measuring the impact of transit from a tod perspective · avenida senior living 229 senior units...

19
Measuring the Impact of Transit from a TOD Perspective October 31, 2018 Chessy Brady RTD TOD Manager [email protected] 303.299.2073

Upload: others

Post on 27-May-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Measuring the Impact of Transit from a TOD Perspective · Avenida Senior Living 229 senior units –Planned 2019 Oak Street Townhomes 81 townhomes –2018 Oak Station Apts 291 units

Measuring the Impact of Transit from a TOD Perspective

October 31, 2018

Chessy BradyRTD TOD [email protected]

Page 2: Measuring the Impact of Transit from a TOD Perspective · Avenida Senior Living 229 senior units –Planned 2019 Oak Street Townhomes 81 townhomes –2018 Oak Station Apts 291 units

What is Transit-Oriented Development?

• More compact and dense development within a 10-minute walk or ½ mile distance from high frequency station

• A mix of uses, usually residential, retail, and office

• High-quality, pedestrian-oriented urban design and streetscapes

Photos: Smart Growth America

2

Page 3: Measuring the Impact of Transit from a TOD Perspective · Avenida Senior Living 229 senior units –Planned 2019 Oak Street Townhomes 81 townhomes –2018 Oak Station Apts 291 units

Why do TOD?

• Compact development makes efficient use of land, infrastructure

• Varied land uses allow for walking to everyday destinations

• Proximity to transit discourages auto commutes, reduces congestion, improves air quality

Page 4: Measuring the Impact of Transit from a TOD Perspective · Avenida Senior Living 229 senior units –Planned 2019 Oak Street Townhomes 81 townhomes –2018 Oak Station Apts 291 units

RTD’s Role in TOD

• Station Area Planning

• Source for local information and TOD best practices

• RTD Coordination

• Encourage TOD on RTD land through public/private partnerships with developers and jurisdictions

Page 5: Measuring the Impact of Transit from a TOD Perspective · Avenida Senior Living 229 senior units –Planned 2019 Oak Street Townhomes 81 townhomes –2018 Oak Station Apts 291 units

TOD vs. Joint DevelopmentExample: Alameda Station

Potential

TODRTD Land

JD

W Alameda Ave

S B

roa

dw

ay

5

The Denizen

• 275 units

• 2,000 SF retail

Page 6: Measuring the Impact of Transit from a TOD Perspective · Avenida Senior Living 229 senior units –Planned 2019 Oak Street Townhomes 81 townhomes –2018 Oak Station Apts 291 units

Agenda

• Economic Impact Analysis

• TOD Trend Tool

• Quality of Life Study

• TOD Database/TOD in Pictures

6

Page 7: Measuring the Impact of Transit from a TOD Perspective · Avenida Senior Living 229 senior units –Planned 2019 Oak Street Townhomes 81 townhomes –2018 Oak Station Apts 291 units

7

Economic Impact of Transit Investments

• Dallas DART $10.8 bn in economic development since 1999 [link]

• Portland MAX $11.5 bn in development within walking distance of stations since 1986 [link]

• Salt Lake TRAX $7 bn in economic development since 2000 [link]

• Phoenix METRO $8.2 bn in economic development since 2008 on an investment of $1.35 billion [link]

• Houston METRO $8 bn in economic development since 2004 on an investment of $324 million [link]

• Twin Cities METRO $8.4 bn in development on an investment of $2.031 billion [link]

• Denver RTD ?

Summary by David Dobbs, LightRailNow.org

Page 8: Measuring the Impact of Transit from a TOD Perspective · Avenida Senior Living 229 senior units –Planned 2019 Oak Street Townhomes 81 townhomes –2018 Oak Station Apts 291 units

8

TOD Trend ToolInteractive Excel Database using Costar data

Sample outputs:

Since 2005,• 12.8 M sf office and 25k

multifamily units built within half-mile of stations

• 18% of new office and 8% of new multifamily units in Denver MSA occurred within half-mile of Union Station

Page 9: Measuring the Impact of Transit from a TOD Perspective · Avenida Senior Living 229 senior units –Planned 2019 Oak Street Townhomes 81 townhomes –2018 Oak Station Apts 291 units

22%

17%61%

Near Open

Representative

Stations

H+T Cost

In 2015, people inthe Metro Denver region spent an

average of 47% of their income on

housing and transportation

costs. Near transit stations, people

spent 39%.

Source: CNT H+T Index

9

RTD’s Quality of Life ReportHOUSING + TRANSPORTATION (H+T) COST

27%

20%

53%

Region

Housing Transportation Remaining Income

H+T = 47%H+T = 39%

Page 10: Measuring the Impact of Transit from a TOD Perspective · Avenida Senior Living 229 senior units –Planned 2019 Oak Street Townhomes 81 townhomes –2018 Oak Station Apts 291 units

New Development

Within half a mile of Union Station,

over 13,000 square feet of

retail space and 390,000 square feet of office

space were built in 2015.

