Shippers meeting 15.12.2011 Meeting gas market intraday modulation needs 1 Sandrine Cervoni-Weigert Vincent Rousseau

Upload: phunganh

Post on 24-Mar-2018

218 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Meeting gas market intraday modulation needs - · PDF fileMeeting gas market intraday modulation needs 1 ... with a significant rise in the intraday modulation needs ... assessed for

Shippers meeting – 15.12.2011

Meeting gas market intraday modulation needs

1

Sandrine Cervoni-WeigertVincent Rousseau

Page 2: Meeting gas market intraday modulation needs - · PDF fileMeeting gas market intraday modulation needs 1 ... with a significant rise in the intraday modulation needs ... assessed for

Shippers meeting – 15.12.2011

Agenda

2

What is intraday modulation?

The intraday flexibility service

GRTgaz intraday flexibility outlook

1

23

Page 3: Meeting gas market intraday modulation needs - · PDF fileMeeting gas market intraday modulation needs 1 ... with a significant rise in the intraday modulation needs ... assessed for

Shippers meeting – 15.12.20113

What is intraday

modulation?

Page 4: Meeting gas market intraday modulation needs - · PDF fileMeeting gas market intraday modulation needs 1 ... with a significant rise in the intraday modulation needs ... assessed for

Shippers meeting – 15.12.2011

Intraday modulationas hourly consumption changes in the course of a day…

4

100

0

50

Intraday flexibility tool position

Consumptions

ConsumptionsGas day

0

100

200

-100

-200

Intradayflexibility

Entry/Exit flows

Entry / Exit Flows

Page 5: Meeting gas market intraday modulation needs - · PDF fileMeeting gas market intraday modulation needs 1 ... with a significant rise in the intraday modulation needs ... assessed for

Shippers meeting – 15.12.2011

… GRTgaz provides intraday flexibility

5

During the last years, a new kind of end-users has connected up to the network, with important intraday modulation needs.They are considered as highly modulated sites.

For highly modulated sites, GRTgaz has to :know the hourly delivered quantity forecasts to

prepare its network

contract external sources

Intraday flexibility can be provided by :Internal sources (useable linepack)External sources (storages, LNG terminals, other TSO)

Page 6: Meeting gas market intraday modulation needs - · PDF fileMeeting gas market intraday modulation needs 1 ... with a significant rise in the intraday modulation needs ... assessed for

Shippers meeting – 15.12.20116

The intraday

flexibility service

Page 7: Meeting gas market intraday modulation needs - · PDF fileMeeting gas market intraday modulation needs 1 ... with a significant rise in the intraday modulation needs ... assessed for

Shippers meeting – 15.12.2011

consumptionMedium daily consumption

The intraday flexibility service (1/2)Definition

7

Daily modulated volume

A specific service for the highly modulated sites : the intraday flexibility service

Who is highly modulated?All end-users with a daily

modulated volume above

0.8 GWh / day

This service has been contracted between end-users and GRTgaz since April 1st

2011

Today, 10 sites have contracted this new service

Page 8: Meeting gas market intraday modulation needs - · PDF fileMeeting gas market intraday modulation needs 1 ... with a significant rise in the intraday modulation needs ... assessed for

Shippers meeting – 15.12.2011

The intraday flexibility service (2/2)Operational management

8

20:30

16:30

Da

y D

-1D

ay D

HH:mm

HH:mm + NP

19:30

14:30

1

D-1 / 14:30 – 16:30The highly modulated site has to declare to GRTgaz its hourly operation program for D, D+1 and D+2

1

2

D-1 / 19:30 – 20:30GRTgaz confirms the program and provides the notice period of the subzone for the day D

2

3

D / HH:MMThe site can notify changes on its scheduled program to GRTgaz

3

4 D / HH:MM + notice periodThe site can apply its running regime

4

Page 9: Meeting gas market intraday modulation needs - · PDF fileMeeting gas market intraday modulation needs 1 ... with a significant rise in the intraday modulation needs ... assessed for

Shippers meeting – 15.12.20119

GRTgaz intraday

flexibility outlook

2012 - 2020on a day-ahead basis

Page 10: Meeting gas market intraday modulation needs - · PDF fileMeeting gas market intraday modulation needs 1 ... with a significant rise in the intraday modulation needs ... assessed for

Shippers meeting – 15.12.2011

Why a new outlook?

