MEETING TIME AND LOCATION Wednesday, July 26, 2017, 9:30 a.m. – 12:00 p.m. Mercer Island Community Center 8236 SE 24th St, Mercer Island, WA 98040 PURPOSE OF THE MEETING Review and Discuss 2018 Preliminary Draft Operating Budget Discuss 2018 - 2023 Capital Budget Follow-up on Opportunity Fund Begin to identify Key Topics for Budget recommendation letter to Board of Supervisors MEETING PACKET CONTENTS Agenda pages 1-2 Meeting Summary July 13, 2017 pages 3-6 Final Approved Operating Procedures pages 7-9 Preliminary Draft Operating Budget page 10 Financial Plan Update page 11 Fund Balance Curve Graph page 12 Draft Capital Budget Updated pages 13-16 Opportunity Fund Historical Expenditures by City page 17

Upload: doque

Post on 06-Feb-2018

231 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MEETING TIME AND LOCATION Wednesday, July 26, · PDF fileMarlla Mhoon, Covington; Councilmember Erika Morgan, Black Diamond; Councilmember Tom Odell, Sammamish; Councilmember Byron

MEETINGTIMEANDLOCATIONWednesday,July26,2017,9:30a.m.–12:00p.m.MercerIslandCommunityCenter8236SE24thSt,MercerIsland,WA98040PURPOSEOFTHEMEETING• ReviewandDiscuss2018PreliminaryDraftOperatingBudget• Discuss2018-2023CapitalBudget• Follow-uponOpportunityFund• BegintoidentifyKeyTopicsforBudgetrecommendationlettertoBoardofSupervisorsMEETINGPACKETCONTENTSAgendapages1-2MeetingSummaryJuly13,2017pages3-6FinalApprovedOperatingProcedurespages7-9PreliminaryDraftOperatingBudgetpage10FinancialPlanUpdatepage11FundBalanceCurveGraphpage12DraftCapitalBudgetUpdatedpages13-16OpportunityFundHistoricalExpendituresbyCitypage17

Page 2: MEETING TIME AND LOCATION Wednesday, July 26, · PDF fileMarlla Mhoon, Covington; Councilmember Erika Morgan, Black Diamond; Councilmember Tom Odell, Sammamish; Councilmember Byron

KingCountyFloodControlDistrictAdvisoryCommitteeMeetingAgenda

TheKingCountyFloodControlDistrictAdvisoryCommittee iscreatedtoprovideexpertpolicyadvicetotheBoardofSupervisorsoftheKingCountyFloodControlZoneDistrictonregionalfloodprotectionissues.Thecommitteeshallreviewandrecommendanannualworkprogramandbudgetforthedistrict,includingcapitalimprovementprogramprojectsandfundinglevels,subjecttoapprovalorapprovalandmodificationbytheBoardofSupervisors.Ordinance15728,April16,2007MEETINGTIMEANDLOCATIONWednesday,July26,2017,9:30a.m.–12:00p.m.MercerIslandCommunityCenter8236SE24thSt,MercerIsland,WA98040PURPOSEOFTHEMEETING• ReviewandDiscuss2018PreliminaryDraftOperatingBudget• Discuss2018-2023CapitalBudget• Follow-uponOpportunityFund• BegintoidentifyKeyTopicsforBudgetrecommendationlettertoBoardofSupervisors

Time Topic Objective Lead Materials9:30 CalltoOrder&

Introductions KenHearing,

AdvisoryCommitteeChair

9:35 PublicComment

Provideopportunityforpubliccomment

KenHearing

9:40 ApprovalofMeetingSummary

KenHearing MeetingSummary,July13,2017

9:45 UpdateaboutFloodDistrictExecutiveCommitteemeetings

HearaboutrecentExecutiveCommitteemeetingactivities

MichelleClark,ExecutiveDirector

9:55 OperatingBudget FamiliarizeAdvisoryCommitteewith2018OperatingBudget

BrianMurray,RiversSection,WaterandLandResources(WLR)

PreliminaryDraft2018OperatingBudget

10:15 Follow-uponcorrectionsandupdates

ReviewchangestofinancialplanandCIPbasedonfeedbackfromJuly13,2017meeting

BrianMurray UpdatedFinancialPlanFundBalanceCurveGraph

10:30 FloodDistrictCapitalBudget

DiscussPreliminaryDraftCapitalImprovementBudget2018-2023

MichelleClarkBrianMurray

Draft2018-2023CapitalBudget

11:15 OpportunityFund

Reviewexpenditurehistoryandbalancesforjurisdictionsanddiscusspossibleprogramimprovements

MichelleClarkBrianMurray

OpportunityFundExpenditureHistory

11:35 IdentifyKeyTopicsforBudgetrecommendationLetter

FlagtopicsofinteresttoAdvisoryCommitteemembers

KjristineLund,Facilitator

Noon Adjourn KenHearing

Kjristine
Typewritten Text
Kjristine
Typewritten Text
Kjristine
Typewritten Text
1
Page 3: MEETING TIME AND LOCATION Wednesday, July 26, · PDF fileMarlla Mhoon, Covington; Councilmember Erika Morgan, Black Diamond; Councilmember Tom Odell, Sammamish; Councilmember Byron

i

COMMITTEEMEMBERS

COMMITTEEGROUNDRULESCometocommitteemeetingspreparedandhonortimeframesRespecteachother’sperspectivesListenandparticipateactivelySilenceelectronicdevicesduringmeetings2017MEETINGSCHEDULEJune8 1:00p.m.-3:30p.m.-OrientationJuly13 1:00p.m.-3:30p.m.July26 9:30a.m.-12:00p.m.August10 9:30a.m.-12:00p.m.August22 1:00p.m.-3:30p.m.(ifneeded)

Seats Jurisdiction Name TitlePermanentSeat,AdvisoryCommittee,Chair

CityofNorthBend KennethHearing Mayor

RotatingSeatSoundCitiesAssociation(SCA),AdvisoryCommittee,Vice-Chair

CityofPacific LeanneGuier Mayor

PermanentSeat CityofAuburn NancyBackus MayorPermanentSeat CityofBellevue JohnStokes MayorPermanentSeat CityofCarnation JimBerger MayorPermanentSeat CityofKent SuzetteCooke MayorPermanentSeat KingCounty DowConstantine Executive