Source: RTD TOD Database

10

RTD’s Quality of Life ReportOFFICE, RETAIL, & INSTITUTIONAL DEVELOPMENT

0.0

0.5

1.0

1.5

2.0

2.5

3.0

3.5

4.0

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

Retail Office Institutional

Millio

ns

of

Sq

ua

re F

ee

t o

f D

ev

elo

pm

en

t

Page 11: Measuring the Impact of Transit from a TOD Perspective · Avenida Senior Living 229 senior units –Planned 2019 Oak Street Townhomes 81 townhomes –2018 Oak Station Apts 291 units

RTD’s Quality of Life ReportHOUSING STARTS

Housing Starts

In Metro Denver, housing starts increased 27%

between 2015 and 2017. The mix of housing built has

shifted from mostly single family to an equal balance of

multi and single family homes.

91%

55%

43%63%

68% 54%40%

44%50%

52%47% 48%

9%

45%

57%

37%

32%46%

60%

56%50%

48%

53%52%

14,900 15,050

9,970

4,500

5,760

7,400

15,270

17,350 17,140

19,020

23,140 24,100

0

5,000

10,000

15,000

20,000

25,000

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017

Single Family Multi Family

Ne

w H

ou

sin

g U

nits

Source: US Census

11

Page 12: Measuring the Impact of Transit from a TOD Perspective · Avenida Senior Living 229 senior units –Planned 2019 Oak Street Townhomes 81 townhomes –2018 Oak Station Apts 291 units

TOD Database/TOD in Pictures

12

Page 13: Measuring the Impact of Transit from a TOD Perspective · Avenida Senior Living 229 senior units –Planned 2019 Oak Street Townhomes 81 townhomes –2018 Oak Station Apts 291 units

TOD Database Summary

Investment in transit has had a significant impact on development in the region.

Transit-oriented development within ~1/2 mile walk of a high frequency station*:• 39,500 Residential Units• 10,400,000 Square Feet Office• 1,500,000 Square Feet Retail• 2,800 Hotel Rooms

*Downtown Denver excluded

13

Lines Resi Units Office S.F. Retail S.F. Hotel KeysCentral 3,035 172,000 18,000 -

Existing TOD 1,838 - 18,000 - Planned TOD 1,197 172,000 - -

Central Platte Valley 119 - - 150 Existing TOD 119 - - 150 Planned TOD - - - -

CU A Line 1,417 1,643,000 272,500 600 Existing TOD 653 755,000 100,000 - Planned TOD 764 888,000 172,500 600

Flatiron Flyer 3,930 470,000 239,700 275 Existing TOD 2,843 300,000 15,700 150 Planned TOD 1,087 170,000 224,000 125

G Line 1,758 - - 136 Existing TOD 1,210 - - 136 Planned TOD 548 - - -

Northwest 3,501 661,000 92,500 - Existing TOD 70 - - Planned TOD 3,431 661,000 92,500 -

R Line 4,598 250,000 282,000 757 Existing TOD 2,344 - 45,000 618 Planned TOD 2,254 250,000 237,000 139

Southeast 7,260 4,917,780 252,569 86 Existing TOD 6,910 2,619,000 196,000 86 Planned TOD 350 2,298,780 56,569 -

Southwest 1,670 145,000 - - Existing TOD 1,307 140,000 - - Planned TOD 363 5,000 - -

L Line 5,954 148,192 95,800 41 Existing TOD 4,234 141,192 95,800 - Planned TOD 1,720 7,000 - 41

W Line 3,538 175,000 - - Existing TOD 2,194 175,000 - - Planned TOD 1,344 - - -

Denver Union Station 2,803 1,836,191 296,404 743 Existing TOD 1,806 1,836,191 254,404 510 Planned TOD 997 - 42,000 233

Grand Total 39,583 10,418,163 1,549,473 2,788 Existing TOD 25,528 5,966,383 724,904 1,650 Planned TOD 14,055 4,451,780 824,569 1,138

Page 14: Measuring the Impact of Transit from a TOD Perspective · Avenida Senior Living 229 senior units –Planned 2019 Oak Street Townhomes 81 townhomes –2018 Oak Station Apts 291 units

What Enables TOD?

