meeting agenda template - western australian planning ... daps/metro central... · issue...
TRANSCRIPT
V
O
I
D
CUT OPENING IN WALL PRECAST
CONCRETE WALL FOR ACCESS
BETWEEN BUILDING 1 & 2
ROLLER DOORS TO
FIRST FLOOR OF
BUILDING 2 TO BE
REMOVED
O
P
E
N
T
O
G
R
O
U
N
D
KITCHENETTE &
BATHROOM TO BE
REMOVED
EXISTING PRECAST
CONCRETE WALL TO BE
CUT FOR PROPOSED
OPENING
G
R
O
U
N
D
F
L
O
O
R
L
E
V
E
L
B
E
L
O
W
CUT OPENINGS IN
PRECAST
CONCRETE WALL
FOR PROPOSED
WINDOWS
CUT OPENINGS IN
PRECAST
CONCRETE WALL
FOR PROPOSED
WINDOWS
AA006
BA006
AA006
BA006
AA006
BA006
AA006
BA006
BE
LM
ON
T A
VE
NU
EB
ELM
ON
T A
VE
NU
E
C
L
E
A
V
E
R
T
E
R
R
A
C
E
BUILDING 1
RL 16.000
FFL 16.480
RL 19.480
BUILDING 2
REMOVE AND
REDIRECT EXISTING
DOWNPIPE
NOTE:
RL: -.-- REFERENCE TO AUSTRRALIAN
HEIGHT DATUM
LEGEND:
ITEMS TO BE DEMOLISHED AND
REMOVED SHOWN DASHED.
GARDEN TO BE REMOVED
Issue Description Date Issue Description Date Client Project Title Drawing No. Issue
Scale
Project Number Date Drawn By
Drawing Size
CAD Reference
A1
D
E
V
E
L
O
P
M
E
N
T
A
P
P
L
IC
A
T
IO
N
O
N
L
Y
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
IO
N
Dimensioned Drawings to take precedence over scaling. Contractor to verify all dimensions
on site before construction. All inconsistencies to be reported to the Architect immediately.
This drawing and its contents remain the copyright of WMK Architecture Pty Ltd ©
ABN 85 164 151 491
Telephone 03 9999 1610
wmkarchitecture.com
WMK Architecture
L5 165 Flinders Lane
Melbourne VIC 3000 1 PRELIMINARY DA ISSUE 11/12/14
A DA ISSUE 15/12/14
CHURCH OF SCIENTOLOGY
AUSTRALIA
12 -22 BELMONT AVENUE,
RIVERVALE, PERTH.
EXISTING FIRST FLOOR
PLAN & DEMOLITION PLAN
A003 A
1:200 @ A1 1:400 @ A3
14122 15/12/2014 KF & DD
DEVELOPMENT ASSESSMENT PANELS APPROVED 31 MAY 2015
CONCRETE FOOTPATH
BELMONT AVENUE
(PARKING AT GROUND FLOOR LEVEL)
RAMP TO PARKING 34 CARPARKS
CAR PARK
GROUND FLOOR
LEVEL(UNCOVERED)
LOT 603
NO 10
SIT
E B
OU
ND
AR
Y
S
IT
E
B
O
U
N
D
A
R
Y
SITE BOUNDARY
NO 27-33
EXISTING
LANDSCAPING TO BE
REFURBISHED
IN
OUT
IN
OUT
2500
EXISTING CAR PARKING:
BUILDING 2 BASEMENT -- 34 BAYS
BUILDING 2 GROUND -- 3 BAYS
BUILDING 1 GROUND -- 32 BAYS
(CAR PARK OFF BELMONT AVE)
TOTAL 69 EXISTING BAYS
PROPOSED CAR PARKING:
BUILDING 2 BASEMENT -- 32 BAYS
BUILDING 2 GROUND -- 3 BAYS
BUILDING 1 GROUND -- 50 BAYS
(CAR PARK OFF BELMONT AVE)
TOTAL 85 PROPOSED BAYS
NEIGHBORING
CAR PARK
TWO WAY
AISLE
ONE WAY
AISLE
13 BAYS
TWO WAY
AISLE
PARKING
14 BAYS
SITE BOUNDARY
54
00
58
00
54
00
54
00
2
5
0
0
NEW ROOF SHEETING
TO REPLACE EXISTING
ROOF LIGHTS
NEW SUN
SHADES
NEW SUN
SHADES AND
SURROUNDS
NEW SUNSHADES/
ROOF TO NEW WINDOWS
NEW SUNSHADE AND
SURROUND TO NEW WINDOW
58
00
1.
NEW ENTRY PAVING
NEW FEATURE WALL
E
X
IS
T
IN
G
L
A
N
D
S
C
A
P
IN
G
T
O
B
E
R
E
F
U
R
B
IS
H
E
D
EXISTING LANDSCAPING TO
BE REFURBISHED
NEIGHBORING
CAR PARK
NEIGHBORING
BUILDING
NEIGHBORING
BUILDING
METAL ROOF
BUILDING
EXISTING BUILDING 1
LOT 601
GROUND FLOOR RL 16.000
FIRST FLOOR RL 19.480
29
55
0
CO
NF
IR
M O
N S
IT
E
36
74
0
CO
NF
IR
M O
N S
IT
E
31
04
5
CO
NF
IR
M O
N S
IT
E
6080
CONFIRM ON SITE
27260
CONFIRM ON SITE
8540
CONFIRM ON SITE
6400
CONFIRM ON SITE
11091
CONFIRM ON SITE
AREAS:
SITE AREA: 5380 m² 100 %
BUILDING 1
SITE COVERAGE: 805 m² 15%
BUILDING 2
SITE COVERAGE: 1640 m² 30.5%
TOTAL COVERAGE: 2445 m² 45.5%
AREAS APPROPRIATE ONLY.
TO BE CONFIRMED BY SITE SURVEYOR.
