  • 8/10/2019 Mech Layout.ppt

    1/34

    Date: 15 December 2014L&T - Sargent & LundyLimited

    GET/DET Training Program

  • 8/10/2019 Mech Layout.ppt

    2/34

    REVISIONHISTORY

    Rev. No. Revised By Revision Description Revision Date

    R0 S R Babu First Issue 9/8/05

    R1 Rajesh Nema Second Issue 11/9/06

  • 8/10/2019 Mech Layout.ppt

    3/34

    Power Plant Layout - Introduction

    Plot Plan

    Site Grading Plan

    Plant Roads and Drains

    Equipment General Arrangements (Eqp. GAs) Hazard Area Classification Drawing

    Above Ground Piping Composite Drawings

    Under Ground Piping Composite Drawings

    Cable Tray/Duct/Trench Layout

  • 8/10/2019 Mech Layout.ppt

    4/34

    Power Plant Layout - Input

    Acquired Land (Vicinity Plan)

    Contour Survey Map

    Plant Table Survey Map Soil Survey Report

    Power Evacuation Location

    Water Availability

    Fuel Linkage Effluent Disposal Point

  • 8/10/2019 Mech Layout.ppt

    5/34

    Power Plant Layout - Input (Cont..)

    Meteorological Data

    Process Data

    Utility Data

    Statutory Requirements

    Non Plant Facilities

    Constructability Aspects

    Expansion Philosophy

  • 8/10/2019 Mech Layout.ppt

    6/34

    Power Plant Layout - Input

    Acquired Land (Vicinity Plan)

    Overall Plot Boundary with access roads

    True North

    Plant Coordinates

  • 8/10/2019 Mech Layout.ppt

    7/34

    Power Plant Layout - Input

    Contour Survey Map

    Plot Levels with respect to mean sea level (every 5 to 10 m

    grids)

    Plot Topography

    Bench Marks

  • 8/10/2019 Mech Layout.ppt

    8/34

    Power Plant Layout - Input

    Plant Table Survey Map

    Overall Plot area indicating existing constraints like

    transmission line, structures, ponds, place of worships etc.

  • 8/10/2019 Mech Layout.ppt

    9/34

    Power Plant Layout - Input

    Soil Survey Report

    Load bearing capacity

    Soil resistivity

  • 8/10/2019 Mech Layout.ppt

    10/34

    Power Plant Layout - Input

    Meteorological Data

    Minimum, maximum and normal temperature

    Rainfall

    Intensity and direction of wind

    seismic zone

    Wet and dry bulb temperatures

    Flood level

  • 8/10/2019 Mech Layout.ppt

    11/34

    Power Plant Layout - Input

    Process Data

    Size/capacity of the unit

    Indoor / outdoor location

    Overall operating philosophy

    Fuel/Water storage philosophy

  • 8/10/2019 Mech Layout.ppt

    12/34

    Power Plant Layout - Input

    Utility Data

    Source and supply of Raw water

    Water quality

    Water consumption

    Fuel requirement and fuel analysis

  • 8/10/2019 Mech Layout.ppt

    13/34

    Power Plant Layout - Input

    Statutory Requirement

    Central / state Pollution control boards

    Factory Inspectorate

    Chief Control of explosive (CCOF)

    Tariff Advisory Committee (TAC)

    Aviation Laws

    Chief Inspector of Boilers (CIB)

    Ministry of Environment and Forest (MoEF)

  • 8/10/2019 Mech Layout.ppt

    14/34

    Plot Plan Development

    Plant North and True north

    Establish the N-S and E-W grids

    Green Belt

    Wind Rose Locate the structures and facilities

    Main power block

    CW pump house

    Cooling Towers & CW Piping

    Fuel Oil Area & Coal Handling Plant

    Water treatment building

    Non Plant Buildings

    CONTD...

