meeting the wind power challenge – industry perspective awea transportation logistics working...

33
Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group

Upload: felicia-ball

Post on 17-Dec-2015

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group

Meeting the Wind Power Challenge – Industry Perspective

AWEA Transportation Logistics WorkingGroup

Page 2: Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group

• Overview of AWEA– Mission– Members– TLWG – Transportation Logistics Working Group

• North America Wind Energy– Early Beginnings– Transition Years– Current Status

• Wind Farm Locations

Page 3: Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group

• Founded in 1974• More than 2,500 business members

– Wind project developers– Transportation and construction companies– Manufacturers from bolts to turbines

• More than 8,000 parts in a turbine• www.AWEA.org provides extensive info on wind

AWEA – American Wind Energy Association

Page 4: Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group

Trade association for the wind energy industryOver 2,500 business members

www.awea.org• Develops policies and conducts analysis to support

wind industry growth• Executes wind industry’s legislative agenda• Promotes wind energy through advocacy, advertising

and media relations• Convenes conferences and workshops to educate the

public and bring industry members together

Page 5: Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group

TLWG - Transportation Logistics Working Group

• AWEA has established a Transportation and Logistics Working Group (TLWG) to identify the key transportation challenges facing the industry and work toward solutions to ensure wind energy growth continues on the path to 20% by 2030.

• Member companies involved in manufacturing, transportation and logistics are represented.

Page 6: Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group

TLWG - Transportation Logistics Working Group

• There are key transportation and logistics challenges impacting all modes of transport.

• For trucking, challenges include a variety of state and local permitting rules for oversized/overweight loads; driver shortages and training; tight carrier capacity and non-optimized loads/scheduling; rising fuel costs; and hours of service constraints.

Page 7: Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group

U.S. Wind Industry Timeline

Page 8: Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group

U.S. Annual and Cumulative Wind Power Capacity Growth (Utility-Scale Wind)

• The wind industry installed 5,116 MW in the U.S. in 2010

• 15% growth in 2010• Total U.S. wind

installations stand at 40,181 MW

• Average annual growth for the past five years was 35 %

• U.S. wind installations represent over 21% of global wind capacity

Source: AWEA U.S. Wind Industry Annual Market Report Year Ending 2010

Page 9: Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group
Page 10: Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group

U.S. Wind Power Capacity Installations by State in 2010 (MW)

• 38 states have utility-scale wind installations.• 14 states have more than 1,000 MW installed.

Page 11: Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group

Wind Power Project Locations for 2009 and 2010

Page 12: Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group

• Manufacturing– History

• Import

– Transition to North American Factories• Shorten The Supply Chain

– Employment• Value to State and Local Governments• Growth during Recession

Page 13: Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group

Wind Power Manufacturing Locations 2004

Nacelle Factories 2004

Blade Factories 2004Tower Factories 2004

Page 14: Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group

All Online Wind-Related Manufacturing Facilities

• At the end of 2010, there were over 400 manufacturing facilities online making wind-related products.

• The online facilities span 42 states

Page 15: Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group

U.S. Wind Industry Jobs by State• Of the 75,000 jobs across

the wind industry, Texas ranked No.1 with the largest amount of new capacity in 2010, energy-hub and offices in Houston and strong manufacturing across the state.

• Illinois took the No. 2 spot with strong 2010 installations and growing manufacturing base.

• With the recent heaving manufacturing investment in Colorado, the state ranked No. 3 in terms of wind jobs.

Page 16: Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group

Winds Economic Ripple Effect for Jobs

Page 17: Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group

U.S. Wind Industry Total Employment Over Time

• Manufacturing continued to grow in 2010, leading to a year-end total of roughly 20,000 jobs in wind-related manufacturing.

• Increase in permanent operations & maintenance jobs to help run the expanding wind power fleet.

• However, jobs in construction and the various service sectors that support project installation were reduced from 2009 due to the decline in new wind installations.

• Overall, even with the economic headwinds, the U.S. wind industry was still able to support 75,000 direct and indirect jobs in 2010, compared with 85,000 in 2009.

Page 18: Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group

Nacelle

TowerSection

Blade

Hub

Page 19: Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group
Page 20: Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group
Page 21: Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group
Page 22: Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group
Page 23: Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group
Page 24: Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group
Page 25: Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group

• Modes of Transport– Truck– Rail– Barge– Ship

• Current and Future Logistical Delivery– Multi-Mode

Page 26: Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group
Page 27: Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group
Page 28: Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group
Page 29: Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group
Page 30: Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group

• Challenges to deliver the product– Safety to the public– Multiple differences in the Commodities– Lack of Uniformity

• Weight restrictions• Height Restrictions• Route Continuity• Pass Through Restrictions• State /Police and Pilot Car Differences

– County and City Changes and Restrictions– Construction

Page 31: Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group

• How Can We Improve The Process– Work closer with State and Local Governments – Wind Corridors– Uniformity

• Weight• Length – Width – Height• Police and Commercial Escort Requirements

– Multi-State Routes– Multi-State Permits

Page 32: Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group

• On the Road to Success– WASHTO Multi State Permit– TxPROS – Texas Permitting and Routing

Optimization System– Wisconsin OS/OW Freight Network– Regional State DOT/Permit Association

• SASHTO - MAASTO - NASTO

Page 33: Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group

OS/OW Supply Chain Management

OS/OW Freight Network

On the Road to Success