EASEMENT
IN
OUT
3 BAYS
43560
CONFIRM ON SITE
17590
CONFIRM ON SITE
UP
RIGHT OF
CARRIAGE
WAY
2
4
0
0
5
8
0
0
NEW
ACCESSIBLE
PATH
A A601
BA601
A A601
BA601
20
20
18.5
18
17.5 17
19.5
19
19
18.5
18
17.5
17
16.5
16
MAIN ENTRANCE
TO BUILDING 1
2.
x2 ACCESSIBLE
PARKING
TOTAL 60 BICYCLE
SPACES
NEW BOLLARDS
TO EXIT
BIN
COLLECTION
PAILING FENCE
TO BIN
ENCLOSURE
BUILDING 1 ACCESS LIMITED TO
CSA MEMBERS & STAFF ONLY
33
38
51
65
68
37
64
50
67
82
34
46 BICYCLE
SPACES
32 CAR PARKS + 14
BICYCLES SPACES
MAIN
ENTRANCE
(FIRST FLOOR LEVEL)
EXISTING
LOADING BAY
EXISTING LANDSCAPING
TO REMAIN
Issue Description Date Issue Description Date Client Project Title Drawing No. Issue
Scale
Project Number Date Drawn By
Drawing Size
CAD Reference
A1
D
E
V
E
L
O
P
M
E
N
T
A
P
P
L
IC
A
T
IO
N
O
N
L
Y
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
IO
N
Dimensioned Drawings to take precedence over scaling. Contractor to verify all dimensions
on site before construction. All inconsistencies to be reported to the Architect immediately.
This drawing and its contents remain the copyright of WMK Architecture Pty Ltd ©
ABN 85 164 151 491
Telephone 03 9999 1610
wmkarchitecture.com
WMK Architecture
L5 165 Flinders Lane
Melbourne VIC 3000 1 PRELIMINARY DA ISSUE 11/12/14
A DA ISSUE 15/12/14
CHURCH OF SCIENTOLOGY
AUSTRALIA
12 - 22 BELMONT AVENUE,
RIVERVALE, PERTH.
PROPOSED SITE PLAN A100 B
1:250 @ A1 1:500 @ A3
14122 09/01/2015 KF & DD
B AMENDMENTS SHOWN CLOUDED 11/02/2015
DEVELOPMENT ASSESSMENT PANELS APPROVED 31 MAY 2015
DEVELOPMENT ASSESSMENT PANELS APPROVED 31 MAY 2015
DEVELOPMENT ASSESSMENT PANELS APPROVED 31 MAY 2015
NORTH ELEVATION
BO
UN
DA
RY
BUILDING 1
FIRST FFL RL 16.000
9028
SUNSHADE OVER PROPOSED
FLOOR WINDOWS
DARK GREY PAINT FINISH
TO BASE OF PRECAST
LIGHT GREY PAINT FINISH
TO TOP OF PRECAST
POWDER COATED
MULLIONS TO WINDOWS
SPANDREL / SILL BEHIND
GLASS
BUILDING 2
GROUND FFL 16.651
FIRST FFL 19.480
2829
SOUTH ELEVATION
RAMP TO GROUND FLOOR
NGL
8162
BO
UN
DA
RY
BO
UN
DA
RY
LIGHT GREY PAINT FINISH
TO TOP OF PRECAST
SUNSHADE SURROUND
TO WINDOW
DARK GREY PAINT FINISH
TO BASE OF PRECAST
SUNSHADE TO
PROPOSED SLOT
WINDOW
CLADDING TO BUILDING 1 SOUTH FACADE
TO MATCH SUNSHADE (BEYOND)
PROPOSED NEW
WINDOWS
PROPOSED NEW WINDOWS
PROPOSED NEW
SIGNAGE ZONE
BLOCK UP EXISTING
OPENINGS AND PAINT TO
MATCH ADJOINING SURFACES
EAST ELEVATION
WEST ELEVATION
BO
UN
DA
RY
FFL 16.65
UNDERSIDE
ROOF BEAM
TOP OF ROOF
PARAPET
BUILDING 1
FFL 16.00
BUILDING 2
FIRST
FLOOR
TOP OF ROOF
PARAPET
GROUND
FLOOR
FFL 19.48
4950
9028
GROUND
FLOOR
2830
8107
LIGHT GREY PAINT
FINISH TO TOP OF
PRECAST
SUNSHADE SURROUND
TO WINDOW
ENTRY
DARK GREY PAINT
FINISH TO BASE OF PRECAST
SUNSHADE TO PROPOSED
FIRST FLOOR WINDOWS
BLACK POWDER
COATED MULLIONS
TO WINDOWS
EXISTING BASEMENT
ENTRY TO REMAIN
EXISTING WINDOW
TO REMAIN
POWDER COATED
MULLIONS TO WINDOW
SUNSHADE TO
PROPOSED WINDOW
NGL
WALL ON BOUNDARY
UNDERSIDE
ROOF BEAM
TOP OF ROOF
PARAPET
8891
2829
BUILDING 1
GROUND FFL 16.00
GROUND FFL 16.651
8268
TOP OF
ROOF PARAPET
FIRST FFL 19.480
4950
NGL
CLADDING TO BUILDING 1 SOUTH
FACADE TO MATCH SUNSHADE
LIGHT GREY PAINT FINISH
TO TOP OF PRECAST
DARK GREY PAINT FINISH
TO BASE OF PRECAST
NEW SLOT
WINDOW
NEW FEATURE
ENTRY WALL
BUILDING 1
OUTLINE
PRE-FINISHED METAL
CLADDING
SUN SHADING EXTENDS
TO ROOF PARAPET LEVEL
SPANDREL / SILL
BEHIND GLASS
PRE-FINISHED METAL
CLADDING
POWDER COATED ALUMINIUM
MULLIONS
NEW GLAZING
SPANDREL (BEHIND GLAZING)
PRE-FINISHED METAL
CLADDING
LEGEND
LIGHT GREY PAINT FINISH
TO PRECAST
NEW METAL SUNSHADE
DARK GREY PAINT FINISH
TO PRECAST
4950
NEW FLYING DOWNPIPE IN
BUILDING 2 CEILING SPACE.
EXISTING RAINWATER
HEAD TO BE REMOVED.
PATCH OPENING IN WALL
CONNECT NEW DOUNPIPE
TO EXISTING SITE
STORMWATER MAIN
3474
2700
2700
3474
GROUND FFL RL 19.480
FIRST FFL 19.480
FFL 19.48
FIRST
FLOOR
3435
2700
NEW MAIN ENTRY
TO BUILDING 1
SUNSHADING EXTENDS TO
ROOF PARAPET LEVEL
Issue Description Date Issue Description Date Client Project Title Drawing No. Issue
Scale
Project Number Date Drawn By
Drawing Size
CAD Reference
A1
D
E
V
E
L
O
P
M
E
N
T
A
P
P
L
IC
A
T
IO
N
O
N
L
Y
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
IO
N
Dimensioned Drawings to take precedence over scaling. Contractor to verify all dimensions
on site before construction. All inconsistencies to be reported to the Architect immediately.
