Mechanical Structures Experience PJOE yard 28-05-2012 From the start of the yard in May 2006 following projects have been realized: Client
Project Description incl weight and year
Frigstad Frigstad Oslo
SSDR bracings
Fabrication of 4 pontoon bracings for Yantai Raffles yard, 800T
Awilco WilPioneer
SSDR sponsoon tanks
Fabrication of sponsoon blocks for Yantai Raffles yard, 1,200T
CNOOC Bozhong
field, Bohai Bay, China
Yoke Mooring System, refurbishment, 300T, 2008
GustoMSC Aramco ARB-
3 jack-up, 550 T crane, Saudi Arabia
Fabrication of tub, column and boom, 500T total with 690 material Nov, 2008 – Apr, 2009
Saipem Overhead
cranes assembly for CastorONE
Assembly and completion of cargo hold overhead cranes from Navalimpianti,March, 2009 May,2009
PJOE
Page 2 of 12
Mechanical Structures Client
Project Description incl weight and year
Bluewater CALM buoys
07 and 08 CALM buoys, combined 500T, Nov, 2007 – Oct, 2008
Hydralift/ AmClyde
Swiber M60 Offshore Crane
Offshore crane, model M60, 640T, 2009
Hydralift/ AmClyde
Global PC-37 Offshore Mast Cranes Global 1200
Offshore crane, model PC-37, 1,400T, 2009
Hydralift/ AmClyde
GSP Bigfoot 1, KP-87 King Post crane
Offshore crane, model KP-87, 400T, 2009
Swiber LDB Swiber
Chai vessel Part engineering, fabrication of tub, counter weight, stinger, boom rest and installation of M60 AmClyde crane and engine room, 1,500 T, June, 2009 – Dec, 2009
PJOE
Page 3 of 12
Mechanical Structures Client
Project Description incl weight and year
Swiber LDB Swiber
Chai vessel Part engineering, fabrication of tub, counter weight, stinger, boom rest and installation of M60 AmClyde crane and engine room, 1,500 T, June, 2009 – Dec, 2009
Aker Solutions
Tupi SRU modules, Brazil
Exotic piping for Tupi modules, 150 kg, May, 2009 – Sep, 2009
CITIC Pacific Mining
Cape Preston Iron Ore project, Desalination Plant, Australia
Fabrication of 7 marine harbour caisson structures 2,450 Ton, July, 2009 – Oct, 2010
CITIC Pacific Mining
Cape Preston Iron Ore project, Desalination Plant, Australia
Fabrication of Brine Tank out fall structure 1,000 Ton, July, 2009 – Oct, 2010
Saipem Completion
work on Pipe joint Hatches CastorONE
Assembly and completion of pipe joint cargo holds hatches from Navalimpianti, 2009
Hyundai Moon
Heat exchangers assembly for power plant Bahrain
Providing of facilities and assistance for heat exchanger assembly, 20, 300T each, 2009
PJOE
Page 4 of 12
Mechanical Structures Client
Project Description incl weight and year
CITIC Pacific Mining
Cape Preston Iron Ore project, Desalination Plant, Australia
Fabrication of 7,600T pre-cast elements for Desalination Plant, July, 2009 – Oct, 2010
CITIC Pacific Mining
Cape Preston Iron Ore project, Desalination Plant, Australia
Part design and fabrication of SR-1 E-House, 780T, July, 2009 – Aug, 2010
CITIC Pacific Mining
Cape Preston Iron Ore project, Desalination Plant, Australia
Part design and fabrication of SR-2 and SR-3 E-Houses, 50 and 45T, July, 2009 – May, 2010
CITIC Pacific Mining
Cape Preston Iron Ore project, Desalination Plant, Australia
Part design and fabrication of control room, 80T, July, 2009 – May, 2010
CITIC Pacific Mining
Cape Preston Iron Ore project, Desalination Plant, Australia
Part design and fabrication of equipment skids, up to 1,200T total, Sep, 2009 – Dec, 2009
PJOE
Page 5 of 12
Mechanical Structures Client
Project Description incl weight and year
CITIC Pacific Mining
Cape Preston Iron Ore project, Desalination Plant, Australia
Part design and fabrication of Reverse Osmosis East and West module, 2 x 3,000 T, each shipped in 2 parts, July, 2009 – May, 2010
CITIC Pacific Mining
Cape Preston Iron Ore project, Desalination Plant, Australia
Part design and fabrication of Pump module East and West, 700T and 600T, July, 2009 – Oct, 2010
CITIC Pacific Mining
Cape Preston Iron Ore project, Desalination Plant, Australia
Part design and fabrication of Pre-treatment modules East and West, 3,600T each, shipped in 4 parts each, July, 2009 – Oct, 2010
PJOE
Page 6 of 12
Mechanical Structures Client
Project Description incl weight and year
Hydralift AmClyde
M52 crane for Bumi Armada