PermanentSeat CityofRenton DenisLaw MayorPermanentSeat CityofSeattle EdMurray MayorPermanentSeat CityofSnoqualmie MattLarson Mayor

PermanentSeat CityofTukwila AllanEkberg MayorRotatingSeatforunincorporatedarea RuralArea AngelaDonaldson (appointmentinprocess)

RotatingSeatnominatedbySCA CityofRedmond ByronShutz Councilmember

RotatingSeatnominatedbySCA TownofSkykomish HenrySladek CouncilmemberRotatingSeatnominatedbySCA BlackDiamond ErikaMorgan CouncilmemberAlternateSCA Bothell JamesMcNeal CouncilmemberAlternateSCA Sammamish TomOdell Councilmember

AlternateSCA Covington MarllaMhoon CouncilmemberAlternateSCA SeaTac KathrynCampbell Councilmember

Alternate CityofAuburn BillPeloza Councilmember

Alternate CityofBellevue

Alternate CityofCarnation

Alternate CityofKent DanaRalph Councilmember

Alternate KingCounty FredJarrett DeputyExecutive

Alternate CityofNorthBend

Alternate CityofRenton

Alternate CityofSeattle LisaHerbold Councilmember

Alternate CityofSnoqualmie

Alternate CityofTukwila DennisRobertson Councilmember

Kjristine
Typewritten Text
2
Page 4: MEETING TIME AND LOCATION Wednesday, July 26, · PDF fileMarlla Mhoon, Covington; Councilmember Erika Morgan, Black Diamond; Councilmember Tom Odell, Sammamish; Councilmember Byron

KingCountyFloodControlDistrictAdvisoryCommitteeMeetingSummaryJuly13,2017Calltoorder:Themeetingwascalledtoorderat1:05pm.Present:MayorKenHearing,NorthBend,chair;MayorJimBerger,Carnation;MayorSuzetteCooke,Kent;AngelaDonaldson,RuralArea;CouncilmemberLisaHerbold,Seattle;DeputyExecutiveFredJarrett,KingCounty;MayorDenisLaw,Renton;CouncilmemberJamesMcNeal,Bothell;CouncilmemberMarllaMhoon,Covington;CouncilmemberErikaMorgan,BlackDiamond;CouncilmemberTomOdell,Sammamish;CouncilmemberByronShutz,Redmond;CouncilmemberHenrySladek,Snohomish;MayorJohnStokes,Bellevue.Staff:MichelleClark,ExecutiveDirector;JoshBaldi,Director,WaterandLandResourcesDivision(WLRD);SteveBleifuhs,Manager,EnvironmentalProgramSection,RiverandFloodplainManagement;BrianMurray,Supervisor,CountywidePolicyandPlanningUnit,RiverandFloodplainManagementSection;KjristineLund,Facilitator,andAnneNoris,ClerkPublicComment.Therewasnopubliccommentgiven.MessagefromDistrictChairman:FloodControlDistrictChairReaganDunnwelcomedthecommitteemembers.HereportedthattheDistricthashadeightcleanauditsandhasoneofthelowestoverheadtocapitalratiointhecountryandhasprovidedover$500millionincriticalimprovementsinitseight-yearhistory.Hespends50%ofhistimeonFloodDistrictissues.HenotedthattheDistrictwouldconsiderbondinginthefuturetoadvancemoreprojectsoncethecapitalexpenditurerateimproves.HealsonotedthattheDistrictiswillingtomakecommitmentstoenvironmentalprojectsassociatedwithfloodcontrolprojectsandisworkingwithtribesandtheDepartmentofEcology.HesaidheisawarethatcitieslikeSeattleandBellevuecontributesubstantiallytofundingtheDistrictandheencouragestheirparticipationinrecommendingprojects.MayorStokescommentedontheoutstandingfundbalanceandtheneedtogetaheadonbuildingprojects.ChairDunnrespondedthattheDistrictapprovednewpositionsinWaterandLandResourcestogetmoreprojectsunderwaybutthatrecruitmentandhiringischallenginginthisjobmarket.Hesaidheisopentohavingcitiesdomoreofthework.CouncilmemberHerboldcommentedonagranttofurtherthehabitatrestorationplanontheCedarRiverthatisbeforetheExecutiveCommittee.Ms.ClarkindictedthattherewillbeaspecialmeetingoftheExecutiveCommitteeonJuly24todiscussthegrant,withDistrictactionscheduledinAugust.MayorCookeaskedaboutrelationswiththeArmyCorpsofEngineers.ChairDunnreportedonhisinteractionswiththeCorpsonvegetation.MayorCookesuggestedtheCorpsbeinvitedtoanAdvisoryCommitteemeetingtoreportontheiractivitiesandtomeetthenewColonel.CouncilmemberMcNealandCouncilmemberOdellcommentedonriskstoLakeWashingtonshorelines,criticalinfrastructure,andfishfromdeficienciesattheBallardLocks.