This drawing and its contents remain the copyright of WMK Architecture Pty Ltd ©
ABN 85 164 151 491
Telephone 03 9999 1610
wmkarchitecture.com
WMK Architecture
L5 165 Flinders Lane
Melbourne VIC 3000 1 PRELIMINARY DA ISSUE 11/12/14
A DA ISSUE 15/12/14
CHURCH OF SCIENTOLOGY
AUSTRALIA
12 - 22 BELMONT AVENUE,
RIVERVALE, PERTH.
PROPOSED ELEVATIONS A501 B
1:200 @ A1 1:400 @ A3
14122 09/01/2015 KF & DD
B ENTRY AMENDMENTS 11/02/2015
DEVELOPMENT ASSESSMENT PANELS APPROVED 31 MAY 2015
PROPOSED
BOUNDARY
EXISTING FLOOR SLAB
EXISTING CAR PARK
EXISTING ROOF STRUCTURE
NEW SUSPENDED CEILING
NEW CONCRETE FLOOR SLAB
EXISTING CONCRETE FLOOR SLAB
NEW SUSPENDED CEILING
FFL 16.480
FFL 19.480
FFL 16.000
FFL 19.480
BUILDING 2
SECTION A-A
BUILDING - 1
AP
PR
OX
27
00
78
0
27
00
AP
PR
OX
30
00
AP
PR
OX
49
50
AP
PR
OX
EXISTING ROOF STRUCTURE
NEW SUSPENDED CEILING
EXISTING COLUMNS
NEW INTERNAL LINING
TO EXISTING WALLS
NEW INTERNAL LINING
TO EXISTING WALLS
EXISTING
BUILDING
NEW SPANDREL PANEL
TO BUILDING INTERIOR
SECTION A-A
BUILDING - 1
SECTION B-B
FFL 16.000
FFL 19.480
27
00
AP
PR
OX
78
0
27
00
AP
PR
OX
NEW CONCRETE FLOOR SLAB
NEW CEILING
EXISTING CONCRETE FLOOR SLAB
EXISTING ROOF STRUCTURE
PROPOSED COLUMN
NEW SUSPENDED CEILING
NEW INTERNAL LINING
TO EXISTING WALLS
NEW INTERNAL LINING
TO EXISTING WALLS
Issue Description Date Issue Description Date Client Project Title Drawing No. Issue
Scale
Project Number Date Drawn By
Drawing Size
CAD Reference
A1
D
E
V
E
L
O
P
M
E
N
T
A
P
P
L
IC
A
T
IO
N
O
N
L
Y
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
IO
N
Dimensioned Drawings to take precedence over scaling. Contractor to verify all dimensions
on site before construction. All inconsistencies to be reported to the Architect immediately.
This drawing and its contents remain the copyright of WMK Architecture Pty Ltd ©
ABN 85 164 151 491
Telephone 03 9999 1610
wmkarchitecture.com
WMK Architecture
L5 165 Flinders Lane
Melbourne VIC 3000 1 PRELIMINARY DA ISSUE 11/12/14
A DA ISSUE 15/12/14
CHURCH OF SCIENTOLOGY
AUSTRALIA
12 -22 BELMONT ANVENUE,
RIVERVALE, PERTH
PROPOSED SECTION AA A601 A
1:100 @ A1 1:200 @ A3
14122 15/12/2014 KF & DD
DEVELOPMENT ASSESSMENT PANELS APPROVED 31 MAY 2015
BOUNDARY
EXISTING FLOOR SLAB
EXISTING CONCRETE FLOOR SLAB
EXISTING CAR PARK
FIRST FFL 19.480
GROUND FFL 16.480
EXISTING ROOF STRUCTURE
FFL 16.000
BUILDING 2
BUILDING 1
8891 A
PP
RO
X
7971 A
PP
RO
X
FFL 16.000
8891 A
PP
RO
X
REMOVE EXISTING ROOF LIGHTS
EXISTING CONCRETE FLOOR SLAB
SECTION A-A
SECTION B-B
BUILDING 1
EXISTING ROOF STRUCTURE
REMOVE EXISTING ROOF LIGHTS
EXISTING ROOF STRUCTURE
CUT OPENING IN WALL FOR ACCESS
BETWEEN BUILDING 1 & 2
EXISTING PRECAST CONCRETE WALL
TO BE CUT FOR PROPOSED OPENING
3000
EXISTING COLUMN
EXISTING COLUMN
EXISTING COLUMNS
NOTE:
RL: -.-- REFERENCE TO AUSTRRALIAN
HEIGHT DATUM
LEGEND:
ITEMS TO BE DEMOLISHED AND
REMOVED SHOWN DASHED.
Issue Description Date Issue Description Date Client Project Title Drawing No. Issue
Scale
Project Number Date Drawn By
Drawing Size
CAD Reference
A1
D
E
V
E
L
O
P
M
E
N
T
A
P
P
L
IC
A
T
IO
N
O
N
L
Y
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
IO
N
Dimensioned Drawings to take precedence over scaling. Contractor to verify all dimensions
on site before construction. All inconsistencies to be reported to the Architect immediately.
This drawing and its contents remain the copyright of WMK Architecture Pty Ltd ©
ABN 85 164 151 491
Telephone 03 9999 1610
wmkarchitecture.com
WMK Architecture
L5 165 Flinders Lane
Melbourne VIC 3000 1 PRELIMINARY DA ISSUE 11/12/14
A DA ISSUE 15/12/14
CHURCH OF SCIENTOLOGY
AUSTRALIA
12 -22 BELMONT AVENUE,
RIVERVALE, PERTH.
