAGNETIC REPLACE EX. VENTURI
(WTR-282-CH-0002)CHAMBER EX. METERING
CONSTRUCTION SEQUENCE:
EX. BELL/ROGERS BOX
4 09/30/16 70% DESIGN SUBMISSION K.A.
16ECS-LU-03TT
& M.H.300 D.V.
50 A.V.
RECORDER
VENTURI
100 A.V.
400 G.V.
& M.H.300 D.V.
100 A.V.
300 D.V. & M.H. 100 A.V.600 G.V.
1050 B.V.
N
282-09
282-04
282-06 282-07
282-02
282-1A282-01
259-12
259-11259-10259-09
1350mm MAIN 282
1350mm MAIN 259
282-03
YO
NG
E S
T.
DU
DLE
Y A
VE.
ALC
AIN
E C
T.
LOCATION OF EXISTING WATERMAIN VALVESSCALE: N.T.S.
P27745
REQUIRED.REMOVE EX. WIRES WHEN ABANDON EX. CONDUITS.
EX. CP1
ENGINEERING
B
359-16
750 B.V.
5. REFER TO I&C DRAWINGS FOR DETAILS.
ELGIN ST.
AND CONDUIT MINIMUM 600mm.
6. PROVIDE VERTICAL SEPARATION BETWEEN GAS LINE
& M.H.300 D.V.
359-17
& M.H.300 D.V.
282-08
900
mm M
AIN 3
59
100 A.V.
282-05
AV
E.
HE
ND
ER
SO
N
ALBIO
N C
L.
5 10/24/16 K.A.CONTROL PANEL RELOCATED AS PER COT COMMENTS
6 95% DESIGN SUBMISSION
173M-2016-1
ISOLATIONFOR WM TO BE CLOSED
ISOLATIONFOR WM TO BE CLOSED
ISOLATIONFOR WM TO BE CLOSED
K.A.
9. FOR UTILITY CO-ORDINATION REFER TO DWG I02.
CONSTRUCTION.PROTECT EX. POLE DURING EX. UTILITY METER ON POLE.
CONDUIT AND CABLES DURING CONSTRUCTION.
7. PROTECT ALL EXISTING UNDERGROUND DUCTWORK,
11/23/16
0.3
0m
7 K.A.
ISOLATIONFOR WM TO BE CLOSED
282-14
282-16
ISOLATIONFOR WM TO BE CLOSED
TO I&C DWG I02 FOR DETAILS. GROUNDING ROD SYSTEM, REFER
(SEE NOTE 2, 3)CHAMBER TO BE ABANDONED EX. ELECTIC/RECORDING
REGION AND CITY OF MARKHAMISOLATION OF WM WITH YORK CONTRACTOR TO COORDINATE
CONSTRUCTION. REMOVE UPON COMPLETION.
10. PROVIDE TEMPORARY ASPHALT SIDEWALK DURING
ISSUED FOR PUCC REVIEW12/08/16
8 12/09/16 K.A.ISSUED FOR TENDER
WILLIAM FERNANDES, P. ENG.
Water Treatment and Supply
DIRECTOR,
Z.Q.
1:100
No. DATE REVISIONS INITIAL SIGNED
DRAWING
NUMBER:
CHECK:DESIGN:
DATE:
SCALE:
DRAFTING: CONTRACT No.
JOHN P. KELLY, P. ENG.
Linear Underground Infrastructure
DIRECTOR, DESIGN & CONSTRUCTION
ENGINEERING & CONSTRUCTION SERVICES
SCHEDULE DETAILS. (NOTE 6)I&C DWG I07 FOR CONDUIT CONDUIT. REFER TO TYPICAL NEW 8x53mm UNDEGROUND
DWG I35.
8. FOR DIRECT BURIED DUCT DETAILS REFER TO TYPICAL
I35
DWG I02.CONDUIT. REFER TO I&C NEW 1x53mm UNDERGROUND
9 K.A.
TO DWG G05.
DWG G04, FOR PERMANENT RESTORATION DETAILS REFER
AND EROSION CONTROL DETAILS AND NOTES REFER TO
1. FOR GENERAL NOTES REFER TO DWG G03, FOR SEDIMENT
AND RETURNED TO THE CITY YARD.
RESTORED. FRAMES AND COVER ARE TO BE SALVAGED
TO SUBGRADE. THE AFFECTED AREA TO BE COMPLETELY
BELOW GRADE AND BACKFILLED WITH UNSHRINKABLE FILL
2. EXISTING RECORDING CHAMBER TO BE BROKEN 1.0m
OF THE DRAIN PIPE. REPAIR DRAIN PIPE AS REQUIRED.
IS FUNCTIONING PROPERLY. CONDUCT CCTV INSPECTION
4. CLEAN, FLUSH AND VERIFY THAT EXISTING CHAMBER DRAIN
REMOVE ALL WIRING FROM CHAMBER.
TO BE SALVAGED AND RETURNED TO THE CITY YARD.
ALL INSTRUMENTATION, CONTROL PANELS AND EQUIPMENT
IN THE EXISTING UNDERGROUND RECORDING CHAMBER.
3. REMOVE ALL EXISTING ELECTRICAL AND CONTROL PANELS
PERMANENT CONC. SIDEWALK RESTORATION
ADDENDUM No.5
PERMANENT ASPHALT RESTORATION
PERMANENT LANDSCAPE RESTORATION
9
LIMITSASPHALT RESTORATIONPERMANENT 40mm HL3
9
9
02/14/17
SPECIAL SPECIFICATION 4A FOR DETAILS.AND REPAIR AND TIGHTEN ALL LEAKS. REFER TO FLUSH. CONTRACTOR TO ENSURE WATER TIGHTNESS 12% CHLORINE SOLUTION AND TORONTO WATER TO METHOD IS NEEDED. SWAB INTERNAL SURFACE WITH DISINFECTION IS NOT REQUIRED, ONLY LOCAL REPAIR CONSTRUCTION SPECIFICATION TS 7.30. FULL MAIN TO BE CONDUCTED BY CONTRACTOR AS PER STANDARD
G. FIELD PRESSURE TEST NOT REQUIRED. DISINFECTION CURBS, DRIVEWAYS, BOULEVARDS AND SODDED AREAS. WITH TS 4.60.07.04 FOR ALL PAVEMENT, SIDEWALKS,
F. PERMANENT RESTORATION REQUIRED IN ACCORDANCE ULTRASONIC MEANS BY THE CONTRACTOR.
E. ALL THE FIELD WELDINGS SHALL BE TESTED BY EXISTING CHAMBER.
D. INSTALL THE NEW FLOW METER AND PIPING WITHIN THE 282-06.
259-12, 282-04, 359-16, 282-14 & 282-16. OPEN DRAIN IN BE IN THE CLOSED POSITION DURING CONNECTION:
C. THE CONTROL VALVES OF THE FOLLOWING CHAMBERS CIRCUMSTANCES LEADING UP TO THE SHUTDOWN.
THESE DATES DEPENDING ON OPERATIONAL TORONTO WATER RESERVES THE RIGHT TO CHANGE WATERMAIN IS AFTER OCTOBER 31 AND BEFORE MAY 1.
B. THE TIME FOR A SHUT-DOWN OF THE EXISTING CONTACT [email protected].
DEPRESSURIZE, AND DRAIN THE EXISTING WATERMAIN. A. COORDINATE WITH TORONTO WATER TO ISOLATE,
9
EXCAVATION LIMITSAPPROXIMATE
9
5.0m5.0m
RAT
OI
N
AL
E
ER
ENI
G
N
P
VO
R
IOFEC O
CIL
NE
OSEF OIS
S
RP
DE
N
N
K. AFZAL
100052014
Feb. 14, 2017
NPS 4 SC IP
EX. 250mm WM
EX. 250
mm W
M
EX. HYD.
EX. 200mm SANEX. 200mm SAN
EX. 1500mm CONC. STM
EX. 1
800m
m C
ON
C. S
TM
EX. 200m
m S
AN
EX. 200
mm S
AN
EX. 300
mm S
TM
EX. VC
EX. 100mm STM
EX. CB
EX. CB
EX. 250mm WM
EX. 150
mm W
M
EX. VC
EX. GAS
EX. HP
EX. HP
EX.
MH
EX. MH
EX. MH
+
EX. CBEX. VC
EX. 900mm WM EX. 900mm WM
EX. BELL
RAT
OI
N
AL
E
ER
ENI
G
N
P
VO
R
IOFEC O
CIL
NE
OSEF OIS
S
RP
DE
N
N
K. AFZAL
100052014
Feb. 14, 2017K.A.
OCTOBER 2015
TORONTO WATER METER REPLACEMENT AND UPGRADES
N
N.K.
C02
CHAMBER No.5 - YONGE ST./ELGIN ST.
CIVIL
MEASUREMENTS SHOWN ON THESE PLANS
METRIC
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
CHAMBER DETAILS
1 100% PRE-DESIGN SUBMISSION K.A.03/28/16
NOTES:
A A
170.42m
EX. FRAME AND COVER
CHAMBEREX. 5400x2400mm
SLAB (TYP.)EX. REMOVABLE
EX. 900x600mm STEEL REDUCER
EX. VICTAULIC COUPLING
STEEL REDUCEREX. 600x400mm
ENCASED STEEL WMEX. 900mm CONC.
ENCASED REDUCEREX. 900mm CONC.
ENCASED STEEL WMEX. 900mm CONC.
EX. PAVEMENTEX. REMOVABLE SLAB (TYP.)
EX. SUMPREMOVE EX. CONC. SUPPORT
EX. 900mm WM
MARK
No.
C9
173.00m
Water
B B
SECTION B-B
EX. PAVEMENT
EX. SUMP
AC CONDUITSABANDON/GROUT EX.
EX. ADJUSTMENT UNITSREMOVE AND REPLACE ALL
1:20
1:20
1:50
1:50
C9
C6
C9
C6
2 07/26/16 K.A.50% DESIGN SUBMISSION
2870
780 600 1450
EXISTING METERING CHAMBER / REMOVALS
SECTION A-A
10
PLAN
4410
50mm DIA. DRAIN VALVE ASSEMBLY - C79
C38
M2
C66C72
OPSD 402.030CAST IRON, RECTANGULAR FRAME AS PER
C79
C79
C6
PIPE IS FUNCTIONING PROPERLYCLEAN, FLUSH AND VERIFY IF EX. DRAIN
NEW FLANGE TO EX. PIPEREMOVE EX. JOINT AND WELD
EX. 1500mm STM EX. 150mm DRAIN TO
EX. VICTAULIC COUPLING
RECORDING CHAMBEREX. 100mm INLET FROM ELECT.
FIELD VARIFIEDEXACT LOCATION AND DEPTH TO BE AC PIPES TO RECORDING CHAMBER. EX. 150mm AND 100mm CONC. ENCASED
4
C14
LP-3
LP-3
LP-3
LP-5
LP11
LP-3
LP-5
C14
TO CONTROL PANEL
16ECS-LU-03TT3 09/30/16 70% DESIGN SUBMISSION K.A.
WALL-MOUNTED LIGHTING FIXTURE
PLAN
PROPOSED UPGRADES
1350
C79 50mm DIA. DRAIN VALVE ASSEMBLY
FLOW
REPAIR DETAL ON DWG S01REFER TO TYP. CONCRETE PENETRATION WITH WALLCONCRETE AROUND PIPE REPAIR DETERIORATED
DETAILS(TYP.) SEE DWG S02 FOR CONCRETE PIPE SUPPORT
REPAIR DETAIL ON DWG S01REFER TO TYP. CONCRETE PENETRATION WITH WALLCONCRETE AROUND PIPE REPAIR DETERIORATED
ENGINEERING
FLOW
FLOWFLOW
C44
C40 C12 C40
C44
C44
C40 C40
C44
C12
C44
C40
SCH 40 FLANGE TO VICTAULIC 900x600m FABRICATED REDUCER SS 304L
FLANGE TO VICTAULIC SPACER600mm NOM. DIA.SS 304L SCH 40
CONDUIT SCHEDULE.REFER TO I&C DRAWINGS FOR INSTALL NEW ELECTRICAL CONDUITS. CORE DRILL INTO EX. CONC. WALL TO
GRADE IN WATER TIGHT ENCLOSURE. SINGLE RECEPTACLE (GFCI) 15A - SPECIFICATION
ELECTRICAL RECEPTACLE
GRADE IN WATER TIGHT ENCLOSURE. DUPLEX RECEPTACLE (GFCI) 15A - SPECIFICATION
DETAILS. REFER TO DWG. I33 FOR INSTALL PRESSURE TRANSMITTER AND GAUGE. SAMPLE PORT LOCATION FOR
173M-2016-2
4 95% DESIGN SUBMISSION K.A.
LIGHTING SWITCH
AFF ABOVE FINISHED FLOOR
C68
LIGHTING FIXTURECEILING MOUNTED
(SEE NOTE 10)C17 LIGHTING FIXTURE
CEILING MOUNTED
LIGHTING FIXTURECEILING MOUNTED
C55
(SEE NOTE 10)C17
C55
GRADE IN WATER TIGHT ENCLOSURE.LIGHTING SWITCH - 15A, 1P SPECIFICATION
C17
STANDARD ALUMINUM LADDER AND STEPSAS PER OPSD 405.020
C68
C90
C4 C3 C4
C3
C3
C3
C3
C3
C90
C90
C55
C3
C4
C81C81
C81
11/23/16
FUSE PROTECTION.STAINLESS STEEL CLIPS, ACCESSORIES - WIRE GAUGE, VOLTAGE - 120VMODEL - BS100LED-70W-WT40MANUFACTURER - BEGHELLILIGHTING FIXTURE BS-100
C3
SEE DWG S02 FOR DETAILSAPPLY NEW WATERPROOFING
DRAIN TYPE 'A'EX. SUMP C/W 150mm
5 12/09/16 ISSUED FOR TENDER K.A.
C66
50mm STAINLESS STEEL ELBOW
THREADED BOTH ENDS125mm LONG 50mm EXTRA STRONG 304L SS
C38
C72
M2
50mm 304L SS THREADOLET, WELDED TO PIPE
TEFLON SEATS50mm THREADED SS BALL VALVE WITH
MATERIALS SUPPLIED BY CONTRACTOR
900mm STEEL FLANGE, AWWA C207 CLASS E
EX. REMOVABLE SLAB
CHAMBERELECTRIC RECORDING PLUG EX. 100mm INLET FROM
MEMBRANE.WATERPROOFING INSTALLATION OF COMPOUND PRIOR TO ASPHALTIC ROOFING SLAB TO BE CAULKED WITH REMOVABLE CONCRETE
LEGEND:
2
GRATING OF EX. DRAINREPLACE EX. FRAME &
PLATE 13mm THICKCONCRETE SUPPORT WITH STEEL
ADJUSTABLE STEEL VALVE SUPPORT
ENTRY POINT.
PERPENDICULAR TO WM PIPE AND FACING LOCAL
NOTE: BOTTOM DRAIN VALVE ASSEMLY TO BE
WILLIAM FERNANDES, P. ENG.
Water Treatment and Supply
DIRECTOR,
Z.Q.
AS SHOWN
No. DATE REVISIONS INITIAL SIGNED
DRAWING
NUMBER:
CHECK:DESIGN:
DATE:
SCALE:
DRAFTING: CONTRACT No.
JOHN P. KELLY, P. ENG.
Linear Underground Infrastructure
DIRECTOR, DESIGN & CONSTRUCTION
ENGINEERING & CONSTRUCTION SERVICES
INSTALL DETAILS. REFER TO TYPICAL I&C DWG. I34 FOR FLOAT SWITCH FOR FLOOD MONITORING,
14. FOR GENERAL CHAMBER NOTES SEE DWG G03.
13. ASSUME 2m OF TOTAL CRACK INJECTION.
12. ASSUME 5m OF TOTAL CONCRETE REPAIRS.
CHAMBER REFER TO DRAWING C01.
11. FOR CONDUIT LAYOUT BETWEEN CONTROL PANEL AND
10. LOCATION NEAR LADDER AT LOCAL ENTRY POINT.
9. PROVIDE ALL EXPOSED CONDUIT.
WORKS.
8. REFER TO I&C DRAWINGS FOR ADDITIONAL DEMOLITION
SUMP PUMP SUPPLIER.