• Market

• Zoning

• Infrastructure/Access

• Jurisdiction Interest/Incentives

• Lot size and ownership

14

Page 15: Measuring the Impact of Transit from a TOD Perspective · Avenida Senior Living 229 senior units –Planned 2019 Oak Street Townhomes 81 townhomes –2018 Oak Station Apts 291 units

Central

Downtown Development

Wellington Apartments253 units – Planned 2019

Tapiz100 affordable units – 2013

Arches93 affordable units – 2014

Mariposa87 affordable units – 2014

The Zephyr77 affordable units – 2014

The Aerie94 affordable units – 2014

DHA HQ172k SF office & retail

– Planned 2019

IMT Alameda Station338 units – 2014

The Denizen275 units, 2k SF retail – 2015

PDG Design District354 units – Planned 2019

Alta SOBO Station187 units – Planned 2019

Broadway Junction60 affordable units – 2008

Windsor at Broadway Station419 units – 2009

1000 S. Broadway Apts260 units – 2014

The Henry403 units – Planned 2019

Broadway Station Partners Office, residential, retail – TBD

D

F

H

E

C

15

Platt Park Townhomes30 townhomes - 2015

Hanover Platt Park303 units – 2018

Page 16: Measuring the Impact of Transit from a TOD Perspective · Avenida Senior Living 229 senior units –Planned 2019 Oak Street Townhomes 81 townhomes –2018 Oak Station Apts 291 units

Southwest

Evans Station Lofts50 affordable units – 2013

Encore Evans Station224 units – Planned 2018

Cherokee Flats139 units, 5k SF retail – Planned 2020

Englewood Civic Center140k SF office – 2000

ArtWalk CityCenter445 units – 2001

Liv Apartments30 units – 2016

Broadway Acoma Lofts111 affordable units – Planned 2018

Oxford Station Apartments238 units – 2016

Vita160 units – 2017

C

D

16

Berkshire Aspen Grove280 units – 2011

Page 17: Measuring the Impact of Transit from a TOD Perspective · Avenida Senior Living 229 senior units –Planned 2019 Oak Street Townhomes 81 townhomes –2018 Oak Station Apts 291 units

Southeast, Part I

University Station Apartments

60 senior affordable units – 2014

Colorado Center1987–2018

Tower 1 – 180,000 SF Office Tower 2 – 261,480 SF Office Tower 3 – 216,352 SF Office

Annex – 60,948 SF Office 11,569 SF Retail

Millennium Colorado Station350 units – Planned 2019

Yale Station50 senior affordable units – 2011

Garden Court at Yale Station64 affordable units – 2016

Yale 25 Station112 units – 2018

The District276 units, retail – 2004

Camden Belleview Station270 units – 2009

Cielo201 units – 2009

Milehouse353 units, retail – 2014

Pearl DTC408 units – 2015

The DEN325 units, retail – 2016

Carillon Belleview Station163 senior units – 2018

One Belleview Station315K SF office – 2018

Denver Tech Center900 acres

25M SF of development150k jobs

Landmark271 condos/apartments,

168k SF retail – 2008

R

F

H

E

17

Monaco Row204 units – 2013

One DTC West75K SF office – 2018

Page 18: Measuring the Impact of Transit from a TOD Perspective · Avenida Senior Living 229 senior units –Planned 2019 Oak Street Townhomes 81 townhomes –2018 Oak Station Apts 291 units

W Line

Outlook Golden Ridge172 units– 2015

Beacon 85343 units – 2017

WestLink244 units – 2015

Avenida Senior Living229 senior units – Planned 2019

Oak Street Townhomes81 townhomes –2018

Oak Station Apts291 units

– Planned 2019

Indy Street Flats115 affordable units

– Planned 2019

Pearson Grove82 townhomes – Planned 2020

Zephyr Line95 affordable units

– 2015

Lamar Sta. Crossing138 affordable units

– 2014

West Line Flats155 units– 2017

40-West Residences60 affordable units

– 2017

Flats at Two Creeks78 affordable units

– Planned 2020

West Line Village175 townhomes

– 2018

Sheridan Sta. Apts63 affordable units

– TBD

Brandon Flats104 affordable units

– TBD

Regatta Sloan’s374 units – 2015

Perry Row32 townhomes

– 2018

Arroyo Village130 affordable units

– Planned 2018

Decatur Place106 affordable units

– 2014

Avalon Apts.80 affordable units

– 2014

Corky Gonzales Public Library

25,000 SF – 2015

CDOT HQ175k SF – 2018

Luxe at Mile High382 units – TBD

Stadium District Master Plan

Mixed use redevelopment

– Planning ongoing

W

18

Page 19: Measuring the Impact of Transit from a TOD Perspective · Avenida Senior Living 229 senior units –Planned 2019 Oak Street Townhomes 81 townhomes –2018 Oak Station Apts 291 units

To summarize

• Economic Impact Analysis Nope, don’t have it!

• TOD Trend Tool Coming soon!

• Quality of Life Study Available now! www.rtd-denver.com/QofL.shtml

• TOD Database/TOD in Pictures Available now!

19