Kjristine
Typewritten Text
3
Page 5: MEETING TIME AND LOCATION Wednesday, July 26, · PDF fileMarlla Mhoon, Covington; Councilmember Erika Morgan, Black Diamond; Councilmember Tom Odell, Sammamish; Councilmember Byron

KingCountyFloodDistrictAdvisoryCommitteeMeetingSummaryJuly13,2017

2

Ms.DonaldsonaskedabouttheNationalFloodInsuranceProgramreauthorizationandreformsandhowthosemightimpacttheDistrict'swork.Ms.LundandMs.ClarkreportedontheNFIPreauthorizationthatisbeforeCongress.ChairDunncommentedonthepriorsuppressionoftheDistrict'slevyandchangesinstatelawthatprotecttheDistrict'sfundingstream.MayorCookesaidthatthelevycertificationissuesareofinteresttosomecitiesandthatamoreindepthdiscussioncouldtakeatanothertimeorthatanissuepapercouldbeprepared.Electionofvice-chair:CouncilmemberMhoonnominatedMayorLeanneGuier,Pacific,asvice-chair.Themotionpassedunanimously.Approvalofmeetingsummary:MayorLawmovedtoapprovetheJune8,2017meetingsummary.Themotionpassedunanimously.StatusReportfromtheExecutiveDirector:Ms.Clarkdistributedabudgetcomparisonof2017recommended,approvedandproposed2017reallocation.Theproposedoperatingbudgetreallocationincludes$150,000foradamevacuationroutestudyand$97,000annualmaintenance.Theproposedcapitalbudgetreallocationincludes$76millionincarryoverandnear-termprojectsfromtheTolt,CedarandSouthFork,implementationoftheinterimSWIFandtheHolbergfeasibilitystudy.Therearenonewproposedprovisos.(Thewrittenreportispartofthemeetingrecord.)CouncilmemberSladekaskedaboutthepurposeofthecarryover.Ms.ClarkindicatedthatthisistocleartheDistrict'sandcities'books.Shealsoindicatedthatthisinthepasthasbeenanopportunitytoaddnewcapitalprojectstorespondtofloodevents.Therewasadiscussionofthenumberofdams(140)inthecounty,mostofwhichareprivatelyowned.FloodDistrictfinancialplan:Mr.MurraymadeaPowerPointpresentationontheworkplanoftheWaterandLandResourcesDivision.HereportedontheDistrict'saccomplishmentsfrom2007through2016andthespendingpatternsoftheDistrictoverthattime.Ms.Donaldsonaskedifhydrologystudiesandprojectinghowclimatechangewillaffectflooddamage?Mr.MurrayrespondedthattheDistricthasfundedaclimatechangestudybytheUniversityofWashingtonandthatwillbeaworkshoponAugust1onthetopic.Ms.Donaldsonaskedifallthebasinshadstrategies.Ms.ClarknotedthattheDistrictExecutiveCommitteeisstillreviewingpreliminarystrategiesforbasins.(ThePowerPointispartofthemeetingrecord.)Mr.Murraythenprovidedanoverviewofthefinancialplan.TheDistrict'srevenuecomesfromapropertytaxlevy,including1%increaseandmoneysfromnewconstruction,interestearningsandmiscellaneousrevenue,revenuefromKingCounty(inter-countyriverimprovement)andgrants(awardedorwhereawardislikelyorimminent).MayorCookeandCouncilmemberOdellsuggestedthattheAdvisoryCommitteeaffirmthatgrantsshouldonlybeincludedwhenawardedorlikelytobeawarded.TheDistrict'sexpendituresincludeWaterandLandResourceDivisionexpenditures,floodmitigationexpendituresandgrantprograms(opportunityfund,WRIAgrantsandfloodreductiongrants).Therewasadiscussionofthevarioustypesoffundbalance:cash,reservesandendingunreservedfundbalanceandhowtobetterexplainthemeaningoftheDistrict'sfundbalancethatincludesprojectedexpenditurescontainedinthefundbalanceamounts.

Kjristine
Typewritten Text
Kjristine
Typewritten Text
4
Page 6: MEETING TIME AND LOCATION Wednesday, July 26, · PDF fileMarlla Mhoon, Covington; Councilmember Erika Morgan, Black Diamond; Councilmember Tom Odell, Sammamish; Councilmember Byron

KingCountyFloodDistrictAdvisoryCommitteeMeetingSummaryJuly13,2017

3

Committeemembersnotedthatthefinancialplanisdifficulttofollowwithrespecttothecommitmentoffunding.Ms.ClarknotedthattheDistrictwouldworkonamorecleardepictionofthefinancialplanthatmakesclearthebudgetisinfactcommittedtocapitalprojectsandthattherearenouncommittedfunds.MayorCookenotedthattheFinancialPlanandCIPshouldshowfutureyearprojectionstocompleteprojectsthatarestartedandgobeyondthe6-yearwindowshowninthebudgetdocuments.CouncilmemberOdellsuggestingaddingacolumnthatshowsfuturefundingneeds.FloodDistrictCapitalBudget:Ms.Lundexplainedthematerialsforthisdiscussion.Mr.Murrayreviewedthesix-yearCIPprojectallocations(TheCIPispartofthemeetingrecord.)HealsoreviewedtheprojectmilestoneliststhatareupdatedquarterlyinWLRD.MayorHearingaskedabouttheNintendoprojectontheCIPlist.Ms.ClarkclarifiedthatitislistedasaprovisointhebudgetbutisnotyetontheCIPlist.MayorCookeaskedabouttheSignaturePointproject.Ms.ClarkindicatedthatthereismoneyintheCIPforastudy,butitisnotyetreadytobeplacedontheCIPlist.MayorCookealsonotedthatshewouldspeakoff-linewithstaffaboutcorrectingprojectschedulesonGreenRiverCityofKentprojects.MayorStokeaskedwhethertheLowerCedarfeasibilitystudy(item77)isresponsivetotheWRIA8letterregardingthedraftCedarRiverplan.Ms.Clarkindicatedshewouldreviewandcomebackwithananswer.Discussionensuedaboutaccreditationoflevees.Ms.Donaldsonaskedaboutlines71-74andtherelationshiptoline85.Mr.Murrayexplainedthatlines85-91relatetotheBlackRiverPumpStationandindicatedthateachelementoftheworkhasbeenincludedasaseparateprojectandthereferencesonthelistwillneedtobeupdated.Ms.DonaldsonaskedabouttheclosureoftheToltBridgeandifthatwouldaffectprioritizationofprojectsintheSnoqualmiebasin.Ms.ClarkrespondedthatSupervisorLambertiscloselymonitoringthisissue.Ms.LundindicatedthatcommentscanbemadeaboutspecificprojectsintheCommittee'stransmittalofitsrecommendations.Shealsoindicatedthattherewillbesomeeffortstoexplainthatthefundbalanceincludesmoneysthathavebeenallocatedbutnotyetspent,includingexpenditureratesfortheopportunityfund.Therewasasuggestionthatsomewaybefoundtoprovidesmallercitieswithmoneystouseinadvance,likearevolvingfund.Ms.Clarkindictedthatshewillprovidecommitteememberswithinformationabouttheopportunityfundprojects.Ms.Donaldsonaskedaboutsitemanagementplans(page34).Mr.Murrayindicatedthatsitemanagementplansareallocatedwithinthemaintenancesectionoftheoperatingbudget.Theyarenotyetscheduledintheworkprogramexceptforaboutfivesites.MayorStokesaskedaboutrecommendationsmadebytheAdvisoryCommitteelastyear.CouncilmemberShutzaskedaboutsettingasidefundingforemergencyrepairs.Ms.ClarkindicatedthatshewillprovideanupdatetotheCommitteemembers.