7. RECEPTACLE FOR SUMP PUMP CO-ORDINATE RATING WITH
6. RECEPTACLE MOUNTING HEIGHT 1.5m ABOVE FLOOR.
UNDERSIDE OF REMOVABLE SLAB.
5. CONTRACTOR SHALL NOT RUN CONDUIT ALONG THE
ELECTRICAL CONDUIT AND LIGHTING PANEL DETAILS.
4. REFER TO TYPICAL I&C DRAWINGS I07 & I06 FOR
EQUAL, WITH CEMENT PROTECTION BOARD.
THICK EXTRUDED STYROFOAM HI40 INSULATION OR
3. WHERE EXISTING INSULATION IS DAMAGED, PROVIDE 50mm
FABRICATION.
TO BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO
2. ALL DIMENSIONS, INCLUDING SS304L SPACER DIMENSIONS
CONSTRUCTION/FABRICATION.
EXISTING PIPE/FLANGE CONNECTIONS PRIOR TO
TAKE MEASUREMENTS TO VERIFY SIZE AND TYPE OF
1. CONTRACTOR TO ENTER CHAMBER TO INVENTORY AND
TYPICAL I&C DWG. I32.DETAILS REFER TO FOR INSTALLATION
SHOULDERED600mm VICTAULIC COUPLING STYLE 44
02/14/17 ADDENDUM No. 5 K.A.
CS, ANSI CL 150600mm MAGNETIC FLOW METER FLANGED,
6
6
6
K.A.
OCTOBER 2015
TORONTO WATER METER REPLACEMENT AND UPGRADES
N
N.K.
NOTES:
C01
SITE PLAN
ARE IN METERS UNLESS OTHERWISE NOTED
MEASUREMENTS SHOWN ON THESE PLANS
METRIC
1 DRAFT PRE-DESIGN SUBMISSION T.B.01/15/16
CHAMBER No.6 - MILLIKEN PUMPING STATION
N
KEY PLANN.T.S.
CIVIL
14TH AVE.
McD
OW
ELL G
T.
MAP
LE P
R.
KE
NN
ED
Y R
D.
LEE AVE.
PUMPING STATIONMILLIKEN
STATIONPUMPING MILLIKEN
EX. DRIVEWAY
CLOSETEX. NETWORK ACCESS
2 K.A.100% PRE-DESIGN SUBMISSION03/23/16
LEGEND:
Water
4355 14th AVENUE
3 K.A.07/26/16 50% DESIGN SUBMISSION
EXISTING WATERMAIN SUPPORT AND PROTECT
SILT FENCE
16ECS-LU-03TT
4 09/30/16 70% DESIGN SUBMISSION K.A.
CONSTRUCTION SEQUENCE:
MILLIKEN RESERVOIR & P.S.
FH
N
100 A.V. & M.H.
348-07
348-08
M.H.
348-09
M.H. 100 A.V. & M.H.
348-10
30P-09
100 A.V.750 H.B.V. &
30P-10
100 A.V.750 H.B.V. &
1350
mm M
AIN 2
13
350 H.B.V.
30P-04
30P-05
900 VENTURI
900 H.B.V.
30P-06
& C.V.3x450 H.B.V.
30P-01 2x1200 H.B.V.
30P-02 350 H.B.V.
30P-03 350 H.B.V.
WASHWATER & FH600 BV TO 150mm
30P-07
BURIED MH
0Y2-01
200 D.V. & 400 G.V.
900mm MAIN X2
FLOWMETER CHAMBERTOWN OF MARKHAM
14th AVE.
SCALE: N.T.S.
C
CABLES DURING CONSTRUCTION.
4. PROTECT ALL UNDERGROUND DUCTWORK, CONDUIT AND
ENGINEERING
I35
2. REFER TO I&C DRAWINGS FOR DETAILS.
DETAILS. I07 FOR CONDUIT SCHEDULE
CONDUIT. REFER TO I&C DWG.NEW 6x53mm UNDERGROUND
THE DRAIN PIPE. REPAIR DRAIN PIPE AS REQUIRED.
IS FUNCTIONING PROPERLY. CONDUCT CCTV INSPECTION OF
3. CLEAN, FLUSH AND VERIFY THAT EXISTING CHAMBER DRAIN
CHAMBER TO PUMPING STATION BUILDING.
PRESSURE TRANSMITTER SENSING LINES RUNNING FROM
5. CONTRACTOR SHALL NOT DAMAGE OR DISRUPT EXISTING
K.A.95% DESIGN SUBMISSION5
30P-2016-1
WM ISOLATIONTO BE CLOSED FOR
WM ISOLATIONTO BE CLOSED FOR
PIPES TO BE REMOVED.ALL VENTURI FLOW METER SENSING DETAILS.SEE DETAILS ON DWG 30P-2016-3 FOR NEW MAGNETIC FLOW METER.REPLACE EX. VENTURI TUBE WITH
11/23/16
(SEE NOTE 3)CONNECTED TO EX. STM EX. 150mm DRAIN PIPE
CONSTRUCTIONPROTECT EX. STM DURING
6 K.A.
LOCATION OF EXISTING PD6s WATERMAIN VALVES
ISSUED FOR PUCC REVIEW12/08/16
7 12/09/16 K.A.ISSUED FOR TENDERWILLIAM FERNANDES, P. ENG.
Z.Q.
1:100
No. DATE REVISIONS INITIAL SIGNED
DRAWING
NUMBER:
CHECK:DESIGN:
DATE:
SCALE:
DRAFTING: CONTRACT No.
JOHN P. KELLY, P. ENG.
Linear Underground Infrastructure
DIRECTOR, DESIGN & CONSTRUCTION
ENGINEERING & CONSTRUCTION SERVICES
Water Treatment and Supply
DIRECTOR,
ISOLATION) & 100 A.V.(TO BE CLOSED FOR WM 600 VENTURI 2x600 H.B.V.
METER CHAMBEREX. VENTURI FLOW
K.A.
TO DWG G05.
DWG G04, FOR PERMANENT RESTORATION DETAILS REFER
AND EROSION CONTROL DETAILS AND NOTES REFER TO
1. FOR GENERAL NOTES REFER TO DWG G03, FOR SEDIMENT
6. FOR DIRECT BURIED DUCT DETAILS REFER TO TYPICAL DWG I35.
400
mm
PD
6S
ADDENDUM No.5
PERMANENT LANDSCAPE RESTORATION
8
8
8 02/14/17
SPECIFICATION 4A FOR DETAILS.AND TIGHTEN ALL LEAKS. REFER TO SPECIAL CONTRACTOR TO ENSURE WATER TIGHTNESS AND REPAIR CHLORINE SOLUTION AND TORONTO WATER TO FLUSH. METHOD IS NEEDED. SWAB INTERNAL SURFACE WITH 12% DISINFECTION IS NOT REQUIRED, ONLY LOCAL REPAIR CONSTRUCTION SPECIFICATION TS 7.30. FULL MAIN BE CONDUCTED BY CONTRACTOR AS PER STANDARD FIELD PRESSURE TEST NOT REQUIRED. DISINFECTION TO G.
CURBS, DRIVEWAYS, BOULEVARDS AND SODDED AREAS. WITH TS 4.60.07.04 FOR ALL PAVEMENTS, SIDEWALKS, PERMANENT RESTORATION REQUIRED IN ACCORDANCE F.
ULTRASONIC MEANS BY THE CONTRACTOR. ALL THE FIELD WELDINGS SHALL BE TESTED BY E.
EXISTING CHAMBER.INSTALL THE NEW FLOW METER AND PIPING WITHIN THE D.
30P-03, 30P-04, AND 30P-07IN THE CLOSED POSITION DURING CONNECTION: 30P-02, THE CONTROL VALVES OF THE FOLLOWING CHAMBERS BE C.
UP TO THE SHUTDOWN.DEPENDING ON OPERATIONAL CIRCUMSTANCES LEADING WATER RESERVES THE RIGHT TO CHANGE THESE DATES IS AFTER OCTOBER 31 AND BEFORE MAY 1. TORONTO THE TIME FOR A SHUT-DOWN OF THE EXISTING WATERMAIN B.
CONTACT [email protected], AND DRAIN THE EXISTING WATERMAIN. COORDINATE WITH TORONTO WATER TO ISOLATE, A.
EXCAVATION LIMITSAPPROXIMATE
8
8
EX. HYD.
EX. V&B
EX. 150
mm P
VC W
M
EX. VC
EX. VC
EX. VC
EX. 600mm WM
EX. 600mm WM
EX. LS
EX. WM
EX. STM
EX. CB
EX. 100mm SAN
EX. MH
EX. 200
mm S
AN
EX. WM
EX. B
ELL
EX.
HY
DR
O
EX.
WM
EX.
HY
DR
O
EX. CONDUIT
EX. WM
EX. WM
EX. WM
EX. 150
mm CI IR
R (
AB
ND.)
EX. S
TM
EX. 900
mm W
M
RAT
OI
N
AL
E
ER
ENI
G
N
P
VO
R
IOFEC O
CIL
NE
OSEF OIS
S
RP
DE
N
N
K. AFZAL
100052014
Feb. 14, 2017
K.A.
OCTOBER 2015
TORONTO WATER METER REPLACEMENT AND UPGRADES
N
N.K.
C02
SITE PLAN
ARE IN METERS UNLESS OTHERWISE NOTED
MEASUREMENTS SHOWN ON THESE PLANS
METRIC
1 DRAFT PRE-DESIGN SUBMISSION T.B.
PROPERTY LINE (TYP.)
01/15/16
CHAMBER No.9 - MILLIKEN PUMPING STATION
PUMPING STATIONMILLIKEN
CIVIL
N
KEY PLANN.T.S.
14TH AVE.
McD
OW
ELL G
T.
MAP
LE P
R.
KE
NN
ED
Y R
D.
LEE AVE.
CLOSET WTR-PMI-COM-1300EX. NETWORK ACCESS
STATIONPUMPING MILLIKEN
ACCESS ROADMAINTANENCE EX. TURFSTONE
K.A.2 100% PRE-DESIGN SUBMISSION
NOTES:
03/23/16
LEGEND:
Water
50% DESIGN SUBMISSION K.A.3
4355 14th AVENUE
SILT FENCE
07/26/16
OF THE DRAIN PIPE. REPAIR DRAIN PIPE AS REQUIRED.
IS FUNCTIONING PROPERLY. CONDUCT CCTV INSPECTION
3. CLEAN, FLUSH AND VERIFY THAT EXISTING CHAMBER DRAIN
4 09/30/16 K.A.70% DESIGN SUBMISSION
16ECS-LU-03TT
MILLIKEN RESERVOIR & P.S.
FH
N
100 A.V. & M.H.
348-07
348-08
M.H.
348-09
M.H. 100 A.V. & M.H.
348-10
30P-09 30P-10 100 A.V.750 H.B.V. &
1350
mm M
AIN 2
13
30P-05
900 VENTURI
900 H.B.V.
30P-06
& C.V.3x450 H.B.V.
NEW-0013
1200 H.B.V.
30P-08
M.H.
30P-07H.B.V. 100 A.V.600 VENTURI 2x600
BURIED MH
0Y2-01
200 D.V. & 400 G.V.
900mm MAIN X2 14th AVE.
ENGINEERING
CI35
PAD FOR PAC ENCLOSURENEW 1.2x1.5m CONCRETE
2. REFER TO I&C DRAWINGS FOR DETAILS.
CHAMBER TO PUMPING STATION BUILDING.
PRESSURE TRANSMITTER SENSING LINES RUNNING FROM
5. CONTRACTOR SHALL NOT DAMAGE OR DISRUPT EXISTING
DETAILS. FOR CONDUIT SCHEDULE REFER TO I&C DWG. I07 UNDERGROUND CONDUIT.NEW 6x53mm
K.A.95% DESIGN SUBMISSION5
30P-2016-2
WM ISOLATIONTO BE CLOSED FOR
& 100 A.V.750 H.B.V.
11/23/16
CONDUIT AND CABLES DURING CONSTRUCTION.
4. PROTECT ALL EXISTING UNDERGROUND DUCTWORK,
6 K.A.
6. FOR DIRECT BURIED DUCT DETAILS REFER TO DWG I35.
WM ISOLATIONTO BE CLOSED FOR
NEW-0014
1800 H.B.V.
LOCATION OF EXISTING PD5o WATERMAIN VALVES
ISSUED FOR PUCC REVIEW12/08/16
K.A.12/09/167 ISSUED FOR TENDER
WILLIAM FERNANDES, P. ENG.
Water Treatment and Supply
DIRECTOR,
Z.Q.
1:100
No. DATE REVISIONS INITIAL SIGNED
DRAWING
NUMBER:
CHECK:DESIGN:
DATE:
SCALE:
DRAFTING: CONTRACT No.
JOHN P. KELLY, P. ENG.
Linear Underground Infrastructure
DIRECTOR, DESIGN & CONSTRUCTION
ENGINEERING & CONSTRUCTION SERVICES
METER CHAMBEREX. VENTURI FLOW
K.A.
FOR PERMANENT RESTORATION DETAILS REFER TO DWG G05.
EROSION CONTROL DETAILS AND NOTES REFER TO DWG G04,
1. FOR GENERAL NOTES REFER TO DWG G03, FOR SEDIMENT AND
ADDENDUM No.5
PERMANENT LANDSCAPE RESTORATION
8
8
8
CONSTRUCTION SEQUENCE:
02/14/17
8
EXCAVATION LIMITSAPPROXIMATE
8
(SEE NOTE 3)EX. STMCONNECTED TO DRAIN PIPE EX. CHAMBER
REMOVEDSHALL BE SENSING PIPES FLOW METER ALL VENTURI DETAILS.30P-2016-4 FOR METER. SEE DWG MAGNETIC FLOW WITH NEW VENTURI TUBE REPLACE EX.
N.T.S.
MEANS BY THE CONTRACTOR. ALL THE FIELD WELDINGS SHALL BE TESTED BY ULTRASONIC E.
CHAMBER.INSTALL THE NEW FLOW METER AND PIPING WITHIN THE EXISTING D.
AND VALVE WITHIN THE PUMPING STATION.CLOSED POSITION DURING CONNECTION: 30P-06, 30P-09, 30P-10 THE CONTROL VALVES OF THE FOLLOWING CHAMBERS BE IN THE C.
OPERATIONAL CIRCUMSTANCES LEADING UP TO THE SHUTDOWN.RESERVES THE RIGHT TO CHANGE THESE DATES DEPENDING ON AFTER OCTOBER 31 AND BEFORE MAY 1. TORONTO WATER THE TIME FOR A SHUT-DOWN OF THE EXISTING WATERMAIN IS B.
[email protected] DRAIN THE EXISTING WATERMAIN. CONTACT COORDINATE WITH TORONTO WATER TO ISOLATE, DEPRESSURIZE, A.
SPECIAL SPECIFICATION 4A FOR DETAILS.TIGHTNESS AND REPAIR AND TIGHTEN ALL LEAKS. REFER TO TORONTO WATER TO FLUSH. CONTRACTOR TO ENSURE WATER INTERNAL SURFACE WITH 12% CHLORINE SOLUTION AND REQUIRED, ONLY LOCAL REPAIR METHOD IS NEEDED. SWAB SPECIFICATION TS 7.30. FULL MAIN DISINFECTION IS NOT CONDUCTED BY CONTRACTOR AS PER STANDARD CONSTRUCTION FIELD PRESSURE TEST NOT REQUIRED. DISINFECTION TO BE G.
BOULEVARDS AND SODDED AREAS. 4.60.07.07 FOR ALL PAVEMENT, SIDEWALKS, CURBS, DRIVEWAYS, PERMANENT RESTORATION REQUIRED IN ACCODANCE WITH TS F. EXCAVATION LIMITS
APPROXIMATE
8
(UTM COORDINATE SYSTEM)N 4855672.27
E 635889.94 TPML1-CP01
NEW PAC PANEL YORK REGION
8
8
EX. 1500mm WM
EX. 1200mm WM
x x x xx x x x
x
xx EX. GAS
METEREX. GAS
EX. BELL
EX. 5x2 D
UC
T B
AN
K
EX. WME
X. 900
mm W
M
EX. 3x4 D
UC
T B
AN
K
EX. C
OM
MO
N C
ON
DUIT
EX. S
TM
EX. 150
mm CI IR
R (
AB
ND.) EX. S
TMEX. S
L
EX. B
ELL
+
RAT
OI
N
AL
E
ER
ENI
G
N
P
VO
R
IOFEC O
CIL
NE
OSEF OIS
S
RP
DE
N
N
K. AFZAL
100052014
Feb. 14, 2017
K.A.