10

Number of gas-fired power plants increased in recent years, with a significant rise in the intraday modulation needs

In 2010, a first statistical study to determine :

Will there be enough intraday flexibility (internal and

external) in the coming years?

How much external flexibility is required to cover all the

intra-day modulation needs?

2011: Update of the first study as major hypothesis evolved

Page 11: Meeting gas market intraday modulation needs - · PDF fileMeeting gas market intraday modulation needs 1 ... with a significant rise in the intraday modulation needs ... assessed for

Shippers meeting – 15.12.2011

Principles

11

Demand of intraday modulation

Conventional market (residential

and industrial end-users)

Historical data analysis

Highly modulated sites

Growing fleet

Consumption profiles of each

highly modulated site

Useable linepack

assessed for a whole range of

consumption levels & entry/exit

flow distribution

input of GRTgaz investments

(650 km of DN1200 new pipelines

by 2020)

External sources technically

available :

Storage facilities, LNG Terminals

Supplyof intraday flexibility

For each month :matching between Demand and Supplyrelative contributions of internal and external sources

Page 12: Meeting gas market intraday modulation needs - · PDF fileMeeting gas market intraday modulation needs 1 ... with a significant rise in the intraday modulation needs ... assessed for

Shippers meeting – 15.12.2011

Co

nv.

mark

et

GT

*

Trends 2012 - 2020

12

Dem

and

of in

tra

da

y m

od

ula

tio

n

Su

pply

of in

tra

da

y fle

xib

ility

CC

GT

Inte

rna

l

fle

xib

ilit

yE

xte

rna

l

fle

xib

ilit

y

2012 - 2015

2016 - 2020

2012 - 2014

2015 - 2020

2012 - 2020

2012 - 2020

CH

P*

2012 - 2020

*GT : Gas Turbine*CHP : Combined Heat Power plant

2012 - 2020

Page 13: Meeting gas market intraday modulation needs - · PDF fileMeeting gas market intraday modulation needs 1 ... with a significant rise in the intraday modulation needs ... assessed for

Shippers meeting – 15.12.2011

Main findings

13

GRTgaz can meet practically all the intraday modulation needs for the highly modulated sites

Partial coverage (1 day/year) might

imply a slight reduction on the

hourly consumption profiles (15%).

External flexibility sources (storages, LNG terminals & TSOs), are necessary to meet these needs, mostly in winter

2012 - 2016 2017 - 2020

GRTgaz is able to cover all the intraday modulation needs for the highly modulated sites

Internal flexibility is sufficient to source at least all the existing sites and the current projects

Page 14: Meeting gas market intraday modulation needs - · PDF fileMeeting gas market intraday modulation needs 1 ... with a significant rise in the intraday modulation needs ... assessed for

Shippers meeting – 15.12.2011

GRTgaz meets identified intraday modulation needs and more…

14

We are convinced that the number of CCGTs

will continue to grow in the next few years

We are anticipating to adapt our network to

maintain our “CCGT friendly” position

We will prepare these changes together with

the stakeholders, through the concertation

process

Page 15: Meeting gas market intraday modulation needs - · PDF fileMeeting gas market intraday modulation needs 1 ... with a significant rise in the intraday modulation needs ... assessed for

Shippers meeting – 15.12.201115

More information on

“Meeting intraday modulation needs” publication

available on www.grtgaz.com

Page 16: Meeting gas market intraday modulation needs - · PDF fileMeeting gas market intraday modulation needs 1 ... with a significant rise in the intraday modulation needs ... assessed for

Shippers meeting – 15.12.201116

Thanks for your attention