Kjristine
Typewritten Text
Kjristine
Typewritten Text
5
Page 7: MEETING TIME AND LOCATION Wednesday, July 26, · PDF fileMarlla Mhoon, Covington; Councilmember Erika Morgan, Black Diamond; Councilmember Tom Odell, Sammamish; Councilmember Byron

KingCountyFloodDistrictAdvisoryCommitteeMeetingSummaryJuly13,2017

4

Operatingprocedures:Ms.Lundreviewedtheproposedchangestotheoperatingprocedures.Thechangesinclude:informingtheExecutiveDirectorofalternatesforpermanentmembersbyMarch31;meetingschedulesetbyMarch31,changeinmeetingplace;meetingmaterialssentoneweekinadvance;delete10yeartermfortheCommittee.CouncilmemberShutzsuggestedthat"priorto"bechangedto"inadvanceof".MayorCookemovedtoaccepttheproposedchanges.Themotionpassedunanimously.Ms.DonaldsonaskedaboutwhetherlandslidesareaconcernfortheDistrict.Ms.ClarkreportedthatthelandslidemappingandchannelmigrationwasprovidedbytheDistricttotheCounty.Themeetingwasadjournedat3:29pm.Follow-upItemsInviteCorpsofEngineerstoAdvisoryCommitteeIssuepaperonFEMAmappingasassociatedissuesRevisedfinancialplanshowingcommittedfundbalancemoreclearlyLowerCedarFeasibilityStudy(line77)descriptionOpportunityFundexpenditurehistoryandbalancesforeachcityFinalApprovedOperatingProceduresCorrectionstoCIP

Kjristine
Typewritten Text
6
Page 8: MEETING TIME AND LOCATION Wednesday, July 26, · PDF fileMarlla Mhoon, Covington; Councilmember Erika Morgan, Black Diamond; Councilmember Tom Odell, Sammamish; Councilmember Byron

Approved:July13,2017KINGCOUNTYFLOODCONTROLDISTRICADVISORYCOMMITTEEOPERATINGPROCEDURESPURPOSEOFTHEADVISORYCOMMITTEEOrdinance2006-0334oftheKingCountyCouncilestablishesaFloodControlZoneDistrict(FCD)forKingCountyandestablishedtheKingCountyFloodControlZoneDistrictAdvisoryCommittee.Thepurposeofthisdistrictisto“undertake,operate,ormaintainfloodcontrolprojectsorstormwatercontrolprojects.Thedistrictisauthorizedtoaddressfloodandstormwatercontrolneedsthroughoutthecounty,includingwithinKingCountycities.”TheKingCountyCouncilgovernstheFloodDistrictasa“DistrictBoardofSupervisors”.TheFCDAdvisoryCommittee,whichiscomposedofelectedofficialsfromthroughoutKingCounty,ischargedwiththetaskofmakingannualrecommendationstotheDistrictBoardofSupervisors.Specifically,theAdvisoryCommitteereviewsandmakesrecommendationsrelatedtotheannualworkprogramandbudgetfortheDistrict,includingcapitalimprovementprogramprojectsandfundinglevels.TheBoardofSupervisors,inturn,takestheserecommendationsunderadvisementasitvotestoapprovetheannualcapitalimprovementandoperatingbudgetfortheDistrict.TheAdvisoryCommittee’srecommendationsmustbefiledwiththeclerkoftheKingCountyCouncilnolaterthanAugust31ofeachyear.MEMBERSHIPANDSTRUCTUREAsestablishedbyOrdinance2006-0334,theAdvisoryCommitteeiscomposedoffifteenmembers.TenseatsontheCommitteearepermanent,andfiveseatsarerotating(two-year)members.ThetenpermanentseatsontheCommitteeareheldbyeachmayor,orcouncilmemberalternatedesignatedbythemayor,ofTukwila,Auburn,Kent,Renton,Snoqualmie,NorthBend,Carnation,SeattleandBellevue.TheKingCountyExecutiveisalsoapermanentmemberofthecommittee.Fourrotatingseatsareheldbymayorsorcitycouncilmembers,ortheiralternates,asnominatedbytheSoundCitiesAssociation.OneoftherotatingseatsisheldbyanindividualwhorepresentsoneofKingCounty’sUnincorporatedAreaCouncils.TheserepresentativesareselectedbytheKingCountyCouncil.EachmemberoftheAdvisoryCommitteeisallowedonealternate,whoshallalsobeanelectedofficialfromtherepresentedjurisdiction.ThealternateshallattendmeetingsasnecessaryduetotheabsenceoftheCommitteemember.AlternatesholdthesameresponsibilitiesandvotingprivilegesasCommitteemembers.AdvisoryCommitteememberswillnotifytheExecutiveDirectorinwritingoftheiralternatenolaterthanMarch31ofeachyear.