  • 8/10/2019 Mech Layout.ppt

    15/34

    Plot Plan Development (Cont)

    Locate the structures and facilities (Cont)

    Non Plant Buildings

    CW pump house

    Construction lay-down areas

    Parking lots

    Construction facilities

    Ware house

    Space for equipment maintenance

  • 8/10/2019 Mech Layout.ppt

    16/34

    Plot Plan Development (Cont)

    Locate the structures and facilities (Cont)

    Identify the piping and electrical duct runs

    Roads and Tracks for both permanent facilitiesand construction period

    Identify the plant security (fence, gates, guard

    house

    Identify the drainage and run off basins

  • 8/10/2019 Mech Layout.ppt

    17/34

    Plot Plan Development (Cont)

    Finalise the site grade level

    Evaluate the for Potential Flooding (if the plant is

    located near to sea or river)

    Elevations referenced to both MSL and plant

    datum to be identified

    Plant Finished floor

    Plant Grade Level

  • 8/10/2019 Mech Layout.ppt

    18/34

    Plot Plan Development - Drawing

    Title Block

    Plant North

    Wind Rose

    Plant Grids Graphical scale

    Item list

    General Notes

    Reference Drawings Legends

  • 8/10/2019 Mech Layout.ppt

    19/34

    LAYOUTS FOR OIL INSTALLATIONS

    Based on OISD-STD-118 Rev 1

    Class A Petroleum : Liquids which have

    flash point below 23 deg C

    Class B Petroleum : Liquids which have

    flash point of 23 deg C and above but below

    65 deg C

    Class C Petroleum : Liquids which have

    flash point of 65 deg C and above but below

    93 deg C

  • 8/10/2019 Mech Layout.ppt

    20/34

    LAYOUTS FOR OIL INSTALLATIONS

  • 8/10/2019 Mech Layout.ppt

    21/34

    Plant Arrangements- Power Block

    Identify the major plant levels (Ground floor,

    mezzanine, main operating floor)

    Plant North and True north direction

    Graphical scale Identify the column rows lines with dimension

    Vertical bracing lines to be identified

    Identify the all equipment and space for future

    equipment (if any)

    Identify the maintenance and dismantling

    requirements

  • 8/10/2019 Mech Layout.ppt

    22/34

    Plant Arrangements- Power Block(cont...)

    Identify the nearest facilities

    Identify the HAVC requirements

    Identify the Turbine room crane travel limits to

    cater all equipment

    Identify the access to turbine carne control

    cabinet

    Identify the noise generating equipment and their

    placement

    Identify the Turbine generator foundation

    Identify the main steam, reheat and low pressure

    steam piping

    Reserve the space for CW piping

    Reserve the area for turbine gland steam and

    lube oil piping

  • 8/10/2019 Mech Layout.ppt

    23/34

    Plant Arrangements- Power Block(contd.)

    General access galleries stairways and doors per

    local codes

    Permanent Elevators and construction elevators(

    if any)

    Identify the mat foundation and individual footing

    foundation

    Identify the control room, electrical equipment

    room, UPS room

    Identify the Toilets, locker room, office area

    Control room of HAVC equipment

    Generator bus duct and potential transformer

    cubicles

    Reserve the area for the cable tray

    Oil and Process water draina e

  • 8/10/2019 Mech Layout.ppt

    24/34

    GT AREA LAYOUTSalalah Power System Privatization Project

  • 8/10/2019 Mech Layout.ppt

    25/34

    DYKE AREASalalah Power System Privatization Project

  • 8/10/2019 Mech Layout.ppt

    26/34

    FUEL OIL PUMP HOUSESalalah Power System Privatization Project

  • 8/10/2019 Mech Layout.ppt

    27/34

    COOLING TOWER AREAHaldia CCPP

  • 8/10/2019 Mech Layout.ppt

    28/34

    CW PUMP HOUSEHaldia CCPP

  • 8/10/2019 Mech Layout.ppt

    29/34

    DEARATOR AREAHaldia CCPP

  • 8/10/2019 Mech Layout.ppt

    30/34

    STATION BUILDINGHaldia CCPP

  • 8/10/2019 Mech Layout.ppt

    31/34

    STATION BUILDINGHaldia CCPP

  • 8/10/2019 Mech Layout.ppt

    32/34

    STATION BUILDINGHaldia CCPP

  • 8/10/2019 Mech Layout.ppt

    33/34

    STATION BUILDINGHaldia CCPP

  • 8/10/2019 Mech Layout.ppt

    34/34