OCTOBER 2015
TORONTO WATER METER REPLACEMENT AND UPGRADES
N
N.K.
C011
CHAMBER No.7 - DUFFERIN ST./MAISON PARK CRT.
SITE PLAN
N
KEY PLANN.T.S.
CIVIL
DUFFERIN ST.
VICEROY RD.
PA
RK C
RT.
MAIS
ON
CNR
STEELES AVE.
GLEN SHIELDS AVE.
DU
FFE
RIN S
T.
VICEROY RD.PARC CRT.
MAISON
EX. CONC. SIDEWALK
EX. PAVEMENT MARKING (TYP.)
NOTES:
(WTR-365-CH-0005)EX. METERING CHAMBER
WITH CONC. POSTSEX. STEEL FENCE
K.A.
EX. MEDIAN
EX. CURB
EX. CURB
03/02/16 ISSUED FOR ROAD CORRIDOR CONTROL APPROVAL
K.A.100% PRE-DESIGN SUBMISSION2
ELECTRIC CHAMBERPLUG EX. DRAIN FROM
03/28/16
LEGEND:
REINSTATE EXISTING CURB AND GUTTER
Water
K.A.3 07/26/16 50% DESIGN SUBMISSION
REINSTATE EXISTING ASPHALT
SILT FENCE
CONSTRUCTION SEQUENCE:
16ECS-LU-03TT
4 09/30/16 70% DESIGN SUBMISSION K.A.
EX. C
ON
C.
WA
LK
WA
Y
SCALE: N.T.S.
WATERMAIN VALVES LOCATION OF EXISTING
N
258-12
900 B.V. & 100 A.V.
365-10
300 D.V. & M.H.
365-09
300 D.V. & M.H.
365-02
300 D.V. & M.H.
1500mm MAIN 258
1500
mm M
AIN 3
65
1200
mm M
AIN 3
65
CENTRE ST.
365-01
900 B.V. & 50 A.V.
STEELES AVE.
MAISON PARC CT.VICEROY RD.
CLARK AVE.
VENTURI
CHAMBER 7
DRAINOPEN
P37820
ENGINEERING
DURING CONSTRUCTIONPROTECT EX. O/H HYDRO
DURING CONSTRUCTIONPROTECTED AND SUPPORTED EX. LIGHT STANDARD TO BE DURING CONSTRUCTION
SIGN TO BE PROTECTED EX. FLOWER BED AND
SEE NOTE 5CONNECTED TO EX. STM. EX. 150mm CHAMBER DRAIN PIPE
IN CBCONTROLS TO BE ESTABLISHED EROSION AND SEDIMENTATION
4. REFER TO I&C DRAWINGS FOR DETAILS.
271M-2016-1
K.A.95% DESIGN SUBMISSION5
WM ISOLATIONTO BE CLOSED FOR
WM ISOLATIONTO BE CLOSED FOR
8. FOR UTILITY CO-ORDINATION REFER TO DWG I02.
DURING CONSTRUCTION.POLE. PROTECT EX. POLE EX. UTILITY METER ON
(UTM COORDINATE SYSTEM)N 4849586.37E 623076.87WTR-365-RPU-0601NEW TORONTO RPU PANEL
ENCLOSUREPAD NEW ELECTRICAL NEW 2.1mx1.5m CONC.
CONDUIT AND CABLES DURING CONSTRUCTION.
6. PROTECT ALL EXISTING UNDERGROUND DUCTWORK,
11/23/16
2.4
m
2.5
0m
DWG. I02 FOR DETAILSSYSTEM REFER TO GROUNDING ROD
PULL ALL EX. WIRINGABANDON EX. CONDUITS AND
SUMP PUMP SUPPLIER.
9. RECEPTACLE FOR SUMP PUMP CO-ORDINATE RATING WITH
(TYP.)TRAFFIC CABLE PROTEXT EX.
6 K.A.
DETAILS. SEE NOTE 8 REFER TO DWG. I02 FOR INSTALL CONDUIT.NEW 1x53mm UNDERGROUND
GAS MAINPROTECT EX.
1.70m
CABLESEX. TRAFFIC/BELL SUPPORT & PROTECT
ABANDONED. SEE NOTE 2, 3.CHAMBER TO BE EX. ELECTRIC/RECORDING
EX. PIPEABANDON AND GROUT
CONSTRUCTION. REMOVE UPON COMPLETION.
10. PROVIDE TEMPORARY ASPHALT SIDEWALK DURING
ISSUED FOR PUCC REVIEW12/08/16
K.A.12/09/167 ISSUED FOR TENDER
WILLIAM FERNANDES, P. ENG.
Water Treatment and Supply
DIRECTOR,
Z.Q.
1:100
No. DATE REVISIONS INITIAL SIGNED
DRAWING
NUMBER:
CHECK:DESIGN:
DATE:
SCALE:
DRAFTING: CONTRACT No.
JOHN P. KELLY, P. ENG.
Linear Underground Infrastructure
DIRECTOR, DESIGN & CONSTRUCTION
ENGINEERING & CONSTRUCTION SERVICES
1.10m
BI35
DWG I35.
7. FOR DIRECT BURIED DUCT DETAILS REFER TO TYPICAL I&C
DETAILS. SEE NOTE 7DWG. I07 FOR CONDUIT SCHEDULE CONDUIT. REFER TO TYPICAL I&C NEW 8x53mm UNDERGROUND
ARE IN METERS UNLESS OTHERWISE NOTED
MEASUREMENTS SHOWN ON THESE PLANS
METRIC
BE SALVAGED AND RETURNED TO THE CITY YARD.
COMPLETELY RESTORED. FRAMES AND COVER ARE TO
FILL TO SUBGRADE. THE AFFECTED AREA TO BE
BELOW GRADE AND BACKFILLED WITH UNSHRINKABLE
2. EXISTING RECORDING CHAMBER TO BE BROKEN 1m
TO DWG G05.
DWG G04, FOR PERMANENT RESTORATION DETAILS REFER
AND EROSION CONTROL DETAILS AND NOTES REFER TO
1. FOR GENERAL NOTES REFER TO DWG G03, FOR SEDIMENT
OF THE DRAIN PIPE. REPAIR DRAIN PIPE AS REQUIRED.
IS FUNCTIONING PROPERLY. CONDUCT CCTV INSPECTION
5. CLEAN, FLUSH AND VERIFY THAT EXISTING CHAMBER DRAIN
K.A.
TO BE SALVAGED AND RETURNED TO THE CITY YARD.
ALL INSTRUMENTATION, CONTROL PANELS AND EQUIPMENT
IN THE EXISTING UNDERGROUND RECORDING CHAMBER.
3. REMOVE ALL EXISTING ELECTRICAL AND CONTROL PANELS
MAGNETIC FLOW METERREPLACE EX. VENTURI TUBE WITH NEW
CONSTRUCTIONMAINTAINED DURING ACCESS TO BE
PERMANENT CONC. SIDEWALK RESTORATION
ADDENDUM No.5
PERMANENT LANDSCAPE RESTORATION
8
8
8
02/14/17
4A FOR DETAILS.AND TIGHTEN ALL LEAKS. REFER TO SPECIAL SPECIFICATION CONTRACTOR TO ENSURE WATER TIGHTNESS AND REPAIR CHLORINE SOLUTION AND TORONTO WATER TO FLUSH. METHOD IS NEEDED. SWAB INTERNAL SURFACE WITH 12% DISINFECTION IS NOT REQUIRED, ONLY LOCAL REPAIR CONSTRUCTION SPECIFICATION TS 7.30. FULL MAIN CONDUCTED BY CONTRACTOR AS PER STANDARD FIELD PRESSURE TEST NOT REQUIRED. DISINFECTION TO BE G.
DRIVEWAYS, BOULEVARDS AND SODDED AREAS.TS 4.60.07.04 FOR ALL PAVEMENT, SIDEWALKS, CURBS, PERMANENT RESTORATION REQUIRED IN ACCORDANCE WITH F.
MEANS BY THE CONTRACTOR.ALL THE FIELD WELDINGS SHALL BE TESTED BY ULTRASONIC E.
EXISTING CHAMBER.INSTALL THE NEW FLOW METER AND PIPING WITHIN THE D.
OPEN DRAIN IN 365-02.THE CLOSED POSITION DURING CONNECTION: 258-12, 365-01. THE CONTROL VALVES OF THE FOLLOWING CHAMBERS BE IN C.
SHUTDOWN.ON OPERATIONAL CIRCUMSTANCES LEADING UP TO THE RESERVES THE RIGHT TO CHANGE THESE DATES DEPENDING AFTER OCTOBER 31 AND BEFORE MAY 1. TORONTO WATER THE TIME FOR A SHUT-DOWN OF THE EXISTING WATERMAIN IS B.
CONTACT [email protected], AND DRAIN THE EXISTING WATERMAIN. COORDINATE WITH TORONTO WATER TO ISOLATE, A.
8
LIMITSmm HL1 RESTORATION PERMANENT ASPHALT 40
5.0m
5.0m
EXCAVATION LIMITSAPPROXIMATE
8
8
EX.
GAS
EX. BELL
EX. BELL
EX. 1200mm WM
EX. 300
mm W
M
EX. 300
mm S
TM
EX. 250mm SAN
EX. LS
EX. HP
EX. TS
EX. 2
50
mm S
AN
EX. 300mm WMEX. 300mm WM
EX. 3
00
mm W
M
EX. 150mm DRAIN
EX. TS
EX. CB
EX. 1200mm WMEX. 1200mm WM
EX. 100mm DRAIN
+
EX.
O/H H
YD
RO
EX. FLOWER BED
EX. HYDRO
EX. B
ELL
EX. G
AS
EX. TL
EX. TL
EX. TL
EX. TL
RAT
OI
N
AL
E
ER
ENI
G
N
P
VO
R
IOFEC O
CIL
NE
OSEF OIS
S
RP
DE
N
N
K. AFZAL
100052014
Feb. 14, 2017
K.A.
OCTOBER 2015
TORONTO WATER METER REPLACEMENT AND UPGRADES
N
N.K.
C02
A
SECTION B-B
CHAMBER No.7 - DUFFERIN ST./MAISON PARK CRT.
CHAMBER DETAILS
EX. 6100x2500mm CHAMBEREX. SUMP PUMP
EX. VICTAULIC COUPLING
EX. AIR VALVE
EX. GATE VALVE
EX. GATE VALVE
EX. VENTURI TUBE
EX. GROUNDEX. REMOVABLE SLAB (TYP.)
CIVIL
MEASUREMENTS SHOWN ON THESE PLANS
METRIC
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
ENCASED WMEX. 900mm CONC.
ENCASED WMEX. 900mm CONC.
EX. FRAME AND COVER
EX. SUMP
189.00m
185.56m
1 100% PRE-DESIGN SUBMISSION K.A.
REMOVE EX.
REMOVE EX. CONC. SUPPORT
NOTES:FIELD VERIFIEDAND LOCATION TO BE CHAMBER. EX. DEPTH RECORDING ENCASED PVC PIPE TO EX. 150/100mm CONC.
03/28/16
MARK
No.
C6
A
Water
50% DESIGN SUBMISSION2 K.A.
EX. GROUND
CHAMBER TO SUMPMETER RECORDING EX. 100mm DRAIN FROM
CONNECTIONEX. FLANGED
1:50
1:50
BB
1:20
1:20
C6
PLAN
BE FIELD VERIFIEDDEPTH AND LOCATION TO RECORDING CHAMBER. EX. ENCASED PVC PIPE TO EX. 150/100mm CONC.
CHAMBER TO SUMPMETER RECORDING EX. 100mm DRAIN FROM
SECTION A-A
EXISTING METERING CHAMBER / REMOVALS
10
07/26/16
50mm DIA. DRAIN VALVE ASSEMBLY - C79
C38
M2
C66C72
C79
C79
C6
EX. 150mm RAISED DRAIN PIPE
EX. 150mm DRAIN TO EX. STORM SEWER
EX. STORM SEWEREX. 150mm DRAIN TO
TYPE 'A' DRAINEX. 150mm
300mm STORM SEWEREX. 150mm DRAIN TO EX.
EX. 100mm DRAINABANDON AND GROUT
CONDUITSABANDON EX. PVC
FUNCTIONING PROPERLYIF EX. DRAIN PIPE IS CLEAN, FLUSH AND VERIFY
FUNCTIONING PROPERLYIF EX. DRAIN PIPE IS CLEAN, FLUSH AND VERIFY
PLUG EX. 100mm DRAIN
AND DISCHARGE PIPINGREPLACE EX. SUMP PUMP
MARK
No.
C3
C3 C3
C3C3
LP-3 LP-3
LP-3LP-3
TO CONTROL PANEL
C3C3
LIGHTING FIXTUREWALL-MOUNTED
LIGHTING FIXTUREWALL-MOUNTED
PLAN
PROPOSED UPGRADES
3 70% DESIGN SUBMISSION K.A.16ECS-LU-03TT
C79 50mm DIA. DRAIN VALVE ASSEMBLY
FLOW
FLOW
09/30/16
REPAIR DETAIL ON DWG S01 REFER TO TYP. CONCRETE WITH WALLPIPE PENETRATION CONCRETE AROUND REPAIR DETERIORATED
ENGINEERING
AND COVERREPLACE EX. FRAME
C44
C40 C12 C42
C40
C44
C12 C42
FRAME AND COVERREPLACE EX. CIRCULAR
SHOULDERED900mm VICTAULIC COUPLING STYLE 44
VICTAULIC TO FLANGE SPACER900mm NOM. DIA. SS 304L SCH 40
401.020CAST IRON, CIRCULAR FRAME AS PER OPSD
C12
C44
C40
C42
±3408
4
1700 1700
4
4
SEE DWG S02 FOR DETAILS.CONCRETE PIPE SUPPORT (TYP.).
GRADE IN WATER TIGHT ENCLOSURE. DUPLEX RECEPTACLE (GFCI) 15A - SPECIFICATION
GRADE IN WATER TIGHT ENCLOSURE. SINGLE RECEPTACLE (GFCI) 15A - SPECIFICATION
271M-2016-2
K.A.95% DESIGN SUBMISSION4
C14
LP-11C14
LP-5C4
C55
LP-5C4
C55
ELECTRICAL RECEPTACLE
LIGHTING SWITCH
AFF ABOVE FINISHED FLOOR
C17C4
C55
C68
GRADE IN WATER TIGHT ENCLOSURE. LIGHTING SWITCH - 15A, 1P SPECIFICATION
PER OPSD 405.020STANDARD ALUMINUM LADDER AND STEPS AS
C68
U/S 2100mm AFFLIGHTING FIXTUREWALL-MOUNTED
U/S 2100mm AFFLIGHTING FIXTUREWALL-MOUNTED
(SEE NOTE 13)C17
(SEE NOTE 13)C17
C81 C81
C81
C6
PROTECTION.STAINLESS STEEL CLIPS,FUSE ACCESSORIES - WIRE GUARD, VOLTAGE - 120VMODEL - BS100LED-70W-WT40MANUFACTURER - BEGHELLILIGHTING FIXTURE BS-100
11/23/16
FOR CONDUIT SCHEDULE DETAILS.CONDUITS. REFER TO I&C DRAWINGS AND INSTALL NEW ELECTRICAL CORE DRILL INTO EX. CONC. WALL
SEE DWG S02 FOR DETAILS.APPLY NEW WATERPROOFING
LEGEND:
OF EX. SUMP/DRAIN.GRATING AND STEEL PLATE REPLACE EX. FRAME,
5 12/09/16 ISSUED FOR TENDER K.A.
