MeDON: Welcome and aims of the meeting

Tim Smyth

Page 2: MeDON: Welcome and aims of the meeting Tim Smyth

Now completed 90% of project

• MeDON Interreg project ends 31/10/2012– 128 days to go …

• Aims of meeting:– To ensure that we make the most of cable for

instrument deployments (ENSTA, PML, UoP)– To ensure that we capitalise on cable for outreach

activities (NMA, Oceanopolis)– To ensure website cleaned up and fit for purpose

(ENSTA, PML)

• Reporting period 6: end 31/10/2012– Need to enter everything by 13/11/2012

Page 3: MeDON: Welcome and aims of the meeting Tim Smyth

MeDON: Web site and data dissemination

Tim Smyth and Jean-Philippe Schneider

Page 4: MeDON: Welcome and aims of the meeting Tim Smyth

Current website

Page 5: MeDON: Welcome and aims of the meeting Tim Smyth

Where are we with the website?

• Have updated with website with news of the launch of the cable– This in conjunction with a French and English press

release.

• Need to decide how to present the data flows (ENSTA website) … and link this to the PML maintained website– OK for acoustics– Environmental data problematic (no working sensors)– Need camera feeds and ADCP added to ENSTA

Page 6: MeDON: Welcome and aims of the meeting Tim Smyth

• http://medon.ensta-bretagne.fr/doku.php

Page 7: MeDON: Welcome and aims of the meeting Tim Smyth

MeDON: Finances and project management

Tim Smyth

Page 8: MeDON: Welcome and aims of the meeting Tim Smyth

Financial – this to ensure that we are spending correctly …

Page 9: MeDON: Welcome and aims of the meeting Tim Smyth
Page 10: MeDON: Welcome and aims of the meeting Tim Smyth
Page 11: MeDON: Welcome and aims of the meeting Tim Smyth
Page 12: MeDON: Welcome and aims of the meeting Tim Smyth
Page 13: MeDON: Welcome and aims of the meeting Tim Smyth
Page 14: MeDON: Welcome and aims of the meeting Tim Smyth

Project co-ordination and overall management

• 1.3 Progress report (PML) – your inputs due by 13/11/2012

• 1.4 Newsletter (PML) – newsletter 05 due for publication after this meeting; highlight the success of the cable deployment and other issues. Possible final newsletter at the end of the project.

WP1 – Co-ordination

Page 15: MeDON: Welcome and aims of the meeting Tim Smyth

• 3.1 Instrument packages: expecting wet and dry tests during March (IFREMER, PML, ENSTA)

• 3.4 Logistics: will need to write up diary of events for the deployment of the cable from beginning to end (IFREMER)

• 3.5 Development and fabrication of the proof of concept: Cable to be deployed (June 2012); Instruments attached.• Need to sort out environmental parameter

measurement.

• 3.6 Acoustics to be plugged into cable (June 2012)

WP3 - Technology

Page 16: MeDON: Welcome and aims of the meeting Tim Smyth

WP4 - Feasibility

• 4.1 Economic model for phase II (PML) – report being finalised, submitted in next reporting period

• 4.2 Site surveys – reports required for both sides of the Channel (IFREMER, PML)

• 4.3 Legal Framework – will be tied up with 4.1

• 4.4 Early test of the proof-of-concept via pilot site – (IFREMER, others); starting in June 2012

Page 17: MeDON: Welcome and aims of the meeting Tim Smyth

WP5 – Public outreach etc.

• 5.1: Touring exhibition, public outreach web portal, best practice model, report on public awareness, report on learning outcomes, educative activities, storyboard and bi-lingual questionnaires.

• 5.2: Sustainability of the partnership

• 5.3: Disseminate outcomes and achievements, regionally and European level: final conference?

Page 18: MeDON: Welcome and aims of the meeting Tim Smyth

What next? Open discussion.

• Future of the partnership

• Possible future funding mechanisms

• Conferences / workshops / papers– Oceans of Potential – September 2012.