Kjristine
Typewritten Text
7
Page 9: MEETING TIME AND LOCATION Wednesday, July 26, · PDF fileMarlla Mhoon, Covington; Councilmember Erika Morgan, Black Diamond; Councilmember Tom Odell, Sammamish; Councilmember Byron

KingCountyFloodDistrictAdvisoryCommitteeOperatingProceduresApprovedJuly13,2017

2

TheAdvisoryCommitteeshallelectbothachairandvice-chair.Thetermsofthechairandvice-chairshallbetwoyears,alternatingappointmentonevenyearsforthechairpositionandoddyearsforthevicechairposition.Aformalvotetofillthesepositionsshallbetakenatthefirstadvisorycommitteemeetingofeachyear.ThechairoftheAdvisoryCommitteeshallpresideatCommitteemeetings,andperformsuchotherdutiesasarecommonlyassociatedwiththatoffice.Thevice-chairshallperformthedutiesofthechairinthechair’sabsence.DECISIONPROCESSTheAdvisoryCommitteeischargedwiththetaskofmakingrecommendationstotheBoardofSupervisors.Theserecommendationsshallbevalidatedthroughvoting.Priortoavote,however,membersshallmakeeveryefforttoreachagreementbyconsensus.Oncethevoteiscast,boththemajorityandminorityopinionsofCommitteemembersinrelationtothatrecommendationshallbefullydocumented.EachseatontheAdvisoryCommitteeshallhaveonevote.AquorumoftheAdvisoryCommitteeisconstitutedifeightCommitteemembers,ortheiralternates,arepresentatthemeeting.AdvisoryCommitteemeetingswillbestructuredtoallowforacomprehensivediscussionoftheissuesathand.TheworkoftheAdvisoryCommitteeshallbeinformedbytheBasinTechnicalCommittees,groupscomposedoftechnicalstafffromeachofthejurisdictionsrepresentedontheAdvisoryCommittee.Priortoa“finalvote”ontheirrecommendations,theAdvisoryCommitteemaytakeapreliminaryor“temperatureread”voteoneachoftheirrecommendations.Thispreliminaryvoteenablesmemberstobetterunderstandtheirareasofagreementanddisagreement,andtoforgecompromisesolutionswheneverpossiblepriortoafinalvote.Ifamemberisunabletoattendameetingatwhichatemperaturereadwillbetaken,thatmembermaysubmithisorher“read”tothechairorfacilitatorinadvanceofthemeeting.Formalvotesmaybetakenoccasionally.Whenaformalvoteisneeded,committeemembers,ortheiralternates,arerequiredtobepresentatthemeetinginordertoparticipateinthevote.Totheextentthatelectronic,telephone,orvideoconferencingisavailable,thesemediumswillqualifyamemberaspresentforthepurposesofvotingrights.MEETINGSCHEDULE,AGENDA,ANDMINUTESTheAdvisoryCommitteeshallgenerallymeettwotothreetimesperyear,butmaymeetmorefrequentlyasnecessary.MeetingsshallbeschedulednolaterthanMarch31eachyeartoprovideAdvisoryCommitteememberswithadequatenoticeofthemeetingdates.MeetingswilltakeplacebeginninginlatespringinordertoincorporatetheCommittee’srecommendationsintotheDistrict’sannualbudgetandmeettheAugust31deadlineofasubmittaltotheDistrictBoardofSupervisorsasrequiredbyordinance.

Kjristine
Typewritten Text
8
Page 10: MEETING TIME AND LOCATION Wednesday, July 26, · PDF fileMarlla Mhoon, Covington; Councilmember Erika Morgan, Black Diamond; Councilmember Tom Odell, Sammamish; Councilmember Byron

KingCountyFloodDistrictAdvisoryCommitteeOperatingProceduresApprovedJuly13,2017

3

SpecialmeetingsoftheAdvisoryCommitteemaybeheldasrequestedbytheBoardofSupervisors,orasmattersarisethatrequiretheCommittee’sattention.AllmeetingsoftheAdvisoryCommitteeareopentothepublicandrecordsofitsmeetingareavailableuponrequest.MeetingswillbeheldatappropriatelocationswithinKingCountytomaximizeparticipationbyCommitteemembers.ThefacilitatorshallconsultwiththeExecutiveDirector,AdvisoryCommitteeChair,andKingCountystaffinpreparingtheagendas.Membersshallbeprovidedwithacopyoftheagendaandsupportingmaterialsatleastoneweekinadvanceofthemeeting,unlessthereislessthanatwo-weekintervalbetweenmeetings.Incaseswhenthereisacompressedscheduleinbetweenmeetings,everyeffortshouldbemadetoprovidematerialsinadvanceofthemeeting.StafffromtheDistrictorafacilitatorshallberesponsiblefortakinganddocumentingtheminutesfromallmeetingsoftheAdvisoryCommittee.ThemeetingsummarywillbemadeavailableforreviewbyCommitteememberspriortothenextscheduledmeeting,andsubsequentlyreviewedandapprovedduringthemeeting’sregularorderofbusiness.PUBLICATTENDANCEANDCOMMENTAllmeetingsoftheFCDAdvisoryCommitteeareopentothepublic.AnymembersofthepublicwhowishtoaddresstheCommitteemustmakethisrequesttotheChairoftheCommitteeinadvanceofthemeeting.Publiccommentsarescheduledatthebeginningofmeetings.Thechairwillfacilitatethepubliccommentprocess.Speakerswillbeaskedtosign-intoindicatetheywouldliketospeak.Eachspeakerwillhaveamaximumof3minutes,andshallstatetheirnameandaddressofresidenceatthebeginningoftheircomments.Speakersareencouragedtoalsoprovidetheircommentsinwrittenform.Speakersshallbecourteousandcivil,andmaynotyieldtimetoanotherspeaker.TERMANDAMENDMENTSTheserulesandproceduresarenotintendedtobecomprehensive.Whenanissuearisesnotforeseenbytheseoperatingrulesandprocedures,theAdvisoryCommitteemayconsideramendingtheserulesandprocedures.TheseamendmentsmaybeamendedatanymeetingoftheAdvisoryCommitteeifnoticeofsuchamendmentisgivenontheagendadistributedtothemembersinadvanceofascheduledmeeting.AmendmentsmaybeapprovedbytheAdvisoryCommitteeuponamajorityvoteinfavortodoso.