C66
50mm STAINLESS STEEL ELBOW
THREADED BOTH ENDS125mm LONG 50mm EXTRA STRONG 304L SS
C38
C72
M2
50mm 304L SS THREADOLET, WELDED TO PIPE
TEFLON SEATS50mm THREADED SS BALL VALVE WITH
MATERIALS SUPPLIED BY CONTRACTOR
EX. REMOVABLE SLAB
MATERIALS SUPPLIED BY CONTRACTOR
CS, AWWA C207 CLASS E900mm MAGNETIC FLOW METER FLANGED,
DETAIL ON DWG S02EX. LADDER. SEE REMOVE & REPLACE
1170
MEMBRANE.WATERPROOFING INSTALLATION OF COMPOUND PRIOR TO ASPHALTIC ROOFING SLAB TO BE CAULKED WITH REMOVABLE CONCRETE
2
PLATE 13mm THICKCONCRETE SUPPORT WITH STEEL
ADJUSTABLE STEEL VALVE SUPPORT
ENTRY POINT.
PERPENDICULAR TO WM PIPE AND FACING LOCAL
NOTE: BOTTOM DRAIN VALVE ASSEMBLY TO BE
WILLIAM FERNANDES, P. ENG.
Water Treatment and Supply
DIRECTOR,
Z.Q.
AS SHOWN
No. DATE REVISIONS INITIAL SIGNED
DRAWING
NUMBER:
CHECK:DESIGN:
DATE:
SCALE:
DRAFTING: CONTRACT No.
JOHN P. KELLY, P. ENG.
Linear Underground Infrastructure
DIRECTOR, DESIGN & CONSTRUCTION
ENGINEERING & CONSTRUCTION SERVICES
SEE NOTE 1
PATTERN TO MATCH EXISTING MATING FLANGEFLANGE TO FLANGE SPACER. FLANGE TYPE/BOLT - 900mm NOM. DIA. SS 304L SCH 40
I34 FOR INSTALL DETAILS.REFER TO TYPICAL I&C DWG FLOOD MONITORINGFLOAT SWITCH FOR
DWG I33 FOR INSTALL DETAILSGAUGE REFER TO TYPICAL I&C PRESSURE TRANSMITTER ANDSAMPLE PORT LOCATION FOR
I32.REFER TO TYPICAL I&C DWG. FOR INSTALLATION DETAILS
SEE DWG G03.
16. FOR GENERAL CHAMBER NOTES
INJECTION.
15. ASSUME 2m OF TOTAL CRACK
REPAIRS.
14. ASSUME 5m OF TOTAL CONCRETE
ENTRY POINT.
13. LOCATION NEAR LADDER AT LOCAL
12. PROVIDE ALL EXPOSED CONDUIT.
ADDITIONAL DEMOLITION WORKS.
11. REFER TO I&C DRAWINGS FOR
PUMP SUPPLIER.
CO-ORDINATE RATING WITH SUMP
10. RECEPTACLE FOR SUMP PUMP
REFER TO I&C DRAWINGS.
CONTROL PANEL AND CHAMBER
9. FOR CONDUIT LAYOUT BETWEEN
SHALL BE 1.5m ABOVE FLOOR.
8. RECEPTACLE MOUNTING HEIGHT
REMOVABLE SLAB.
CONDUIT ON UNDERSIDE OF
7. CONTRACTOR SHALL NOT RUN
AND LIGHTING PANEL DETAILS.
I07 & I06 FOR ELECTRICAL CONDUIT
6. REFER TO TYPICAL I&C DRAWINGS
CEMENT PROTECTION BOARD.
INSULATION OR EQUAL, WITH
EXTRUDED STYROFOAM HI40
DAMAGED, PROVIDE 50mm THICK
5. WHERE EXISTING INSULATION IS
EXISTING ELECTRICAL CHAMBER.
DISCONNECTED FROM THE
4. ELECTRICAL SERVICE TO BE
FABRICATION.
CONTRACTOR PRIOR TO
TO BE FIELD VERIFIED BY THE
SS304L SPOOL PIECE DIMENSIONS
3. ALL DIMENSIONS, INCLUDING
TO CONSTRUCTION/FABRICATION.
PIPE/FLANGE CONNECTIONS PRIOR
AND TYPE OF EXISTING
MEASUREMENTS TO VERIFY SIZE
TO INVENTORY AND TAKE
2. CONTRACTOR TO ENTER CHAMBER
PUMP.
SUPPLY AND INSTALL NEW SUMP
1. REMOVE EXISTING SUMP PUMP,
ADDENDUM No.502/14/17
6
K.A.
±1000
6
6
RAT
OI
N
AL
E
ER
ENI
G
N
P
VO
R
IOFEC O
CIL
NE
OSEF OIS
S
RP
DE
N
N
K. AFZAL
100052014
Feb. 14, 2017
K.A.
OCTOBER 2015
TORONTO WATER METER REPLACEMENT AND UPGRADES
N
N.K.
C01
SITE PLAN
ARE IN METERS UNLESS OTHERWISE NOTED
MEASUREMENTS SHOWN ON THESE PLANS
METRIC
1
CHAMBER No.8 - BATHURST ST./STEELES AVE.
BA
TH
UR
ST S
T.
CIVIL
N
KEY PLANN.T.S.
BA
TH
UR
ST S
T.
STEELES AVE. W.
CORDOBA DR.
TOWNSGATE DR.
EX. C
ON
C. SID
EW
AL
K
EX. C
ON
C. SID
EW
AL
K
CRESTWOOD RD.
MAGNETIC FLOW METERMETER WITH NEW REPLACE EX. VENTURI
NOTES:
K.A.
(WTR-250-CH-003B)CHAMBER EX. METERING
EX. CURB
EX. CURB
0.83m
EX. BUS SHELTER
PROPERTY LINE (TYP.)
EX. MEDIAN
EX. PAVEMENT MARKING (TYP.)
03/02/16 ISSUED FOR ROAD CORRIDOR CONTROL APPROVAL
K.A.100% PRE-DESIGN SUBMISSION2 03/28/16
LEGEND:
REINSTATE EXISTING CURB AND GUTTER
Water
K.A.3 07/26/16 50% DESIGN SUBMISSION
SILT FENCE
RETURNED TO THE CITY YARD.
RESTORED. FRAMES AND COVER ARE TO BE SALVAGED AND
SUBGRADE. THE AFFECTED AREA TO BE COMPLETELY
GRADE AND BACKFILLED WITH UNSHRINKABLE FILL TO
2. EXISTING RECORDING CHAMBER TO BE BROKEN 1.0m BELOW
SEE NOTE 5
4 70% DESIGN SUBMISSION K.A.
16ECS-LU-03TT
N
450mm
250-04
100 A.V.
250-05
300 D.V. & MH
150mm
250-06
TAKE OFF400 G.V. VERT.
250-3C
METER
250-3B
VENTURI
250-3A
100A.V.
250-02
750 B.V. & 40 A.V.
250-03
300 D.V. & M.H.
250-01
TAKE OFF400 G.V. VERT.
232-12
750 B.V. & 150 D.V.
1200
mm M
AIN 2
50
STEELES AVE.
CRESTWOOD RD.
250-09
100 A.V. & M.H.
250-10
900 B.V. & 40 A.V.
WATERMAIN VALVESLOCATION OF EXISTING
SCALE: N.T.S.
900
mm M
AIN 2
32
VENTURI
CHAMBER 8
09/30/16
ABANDONEDEX. DUCT BANK TO BE
TREE PROTECTION FENCE
P38692EX. HP
ENGINEERING
ABANDONEDEX. 200mm WM TO BE
ARNOLD AVE.
4. REFER TO I&C DRAWINGS FOR DETAILS.
SEE NOTE 2, 3.CHAMBER TO BE ABANDONED. EX. ELECTRIC/RECORDING
EXISTING WIRING FROM CHAMBER.
SALVAGED AND RETURNED TO THE CITY YARD. PULL ALL
INSTRUMENTATION, CONTROL PANELS AND EQUIPMENT TO BE
THE EXISTING UNDERGROUND RECORDING CHAMBER. ALL
3. REMOVE ALL EXISTING ELECTRICAL AND CONTROL PANELS IN
143M-2016-1
K.A.95% DESIGN SUBMISSION5
WM ISOLATIONTO BE CLOSED FOR
WM ISOLATIONTO BE CLOSED FOR
WM ISOLATIONTO BE CLOSED FOR
9. FOR UTILITY CO-ORDINATION REFER TO DWG I02.
CONDUIT AND CABLES DURING CONSTRUCTION.
7. PROTECT ALL EXISTING UNDERGROUND DUCTWORK,
No.10
No.9
NO. NAME SPECIES(CM)DBH CONDITIONS
2.49 33.4 FAIR
(M)TPZ
11/23/16
MAPLENORWAY
PLATANOIDESACER
10MAPLE
NORWAY PLATANOIDES
ACER 37.6 FAIR 2.4
SYSTEM)(MTM COORDINATE E 309119.77N 4850121.41WTR-250-RPU-3B01TORONTO RPU PANEL
2.4
m
2.4m
MOUNTED ON POLEEX. UTILITY METER
TREE INVENTORY:
THE DRAIN PIPE. REPAIR DRAIN PIPE AS REQUIRED.
FUNCTIONING PROPERLY. CONDUCT CCTV INSPECTION OF
6. CLEAN, FLUSH AND VERIFY THAT EXISTING CHAMBER DRAIN IS
LIGHT AND STM.
THE DEPTH AND LOCATION OF EX. BELL, HYDRO, STREET
5. CONTRACTOR TO CONDUCT VACUUM TEST PIT TO CONFIRM
EX. O/H HYDRO
6 K.A.
EX. FIBER OPTIC
12/08/16
DETAIL NHFS-04 (TYP.)AS PER YORK REGION TREE PROTECTION FENCE
DETAIL NHFS-04 (TYP.)AS PER YORK REGION TREE PROTECTION FENCE
(0.3mx0.3mx1.8m)HOLE BURIED DRAINAGE ABANDON EX.
150mm DRAIN TO BE FIELD VERIFIED.
LOCATION AND DEPTH OF EX. CB. ELEVATION OF NEW
STM CB. CORE INTO EX. CB. CONTRACTOR TO CONFIRM
10. CONNECT NEW 150mm PVC DR35 CHAMBER DRAIN TO EX.
NOTE 10)2% SLOPE TO EX. CB (SEE DR35 RAISED DRAIN @ MIN. PROP. 8.0m - 150mm PVC
CONSTRUCTIONEXISTING POLE DURING PROTECT/SUPPORT
WM ISOLATIONTO BE CLOSED FOR
OF VAUGHANREGION AND CITY WITH YORK ISOLATION OF WM COORDINATE CONTRACTOR TO
WILLIAM FERNANDES, P. ENG.
Water Treatment and Supply
DIRECTOR,
ELECTRICAL ENCLOSUREPAD FOR NEW PROP. 2.1mx1.5m CONC.
ISSUED FOR PUCC REVIEW
7 12/09/16 K.A.ISSUED FOR TENDER
Z.Q.
1:100
No. DATE REVISIONS INITIAL SIGNED
DRAWING
NUMBER:
CHECK:DESIGN:
DATE:
SCALE:
DRAFTING: CONTRACT No.
JOHN P. KELLY, P. ENG.
Linear Underground Infrastructure
DIRECTOR, DESIGN & CONSTRUCTION
ENGINEERING & CONSTRUCTION SERVICES
AI35
DWG I35.
8. FOR CONCRETE ENCASE DETAILS REFER TO TYPICAL I&C
REFER TO DWG I02CONDUITNEW 1x53mm UNDERGROUND
DETAILS. REFER TO DWG I02 FOR GROUNDING ROD SYSTEM
DETAILS.FOR CONDUIT SCHEDULE TO TYPICAL I&C DWG I07 NEW DUCT BANK. REFER
K.A.
TO DWG G05.
DWG G04, FOR PERMANENT RESTORATION DETAILS REFER
AND EROSION CONTROL DETAILS AND NOTES REFER TO
1. FOR GENERAL NOTES REFER TO DWG G03, FOR SEDIMENT
FOR INSPECTION. PHONE: (905) 830-4444 EXT. 75277.
CONTACT YORK REGION NHF PRIOR TO CONSTRUCTION
NOTE: CONTRACTOR TO INSTALL TREE PROTECTION AND
REINSTATE EX. ASPHALT SPLASH PAD
ROAD SIGNEXISTING
PERMANENT CONC. SIDEWALK RESTORATION
ADDENDUM No.5
PERMANENT ASPHALT RESTORATION
PERMANENT LANDSCAPE RESTORATION
8
8
8
CONSTRUCTION SEQUENCE:
02/14/17
8
DETAILS.REFER TO SPECIAL SPECIFICATION 4A FOR TIGHTNESS AND REPAIR AND TIGHTEN ALL LEAKS. FLUSH. CONTRACTOR TO ENSURE WATER CHLORINE SOLUTION AND TORONTO WATER TO NEEDED. SWAB INTERNAL SURFACE WITH 12% IS NOT REQUIRED, ONLY LOCAL REPAIR METHOD IS SPECIFICATION TS 7.30. FULL MAIN DISINFECTION CONTRACTOR AS PER STANDARD CONSTRUCTION DISINFECTION TO BE CONDUCTED BY FIELD PRESSURE TEST NOT REQUIRED. G.
BOULEVARDS AND SODDED AREAS. PAVEMENT, SIDEWALKS, CURBS, DRIVEWAYS, ACCORDANCE WITH TS.4.60.07.04 FOR ALL PERMANENT RESTORATION REQUIRED IN F.
ULTRASONIC MEANS BY THE CONTRACTOR. ALL THE FIELD WELDINGS SHALL BE TESTED BY E.
WITHIN THE EXISTING CHAMBER.INSTALL THE NEW FLOW METER AND PIPING D.
POSITION : 250-03 DV, 250-09 AV.OF THE FOLLOWING CHAMBER BE IN THE OPEN ISOLATE NORTH OF 250-06. THE CONTROL VALVES THERE IS ALSO 450/150 VAUGHAN BRANCH TO CONNECTION: 250-10, 232-12, 250-01, 250-02, 250-06. CHAMBERS BE IN THE CLOSED POSITION DURING THE CONTROL VALVES OF THE FOLLOWING C.
THE SHUTDOWN.OPERATIONAL CIRCUMSTANCES LEADING UP TO CHANGE THESE DATES DEPENDING ON MAY 1. TORONTO WATER RESERVES THE RIGHT TO WATERMAIN IS AFTER OCTOBER 31 AND BEFORE THE TIME FOR A SHUT-DOWN OF THE EXISTING B.
[email protected]. CONTACT DEPRESSURIZE, AND DRAIN THE EXISTING COORDINATE WITH TORONTO WATER TO ISOLATE, A.
8
RESTORATION LIMITSASPHALTPERMANENT 40mm HL1
EXCAVATION LIMITSAPPROXIMATE
5.0
m
5.0
m
8
LIMITSAPPROXIMATE EXCAVATION
8
TO BE ESTABLISHED IN CBSENDIMENTATION CONTROLS EROSION AND
EXCAVATION LIMITSAPPROXIMATE
8
RAT
OI
N
AL
E
ER
ENI
G
N
P
VO
R
IOFEC O
CIL
NE
OSEF OIS
S
RP
DE
N
N
K. AFZAL
100052014
Feb. 14, 2017
EX.
GAS
EX. 1050
mm S
TM
EX. 900
mm S
TM
EX. DUCT BANK
EX. 1200
mm W
M
EX.
HY
DR
O
EX. 300
mm W
M
EX. 1200
mm W
M
EX. B
ELL
EX. B
ELL
EX. B
ELL
EX. C
B
EX. C
B
EX. LS
EX. LS
EX. C
B
EX. 200mm WM
EX.
HY
DR
O (
UN
DE
RG
RO
UN
D)
EX. B
ELL
EX. B
ELL
EX. BP
x
x
x
x
x
x
x
x
x
EX. S
L
CO
ND
UIT
EX. E
MP
TY
EX. F
O
EX. F
O
EX.
HW
+E
X.
HY
D.
EX.
O/H H
YD
RO
EX. F
O
EX. F
O
EX.
O/H H
YD
RO
GENERAL
K.A.
OCTOBER 2015
TORONTO WATER METER REPLACEMENT AND UPGRADES
N
N.K.
C02
A
A
SECTION B-B
B
B
CHAMBER No.8 - BATHURST ST./STEELES AVE.
