measurements_2014.pptx

29
Measurements Soundings; Ullages; Draught Marks

Upload: anonymous-s9obmilkv

Post on 01-Feb-2016

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Measurements_2014.pptx

Measurements

Soundings; Ullages; Draught Marks

Page 2: Measurements_2014.pptx

Purpose

Ship Safety

Equipment monitoring

Engine performance monitoring

Cargo monitoring

Page 3: Measurements_2014.pptx

Ship Safety

Battery Levels for Ships Radio & GMDSS

Unmanned Machinery Space monitoring

Trim and List indicators

Draught Surveys

Page 4: Measurements_2014.pptx

Equipment Monitoring

UMS equipment on Bridge

Machinery Rounds

Comparing actual readings with UMS readings

Be diligent and conscientious – record units alongside every figure

Page 5: Measurements_2014.pptx

Cargo Monitoring

Draught survey

Soundings

Ullage measurements

Inert gas supply

Page 6: Measurements_2014.pptx

Reading Level Guages

Beware of Parallax Error

Page 7: Measurements_2014.pptx

Parallax is a displacement or difference in the apparent position of an object viewed along two different lines of sight, and is measured by the angle or semi-angle of inclination between those two lines.

Page 8: Measurements_2014.pptx

Pressure Measurements

Bourdon Tube Pressure Gauge

Manometer

Page 9: Measurements_2014.pptx
Page 10: Measurements_2014.pptx

Temperature Gauges

Thermometersa. Mercuryb. Alcohol solutionc. Bi-metallicd. Burdon tube

Page 11: Measurements_2014.pptx

Level Measurements

Soundings

Ullages

Sight Glasses

Dipsticks

Page 12: Measurements_2014.pptx
Page 13: Measurements_2014.pptx

Sounding

Page 14: Measurements_2014.pptx

Ullage

Page 15: Measurements_2014.pptx

Draft Marks

Forward – Painted on both sides of the Stem

Aft – Painted on both sides in line with the Rudder Stock

Amidships – On both sides near the Loadline markings

Page 16: Measurements_2014.pptx

Load Lines & Draught Marks

W

TF

F

S

T

WNA

All lines are 25mm in thickness

Deck line

300mm

450mm

540mm

230mm 230mm

Page 17: Measurements_2014.pptx
Page 18: Measurements_2014.pptx

2

9 M 8

6 8

4 WL 6

11M

Fwd Aft

Page 19: Measurements_2014.pptx
Page 20: Measurements_2014.pptx
Page 21: Measurements_2014.pptx

2

9 M 8

6 8

4 WL 6

10M

Fwd Aft

Page 22: Measurements_2014.pptx

8

6

4 WL

11M 2

9 M

8

6

FwdAft

Page 23: Measurements_2014.pptx
Page 26: Measurements_2014.pptx

d s

d l

d p60%

Level trim

Level trim

Service tr imM ean draught d l

100%

Draught and Trim

Page 27: Measurements_2014.pptx

Flow MeasurementWorks on Rate over a time period

Page 28: Measurements_2014.pptx

DensityUsed for the calculation of Dock Water Allowance &Density of liquid cargos

Page 29: Measurements_2014.pptx