Kjristine
Typewritten Text
9
Page 11: MEETING TIME AND LOCATION Wednesday, July 26, · PDF fileMarlla Mhoon, Covington; Councilmember Erika Morgan, Black Diamond; Councilmember Tom Odell, Sammamish; Councilmember Byron

July 19, 2017 Preliminary Draft - 2018 Flood District Operating Budget Summary

Work Category

Sum of Total

Budget Program Summary

Annual Maintenance 3,386,766

Maintenance activities to properly operate and maintain the District’s investments, including levees, revetments, properties, and pump stations, as well as large wood hazard investigations in support of the King County Sheriff. Facility inspections and assessments may lead to proposed repairs in the capital program. Inspections and assessments also help to increase the potential for federal funding assistance for future flood damages. This includes implementation of routine flood facility inspection and maintenance for approximately 500 levees and and revetments along 119 miles of river so that minor maintenance needs do not become larger scale repair problems. The program also includes property inspections and maintenance for the approximately 800 acres of publicly owned floodplain property (managed as 200 separate sites), a responsibility that grows each year as property is acquired to reduce flood risks and/or support capital project construction. Maintenance actions to identify and resolve problems that might pose a risk to the community such as attractive nuisances (a hazardous object or condition that poses a risk), illegal dumping, noxious weeds, and public health risks. The largest expenditures in this category are (1) operation and maintenance of the Green River Pump Stations (2) maintenance crew time and (3) inspections of levees, revetments, and property on a 2-year cycle. This category also includes staff time from the King County Sheriff's Office to conduct large wood investigations in unincorporated King County, along with staff time for annual levee inspections by boat on the Lower Snoqualmie River.

Flood Hazard Studies, Maps, Technical Services 1,181,741

Generate technical information used to characterize, quantify, and delineate flood risks, as well as to develop and implement strategies and actions to reduce those risks. Flood hazard technical information types include hydrologic and hydraulic studies, floodplain and channel migration zone maps, geologic studies, geographic information system (GIS) land use data, dam operations studies, risk assessments and flood hazard management corridor working maps. These technical assessments are used to inform the capital project feasibility, prioritization, and design process funded by the capital program. The base budget includes $300,000 for LiDAR and post-flood channel evaluations that will not occur unless there are high flow events. The base budget assumes completion of channel migration hazard mapping for the Raging and White Rivers, following technical analysis initiated in 2017. The base budget also includes a placeholder of $75,000 ($25,000 each for the Green, Cedar, and Snoqualmie) for hydrologic and hydraulic analyses, as well as a $50,000 placeholder for a third phase of the Snoqualmie Hydrologic and Hydraulic analysis in response to community questions and concerns. This category also includes funding in response to 3/31/17 proviso report on financial barriers to participation in the home elevation program to fund an external review of the program to identify additional barriers and recommend solutions. This category also includes USGS sediment study for the White River. The purpose of this proposed study is to quantify current and potential future sediment supply and deposition in the White River to better inform capital flood-risk reduction projects along the Lower White River in King County.

Flood Hazards Plan, Grants, Outreach 1,305,934

Floodplain management planning, public outreach and awareness, coordination of repetitive loss area mitigation, and grant preparation. Repetitive loss mitigation is generally achieved by buying or elevating at-risk homes. While buyouts and elevations are funded via the capital program, the planning, prioritization, and the grant submittals to FEMA or other agencies are funded via the operating program. Most operating costs for grant development are reimbursable if the FEMA grant is awarded. Grants are only submitted with prior authorization (at least 30 days before submittal) from the Flood Control District. Public outreach for specific capital projects is funded through the capital program; basin-wide outreach regarding on-going and planned capital projects is considered an operating expense. This category includes funding for the 2013 Flood Hazard Management Plan Update process, the Community Rating System (CRS) program, and strategic planning of flood risk reduction products, targets, and milestones for the River and Floodplain Management Section. The 2018 budget includes consultant funding of $100,000 for the Flood Hazard Management Plan Update, and assumes that the $125,000 budgeted in 2017 will be carried over to 2018. The 2018 budget assumes staff time for King County's Community Assistance Visit or "CAV", which is an audit of King County's compliance with the National Flood Insurance Program conducted by FEMA and the Washington State Department of Ecology.

Flood Preparation, Flood Warning Center 910,427

Implement a comprehensive approach to preparing and educating the community for flood events, coordinating emergency response and regional flood warning center operations during flood events, and ensuring consistency across basins for post-flood recovery actions. Post-flood damage assessments may result in capital projects to repair damaged facilities. Flood and post-flood activities are tracked with a unique project number so that expenditures may be submitted for any federal assistance that becomes available following a federal disaster declaration. Base budget includes annual flood preparedness campaign, sandbag supplies for distribution centers in each basin, the King County Flood Alert system, and $165,000 cost-share with U.S. Geological Survey for operations and maintenance of real-time river gauges around King County. This program includes funding for a new gauge on the Lower Snoqualmie, implementing a recommendation of the Snoqualmie Hydraulic and Hydrologic Study (2017).

Overhead / Central Costs 3,218,261

This category includes use-based and FTE-based overhead costs from the Water and Land Resources Division of the Department of Natural Resources and Parks and King County. Examples include use-based charges for the Prosecuting Attorney’s Office, risk management, and the financial management system, as well as FTE-based charges for building rent and utilities. When staff loan out from the operating fund to the capital fund, the capital fund reimburses the operating fund for FTE-related overhead charges. Per the Inter-Local Agreement between the District and King County, "administrative overhead costs shall be determined in accordance with the Overhead Cost Allocation Policy adopted as part of the County’s Comprehensive Financial Management Policies, as currently in effect and as amended, and with the overhead costs in the adopted County budget."

Program Implementation (106,434)

Implement flood hazard management programs and coordinate capital improvement projects for the District. This work category includes river basin team as well as the countywide capital strike team, responsible for identifying, implementing, and tracking flood risk reduction program and project actions within a given basin. This work category includes coordination with other flood risk reduction partners through the Basin Technical Committees, the Flood-Fish-Farm work group, and similar multi-stakeholder efforts to manage risk and coordinate efforts in each river basin. This category also includes coordination meetings at the Section, team, and individual supervisory level, as well as trainings for River and Floodplain Management Section staff. Time spent on capital projects is reimbursed from the capital project fund. Since this reimbursement includes overhead charges that are budgeted separately in the Overhead/Central Cost work category, the Program Implementation work category has a negative budget.