CHAMBER DETAILS
MEASUREMENTS SHOWN ON THESE PLANS
METRIC
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
190.59m
188.06m
187.20m
1 03/28/16 100% PRE-DESIGN SUBMISSION K.A.
-
REDUCEREX. 900mm x 600mm
EX. VICTAULIC COUPLING
EX. 100mm AC CONDUITS
REDUCEREX. 900 x 600mm
EX. FRAME AND COVER
EX. FRAME AND COVER EX. PAVEMENT
SUPPORT (TYP.)REMOVE EX. CONC.
EX. REMOVABLE SLAB
MARK
No.
C6
Water
07/26/162 50% DESIGN SUBMISSION K.A.
EX. PAVEMENT
1:50
1:50
1:20
EX. AC CONDUITSABANDON/PLUG
470
C9
EX. ADJUSTMENT UNITSREMOVE AND REPLACE ALL
C6
TUBE (+ 3000)REMOVE EX. VENTURI
C9
SCH 40 REDUCER900mm x 600mm SS 304L
PLAN
SECTION A-A
EXISTING METERING CHAMBER / REMOVALS
10 4
50mm DIA. DRAIN VALVE ASSEMBLY - C79
C38
M2
C66C72
OPSD 402.030CAST IRON, RECTANGULAR FRAME AS PER
C79
C79
FLOW
FLOW
1200mmSTEEL WM REDUCED FROM EX. 900mm CONC. ENCASED
EX. REMOVABLE SLAB
C14
PLAN
PROPOSED UPGRADES
LP-3
LP-3C14
LP-5
LP-5
LP-3
3 09/30/16 70% DESIGN SUBMISSION K.A.16ECS-LU-03TT
C79 50mm DIA. DRAIN VALVE ASSEMBLY
SEE DWG S02 FOR DETAILSCONCRETE PIPE SUPPORT (TYP.)
DETAIL ON DWG S01REFER TO CONCRETE REPAIR PENETRATION WITH WALLCONCRETE AROUND PIPE REPAIR DETERIORATED
DETAIL ON DWG S01REFER TO CONCRETE REPAIR PENETRATION WITH WALLCONCRETE AROUND PIPE REPAIR DETERIORATED
ENGINEERING
C12
C44
C42
C40
SHOULDERED600mm VICTAULIC COUPLING STYLE 44
FLANGE TO FLANGE SPACER600mm NOM. DIA.SS 304L SCH 40
VICTAULIC TO FLANGE SPACER600mm NOM. DIA.SS 304L SCH 40
C44
C40 C12 C42
AND COVERREPLACE EX. FRAME
C42C12
C40
C44
C79
PIPEWELD NEW FLANGE TO EX. C9 - REMOVE EX. JOINT AND
DETAILS.TO I&C DRAWINGS FOR CONDUIT SCHEDULE INSTALL NEW ELECRICAL CONDUITS. REFER CORE DRILL INTO EX. CONC. WALL TO
TO CONTROL PANEL
4
470
4
4
NON-SHRINK GROUT ON THE EXTERIOR SIDE.PROP. LINK SEAL SIZED TO SUIT PIPES I/C
200mm DIA. PVC WALL PIECE
SUMP PUMP. SEE DWG G05 FOR DETAILSC5
C65(ALLUMINUM FRAME AND GRATING)400x400x400 DEEP SUMP
C65
1:20
C5
C65
DETAIL ON DWG S01.REFER TO TYP. SUMP PROP. SUMP PIT.
MUD SLAB75mm CONCRETE
EX. 4000x1800mm CHAMBER
GRADE IN WATER TIGHT ENCLOSURE. SINGLE RECEPTACLE (GFCI) 15A - SPECIFICATION
GRADE IN WATER TIGHT ENCLOSURE. DUPLEX RECEPTACLE (GFCI) 15A - SPECIFICATION
FIXTUREWALL- MOUNTED LIGHTING
LP-11
K.A.95% DESIGN SUBMISSION11/23/164
143M-2016-2
1270
ELECTRICAL RECEPTACLE
LIGHTING SWITCH
AFF ABOVE FINISHED FLOOR
PER OPSD 405.020STANDARD ALUMINUM LADDER AND STEPS AS
GRADE IN WATER TIGHT ENCLOSURE. LIGHTING SWITCH - 15A, 1P SPECIFICATION
C17
C68
C68
C55
C3
C3C4
C90
C3C4
C10
C92
C92
LIGHTING FIXTURECEILING MOUNTED
C3 C3
C90
C6
C55
(SEE NOTE 13)C17
C10
C90
C55
C3
C4
U/S 2400mm AFFLIGHTING FIXTURE WALL- MOUNTED
C81
C81 C81
STEEL CLIPS,FUSE PROTECTION.ACCESSORIES - WIRE GUARD, STAINLESS VOLTAGE - 120VMODEL - BS100LED-70W-WT40MANUFACTURER - BEGHELLILIGHTING FIXTURE BS-100
(SEE NOTE 13)C17
SEE DWG S02 FOR DETAILSAPPLY NEW WATERPROOFING
IN CONCRETEBY ENGINEER, PRIOR TO RE-ENCASING AROUND STEEL BEAM FOR INSPECTION REMOVE DETERIORATED CONCRETE
LEGEND:
UNKNOWN)EX. DRAIN PIPE (CONNECTION
ABANDON EX. SUMP/DRAIN
STMSLOPE TO EX. 1050mm CHAMBER DRAIN @ 2% NEW 150mm RAISED
12/09/16 ISSUED FOR TENDER K.A.5
C66
50mm STAINLESS STEEL ELBOW
THREADED BOTH ENDS125mm LONG 50mm EXTRA STRONG 304L SS
C38
C72
M2
50mm 304L SS THREADOLET, WELDED TO PIPE
TEFLON SEATS50mm THREADED SS BALL VALVE WITH
MATERIALS SUPPLIED BY CONTRACTOR
900mm DIA. STEEL FLANGE, AWWA C207 CLASS E
CS, ANSI CL 150600mm MAGNETIC FLOW METER FLANGED,
ON DWG S02LADDER. SEE DETAIL EX. ALUMINUM REMOVE & REPLACE
780
MEMBRANE.WATERPROOFING INSTALLATION OF COMPOUND PRIOR TO ASPHALTIC ROOFING SLAB TO BE CAULKED WITH REMOVABLE CONCRETE
PLATE 13mm THICKCONCRETE SUPPORT WITH STEEL
ADJUSTABLE STEEL VALVE SUPPORT
EX. SUMP AND GRATING
ENTRY POINT.
PERPENDICULAR TO WM PIPE AND FACING LOCAL
NOTE: BOTTOM DRAIN VALVE ASSEMBLY TO BE
EX. REMOVABLE SLAB
WILLIAM FERNANDES, P. ENG.
Water Treatment and Supply
DIRECTOR,
Z.Q.
AS SHOWN
No. DATE REVISIONS INITIAL SIGNED
DRAWING
NUMBER:
CHECK:DESIGN:
DATE:
SCALE:
DRAFTING: CONTRACT No.
JOHN P. KELLY, P. ENG.
Linear Underground Infrastructure
DIRECTOR, DESIGN & CONSTRUCTION
ENGINEERING & CONSTRUCTION SERVICES
I32REFER TO TYPICAL I&C DWG. FOR INSTALLATION DETAILS
DWG. I33 FOR INSTALL DETAILS. GAUGE REFER TO TYPICAL I&C PRESSURE TRANSMITTER ANDSAMPLE PORT LOCATION FOR
DETAILS. TYPICAL I&C DWG I34 FOR INSTALL FLOOD MONITORING. REFER TO FLOAT SWITCH FOR
REDUCED FROM 1200mmENCASED STEEL WM EX. 900mm CONC.
02/14/17 ADDENDUM No.5 K.A.
6
6
6
6
700
+ -
6
6
16. FOR GENERAL CHAMBER NOTES SEE DWG G03.
15. ASSUME 2m OF TOTAL CRACK INJECTION.
14. ASSUME 5m OF TOTAL CONCRETE REPAIRS.
13. LOCATE NEAR LADDER AT LOCAL ENTRY POINT.
12. PROVIDE ALL EXPOSED CONDUIT.
DEMOLITION WORKS.
11. REFER TO I&C DRAWINGS FOR ADDITIONAL
RATING WITH SUMP PUMP SUPPLIER.
10. RECEPTACLE FOR SUMP PUMP CO-ORDINATE
PANEL AND CHAMBER REFER TO DRAWING C01.
9. FOR CONDUIT LAYOUT BETWEEN CONTROL
UNDERSIDE OF REMOVABLE SLAB.
8. CONTRACTOR SHALL NOT RUN CONDUIT ON THE
ABOVE FLOOR.
7. RECEPTACLE MOUNTING HEIGHT SHALL BE 1.5m
STM.
OF SUMP AND DRAIN PIPE CONNECTION TO EX.
6. CONTRACTOR TO FIELD VERIFY THE LOCATION
DETAILS.
ELECTRICAL CONDUIT AND LIGHTING PANEL
5. REFER TO TYPICAL I&C DRAWINGS I07 & I06 FOR
PROTECTION BOARD.
HI40 INSULATION OR EQUAL, WITH CEMENT
PROVIDE 50mm THICK EXTRUDED STYROFOAM
4. WHERE EXISTING INSULATION IS DAMAGED,
FROM THE EXISTING ELECTRICAL CHAMBER.
3. ELECTRICAL SERVICE TO BE DISCONNECTED
THE CONTRACTOR PRIOR TO FABRICATION.
PIECE DIMENSIONS TO BE FIELD VERIFIED BY
2. ALL DIMENSIONS, INCLUDING SS304L SPOOL
CONSTRUCTION/FABRICATION.
PIPE/FLANGE CONNECTIONS PRIOR TO
VERIFY SIZE AND TYPE OF EXISTING
INVENTORY AND TAKE MEASUREMENTS TO
1. CONTRACTOR TO ENTER CHAMBER TO
2
NOTES:
6
STRUCTURAL NOTES:
PROVINCE OF ONTARIO.
BY PROFESSIONAL ENGINEER LICENSED IN THE
3. PROVIDE SHOP DRAWING FOR REVIEW SEALED
OF STEEL BEAM.
ALL REQUIRED SHORING DURING REPLACEMENT
2. CONTRACTOR TO DESIGN, SUPPLY AND INSTALL
W250x45 STEEL BEAM.
WITH 1.5M OF 1500mm CONCRETE ENCASED
CONCRETE AROUND STEEL BEAM AND REPLACE
1. REMOVE STEEL BEAM AND DETERIORATED
CHAMBER # 8
RAT
OI
N
AL
E
ER
ENI
G
N
P
VO
R
IOFEC O
CIL
NE
OSEF OIS
S
RP
DE
N
N
K. AFZAL
100052014
Feb. 14, 2017
T
EX. GAS
xx xxx xxx x
+
RAT
OI
N
AL
E
ER
ENI
G
N
P
VO
R
IOFEC O
CIL
NE
OSEF OIS
S
RP
DE
N
N
K. AFZAL
100052014
Feb. 14, 2017
K.A.
OCTOBER 2015
TORONTO WATER METER REPLACEMENT AND UPGRADES
N.K.
ARE IN METERS UNLESS OTHERWISE NOTED
MEASUREMENTS SHOWN ON THESE PLANS
METRIC
1
CHAMBER No.8 - BATHURST ST./STEELES AVE.
N
KEY PLANN.T.S.
BA
TH
UR
ST S
T.
STEELES AVE. W.
CORDOBA DR.
TOWNSGATE DR.
CRESTWOOD RD.
K.A.
ST
EE
LE
S A
VE. W
TRAFFIC CONTROL
Water
07/26/16 50% DESIGN SUBMISSION
LEGEND:
NBATHURST ST.
NOTES:
1. FOR GENERAL AND TRAFFIC NOTES REFER TO DWG G03.
SEE I&C DWG'S FOR DETAILSPROP. TORONTO RPU PANEL.
TM01
16ECS-LU-03TT2 70% DESIGN SUBMISSION K.A.09/30/16
ENGINEERING
TRAFFIC PATTERN DURING CONSTRUCTION
TRAFFIC PATTERN PRIOR TO CONSTRUCTION
3 10/19/16 SUBMISSION TO YORK REGION TRAFFIC GROUP K.A.
3.2
5m
(TY
P.)
MIN.
TEMPORARY PAVEMENT MARKING
EXISTING PAVEMENT MARKING
NOTE:
THROUGH CONSTRUCTION ZONEREDUCE SPEED TO 50km/h
REINSTATEMENT OF THE BUS STOP.COORDINATE WITH YORK REGION TRANSIT TO ARRANGE SIGN AND TEMPORARY RELOCATION OF THE BUS STOP. NOTICE TO ARRANGE FOR REMOVAL OF THE BUS STOP
2. PROVIDE YORK REGION TRANSIT A MINIMUM OF 2 WEEKS
K.A.4
143M-2016-3
CONSTRUCTIO
NT
C-1
TC-2
B
TC-3
L
TC-4
R
TRAFFIC MANAGEMENT PLAN - STAGE 1
TAPER
20m 40m 40m 40m 40m
TAPER TAPER
90m 90m 90m
Rb-4
1Rb-4
7Rb-4
4
TC-1
2R
DETAILSSEE DWG C02 FOR CHAMBER.EXISTING METERING
WIDENINGACCOMMODATE ROAD CURB TO SAW CUT 95.0m OF EX.
TC-3
L
8m
TYP.
WORK AREA
11/16/16
TEMPORARY CONDITIONS/REGULATORY SIGN
BUFFER BUFFER
SIGNAGE ADDED
NTS NTS NTS
5 12/09/16 ISSUED FOR TENDER K.A.
Z.Q.
N.T.S.
No. DATE REVISIONS INITIAL SIGNED
DRAWING
NUMBER:
CHECK:DESIGN:
DATE:
SCALE:
DRAFTING: CONTRACT No.
JOHN P. KELLY, P. ENG.
Linear Underground Infrastructure
DIRECTOR, DESIGN & CONSTRUCTION
ENGINEERING & CONSTRUCTION SERVICES
WILLIAM FERNANDES, P. ENG.
Water Treatment and Supply
DIRECTOR,
COMPLETIONWIDENING. REMOVE UPON 1.0m TEMPORARY ROAD
TC - 54 DRUM BARELL
REMOVE UPON COMPLETION
TEMPORARY ROAD WIDENING AS REQUIRED.
ADDENDUM No.56 02/14/17 K.A.
TEMP. PAVEMENT MARKING
6
K.A.
OCTOBER 2015
TORONTO WATER METER REPLACEMENT AND UPGRADES
N
N.K.
C01
SITE PLAN
ARE IN METERS UNLESS OTHERWISE NOTED
MEASUREMENTS SHOWN ON THESE PLANS
METRIC
1
PROPERTY LINE (TYP.)
CHAMBER No.10 - THORNHILL PUMPING STATION
EX. SID
EW
AL
K
EX. SID
EW
AL
K
N
THORNHILL PS
KEY PLANN.T.S.
CIVIL
JOHN ST.
GREEN LN.
BA
YVIE
W A
VE.
BAYWOOD CT.
STATIONTHORNHILL PUMPING
EX. CURB
EX. CURB
EX. CURB
BL
VD.
RO
YA
L O
RC
HA
RD
BA
YVIE
W
AV
E.
100% PRE-DESIGN SUBMISSION K.A.
NOTES:
03/24/16
LEGEND:
Water
50% DESIGN SUBMISSION K.A.
1 GREEN LANE
07/26/16
SILT FENCE
EX. PARKING LOT
TREE PROTECTION FENCE
AND GUTTER/BARRIER CURB
REINSTATE EXISTING CURB
16ECS-LU-03TT3 70% DESIGN SUBMISSION K.A.
2
CONSTRUCTION SEQUENCE:
THORNHILL PS
N
28P-02
900 B.V. & 100 A.V.
28P-01
VENTURI
275-01
300 D.V. & M.H.
274-09
300 D.V. & M.H.282-14
600 G.V.
282-15
282-16
1050 B.V. & 50 A.V.
OPEN FOR FCL S/D
1050
mm M
AIN 2
75
MAIN 275
BA
YVIE
W A
VE.