EXISTING SECTION A006 A
1:100 @ A1 1:200 @ A2
14122 15/12/2014 KF & DD
DEVELOPMENT ASSESSMENT PANELS APPROVED 31 MAY 2015
BUILDING 1
NORTH ELEVATION
UNDERSIDE
ROOF BEAM
TOP OF ROOF
PARAPET
FFL 16.00
GROUND
FLOOR
6902 A
PP
RO
X
8891 A
PP
RO
X
GROUND FFL 16.651
FIRST FFL 19.480
2829
UNDERSIDE
ROOF BEAM
TOP OF ROOF
PARAPET
EAST ELEVATION
BUILDING 2
BUILDING 1
UNDERSIDE
ROOF BEAM
TOP OF ROOF
PARAPET
CAR PAKING ONLY
GROUND FFL 16.651
GROUND FFL 16.00
FIRST FFL 19.480
2763
6456 A
PP
RO
X
8107 A
PP
RO
X
6902 A
PP
RO
X
8891 A
PP
RO
X
BUILDING 2
SOUTH ELEVATION
WEST ELEVATION
W
A
L
L
O
N
B
O
U
N
D
A
R
Y
BUILDING 2
UNDERSIDE
ROOF BEAM
TOP OF ROOF
PARAPET
6902 A
PP
RO
X
2829
AP
PR
OX
BUILDING 1
9358 A
PP
RO
X
GROUND FFL 16.00
GROUND FFL 16.651
UNDERSIDE
ROOF BEAM
8268 A
PP
RO
X
TOP OF ROOF
PARAPET
FIRST FFL 19.480
6527 A
PP
RO
X
R
A
M
P
T
O
G
R
O
U
N
D
F
L
O
O
R
NGL
8162 A
PP
RO
X
NGL
BO
UN
DA
RY
BO
UN
DA
RY
BO
UN
DA
RY
BO
UN
DA
RY
NGL
NGL
CUT, DEMOLISH AND REMOVE
PRECAST WALLING FOR NEW
OPENINGS
REMOVE EXISTING ROLLER
SHUTTER DOORS
REMOVE EXISTING DOOR
REMOVE EXISTING ROLLER
SHUTTER DOORS
CUT, DEMOLISH AND REMOVE
PRECAST WALLING FOR NEW
OPENINGS
CUT, DEMOLISH AND
REMOVE PRECAST WALLING
FOR NEW OPENINGS
REMOVE EXISTING ROLLER
SHUTTER DOORS
DEMOLISH AND REMOVE EXISTING
AWNING
EXISTING RAINWATER
HEAD AND DOWNPIPE TO
BE REMOVED.
Issue Description Date Issue Description Date Client Project Title Drawing No. Issue
Scale
Project Number Date Drawn By
Drawing Size
CAD Reference
A1
D
E
V
E
L
O
P
M
E
N
T
A
P
P
L
IC
A
T
IO
N
O
N
L
Y
N
O
T
F
O
R
C
O
N
S
T
R
U
C
T
IO
N
Dimensioned Drawings to take precedence over scaling. Contractor to verify all dimensions
on site before construction. All inconsistencies to be reported to the Architect immediately.
This drawing and its contents remain the copyright of WMK Architecture Pty Ltd ©
ABN 85 164 151 491
Telephone 03 9999 1610
wmkarchitecture.com
WMK Architecture
L5 165 Flinders Lane
Melbourne VIC 3000 1 PRELIMINARY DA ISSUE 11/12/14
A DA ISSUE 15/12/14
CHURCH OF SCIENTOLOGY
AUSTRALIA
12 -22 BELMONT AVENUE,
RIVERVALE, PERTH.
EXISTING / DEMOLITION
ELEVATIONS
A005 A
1:200 @ A1 1:400 @ A3
14122 15/12/2014 KF & DD
DEVELOPMENT ASSESSMENT PANELS APPROVED 31 MAY 2015
LG Ref: 826/2014/A DoP Ref: DAP/14/00699 Enquiries: Development Assessment Panels Telephone: (08) 6551 9919
Mr Aaron Lohman Rowe Group Level 3, 369 Newcastle Street Northbridge WA 6003
Dear Mr Lohman
Metro Central JDAP – City of Belmont – DAP Application 826/2014/A Lot 604 (22) Belmont Avenue, cnr Cleaver Terrace, Rivervale Change of Use from Warehouse to Place of Public Worship, Education Establishment, Offices.
Thank you for your application and plans submitted to the City of Belmont on 27 April 2017 for the above development at the abovementioned site.
This application was considered by the Metro Central Joint Development Assessment Panel at its meeting held on 21 June 2017, where in accordance with the provisions of the City of Belmont Local Planning Scheme No.15, it was resolved to approve the application as per the attached notice of determination.
Should the applicant not be satisfied by this decision, a DAP Form 2 application may be made to amend or cancel this planning approval in accordance with regulation 17 of the Planning and Development (Development Assessment Panels) Regulations 2011.
Please also be advised that there is a right of review by the State Administrative Tribunal in accordance with Part 14 of the Planning and Development Act 2005. Such an application must be made within 28 days of the determination, in accordance with the State Administrative Tribunal Act 2004.
Should you have any queries with respect to the conditions of approval, please contact Ms Helen Taylforth at the City of Belmont on (08) 9477 7175.
Yours sincerely,
Zoe Hendry DAP Secretariat
26/06/2017
Encl. DAP Determination Notice Approved plans
Cc: Ms Helen Taylforth City of Belmont
Postal address: Locked Bag 2506 Perth WA Street address: 140 William Street Perth WA 6000 Tel: (08) 6551 9919 Fax: (08) 6551 9961 TTY: 6551 9007 Infoline: 1800 626 477
[email protected] www.planning.wa.gov.au ABN 35 482 341 493
Planning and Development Act 2005
City of Belmont Local Planning Scheme No.15
Metro Central Joint Development Assessment Panel
Determination on Development Assessment Panel Application for Planning Approval
Location: Lot 604 (22) Belmont Avenue, cnr Cleaver Terrace, Rivervale Description of proposed Development: Change of Use from Warehouse to Place of Public Worship, Education Establishment, Offices. In accordance with regulation 8 of the Planning and Development (Development Assessment Panels) Regulations 2011, the above application for planning approval was granted on 21 June 2017, subject to the following: 1. Accept that the DAP Application reference 826/2014/A as detailed on the DAP
Form 2 dated 28 April 2017 is appropriate for consideration in accordance with regulation 17 of the Planning and Development (Development Assessment Panels) Regulations 2011;
2. Approve the DAP Application reference 826/2014/A as detailed on the DAP
Form 2 dated 28 April 2017 and accompanying plans – Elevations dated 27 April 2017, Site plan dated 2 June 2017 and Basement car park plan dated 8 June 2017 - (Attachment 2) in accordance with Clause 68 of the Planning and Development (Local Planning Schemes) Regulations 2015 and the provisions of Clause 10.3 of the City of Belmont Local Planning Scheme No.15, for the proposed two year extension of time and minor modifications to the approved Change of Use from Warehouse to Place of Public Worship, Education Establishment, Offices at No.22 (Lot 64) Belmont Avenue, corner Cleaver Terrace, Rivervale, subject to:
Amended Conditions 1. Deletion of Condition 2 and the associated Footnotes 6 and 7 of the original
planning approval, which required the amalgamation of Lot 601 and 603, on the basis that the two original lots are now amalgamated into the current Lot 604.