Program Management, Supervision, Finance, Budget 1,283,543

Provide supervisory, financial management, contract administration, capital program oversight, and administrative services for the River and Floodplain Management Section to implement the District's work program. Financial management tasks include forecasting, budget development, accounting, and financial and performance audits from the State of Washington, Flood Control District, King County Council, state and federal grantors, as well as quarterly internal audits by King County Procurement. This category also include contract development and administration for work order contracts, individual work orders are budgeted and accounted for under other work categories or under a specific capital project.

Grand Total

11,180,238

Kjristine
Typewritten Text
Kjristine
Typewritten Text
10
Page 12: MEETING TIME AND LOCATION Wednesday, July 26, · PDF fileMarlla Mhoon, Covington; Councilmember Erika Morgan, Black Diamond; Councilmember Tom Odell, Sammamish; Councilmember Byron

July 19th Preliminary Draft - King County Flood Control District

Flood Program Financial Plan: 2018 Preliminary Draft Budget and 6-Year CIP

2016

Actual

2017

Adopted

2017

Revised

2018

Projected

2019

Projected

2020

Projected

2021

Projected

2022

Projected

2023

Projected

Beginning Balance 51,053,280 49,356,357 57,732,800 63,455,548 62,124,655 52,697,262 39,080,222 31,714,024 27,814,003

Revenue

Flood District

Flood District Levy 1

54,883,157 54,396,709 54,573,464 56,068,170 57,476,207 58,823,943 60,166,026 61,524,051 62,889,508

Interest Earnings 2

497,983 364,625 381,036 418,807 410,023 347,802 257,929 209,313 183,572

Miscellaneous Revenue 3

305,979 300,000 300,000 300,000 300,000 300,000 300,000 300,000

King County

Inter-County River Improvement 4

48,250 50,000 50,000 50,000 50,000 50,000 50,000 0 0

Grants 10

6,664,786 8,896,980 9,289,000 0 0 0 0 0 0

Miscellaneous Revenue 5

172,366 175,000 4,139,907 175,000 175,000 175,000 175,000 175,000 175,000

Total Revenue 62,572,521 63,883,315 68,733,407 57,011,976 58,411,230 59,696,745 60,948,956 62,208,363 63,548,081

Expenditure

District Administration 6

(624,248) (661,932) (671,932) (692,090) (712,853) (734,238) (734,238) (756,265) (756,265)

Operating Expenditure (8,246,768) (10,912,177) (11,159,377) (10,926,918) (11,254,726) (11,592,367) (11,940,138) (12,298,342) (12,667,293)

Capital Expenditure

WLR Projects New Appropriation (11,494,066) (8,922,861) (34,363,841) (28,385,682) (42,911,872) (61,078,822) (20,164,067) (13,060,225) (39,263,699)

WLR Projects Carryover (31,591,413) (25,088,622) (35,671,478) (41,637,154) (54,956,867) (81,224,982) (69,958,444) (52,301,762)

Expenditure Rate 51% 100% 40% 35% 35% 30% 31% 37% 45%

A. WLR Project Expenditures (21,931,825) (8,922,861) (23,780,985) (22,420,006) (29,592,159) (34,810,707) (31,430,605) (30,716,908) (41,204,457)

WLR Flood Mitigation New Appropriation (2,462,999) (1,547,708) (7,575,179) (3,335,883) (4,210,975) (2,593,789) (2,559,051) (2,635,823) (319,405)

WLR Flood Mitigation Carryover (14,273,004) (10,565,584) (12,517,126) (10,938,577) (10,453,191) (9,002,416) (7,977,412) (7,323,132)

Expenditure Rate 14% 100% 31% 31% 31% 31% 31% 31% 31%

B. WLR Flood Mitigation Expenditures (2,268,892) (1,547,708) (5,623,637) (4,914,433) (4,696,361) (4,044,564) (3,584,055) (3,290,103) (2,369,187)

Other Agency New Appropriation (5,477,369) (5,628,425) (5,616,948) (2,672,661) (11,421,613) (9,173,661) (2,315,679) (1,611,267) (1,980,605)

Other Agency Carryover (21,440,630) (16,987,285) (13,562,540) (9,741,120) (12,697,640) (13,122,781) (8,491,153) (5,051,210)

Expenditure Rate 37% 100% 40% 40% 40% 40% 45% 50% 60%

C. External Agency Project Expenditures (9,897,267) (5,628,425) (9,041,693) (6,494,080) (8,465,093) (8,748,520) (6,947,307) (5,051,210) (4,219,089)

Opportunity Fund New Appropriation (5,564,780) (5,564,783) (5,743,771) (5,755,774) (5,879,816) (6,017,689) (6,154,984) (6,293,910) (6,433,597)

Opportunity Fund Carryover (9,682,907) (10,901,037) (10,819,125) (10,773,684) (10,824,775) (10,947,602) (11,116,681) (11,316,884)

Expenditure Rate 29% 100% 35% 35% 35% 35% 35% 35% 35%

D. Opportunity Fund Payments (4,346,649) (5,564,783) (5,825,683) (5,801,215) (5,828,725) (5,894,863) (5,985,905) (6,093,707) (6,212,668)

WRIA Grants New Appropriation (4,308,013) (4,308,013) (4,390,296) (4,390,296) (4,520,525) (4,654,618) (4,792,688) (4,934,853) (5,081,236)

WRIA Grants Carryover (4,921,097) (7,360,485) (7,638,008) (7,818,397) (8,020,300) (8,238,696) (8,470,400) (8,713,414)

Expenditure Rate 20% 100% 35% 35% 35% 35% 35% 35% 35%

E. WRIA Grant Payments (1,868,625) (4,308,013) (4,112,773) (4,209,906) (4,318,623) (4,436,221) (4,560,984) (4,691,838) (4,828,127)