GREEN LN.
JOHN ST.
MARKING (TYP.)EX. PAVEMENT
SCALE: N.T.S.
09/28/16
ENGINEERING
OUTLET. SEE NOTE 3.EX. CHAMBER DRAIN
298-01
100 A.V.1050 B.V. &
MAIN 298 1350mm
PAC ENCLOSURECONCRETE PAD FOR NEW 1.2x1.5m
2. REFER TO I&C DRAWINGS FOR DETAILS.
28P-2016-1
K.A.95% DESIGN SUBMISSION4
CONDUIT AND CABLES DURING CONSTRUCTION.
4. PROTECT ALL EXISTING UNDERGROUND DUCTWORK,
THE DRAIN PIPE. REPAIR DRAIN PIPE AS REQUIRED.
IS FUNCTIONING PROPERLY. CONDUCT CCTV INSPECTION OF
3. CLEAN, FLUSH AND VERIFY THAT EXISTING CHAMBER DRAIN
M.H.100 A.V. &
3.0m
2.4
m
NO. NAME SPECIES(CM)DBH CONDITIONS
2.434 34.1 POOR
(M)TPZ
NOTE
35 35.0 GOOD 2.4
36 CHERRY 29.9 GOOD 2.4 WORK IN TPZ
37 CHERRY 24.5 FAIR 1.8 WORK IN TPZ
38 BEECH 30.2 FAIR 2.4
39 42.7 FAIR 3.0
PRUNUS
SACCHARINUMACER
SACCHARINUMACER
SACCHARINUMACER
GRANDIFOLIAFAGUS
PRUNUS
2.4m
1.8m
No.39
No.37
No.38
No.36
11/23/16
MAPLESILVER
MAPLESILVER
MAPLESILVER
TREE INVENTORY:
No.35
No.34
DUCTSEX. AC
750mm REDUCEREX. 900mm TO
DRAINPROTECT EX.
5 K.A.
WATERMAIN VALVESLOCATION OF EXISTING PD6
PHONE: (905) 830-4444 EXT. 75277.
YORK REGION NHF PRIOR TO CONSTRUCTION FOR INSPECTION.
NOTE: CONTRACTOR TO INSTALL TREE PROTECTION AND CONTACT
WM ISOLATIONTO BE CLOSED FOR
WM ISOLATIONTO BE CLOSED FOR
WM ISOLATIONTO BE CLOSED FOR
ISOLATIONFOR WM TO BE CLOSED
WILLIAM FERNANDES, P. ENG.
Water Treatment and Supply
DIRECTOR, 12/08/16 ISSUED FOR PUCC REVIEW
6 12/09/16 K.A.ISSUED FOR TENDER
Z.Q.
1:100
No. DATE REVISIONS INITIAL SIGNED
DRAWING
NUMBER:
CHECK:DESIGN:
DATE:
SCALE:
DRAFTING: CONTRACT No.
JOHN P. KELLY, P. ENG.
Linear Underground Infrastructure
DIRECTOR, DESIGN & CONSTRUCTION
ENGINEERING & CONSTRUCTION SERVICES
BI35
BE REMOVED.METER SENSING PIPES SHALL DETAILS. ALL VENTURI FLOW METER. SEE DWG C02 FOR WITH NEW MAGNETIC FLOW REPLACE EX. VENTURI TUBE
SCHEDULE DETAILS.REFER TO I&C DWG. I04 FOR CONDUIT NEW 8x53mm UNDERGROUND CONDUIT
(TYP.)DETAIL NHFS-04 YORK REGION FENCE AS PER TREE PROTECTION
(UTM COORDINATE SYSTEM)N 4853215.22E 628567.82TPTH1 CP01YORK REGIONNEW PAC PANEL
FOR PERMANENT RESTORATION DETAILS REFER TO DWG G05.
EROSION CONTROL DETAILS AND NOTES REFER TO DWG G04,
1. FOR GENERAL NOTES REFER TO DWG G03, FOR SEDIMENT AND
5. FOR DIRECT BURIED DUCT DETAILS REFER TO TYPICAL I&C DWG I35.
K.A.
METER CHAMBEREX. VENTURI FLOW
RESTORATION
PERMANENT CONC. SIDEWALK
ADDENDUM No.5
RESTORATION
PERMANENT LANDSCAPE
7
7 02/14/17
REFER TO SPECIAL SPECIFICATION 4A FOR DETAILS.CONTRACTOR TO ENSURE WATER TIGHTNESS AND REPAIR AND TIGHTEN ALL LEAKS. INTERNAL SURFACE WITH 12% CHLORINE SOLUTION AND TORONTO WATER TO FLUSH. DISINFECTION IS NOT REQUIRED, ONLY LOCAL REPAIR METHOD IS NEEDED. SWAB CONTRACTOR AS PER STANDARD CONSTRUCTION SPECIFICATION TS 7.30. FULL MAIN FIELD PRESSURE TEST NOT REQUIRED. DISINFECTION TO BE CONDUCTED BY G.
PAVEMENT, SIDEWALKS, CURBS, DRIVEWAYS, BOULEVARDS, AND SODDED AREAS. PERMANENT RESTORATION REQUIRED IN ACCORDANCE WITH TS.4.60.07.04 FOR ALL F.
CONTRACTOR. ALL THE FIELD WELDINGS SHALL BE TESTED BY ULTRASONIC MEANS BY THE E.
INSTALL THE NEW FLOW METER AND PIPING WITHIN THE EXISTING CHAMBER.D.
DURING CONNECTION: 28P-02, 282-14, 282-16, 298-01. OPEN DRAIN IN 275-01.THE CONTROL VALVES OF THE FOLLOWING CHAMBERS BE IN THE CLOSED POSITION C.
SHUTDOWN.DATES DEPENDING ON OPERATIONAL CIRCUMSTANCES LEADING UP TO THE AND BEFORE MAY 1. TORONTO WATER RESERVES THE RIGHT TO CHANGE THESE THE TIME FOR A SHUT-DOWN OF THE EXISTING WATERMAIN IS AFTER OCTOBER 31 B.
EXISTING WATERMAIN. CONTACT [email protected] WITH TORONTO WATER TO ISOLATE, DEPRESSURIZE, AND DRAIN THE A.
EXCAVATION LIMITSAPPROXIMATE
7
7
7
NPS 6 S
C IP
EX. B
ELL
EX. B
ELL
EX.
WM
EX.
WM
EX. B
ELL P
ED
EX.
HY
D.
EX. C
B
EX. 250mm STM
EX. HP
EX. 1800
mm M
ET
RO W
M
EX. 400
mm C
P S
TM
EX. 900
mm W
M
EX. 900
mm W
MEX. S
TR
EX. B
MH
EX. R
W
EX. R
W
EX.
WM
EX.
GAS
EX.
HY
DR
O (
UN
DE
RG
RO
UN
D)
EX. OVERHEAD WIRES
EX.
OV
ER
HE
AD W
IRES
EX. 150mm VC DRAIN
EX. 150
mm V
C D
RAIN
EX. 150
mm V
C D
RAIN
EX. VC #2
EX. SL
EX. C
OM
+
RAT
OI
N
AL
E
ER
ENI
G
N
P
VO
R
IOFEC O
CIL
NE
OSEF OIS
S
RP
DE
N
N
K. AFZAL
100052014
Feb. 14, 2017
K.A.
OCTOBER 2015
TORONTO WATER METER REPLACEMENT AND UPGRADES
N
N.K.
C01
SITE PLAN
ARE IN METERS UNLESS OTHERWISE NOTED
MEASUREMENTS SHOWN ON THESE PLANS
METRIC
1
CHAMBER No.11 - KEELE ST./STEELES AVE.
KEY PLANN.T.S.
NOTE:
N
CIVIL
KE
ELE S
T.
HWY 407
KE
ELE S
T.
SNIDERCROFT RD.
STEELES AVE. W.
STEELES AVE. W.
EX. C
ON
C. SID
EW
AL
K
EX. PAVEMENT MARKING (TYP.)
K.A.
EX. MEDIAN
EX. CURB
EX. CURB
03/02/16
(MTM COORDINATE SYSTEM)E 305249.91N 4848885.25WTR-194-RPU-0701TORONTO RPU PANEL
MAGNETIC FLOW METERFLOW METER WITH NEW REPLACE EX. MAGNETIC
ISSUED FOR ROAD CORRIDOR CONTROL APPROVAL
FU
TU
RE SID
EW
AL
K
15.40m
K.A.100% PRE-DESIGN SUBMISSION2 03/28/16
LEGEND:
ENCLOSURE ELECTRICAL PAD FOR NEW NEW 2.1x1.5m CONC.
STEELE AVE. W.2200
(WTR-194-CH-0007)CHAMBER EX. METERING
Water
3 50% DESIGN SUBMISSION K.A.07/26/16
SILT FENCE
16ECS-LU-03TT
4 70% DESIGN SUBMISSION K.A.
BE REMOVEDEX. CONDUIT TO
THE DRAIN PIPE. REPAIR DRAIN PIPE AS REQUIRED.
FUNCTIONING PROPERLY. CONDUCT CCTV INSPECTION OF
4. CLEAN, FLUSH AND VERIFY THAT EXISTING CHAMBER DRAIN IS
CONSTRUCTION.
3. PROTECT AND SUPPORT EXISTING UTILITIES DURING
193-02
2x 1050 B.V.
317-07900 B.V. ,50 A.V.
& 100 D.V.
300 D.V. & M.H.
317-06
317-05
50 A.V.
317-04
VENTURI
317-03
50 A.V. & M.H.
363-17
2-50 A.V.
1350 B.V. &
RES
194-03
194-02
194-01
400 GV
600 BV
400 G.V.
W.M.400mm ACM
600 B.V. &100 A.V.
450
mm
DIP
YO
RK R
EGIO
N
M.H.
317-08
900
mm
CP
PY
OR
K R
EGIO
N
N
METERMAG
317-3A
194-05
194-06
317-09
KE
ELE S
T.
P.S.RESERVOIR & KEELE
09/28/16
SCALE: N.T.S.
ENGINEERING
2. REFER TO I&C DRAWINGS FOR DETAILS.
12.0
m
WIDENNING
FUTURE ROAD
(BY OTHERS)PROP. ROGERS
0.6m
PROPERTY LINE
CONDUIT. REFER TO DWG. I02NEW 1x53mm UNDERGROUND
DWG. I02SYSTEM REFER TO GROUNDING ROD
K.A.95% DESIGN SUBMISSION5
84M-2016-1
ISOLATIONFOR WM TO BE CLOSED
ISOLATIONFOR WM TO BE CLOSED
50 A.V.400 G.V. &
CONDUIT AND CABLES DURING CONSTRUCTION.
6. PROTECT ALL EXISTING UNDERGROUND DUCTWORK,
CONDUIT MINIMUM 600mm.
5. PROVIDE VERTICAL SEPARATION BETWEEN GAS LINE AND
CONSTRUCTIONPOLE DURING PROTECT EXISTING
11/23/16
CONSTRUCTIONCABLES DURING PROTECT EX.
PLANTERREINSTATE EXISITING
6 K.A.
2.4m
±
SHELTEREX. BUS
MAINS. SEE NOTE 9.EX. 650/750mm GAS
EX. CB
REPLACE EX. CURB
REMOVE EX. CONCRETE PAD.REMOVED AND SALVAGED. EX. CONTROL PANEL TO BE
CORE INTO EX. CB
EX. NPS 30 XHP GAS
LOCATION OF EXISTING PD6 WATERMAIN VALVES
EX. CBDRAIN @ MIN. 2% SLOPE TO PROP. 33.0m - 150mm DR35
WILLIAM FERNANDES, P. ENG.
Water Treatment and Supply
DIRECTOR,
ISSUED FOR PUCC REVIEW12/08/16
K.A.
12/09/167 ISSUED FOR TENDER
Z.Q.
1:100
No. DATE REVISIONS INITIAL SIGNED
DRAWING
NUMBER:
CHECK:DESIGN:
DATE:
SCALE:
DRAFTING: CONTRACT No.
JOHN P. KELLY, P. ENG.
Linear Underground Infrastructure
DIRECTOR, DESIGN & CONSTRUCTION
ENGINEERING & CONSTRUCTION SERVICES
BI35
(NOTE 5)DETAILS. FOR CONDUIT SCHEDULE REFER TO TYPICAL I&C I07 UNDERGROUND CONDUIT. NEW 8x53mm
DWG I35.
7. FOR DIRECT BURIED DUCT DETAILS REFER TO TYPICAL I&C
THAT ARE ATTACHED TO THE CONTRACT DOCUMENT.
ADHERE TO THE REQUIREMENTS AS DETAILED BY ENBRIDGE ,
9. ALL WORKS WITHIN THE VICINITY OF EX. GAS PIPELINE MUST
8. FOR UTILITY CO-ORDINATION REFER TO DWG I02.
TO DWG G05.
DWG G04, FOR PERMANENT RESTORATION DETAILS REFER
AND EROSION CONTROL DETAILS AND NOTES REFER TO
1. FOR GENERAL NOTES REFER TO DWG G03, FOR SEDIMENT
ADDENDUM No.502/14/17
K.A.
PERMANENT CONC. SIDEWALK RESTORATION
CONSTRUCTION SEQUENCE:
PERMANENT LANDSCAPE RESTORATION
8
8
SPECIFICATION 4A FOR DETAILS.REPAIR AND TIGHTEN ALL LEAKS. REFER TO SPECIAL CONTRACTOR TO ENSURE WATER TIGHTNESS AND CHLORINE SOLUTION AND TORONTO WATER TO FLUSH. METHOD IS NEEDED. SWAB INTERNAL SURFACE WITH 12% DISINFECTION IS NOT REQUIRED, ONLY LOCAL REPAIR CONSTRUCTION SPECIFICATION TS 7.30. FULL MAIN BE CONDUCTED BY CONTRACTOR AS PER STANDARD FIELD PRESSURE TEST NOT REQUIRED. DISINFECTION TO G.
CURBS, DRIVEWAYS, BOULEVARDS AND SODDED AREAS. WITH TS.4.60.07.04 FOR ALL PAVEMENT, SIDEWALKS, PERMANENT RESTORATION REQUIRED IN ACCORDANCE F.
ULTRASONIC MEANS BY THE CONTRACTOR. ALL THE FIELD WELDINGS SHALL BE TESTED BY E.
EXISTING CHAMBER.INSTALL THE NEW FLOW METER AND PIPING WITHIN THE D.
NORTH.317-09, 194-06 AND ONE VAUGHAN/YORK 450mm VALVE TO BE IN THE CLOSED POSITION DURING CONNECTION: THE CONTROL VALVES OF THE FOLLOWING CHAMBERS C.
CIRCUMSTANCES LEADING UP TO THE SHUTDOWN.THESE DATES DEPENDING ON OPERATIONAL TORONTO WATER RESERVES THE RIGHT TO CHANGE WATERMAIN IS AFTER OCTOBER 31 AND BEFORE MAY 1. THE TIME FOR A SHUT-DOWN OF THE EXISTING B.
CONTACT [email protected], AND DRAIN THE EXISTING WATERMAIN. COORDINATE WITH TORONTO WATER TO ISOLATE, A.
8
EXCAVATION LIMITSAPPROXIMATE
8
REINSTATE EXISTING CURB AND GUTTER
8
EX.
GAS
EX. FIB
RE O
PTIC
EX. C
AB
LE
EX. HYDRO DUCT
EX. 450mm CI WM
EX. 450
mm DI
WM
EX. 400
mm DI
WM
EX. 1
050
mm CI W
M
EX. TS
EX. TS
EX. TS
EX. LS
EX. TS
+
EX. HH
EX. HH
EX. HH
EX. HH
EX. HH
EX. HH
EX. 400mm WMEX. HW
EX. BELL
EX. HH
EX. HYD.
EX. BP
EX. HW
EX. N
PS 2
6 X
HP G
AS
EX. V
EX. V
EX. HW
EX. MW
EX. FIBRE OPTIC
P40123EX. HP
GT-H
H
EX. F
O C
OM
MU
NIC
ATIO
N C
ABLE
EX. C
OM
MU
NIC
ATIO
N C
ABLE
EX. T
ELU
S
EX. H
YD
RO
EX. HYDRO
EX. T
ELU
S
EX. N
PS 3
0 X
HP G
AS (
BY O
TH
ER
S)
RAT
OI
N
AL
E
ER
ENI
G
N
P
VO
R
IOFEC O
CIL
NE
OSEF OIS
S
RP
DE
N
N
K. AFZAL
100052014
Feb. 14, 2017
K.A.