2. Deletion of Condition 14 of the original planning approval with respect to the
contribution to public art and replace planning condition 14 with two new conditions, which reflect the City’s upgraded planning condition for public art contribution and also to reflect the increased public art contribution ($) dollar value due to the increased value of the estimated cost of the development.
Additional Conditions 1. The removal of the electrical substation from within the 7.5m Cleaver Terrace
setback or unless otherwise approved by the City.
2. The colour of the hydrant booster cabinet and the electrical substation shall be consistent with the proposed colour of the development/building to the satisfaction of the City.
Page 1 of 2
3. Within 120 days of the date of this approval, the owner/applicant shall elect to
either:
a) Seek approval from the City of Belmont for an artist to provide public art on the development site to a minimum value of 1% of the estimated cost of the development (exclusive GST); or
b) Make arrangements with the City of Belmont for a cash-in-lieu payment of
1% of the estimated cost of the development (exclusive GST).
to the satisfaction of the City. 4. Where public art will be provided on the development site in accordance with
the Condition above, the approved concept/strategy shall be thereafter implemented and the artwork constructed and maintained for the life of the development to the satisfaction of the City.
Additional Advice Notes 1. With regard to the relocation of the electrical substation, the City’s preferred
external/free standing location for the substation is within the landscape area abutting the northern corner of the site and subject to modifications to ground levels to accommodate Western Power access to the structure. Landscaping should be provided along the Belmont Ave frontage to assist screening of the structure. Should this site not be acceptable after further investigation with Western Power, then the site within the Cleaver Terrace setback area will be reconsidered.
2. With regard to the required 1% contribution to public art, the City acknowledges
the applicant/owner has made a cash-in-lieu payment of $60,000 to the City. The City now seeks the balance of the 1% public art contribution based on the upgraded estimated cost of the development.
All other conditions and requirements detailed on the previous approval determined by the Metro Central Joint Development Assessment Panel (JDAP) on 31 May 2015 shall remain unless altered by this application. Where an approval has so lapsed, no development shall be carried out without further approval having first been sought and obtained, unless the applicant has applied and obtained Development Assessment Panel approval to extend the approval term under regulation 17(1)(a) of the Planning and Development (Development Assessment Panels) Regulations 2011.
Page 2 of 2
CLEAR
5800 1000
7500
CLEAR
5800
5400
CLEAR5800
540
NEW POWDERCOATED ALUMINIUM FENCE WHERE FALL EXCEEDS 900mm. CONFIRM EXTENT ON SITE
CO
S
6105
COS
16300
NEW LINEMARKING TO CARBAYS TYPICALLY
NEW KERB TO MATCH EXISTING KERB HEIGHT AND PROFILE
CAR
BAY
TYP
5400
x 2
500
5800
MIN
CLE
AR
5835
5400
5400
5800
5400
NEW RETAINING WALL TO ACCOMMODATE CARBAYS. RE-USE EXISTING RETAINING WALL MATERIALS WHERE POSSIBLE. NEW FINISHES TO MATCH EXISTING
NEW 150 H x 300 W KERB TO BUILDING FACE
NEW GARDEN BED. REFER LANDSCAPE ARCHITECT
NEW 150mm HIGH KERB TO MATCH EXISTING PROFILE
300
ALIG
N
NEW GARDEN BED. REFER LANDSCAPE ARCH.
NEW BOLLARDS TO EXIT
BIN ENCLOSURE
EXISTING ACCESS EASEMENT
NEW POWDERCOATED ALUMINIUM FENCE WHERE FALL EXCEEDS 900mm. CONFIRM EXTENT ON SITE
NEW SUNSHADES TO EXTERNAL FACADE GLAZING
CARBAY 5400 x 2400
ALLOW TO RECTIFY ANY POTHOLES CREATED IN CARPARK AND RAMP SURFACES DURING CONSTRUCTION AND RESURFACE CARPARK AND RAMPS WITH BITUMEN FINISH
REPLACE CROSSOVER TO COUNCIL'S REQUIREMENTS IF DAMAGED DURING CONSTRUCTION
1200
4500
NEW ACCESSIBLE PATH
32500
2500
BOL BOL
EXIST POWER POLE
EXIST POWER POLE
EXIST POWER POLE
EXIST POWER POLE
MH
MH
MH
REFER LANDSCAPE ARCHITECT'S DOCUMENTATION FOR EXTENT OF LANDSCAPE WORKS.
NEW HYDRANT BOOSTER CABINET
HOT WATER PLANT
35KL
FIR
E TA
NK
ON
SER
VIC
ES
PLAT
FOR
M
STEEL GRATED DECK FOR SERVICES PLANT OVER CAR PARK SHOWN HATCHED
NEW
DIS
TRIC
T SU
BSTA
TIO
N
NEW EXTERNAL MSB
NEW CONC SLAB FOR RELOCATED CARBAYS
NEW CONCRETE SLAB TO SUIT NEW RETAINING WALL POSITION
NEW CONC KERB
7300 1400
1000
ALIGN
150
700
NEW 800H RAISED PLANTERS
NEW LARGE FORMAT PAVERS TO ENTRY FORECOURT
PUMP ROOM
4M HIGH ACOUSTIC LOUVER SYSTEM TO SURROUND MECHANICAL DECK AND ENTRANCE AREA