Offshore crane model M52 suitable for Caspian Sea transport, 410T, 2010
Conoco Phillips
Penglai helicopter base, China
Aluminum helicopter maintenance platform, 3T, 2010
CITIC Pacific Mining
Cape Preston Iron Ore project, Desalination Plant, Australia
Part design and fabrication of pipe racks and supports, total 600T, 2010
CNOOC Spooling
Reels Fabrication of 2 cable reels, 35T each, July, 2009
Hydralift/ AmClyde
Global PC-37 Offshore Mast Cranes Global 1201
Offshore crane, model PC-37, 1,200T capacity, 1,400T, Oct, 2009 – Sep, 2010
PJOE
Page 7 of 12
Mechanical Structures Client
Project Description incl weight and year
Hydralift AmClyde
PC-37 crane for Saipem FDS II
Offshore crane model PC-37 1,000T capacity for Saipem, 720T, Nov, 2009 – July, 2010
CITIC Pacific Mining
Cape Preston Iron Ore project, Desalination Plant, Australia
Design and fabrication of 2 barge loading dolphins, ~ 750T, delivery 2010
CITIC Pacific Mining
Cape Preston Iron Ore project, Desalination Plant, Australia
In-take caisson for desalination plant, 3,600T, delivery October 2010
Hyundai Moon
Sabiya HRSG power plant, Kuwait,
Assembly and part fabrication of 92 heat exchanger modules including load-out, ~ 400T/each, Dec, 2010 – Aug, 2011
PJOE
Page 8 of 12
Mechanical Structures Client
Project Description incl weight and year
Sofec Oil Search,
Papua New Guinea LNG
Fabrication of CALM buoy and PLEM for export, Dec, 2010 – Sep, 2011
EMAS Offshore
Oil Search, Kumul terminal, Papua New Guinea
Fabrication of various components for pipeline installation, 87 Ton including load-out and seafastening of CALM buoy system, Dec, 2010 – Nov, 2011
Hyundai Moon
Power plant, Saudi Arabia
Assembly and part fabrication of 62 heat exchanger modules including load-out, ~ 300T/each, delivery 2011
PJOE
Page 9 of 12
Mechanical Structures Client
Project Description incl weight and year
Seajacks Zaratan jack-up plfm, 800 ton crane
Fabrication of Leg Crane, 860T, Dec, 2010 – Nov, 2011
GustoMSC A2SEA Sea
Installer jack-up plfm, 800 ton crane
Fabrication of Leg Crane, 860T, March, 2011 – Feb, 2012
Karara Mining Ltd
Karara Iron Ore Mine, EPCM Worley Parsons, West Australia
Fabrication of chute platework for inland assembly including installation of liners, 1,315T Nov, 2011 – Apr, 2012
PJOE
Page 10 of 12
Mechanical Structures Ongoing projects PJOE yard The following projects are presently ongoing in the PJOE yard: Client
Project Description incl weight and year
Sandvik Rio Tinto,
Cape Lambert port B, Ship Loader 11, Australia
Fabrication, final assembly and disassembly of ship-loader, June, 2011 – Nov, 2012
Sandvik Rio Tinto,
Hope Down, two Stackers and one reclaimer, Australia
Fabrication, final assembly and disassembly of two stackers, 590T/each and one reclaimer 1,530T, June, 2011 – Aug, 2012
BMA(BHP Billiton & Mitsubishi Alliance)
Hay Point Expansion Stage 3, Australia
Procurement, fabrication and assembly of 262 Conveyor Gallery Modules, ~9,500T and fabrication of 176T welded frames for conveyor galleries drives, July, 2011 – Oct, 2012
COSCO ATP, Cheviot
filed, Octobuoy topsides
Rolling of tubulars for deck structure, 1,255T Oct, 2011 – June, 2012
PJOE
Page 11 of 12
Mechanical Structures Client
Project Description incl weight and year
BMA(BHP Billiton & Mitsubishi Alliance)
Hay Point Expansion Stage 3, Australia
Procurement, fabrication and assembly of 7 Surge Bins and Transfer Tower modules, 6,600T and fabrication of 212T chutes platwork, July, 2011 – Dec, 2012
Sofec Tesoro
Hawaii, USA Fabrication of CALM buoy, 210T Nov, 2011 – July, 2012
Sofec CNOOC,
LuFeng field, P R of China
Fabrication of spider buoy, 290T Nov, 2011 – June, 2012
Heerema ExxonMobil
Arkutun-Dagi field, Sakhalin, Russia
Fabrication of spools, protection sections and miscellaneous structures, 400T total, Nov, 2011 – July, 2012
PJOE
Page 12 of 12
Mechanical Structures Client
Project Description incl weight and year
BP BP, Jacobs Engineering EPCM, Bulwer Refinery, Brisbane, Australia
Fabrication of Hydroisom & HF Alkylation modules, 550T, March, 2012 – Aug, 2012
Sandvik Semarco
Brazil Fabrication of shiploader, 1,000T, May, 2012 – Feb, 2013