OCTOBER 2015
TORONTO WATER METER REPLACEMENT AND UPGRADES
N
N.K.
C02
A
A
CHAMBER DETAILS
CHAMBER No.11 - KEELE ST./STEELES AVE.
EX. 400mm SS WM
EX. REMOVABLE SLAB
EX. FRAME AND COVER
EX. GROUND
EX. REMOVABLE SLAB
CIVIL
MEASUREMENTS SHOWN ON THESE PLANS
METRIC
ARE IN MILLIMETERS UNLESS OTHERWISE NOTED
REMOVE EX. CONC. SUPPORT
03/28/16 100% PRE-DESIGN SUBMISSION1 K.A.
EX. VICTAULIC COUPLING
NOTES:
GALVANIZED CONDUITSEX. 2-25mm DIA.
EX. 2300mmx2300mm CHAMBER
MARK
No.
C6
Water
07/26/162 K.A.50% DESIGN SUBMISSION
SECTION B-B
B
B
EX. GROUND
3300
1:50
1:50
1:20
1:20
C9
EX. ADJUSTMENT UNITSREMOVE AND REPLACE ALL
EX. DRAIN VALVE
PLAN
EXISTING METERING CHAMBER / REMOVALS
SECTION A-A
104
C66
50mm STAINLESS STEEL ELBOW
THREADED BOTH ENDS125mm LONG 50mm EXTRA STRONG 304L SS
C38
M2
C66C72
C38
C72
M2
C6
C79
C79
METEREX. MAGNETIC FLOW
REMOVE EX. PIPING
POWER CABLESEX. 50mm DIA. CONDUIT
EX. MOISTURE TRAP BOX
+209.22m -+
+- 206.52m
205.92m -+
-+
REDUCED FROM 450 mm WMEX. 400mm SS WM
FLOW
FLOW
PLAN
PROPOSED UPGRADES
FLOW
LP-3C3
C3
16ECS-LU-03TT3 09/30/16 70% DESIGN SUBMISSION K.A.
REMOVE EXISTING VENTURI TUBE
(1100)+-
TO CONTROL PANEL
C3
C4
C79 50mm DRAIN VALVE ASSEMBLY
REPAIR DETAIL ON DWG S01REFER TO CONCRETE CONCRETE ON WALLREPAIR DETERIORATED
ENGINEERING
REPLACE EX. FRAME AND COVER
C44
C40
C9
SHOULDERED400mm VICTAULIC COUPLING STYLE 44
VICTAULIC TO FLANGE SPACER400mm NOM. DIA. SS 304L SCH 40
401.020CAST IRON, CIRCULAR FRAME AS PER OPSD
C12C40
C44
REDUCED TO 400 mm WMEX. 450mm SS WM
150
C9
C12
C40
C44
EXISTING PIPEWELD NEW FLANGE ONTO REMOVE EXISTING FLANGE AND
CONDUIT SCHEDULE DETAILS.REFER TO I&C DRAWINGS FOR INSTALL NEW ELECRICAL CONDUITS. CORE DRILL INTO EX. CONC. WALL TO
COVERREPLACE EX. FRAME AND
600
DETAIL ON DWG S01.REFER TO TYP. SUMP PROP. SUMP PIT.
MUD SLAB75mm CONCRETE
200mm DIA. PVC WALL PIECE
NON-SHRINK GROUT ON THE EXTERIOR SIDE.PROP. LINK SEAL SIZED TO SUIT PIPES I/C
C82
C10
C10
GRADE IN WATER TIGHT ENCLOSURE. DUPLEX RECEPTACLE (GFCI) 15A - SPECIFICATION
GRADE IN WATER TIGHT ENCLOSURE. SINGLE RECEPTACLE (GFCI) 15A - SPECIFICATION
LP-5C4
LP-3
C3
C82
K.A.95% DESIGN SUBMISSION11/23/164
84M-2016-2
LP-11C14
C14
C55C55
C55
C6
C5
C65
(ALLUMINUM FRAME AND GRATING)400x400x400 DEEP SUMP
C65
SUMP PUMP. SEE DWG S01 FOR DETAILSC5
PER OPSD 405.020STANDARD ALUMINUM LADDER AND STEPS AS
GRADE IN WATER TIGHT ENCLOSURE. LIGHTING SWITCH - 15A, 1P SPECIFICATION C17
C68
ELECTRICAL RECEPTACLE
LIGHTING SWITCH
AFF ABOVE FINISHED FLOOR
C17 (SEE NOTE 12)
(SEE NOTE 12)C17
LIGHTING FIXTURECEILING MOUNTED
U/S 1900mm AFFLIGHTING FIXTURE
WALL-MOUNTED C68
C81 C81
C81
PROTECTION.STAINLESS STEEL CLIPS,FUSE ACCESSORIES - WIRE GUARD, VOLTAGE - 120VMODEL - BS100LED-70W-WT40MANUFACTURER - BEGHELLILIGHTING FIXTURE BS-100
REFER TO DETAILS ON DWG S01PENETRATION WITH WALLREPAIR CONCRETE AROUND CONDUIT
DWG S02REFER TO DETAIL ON REPLACE EX. LADDER
SEE DWG SO2 FOR DETAILS.APPLY NEW WATERPROOFING
LEGEND:
T-1102.01-6.FRAME AND GRATING PER CoT STD. EX. MOISTURE TRAP BOX. REPLACE EX.
12/09/16 ISSUED FOR TENDER K.A.5
50mm 304L SS THREADOLET, WELDED TO PIPE
TEFLON SEATS50mm THREADED SS BALL VALVE WITH
C12
MATERIALS SUPPLIED BY CONTRACTOR
VALVE ASSEMBLY - C79 50mm DIA. DRAIN
MEMBRANE.WATERPROOFING INSTALLATION OF COMPOUND PRIOR TO ASPHALTIC ROOFING SLAB TO BE CAULKED WITH REMOVABLE CONCRETE
CS, ANSI CL 150400mm MAGNETIC FLOW METER FLANGED,
EX. REMOVABLE SLAB
4
485
2
DETAILS)CB (SEE SITE PLAN FOR @ MIN. 2% SLOPE TO EX. NEW 150mm DR35 DRAIN
ADJUSTABLE STEEL VALVE SUPPORT
PLATE 13mm THICKCONCRETE SUPPORT WITH STEEL
15. FOR GENERAL CHAMBER NOTES SEE DWG G03.
14. ASSUME 2m OF TOTAL CRACK INJECTION.
13. ASSUME 5m OF TOTAL CONCRETE REPAIRS.
12. LOCATION NEAR LADDER AT LOCAL ENTRY POINT.
11. PROVIDE ALL EXPOSED CONDUIT.
400mm DIA. STEEL FLANGE, ANSI CL150
ENTRY POINT.
PERPENDICULAR TO WM PIPE AND FACING LOCAL
NOTE: BOTTOM DRAIN VALVE ASSEMBLY TO BE
WILLIAM FERNANDES, P. ENG.
Water Treatment and Supply
DIRECTOR,
Z.Q.
AS SHOWN
No. DATE REVISIONS INITIAL SIGNED
DRAWING
NUMBER:
CHECK:DESIGN:
DATE:
SCALE:
DRAFTING: CONTRACT No.
JOHN P. KELLY, P. ENG.
Linear Underground Infrastructure
DIRECTOR, DESIGN & CONSTRUCTION
ENGINEERING & CONSTRUCTION SERVICES
DETAILS.TYPICAL I&C DWG. I33 FOR INSTALL TRANSMITTER AND GAUGE. REFER TO SAMPLE PORT LOCATION FOR PRESSURE
DRAWING I32REFER TO TYPICAL I&C FOR INSTALLATION DETAILS
DETAILS. DWG. I34 FOR INSTALL
REFER TO TYPICAL I&C FLOOD MONITORING
FLOAT SWITCH FOR
WORKS.
10. REFER TO I&C DRAWINGS FOR ADDITIONAL DEMOLITION
SUMP PUMP SUPPLIER.
9. RECEPTACLE FOR SUMP PUMP CO-ORDINATE RATING WITH
CHAMBER REFER TO DRAWING C01.
8. FOR CONDUIT LAYOUT BETWEEN CONTROL PANEL AND
FLOOR.
7. RECEPTACLE MOUNTING HEIGHT SHALL BE 1.5m ABOVE
UNDERSIDE OF THE REMOVABLE SLAB.
6. CONTRACTOR SHALL NOT RUN CONDUIT ON THE
ELECTRICAL CONDUIT AND LIGHTING PANEL DETAILS.
5. REFER TO TYPICAL I&C DRAWINGS I07 & I06 FOR
WITH CEMENT PROTECTION BOARD.
THICK EXTRUDED STYROFOAM HI40 INSULATION OR EQUAL,
4. WHERE EXISTING INSULATION IS DAMAGED, PROVIDE 50mm
EXISTING CONTROL PANEL.
3. ELECTRICAL SERVICE TO BE DISCONNECTED FROM THE
FABRICATION.
TO BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO
2. ALL DIMENSIONS, INCLUDING SS304L SPACER DIMENSIONS
CONSTRUCTION/FABRICATION.
EXISTING PIPE/FLANGE CONNECTIONS PRIOR TO
TAKE MEASUREMENTS TO VERIFY SIZE AND TYPE OF
1. CONTRACTOR TO ENTER CHAMBER TO INVENTORY AND
6 02/14/17 ADDENDUM No.5 K.A.
6
RAT
OI
N
AL
E
ER
ENI
G
N
P
VO
R
IOFEC O
CIL
NE
OSEF OIS
S
RP
DE
N
N
K. AFZAL
100052014
Feb. 14, 2017
K.A.
OCTOBER 2015
TORONTO WATER METER REPLACEMENT AND UPGRADES
N
N.K.
C01
SITE PLAN
ARE IN METERS UNLESS OTHERWISE NOTED
MEASUREMENTS SHOWN ON THESE PLANS
METRIC
1
KEY PLANN.T.S.
N
CIVIL
STEELES AVE. E.
CHAMBER No.14 - McCOWAN RD./STEELES AVE.
McC
OW
AN R
D.
STEELES AVE. E.
WO
OD
HA
LL R
D.
CH
AR
LES A
LF
RE
D C
R.
CHAMBER (TYP.)EX. WATER
SHELTEREX. BUS
LINE (TYP.)PROPERTY
EX. C
ON
C. SID
EW
AL
K
EX. GAS STATION
STATIONEX. SAMPLING
NOTES:
(WTR-316-CH-0006)EX. METERING CHAMBER
EX. MEDIAN
EX. CURB
EX. CURB
EX. PAVEMENT MARKING (TYP.)
McC
OW
AN R
D.
K.A.
0.90
m
6.4
0m
03/02/16 ISSUED FOR ROAD CORRIDOR CONTROL APPROVAL
(MTM COORDINATE SYSTEM)E 322849.40
N 4854334.15WTR-316-RPU-0601
TORONTO RPU PANEL
K.A.100% PRE-DESIGN SUBMISSION2
NEW ELECTRICAL ENCLOSURENEW 2.1mx1.5m CONC. PAD FOR
03/28/16
LEGEND:
THE CITY YARD.
AND EQUIPMENT TO BE SALVAGED AND RETURNED TO
CHAMBER. ALL INSTRUMENTATION, CONTROL PANELS
PANELS IN THE EXISTING UNDERGROUND RECORDING
4. REMOVE ALL EXISTING ELECTRICAL AND CONTROL
Water
3 50% DESIGN SUBMISSION K.A.
RETURNED TO THE CITY YARD.
RESTORED. FRAMES AND COVER ARE TO BE SALVAGED AND
SUBGRADE. THE AFFECTED AREA TO BE COMPLETELY
GRADE AND BACKFILLED WITH UNSHRINKABLE FILL TO
2. EXISTING RECORDING CHAMBER TO BE BROKEN 1.0m BELOW
07/26/16
SILT FENCE
0.30
m
DRAINAGE PITEX. GRAVEL (2.4mx2.4mx1.8m)
16ECS-LU-03TT
4 70% DESIGN SUBMISSION K.A.
CONDUIT MINIMUM 600mm.
6. PROVIDE VERTICAL SEPARATION BETWEEN GAS LINE AND
ENGINEERING
09/30/16
3. REFER TO I&C DRAWINGS FOR DETAILS.
K.A.95% DESIGN SUBMISSION5
224M-2016-1
9. FOR UTILITY CO-ORDINATION REFER TO DWG I02.
POLE DURING CONSTRUCTION. ENCLOSURE. PROTECT EX.
EX. CHAMBER POWER METER
CONDUIT AND CABLES DURING CONSTRUCTION.
7. PROTECT ALL EXISTING UNDERGROUND DUCT WORK,
REFER TO I&C DRAWING I02NEW1x53mm UNDERGROUND CONDUIT.
TO I&C DWG. I02 FOR DETAILS. GROUNDING ROD SYSTEM REFER
ABANDONED. SEE NOTE 2, 4. CHAMBER TO BE
EX. ELECTRIC/RECORDING
COMPLETION.SIDEWALK. REMOVE UPON TEMPORARY ASPHALT
11/23/16
FIBER TV AND HYDRO PROTECT EX. GAS,
6 K.A.
(SEE NOTE 5)PIPE CONNECTED TO EX. STMEX. 150mm CHAMBER DRAIN
(SEE NOTE 5)GRAVEL DRAINAGE PIT EX. 150mm DRAIN TO EX.
REQUIRED
INSPECTION OF THE DRAIN PIPE. REPAIR DRAIN PIPE AS
PIPE IS FUNCTIONING PROPERLY. CONDUCT CCTV
5. CLEAN, FLUSH AND VERIFY THAT EXISTING CHAMBER DRAIN
CONSTRUCTION. REMOVE UPON COMPLETION.
10. PROVIDE TEMPORARY ASPHALT SIDEWALK DURING
WILLIAM FERNANDES, P. ENG.
Water Treatment and Supply
DIRECTOR,
ISSUED FOR PUCC REVIEW12/08/16
K.A.12/09/167 ISSUED FOR TENDER
Z.Q.
1:100
No. DATE REVISIONS INITIAL SIGNED
DRAWING
NUMBER:
CHECK:DESIGN:
DATE:
SCALE:
DRAFTING: CONTRACT No.
JOHN P. KELLY, P. ENG.
Linear Underground Infrastructure
DIRECTOR, DESIGN & CONSTRUCTION
ENGINEERING & CONSTRUCTION SERVICES
BI35
(NOTE 6)SCHEDULE DETAILS. DWG. I07 FOR CONDUIT REFER TO TYPICAL I&C UNDERGROUND CONDUIT. NEW 8x53mm
I35.
8. FOR DIRECT BURIED DUCT DETAILS REFER TO TYPICAL DWG
TO DWG G05.
DWG G04, FOR PERMANENT RESTORATION DETAILS REFER
AND EROSION CONTROL DETAILS AND NOTES REFER TO
1. FOR GENERAL NOTES REFER TO DWG G03, FOR SEDIMENT
PERMANENT CONC. SIDEWALK RESTORATION
PERMANENT LANDSCAPE RESTORATION
8
ADDENDUM No.5 K.A.8
8
02/14/17
EXCAVATION LIMITSAPPROXIMATE
8
CURBS, DRIVEWAYS, BOULEVARDS AND SODDED AREAS.
WITH TS 4.60.07.04 FOR ALL PAVEMENT, SIDEWALKS,
11. PERMANENT RESTORATION REQUIRED IN ACCORDANCE 8
RAT
OI
N
AL
E
ER
ENI
G
N
P
VO
R
IOFEC O
CIL
NE
OSEF OIS
S
RP
DE
N
N
K. AFZAL
100052014
Feb. 14, 2017
T
TEX. BELL CONDUIT
EX. B
ELL C
ON
DUIT
EX. BP
NPS 6 S
C H
P
EX. FIB
ER T
V P
LA
NT
EX.