ALLOW TO RECTIFY ANY POTHOLES CREATED IN CARPARK AND RAMP SURFACES DURING CONSTRUCTION AND RESURFACE CARPARK AND RAMPS WITH BITUMEN FINISH
4700
5900
NEW MAIN ENTRANCE TO BUILDING 1C
L E
A V
E R
T E
R R
A C
E
B E L M O N T A V E N U E
4055
EXISTING BUILDING 1 GROUND FLOOR RL 16.000
FIRST FLOOR RL 19.565
EXISTING BUILDING 2 GROUND FLOOR RL 16.670
FIRST FLOOR RL 19.490
33 CAR PARKS + 60 BICYCLE SPACES
BUILDING 1 ACCESS LIMITED TO CSA MEMBERS AND STAFF ONLY
EXTERNAL PLANT REQUIRED FOR MECHANICAL, ELECTRICAL, HYDRAULIC AND FIRE SERVICES EQUIPMENT. ACOUSTIC WALL ADDED TO ACOUSTIC ENGINEER'S RECOMMENDATION
FIRE SERVICES TANK ADDED TO FIRE SERVICES ENGINEER'S RECOMMENDATION
FIRE PUMP ROOM ADDED TO FIRE SERVICES ENGINEER'S RECOMMENDATION
HYDRANT BOOSTER CABINET ADDED TO FIRE SERVICES ENGINEER'S RECOMMENDATION
RAISED PLANTERS ADDED IN LIEU OF FEATURE WALL TO SOFTEN ENTRY AND INCREASE LANDSCAPE
SUBSTATION AND EXTERNAL MSB ADDED TO ELECTRICAL ENGINEER'S RECOMMENDATION
KERB ADDED FOR WALL PROTECTION
EXISTING CARBAYS RELOCATED TO CREATE ENTRY FORECOURT
REQUIRED FOR BCA COMPLIANCE
REQUIRED FOR BCA COMPLIANCE
CANOPY ADDED FOR WEATHER PROTECTION OF ENTRY
LOADING BAY
AREAS:SITE AREA:
BUILDING 1SITE COVERAGE:
BUILDING 2 SITE COVERAGE:
TOTAL COVERAGE:AREAS APPROXIMATE ONLY.TO BE CONFIRMED BY A LICENSED SURVEYOR
5,380m²
805m²
1,640m²
2,445m²
100%
15%
30.5%
45.5%
EXISTING CAR PARKING:BUILDING 2 BASEMENT:BUILDING 2 GROUND:
BUILDING 1 GROUND:(CARPARK OFF BELMONT AVE)
TOTAL
34 BAYS3 BAYS
32 BAYS
69 BAYS
PROPOSED CAR PARKING:BUILDING 2 BASEMENT:BUILDING 2 GROUND:
BUILDING 1 GROUND:(CARPARK OFF BELMONT AVE)
TOTAL
33 BAYS2 BAYS
50 BAYS
85 BAYS(INCL. 1 LOADING AND 3 DDA BAYS)
0 8m1:200
2 4 6
FOR APPROVAL
N
Issue Description Date Client Project Title Drawing No. Issue
Scale Drawing Size
Drawn ByProject No.
CAD ReferenceDimensioned Drawings to take precedence over scaling. Contractor to verify all dimensions on site before construction. All inconsistencies to be reported to the Architect immediately. This drawing and its contents remain the copyright of WMK Architecture Pty Ltd ©
WMK ArchitectureL1 346-348 Kent StSydney NSW 2000Telephone 02 9299 0401Facsimile 02 9299 0402wmkarchitecture.comABN 25 082 956 929 A1
Issue Description Date
KEY PLAN
2
1
E
1 : 200@A1
14122 TD
PROJECT\14122 CSI PERTH\DWG\REVIT\14122 CSI_Perth.RVT
CHURCH OF SCIENTOLOGYINTERNATIONAL
BUILDING & SITE REFURBISHMENT18-22 BELMONT AVENUE, RIVERVALEPERTH WA 6103
DA100PROPOSED SITE PLAN
DDA CARBAY RELOCATED FROM BASEMENT TO ENTRY FORECOURT
P 1 PRELIMINARY DA ISSUE 11/12/14
A DA ISSUE 15/12/14B AMENDMENTS SHOWN CLOUDED 11/02/2015
C EXTERNAL AMENDMENTS FOR COUNCIL REVIEW 14/02/2017
D JDAP RESUBMISSION 19.04.17E LOADING BAY DESIGNATION ADDED 30.05.17
BUILDING 1 GROUNDRL 16000
BUILDING 1 PARAPETRL 25090
BUILDING 1 LEVEL 1RL 19565
P11P11
SC4SC4SC4
GL2
GL3
GL2
GL2
GL3
P11 SC1
SPANDREL
SPANDREL
1. RETURN LEG ADDED FOR CONSISTENT AWNING DESIGN2. CANOPY ADDED FOR WEATHER PROTECTION
BUILDING 2 LOWERGROUND
RL 16670BUILDING 2 GROUNDRL 19490
BUILDING 2 PARAPETRL 27690
SC4
P11
GL2
GL2
GL3
P11GL2
P11
P11
RENDER AND PAINT FINISH TO EXISTING BRICK WALL AND SLAB/BEAM EDGE
P11
SC4
SC1
SC1
P11DP & RWHCANOPY TO NEW WINDOWS
NEW SLOT WINDOW EXISTING BASEMENT ENTRY TO REMAIN
EXISTING LOUVER SCREEN TO BE REPAINTED AND MADE GOOD
NEW MAIN ENTRY TO BUILDING 1
NEW SUNSHADES OVER WINDOWS.
SUNSHADE EXTENDS TO ROOF PARAPET LEVEL
NEW WINDOWS WITH BLACK POWDERCOATED ALUMINIUM MULLIONS
1. VERTICAL LEG OF UPPER CANOPY REMOVED2. SLOT WINDOW WIDTH REDUCED FOR FIRE SEPARATION TO BOUNDARY3. FULL WRAP SUNSHADE TO SLOT WINDOW REPLACED WITH CANOPY TO INCREASE AMENITY AND PROVIDE COVERED WALKWAY TO DDA CARBAY
WIDTH OF GLAZING ELEMENT REDUCED TO ACCOMMODATE EXISTING RETAINING WALL
BUILDING 1 GROUNDRL 16000
BUILDING 1 PARAPETRL 25090
BUILDING 1 LEVEL 1RL 19565
P11
MT4
GL2
GL3
GL2
GL3
SC1
SC4
GL2 GL2
P11P11
P11
P13
NEW SUNSHADES OVER WINDOWS.
NEW WINDOWS WITH BLACK POWDERCOATED ALUMINIUM MULLIONS
SUNSHADE EXTENDS TO ROOF PARAPET LEVEL
LINE OF EXISTING BUILDING 2 PARAPET BEYOND
NEW SUBSTATIONBLOCK WALLS WITH CEMENT RENDER + PAINT FINISH TO MATCH BUILDING FACADE
PREFINISHED METAL CLADDING
SPANDREL
SPANDREL
SUBSTATION + EXTERNAL MSB ADDED ON BOUNDARY TO ELECTRICAL ENGINEER'S RECOMMENDATION
BIN ENCLOSURE
BUILDING 2 GROUNDRL 19490
BUILDING 2 PARAPETRL 27690
P11
EXISTING OPENINGS TO BE INFILLED, RENDERED AND PAINTED TO MATCH ADJOINING SURFACES
P11
P11
PROPOSED PUMP ROOM. HEIGHT OF ROOM TO BE CONFINED BY SERVICES ENGINEER.BLOCK WALLS WITH CEMENT RENDER + PAINT FINISH TO MATCH MAIN BUILDING FACADEP11
NEW AWNING OVER WINDOW SLOT. REFER DETAILS ON DRAWING A12.47
NEW CANOPIES OVER WINDOWS.