GAS
EX. TS
EX. LS
EX. 900
mm
WM
EX. 300mm PVC WM
EX. 300
mm P
VC W
M
EX. 300mm PVC WM
EX. TS
EX. TS
EX. LS
EX. FP
EX. FP
EX. CB
EX. 400mm DI WM
EX. 100
mm D
RAIN
EX. 150
mm D
RAIN
EX. BP
EX. SIGN
EX. SIGN
EX. P
OLE
EX. SIG
N
POLEEX. ELECT.
+
EX. T
OR
ON
TO H
YD
RO
HYDR
O
EX. T
OR
ONTO
EX. O
VE
RH
EA
D WIR
E
P5445EX. HYDRO POLE
HYDRO
EX. T
ORO
NTO
2W1H
EX. TORONTO HYDRO
2W2H
EX. H
YD
RO
EX.
HY
DR
O
EX. BP
EX. H
YDRO
EX. B
ELL
K.A.
OCTOBER 2015
TORONTO WATER METER REPLACEMENT AND UPGRADES
N
N.K.
C01
SITE PLAN
ARE IN METERS UNLESS OTHERWISE NOTED
MEASUREMENTS SHOWN ON THESE PLANS
METRIC
1
PROPERTY LINE (TYP.)
STEELES AVE. W.
KEY PLANN.T.S.
NOTES:
N
CIVIL
CHAMBER No.15 - ISLINGTON AVE./STEELES AVE.
ISLIN
GT
ON A
VE.
HWY 407
ISLIN
GT
ON A
VE.
STEELES AVE. W.
FRIULI CT.
VINYL CT. PIN
E V
ALLE
Y D
R.
HANLAN RD.
29 SOMBRERO CRT.
25 SOMBRERO CRT.
EX. SHED
EX. GAS STATION
EX. GUARD RAIL
EX. C
ON
C. SID
EW
AL
K
EX. C
ON
C. SID
EW
AL
K
EX. CURB
MARKING (TYP.)EX. PAVEMENT
EX. MEDIAN
EX. CURB
EX. CURB
(WTR-300-CH-0012)EX. METERING CHAMBER
K.A.
0.3m
19.5
0m
03/02/16 ISSUED FOR ROAD CORRIDOR CONTROL APPROVAL
K.A.100% PRE-DESIGN SUBMISSION
THE CITY YARD.
AND EQUIPMENT TO BE SALVAGED AND RETURNED TO
CHAMBER. ALL INSTRUMENTATION, CONTROL PANELS
PANELS IN THE EXISTING UNDERGROUND RECORDING
3. REMOVE ALL EXISTING ELECTRICAL AND CONTROL
2
ENCLOSURE PAD FOR NEW ELECTRICAL
NEW 2.5x1.0m OF CONC.
03/28/16
LEGEND:
Water
3 50% DESIGN SUBMISSION K.A.
(MTM COORDINATE SYSTEM)E 298763.32
N 4846893.90WTR-300-RPU-1101
TORONTO RPU PANEL
07/26/16
SILT FENCE
(SEE NOTE 5)TO EX. 450mm STMDRAIN PIPE CONNECTED EX. 150mm CHAMBER
TO BE PROTECTEDEX. TORONTO HYDRO DUCTS
16ECS-LU-03TT
4 09/30/16 70% DESIGN SUBMISSION K.A.
OF THE DRAIN PIPE. REPAIR DRAIN PIPE AS REQUIRED.
IS FUNCTIONING PROPERLY. CONDUCT CCTV INSPECTION
5. CLEAN, FLUSH AND VERIFY THAT EXISTING CHAMBER DRAIN
SPLASHPADASPHALT
ENGINEERING
SEE NOTE 2, 3. CHAMBER TO BE ABANDONED.
EX. ELECTRIC/RECORDING
4. REFER TO I&C DRAWINGS FOR DETAILS.
REFER TO I&C DWG. I02GROUNDING ROD SYSTEM
DEMOLISHED. AND CONCRETE PAD TO BE
ENCLOSURE, METERING BOXEX. POWER METER
210M-2016-1
K.A.95% DESIGN SUBMISSION11/23/165
8. FOR UTILITY CO-ORDINATION REFER TO DWG I02.
DISCHARGE PIPINGREPLACE EX. SUMP PUMP &
No.1
NO. NAME SPECIES(CM)DBH CONDITIONS
1.21 4.5 GOOD
(M)TPZ
AMELANCHIER SP.SERVICEBERRY
CONDUIT AND CABLES DURING CONSTRUCTION.
6. PROTECT ALL EXISTING UNDERGROUND DUCT WORK,
TREE INVENTORY:
AND BELLPROTECT EX. HYDRO
6 12/08/16 K.A.
DETAIL NHFS-04 (TYP.) AS PER YORK REGION
TREE PROTECTION FENCE
0.4m
PHONE: (905) 830-4444 EXT. 75277.
YORK REGION NHF PRIOR TO CONSTRUCTION FOR INSPECTION.
NOTE: CONTRACTOR TO INSTALL TREE PROTECTION AND CONTACT
CONSTRUCTION. REMOVE UPON COMPLETION.
9. PROVIDE TEMPORARY ASPHALT SIDEWALK DURING
WILLIAM FERNANDES, P. ENG.
Water Treatment and Supply
DIRECTOR, ISSUED FOR PUCC REVIEW
K.A.12/09/167 ISSUED FOR TENDER
Z.Q.
1:100
No. DATE REVISIONS INITIAL SIGNED
DRAWING
NUMBER:
CHECK:DESIGN:
DATE:
SCALE:
DRAFTING: CONTRACT No.
JOHN P. KELLY, P. ENG.
Linear Underground Infrastructure
DIRECTOR, DESIGN & CONSTRUCTION
ENGINEERING & CONSTRUCTION SERVICES
BI35
I35.
7. FOR DIRECT BURIED DUCT DETAILS REFER TO TYPICAL DWG
REFER TO DWG.I02CONNECTION DETAILS HYDRO. FOR HYDRO REQUIRED BY TORONTO ENCASED DUCT BANK NEW 1H1W CONCRETE
CONDUIT SCHEDULE DETAILS TYPICALI&C DWG. I07 FOR
CONDUIT. REFER TONEW 8x53mm UNDERGROUND
SALVAGED AND RETURNED TO THE CITY YARD.COMPLETELY RESTORED. FRAMES AND COVER ARE TO BE FILL TO SUBGRADE. THE AFFECTED AREA TO BE BELOW GRADE AND BACKFILLED WITH UNSHRINKABLE
2. EXISTING ELECTRIC CHAMBER TO BE BROKEN TO 1.2m
TO DWG G05.
DWG G04, FOR PERMANENT RESTORATION DETAILS REFER
AND EROSION CONTROL DETAILS AND NOTES REFER TO
1. FOR GENERAL NOTES REFER TO DWG G03, FOR SEDIMENT
02/14/17 ADDENDUM No.5
PERMANENT CONC. SIDEWALK RESTORATION
PERMANENT LANDSCAPE RESTORATION
PERMANENT ASPHALT RESTORATION
8
8 K.A.
8
8
EXCAVATION LIMITSAPPROXIMATE
DRIVEWAYS, BOULEVARDS AND SODDED AREAS.
WITH TS 4.60.07.04 FOR ALL PAVEMENT, SIDEWALKS, CURBS,
10. PERMANENT RESTORATION REQUIRED IN ACCORDANCE 8
EX. BELL CONDUIT
EX. B
ELL
EX. B
ELL
EX. B
ELL
NPS 8 S
C IP
EX. GAS
EX. 750
mm CI
WM
EX.
GAS
EX. 750
mm CI
WM
EX. 750
mm CI
WM
EX. 450mm CO
NC. STM
EX. 450
mm C
ON
C. S
TM
EX. LS
EX. LS
EX. LS
EX. TS
EX. TP
EX.
HW
EX. TS
EX. HW
EX. C
B
EX. C
B
EX. SIG
N
EX. BP
EX. BP
EX. 2600mm STM TUNNEL
EX. 300
mm CI
WM
EX. TS
EX. TS
EX. CB
+
EX. TORONTO HYDRO
HY
DR
OE
X. T
OR
ON
TO
EX. TORONTO HYDRO
EX. BELL
EX. T
ORONTO HYDRO
EX. T
OR
ONTO H
YDR
O
EX. B
ELL
EX.
HY
DR
O
RAT
OI
N
AL
E
ER
ENI
G
N
P
VO
R
IOFEC O
CIL
NE
OSEF OIS
S
RP
DE
N
N
K. AFZAL
100052014
Feb. 14, 2017
K.A.
OCTOBER 2015
TORONTO WATER METER REPLACEMENT AND UPGRADES
N
N.K.
C01
SITE PLAN
ARE IN METERS UNLESS OTHERWISE NOTED
MEASUREMENTS SHOWN ON THESE PLANS
METRIC
1 DRAFT PRE-DESIGN SUBMISSION T.B.
AD
ESS
O D
R.
PROPERTY LINE (TYP.)
PE
TE
R K
AIS
ER G
T.
01/15/16
CHAMBER No.16 - ADESSO DR./STEELES AVE.
KEY PLANN.T.S.
N
HW
Y 4
00
HWY 407
CHAMBEREX. METERING
EX. PAINTED MARKING (TYP.)
EX. PAINTED MARKING (TYP.)
CIVIL
STEELES AVE. W.
AD
ESS
O D
R.
SA
NTE D
R.
JA
NE S
T.
EX. CONC. SIDEWALK
EX. CONC. SIDEWALK
STEELES AVE. W.
2 K.A.
5.00m 4.6
0m
03/02/16 ISSUED FOR ROAD CORRIDOR CONTROL APPROVAL
(MTM COORDINATE SYSTEM)E 302596.98N 4848048.64WTR-307-RPU-1601TORONTO RPU PANEL
3 100% PRE-DESIGN SUBMISSION K.A.03/23/16
LEGEND:
REINSTATE EXISTING CURB AND GUTTER
Water
50% DESIGN SUBMISSION K.A.4
SILT FENCE
07/26/16
SEE NOTE 5PIPE TO REMAIN.EX. 150mm CHAMBER DRAIN
16ECS-LU-03TT
5 70% DESIGN SUBMISSION K.A.09/30/16
P514EX. HP
ENCLOSUREPAD FOR NEW ELECTRICAL PROP. 2.1x1.8m OF CONCRETE
ENGINEERING
A
SEE NOTE 2, 3.TO BE ABANDONED.EX. RECORDING CHAMBER
6 10/24/16 K.A.CONTROL PANEL RELOCATED AS PER COT COMMENTS
1.2
0m
DEMOLISHED. AND CONCRETE PAD TO BE ENCLOSURE. METERING BOX EXISTING POWER METER
REFER TO I&C DWG. I02GROUNDING ROD SYSTEM
K.A.95% DESIGN SUBMISSION7
200M-2016-1
NO. NAME SPECIES(CM)DBH CONDITIONS
1.22 3.9 POOR
(M)TPZ
GINKGO GINKGO BILOBA
No.2
11/23/16
TREE INVENTORY:
1.2
m
TRAFFIC CABLEPROTECT EX. WM AND
K.A.8 12/08/16
DETAIL NHFS-04 (TYP.)AS PER YORK REGION TREE PROTECTION FENCE
PHONE: (905) 830-4444 EXT. 75277.
FOR INSPECTION.
CONTACT YORK REGION NHF PRIOR TO CONSTRUCTION
NOTE: CONTRACTOR TO INSTALL TREE PROTECTION AND
WILLIAM FERNANDES, P. ENG.
Water Treatment and Supply
DIRECTOR,
ISSUED FOR PUCC REVIEW
K.A.12/09/169 ISSUED FOR TENDER
Z.Q.
1:100
No. DATE REVISIONS INITIAL SIGNED
DRAWING
NUMBER:
CHECK:DESIGN:
DATE:
SCALE:
DRAFTING: CONTRACT No.
JOHN P. KELLY, P. ENG.
Linear Underground Infrastructure
DIRECTOR, DESIGN & CONSTRUCTION
ENGINEERING & CONSTRUCTION SERVICES
REFER TO DWG. I02UNDERGROUND CONDUIT. NEW 1x53mm
CONDUIT SCHEDULE DETAILS. TO TYPICAL I&C DWG I07 FOR
ENCASED DUCT BANK. REFERNEW 8x53mm CONCRETE
I35
PERMANENT CONC. SIDEWALK RESTORATION
10
ADDENDUM No.5
PERMANENT ASHPALT RESTORATION
EX. COMMUNICATION CABLE
PERMANENT LANDSCAPE RESTORATION
10
10
10 K.A.02/14/17
NOTES:
THE CITY YARD.
AND EQUIPMENT TO BE SALVAGED AND RETURNED TO
CHAMBER. ALL INSTRUMENTATION, CONTROL PANELS
PANELS IN THE EXISTING UNDERGROUND RECORDING
3. REMOVE ALL EXISTING ELECTRICAL AND CONTROL
AND RETURNED TO THE CITY YARD.
RESTORED. FRAMES AND COVER ARE TO BE SALVAGED
FILL. THE AFFECTED AREA TO BE COMPLETELY
BELOW GRADE AND BACKFILLED WITH UNSHRINKABLE
2. EXISTING RECORDING CHAMBER TO BE BROKEN TO 1m
4. REFER TO I&C DRAWINGS FOR DETAILS.
8. FOR UTILITY CO-ORDINATION REFER TO DWG I02.
CONDUIT AND CABLES DURING CONSTRUCTION.
6. PROTECT ALL EXISTING UNDERGROUND DUCTWORK,
OF THE DRAIN PIPE. REPAIR DRAIN PIPE AS REQUIRED.
IS FUNCTIONING PROPERLY. CONDUCT CCTV INSPECTION
5. CLEAN, FLUSH AND VERIFY THAT EXISTING CHAMBER DRAIN
7. FOR DUCT BANK DETAILS REFER TO TYPICAL DWG I35.
TO DWG G05.
DWG G04, FOR PERMANENT RESTORATION DETAILS REFER
AND EROSION CONTROL DETAILS AND NOTES REFER TO
1. FOR GENERAL NOTES REFER TO DWG G03, FOR SEDIMENT
10
ASHPALT RESTORATION LIMITS
PERMANENT 40mm HL1
DRIVEWAYS, BOULEVARDS AND SODDED AREAS.
WITH TS.4.60.07.07 FOR ALL PAVEMENT, SIDEWALKS, CURBS,
9. PERMANENT RESTORATION REQUIRED IN ACCORDANCE 10
EXCAVATION LIMITSAPPROXIMATE
5.00m
5.0
0m
10
EX. TORONTO HYDRO
SUPPORT AND PROTECT
LIMITS
APPROXIMATE EXCAVATION
1010
10
EXCAVATION LIMITSAPPROXIMATE
LS
LSEX. BELL CONDUIT
EX. TS
EX. G
AS
EX. GAS
EX.
GAS
EX. ALLSTREAM
EX. 500mm CPP WM
EX. 600
mm DI
WM
EX. 600mm CI WM
EX. 900mm CI WM
EX. 300mm PVC WM
EX. 250mm AC SAN
EX. 1050mm CONC. STM
EX. 1050mm CONC. STM
EX. 300mm DI WM (ABND.)
EX. 150
mm S
TM
EX. 100m
m S
TM
EX. 100mm S
TM
EX. TP
EX. TS
EX. CB
EX. CB
EX. VC
EX. VC
EX. TS
EX. UP
EX. CB EX. CB
EX. TS
EX. TS
EX. CONC. SIDEWALK
EX. TS
EX. TSEX. HW
EX. TRANSFORMER
EX. 300mm DI WM
EX. CONC. SIDEWALK
EX. HW
EX. LS/TS
EX. LS
UTILITY PANEL
EX. HYDRO
+
HYDRO
EX. TORONTO
EX. OVERHEAD CABLES
EX. OVERHEAD CABLES
EX. ALLSTREM
EX.
WM
UKNUKN
EX. T
L
EX. WM
EX. TELUS EX. T
L
ZAYO HH
RAT
OI
N
AL
E
ER
ENI
G
N
P
VO
R
IOFEC O
CIL
NE
OSEF OIS
S
RP
DE
N
N
K. AFZAL
100052014
Feb. 14, 2017