NEW BLACK POWDERCOATED ALUMINIUM ACOUSTIC LOUVRE SCREEN TO 4m ABOVE PLANT DECK
WALL ON BOUNDARY
1. VERTICAL LEG OF UPPER CANOPY REMOVED2. FULL WRAP SUNSHADE TO SLOT WINDOW REPLACED WITH CANOPY TO INCREASE AMENITY
ACOUSTIC SCREEN WALL ADDED TO ACOUSTIC ENGINEER'S RECOMMENDATION
PUMP ROOM ADDED TO FIRE SERVICES ENGINEER'S RECOMMENDATION
BUILDING 1 GROUNDRL 16000 BUILDING 2 LOWER
GROUND
RL 16670
BUILDING 2 GROUNDRL 19490
BUILDING 2 PARAPETRL 27690
BUILDING 1 PARAPETRL 25090
BUILDING 1 LEVEL 1RL 19565
P11
P11
NEW ACOUSTIC LOUVERS. TOP OF LOUVERS TO BE 4m ABOVE MECHANICAL PLANT DECK
NEW COLUMNS FOR MECHANICAL DECK BEHIND ACOUSTIC SCREEN
HEAD HEIGHT 23.390
WALL ON BOUNDARY
ACOUSTIC SCREEN WALL ADDED TO ACOUSTIC ENGINEER'S RECOMMENDATION
BIN ENCLOSURE
BUILDING 1 GROUNDRL 16000BUILDING 2 LOWER
GROUND
RL 16670BUILDING 2 GROUNDRL 19490
BUILDING 2 PARAPETRL 27690
BUILDING 1 PARAPETRL 25090
BUILDING 1 LEVEL 1RL 19565
P11
P11
P11
P11
NEW SUBSTATION TO BOUNDARY
EXISTING BUILDING 1
EXISTING BUILDING 2
NEW PUMP ROOM ALIGNED WITH FRONT FACE OF BUILDING 1
NEW ACOUSTIC SCREEN TO PLANT
NEW PREFINISHED METAL SUNSHADES TO NEW WINDOWS
NEW CANOPIES TO NEW WINDOWS
RAISED PLANTERS ADDED IN LIEU OF FEATURE WALL TO INCREASE LANDSCAPE AREA
FIRE PUMP ROOM ADDED TO FIRE SERVICES ENGINEER'S RECOMMENDATION
SUBSTATION + EXTERNAL MSB ADDED ON BOUNDARY TO ELECTRICAL ENGINEER'S RECOMMENDATION
1. VERTICAL LEG OF UPPER CANOPY REMOVED2. SLOT WINDOW WIDTH REDUCED FOR FIRE SEPARATION TO BOUNDARY3. FULL WRAP SUNSHADE TO SLOT WINDOW REPLACED WITH CANOPY TO INCREASE AMENITY
P11
P13
SC1
SC4
MT4
GL3
GL2
FINISHES LEGEND:NEW GLAZING - VISION PANEL
NEW GLAZING - SPANDREL PANEL
PREFINISHED METAL CLADDING
PAINT FINISH - SAND COLOUR
PAINT FINISHED - DARK GREY COLOUR
ALUMINIUM WINDOW FRAME - POWDERCOAT CHARCOAL
METAL SUNSHADE/CANOPY - POWDERCOAT CHARCOAL
0 8m1:200
2 4 6
FOR APPROVALIssue Description Date Client Project Title Drawing No. Issue
Scale Drawing Size
Drawn ByProject No.
CAD ReferenceDimensioned Drawings to take precedence over scaling. Contractor to verify all dimensions on site before construction. All inconsistencies to be reported to the Architect immediately. This drawing and its contents remain the copyright of WMK Architecture Pty Ltd ©
WMK ArchitectureL1 346-348 Kent StSydney NSW 2000Telephone 02 9299 0401Facsimile 02 9299 0402wmkarchitecture.comABN 25 082 956 929 A1
Issue Description Date
D
1 : 200@A1
14122 TD
PROJECT\14122 CSI PERTH\DWG\REVIT\14122 CSI_Perth.RVT
CHURCH OF SCIENTOLOGYINTERNATIONAL
BUILDING & SITE REFURBISHMENT18-22 BELMONT AVENUE, RIVERVALEPERTH WA 6103
DA501PROPOSED ELEVATIONS
1 : 200EAST ELEVATION2
1 : 200NORTH ELEVATION3
1 : 200SOUTH ELEVATION5
1 : 200WEST ELEVATION4
1 : 200CLEAVER TCE STREETSCAPE1
P 1 PRELIMINARY DA ISSUE 11/12/14
A DA ISSUE 15/12/14B AMENDMENTS SHOWN CLOUDED 11/02/2015
C EXTERNAL AMENDMENTS FOR COUNCIL REVIEW 14/02/2017
D JDAP RESUBMISSION 19.04.17
PROPOSED PAINT SCHEME TO BE CONSISTENT WITH EXISTING - SINGLE WALL COLOUR
STAFFSTAFFSTAFF STAFFSTAFFSTAFF STAFF STAFFSTAFFSTAFFSTAFF
STAFFSTAFFSTAFF STAFFSTAFFSTAFF STAFF STAFFSTAFFSTAFFSTAFF
1 2 3 4 5 6 7
A
D
E
F
G
H
7250 9250 7600 4520 8080 7000
LIFT
REFER DRAWING A02.00.02
REFER DRAWING A02.00.01
B
C
0 8m1:200
2 4 6
TENDER
N
Issue Description Date Client Project Title Drawing No. Issue
Scale Drawing Size
Drawn ByProject No.
CAD ReferenceDimensioned Drawings to take precedence over scaling. Contractor to verify all dimensions on site before construction. All inconsistencies to be reported to the Architect immediately. This drawing and its contents remain the copyright of WMK Architecture Pty Ltd ©
WMK ArchitectureL1 346-348 Kent StSydney NSW 2000Telephone 02 9299 0401Facsimile 02 9299 0402wmkarchitecture.comABN 25 082 956 929 A1
Issue Description Date
KEY PLAN
2
1
B
1 : 200@A1
14122 Author
PROJECT\14122 CSI PERTH\DWG\REVIT\14122 CSI_Perth.RVT
CHURCH OF SCIENTOLOGYINTERNATIONAL
BUILDING & SITE REFURBISHMENT18-22 BELMONT AVENUE, RIVERVALEPERTH WA 6103
PROPOSED PLANGROUND FLOOR KEY PLAN
A02.00.00
LEGENDPARTITION TYPE:REFER DRAWINGS A12.01 -12.03 FOR DETAILS
DOOR NUMBER:REFER DRAWINGS A00.30 -A00.31 FOR DETAILS
D
1.12 ROOM NUMBER
EXISTING WALL
NEW PARTITION
CHAIR RAIL TO WALL REFER FINISHES SCHEDULEFOR DETAILS
PARTITION NOTESTHIS DRAWING IS TO BE READ IN CONJUNCTION WITH SPECIFICATION AND PARTITION PLANS. REFER TO REFLECTED CEILING PLANS FOR CEILING LEVELS.
ALL NEW PARTITIONS TO COMPLY WITH ALL RELEVANT BCA REQUIREMENTS, AUSTRALIAN STANDARDS AND MANUFACTURERS INSTRUCTIONS
ALL PARTITIONS TO BE SET OUT FROM THE CENTRELINE OF EXISTING PARTITIONS, CEILING GRID OR CENTRELINE OF EXISTING WINDOW MULLIONS UNLESS OTHERWISE NOTED.
ALL PARTITIONS, WORKSTATIONS AND FURNITURE LOCATIONS TO BE MARKED ON SITE FOR SUPERINTENDANT'S REVIEW PRIOR TO CONSTRUCTION/INSTALLATION.
ALL DIMENSIONS TO BE CONFIRMED ON SITE PRIOR TO FABRICATION OF ANY ITEMS.
NOGGINGS ARE TO BE PROVIDED IN PLASTERBOARD STUD WALLS WHERE REQUIRED FOR BUILT-IN JOINERY AND FIXING OF WHITEBOARDS, HOOKS AND OTHER WALL MOUNTED FIXTURES. REFER TO FURNITURE AND EQUIPMENT PLANS FOR EXTENT.
GLAZING MATERIALS TO COMPLY WITH AS1288.
PROVIDE REFLECTIVE FILM TO WINDOWS WHERE FURNITURE ITEMS ABUT.
HEAD CONTRACTOR IS TO ALLOW FOR AND PROVIDE ALL MATERIALS, LABOUR AND ACCESSORIES NECESSARY TO COMPLETE THE WORKS TO THE SPECIFIED PERFORMANCE. NO VARIATIONS WILL BE CONSIDERED FOR THE PROJECT UNLESS IT IS A CLEAR CHANGE TO THE INTENT AND SCOPE OF THE WORKS INITIATED IN WRITING BY THE SUPERINTENDENT
ALL WALL TYPES TO COMPLY TO BCA AND AUSTRALIAN STANDARD REQUIREMENTS.
A PRELIMINARY TENDER ISSUE 06.02.17
B TENDER ISSUE 09.02.17
ATTACHMENT 3 – Minutes Metro Central JDAP and
Responsible Authority Report of Meeting 21 June 2017. Address: Lot 604 (22) Belmont Avenue, cnr Cleaver Terrace, Rivervale LG Reference: 826/2014/A DAP Reference: DAP/14/00699
Meeting No. MCJDAP/244
21 June 2017
Minutes of the Metro Central Joint Development Assessment Panel
Meeting Date and Time: 21 June 2017; 3.00pm Meeting Number: MCJDAP/244 Meeting Venue: City of Belmont 215 Wright Street Cloverdale Attendance
DAP Members Mr Ian Birch (Presiding Member) Mr Chris Antill (Deputy Presiding Member) Mr Lou D’Alessandro (Specialist Member) Cr Robert Rossi (Local Government Member, City of Belmont) Cr Janet Powell (Local Government Member, City of Belmont) Officers in attendance Mr Dean Pettit (City of Belmont) Mr Wilmot Loh (City of Belmont) Mr Murray Ralph (City of Belmont) Ms Janet Lankester (City of Belmont) Mr David Richards (City of Belmont) Mr Steve Harling (City of Belmont) Ms Uma Rajaram (City of Belmont) Ms Denise Morton (City of Belmont) Mr Steve Morrison (City of Belmont) Local Government Minute Secretary Ms Erin Cashman (City of Belmont) Applicants and Submitters Mr Aaron Lohman (Rowe Group) Mr Steve Cook (Arup) Mr Nik Hidding (Peter Webb & Associates) Mr Behnam Bordbar (Transcore) Mr Tom Carroll (SITE Planning & Design) Mr Peter Betz Mr Axel Kraft Mr James Farquhar Mr Terence O’Meara
Mr Ian Birch Presiding Member, Metro Central JDAP Page 1
Meeting No. MCJDAP/244
21 June 2017
Mr Trevor Atkins Mr Tim Margieson Mr Brian Ralph Mr Steven Halls (Squire Patton Boggs (AU)) Mr Tim Reynolds (Herring Storer Acoustics) Members of the Public / Media There were 20 members of the public in attendance. Jessica Wariner from the Southern Gazette was in attendance. 1. Declaration of Opening
The Presiding Member, Mr Ian Birch declared the meeting open at 3.00pm on 21 June 2017 and acknowledged the past and present traditional owners and custodians of the land on which the meeting was being held.
Due to the leave of absence of the Mr Charles Johnson Presiding Member and in accordance with regulation 27(3A) of the Planning and Development (Development Assessment Panel) Regulations 2011, Mr Ian Birch has been appointed as Presiding Member for this meeting. The Presiding Member announced the meeting would be run in accordance with the DAP Standing Orders 2017 under the Planning and Development (Development Assessment Panels) Regulations 2011.
The Presiding Member advised that in accordance with Section 5.16 of the DAP Standing Orders 2017; No Recording of Meeting, which states: 'A person must not use any electronic, visual or audio recording device or instrument to record the proceedings of the DAP meeting unless the Presiding Member has given permission to do so.', the meeting would not be recorded.
2. Apologies
Mr Charles Johnson (Presiding Member) Cr Phil Marks (City of Belmont)
3. Members on Leave of absence Nil
4. Noting of minutes
Minutes of the Metro Central JDAP meeting no. 242 held on 14 June 2017 and Metro Central JDAP meeting no. 243 held on 21 June 2017 were not available for noting at the time of meeting.
Mr Ian Birch Presiding Member, Metro Central JDAP Page 2