Flood Reduction Grants New Appropriation (2,991,819) (2,991,819) (3,058,908) (3,083,749) (3,161,191) (3,235,317) (3,309,131) (3,383,823) (3,458,923)

Flood Reduction Grants Carryover (4,900,741) (5,955,863) (6,220,192) (6,419,719) (6,610,828) (6,793,840) (6,971,050) (7,144,862)

Expenditure Rate 25% 100% 31% 31% 31% 31% 31% 31% 31%

F. Flood ReductionGrant Payments (1,936,697) (2,991,819) (2,794,579) (2,884,222) (2,970,082) (3,052,305) (3,131,921) (3,210,011) (3,287,173)

Capital Summary - All Expenditures A-F

Total New Capital Appropriation 11

(32,299,046) (28,963,609) (60,748,943) (47,624,045) (72,105,993) (86,753,896) (39,295,600) (31,919,902) (56,537,464)

Total Carryover (86,809,792) (76,858,876) (86,428,469) (87,328,652) (103,563,601) (129,330,317) (112,985,140) (91,851,265)

Overall Expenditure Rate 39% 100% 37% 35% 35% 32% 33% 37% 42%

Total Capital Expenditure 7

(47,021,985) (28,963,609) (51,179,350) (46,723,862) (55,871,044) (60,987,179) (55,640,777) (53,053,776) (62,120,702)

Total Expenditure (55,893,001) (56,635,032) (63,010,659) (58,342,870) (67,838,622) (73,313,785) (68,315,154) (66,108,384) (75,544,260)

Ending Fund Balance (Cash) 57,732,800 56,604,639 63,455,548 62,124,655 52,697,262 39,080,222 31,714,024 27,814,003 15,817,824

Fund Balance Reserves

Subregional Opportunity Fund Reserve (10,819,125) (10,773,684) (10,824,775) (10,947,602) (11,116,681) (11,316,884) (11,537,813)

WRIA Grants Reserve (7,638,008) (7,818,397) (8,020,300) (8,238,696) (8,470,400) (8,713,414) (8,966,522)

Flood Reduction Grants Reserve (6,220,192) (6,419,719) (6,610,828) (6,793,840) (6,971,050) (7,144,862) (7,316,612)

Cash Advance (4,000,000) (4,000,000) (4,000,000) (4,000,000) (4,000,000) (4,000,000) (4,000,000)

Self-insured Retention (6,500,000) (6,500,000) (6,500,000) (6,500,000) (6,500,000) (6,500,000) (6,500,000)

District Admin 90-Day Reserve (167,983) (173,022) (178,213) (183,560) (183,560) (189,066) (189,066)

District Operations 90-Day Reserve (2,789,844) (2,731,730) (2,813,681) (2,898,092) (2,985,035) (3,074,586) (3,166,823)

Total Reserves (38,135,152) (38,416,553) (38,947,798) (39,561,790) (40,226,725) (40,938,813) (41,676,837)

Ending Unreserved Fund Balance 8

25,320,396 23,708,101 13,749,465 (481,567) (8,512,701) (13,124,809) (25,859,013)

Target Fund Balance 7,500,000 8,000,000 0 0 0 0 0 0 0

Budgetary Carryover Reserves (72,086,853) (66,246,639) (86,428,469) (87,328,652) (103,563,601) (129,330,317) (112,985,140) (91,851,265) (86,268,027)

Ending Budgetary Fund Balance 9

(14,354,053) (9,642,000) (22,972,921) (25,203,998) (50,866,338) (90,250,095) (81,271,115) (64,037,261) (70,450,203)

Notes:1 Property tax forecast provided by the Office of Economic and Financial Analysis in March, 2017, less undercollection assumption of 1%. 2 Interest earnings approximated using prior year actuals and increasing by 3% per year. 3 District miscellaneous revenue due to multiple sources such as state forest sales, private timber harvest tax, unrealized investments, leashold excise taxes, and immaterial corrections from prior years.4 The ICRIF amount is based on the 1919 Inter-County Agreement for improvements to the White River.5 Miscellaneous revenue due to multiple sources such as state forest sales, private timber harvest tax, rent from tenants of acquired real estate, and immaterial corrections from prior years.6 Costs based on contract established under FCD 2008-07 for District executive services, and inflated at 3% in succeeding years. 7

A.     Based on prior year experience and knowledge of existing staff capacity to implement construction projects implemented by WLR Division. 

The expenditure rate increases at the end of the six years as new appropriation decreases and carryover projects are completed.

B.     Based on prior year experience for acquisitions and home elevations, where expenditure patterns are strongly influenced by factors such as landowner willingness. Rate shown here is

similar to the expenditure rate for acquisition-focused funds such as King County’s Conservation Futures Trust (CFT).

C.     Based on increase from past expenditure rates as city projects move through the engineering design phase toward construction.

D-E. Based on prior year experience with expenditure rates for these capital grant programs, which have a 2-3 year minimum time lag between appropriation and expenditures due to funding

allocation decision-making process, execution of agreements for awarded projects, and reimbursement of eligible expenditures during or following implementation by the grant recipient. While the Opportunity Fund does not require time for an allocation process, many jurisdictions choose to accrue funding over multiple years which limits the expenditure rate.

Note that a constant expenditure rate results in increased expenditures as unspent allocations are carried over each year.8

9

10

11 Total New Capital Appropriation corresponds to the "Grand Total" shown on Attachment H

7/19/17

The Unreserved Fund Balance is the remaing balance less reserves described in resolution FCD2016-21.1 adopting a fund balance reserve policy. While the policy provides general guidance on types of reserves, it does not specify their

quantification. The reserve quantities above reflect initial considerations by the District in lieu of more formal direction.

The budgetary fund balance assumes 100% expenditure of all budgeted amounts and is used to understand the District's total budgetary commitment.

The capital expenditure is equal to the expenditure rate times the sum of the new capital appropriation and carryover. Rationale for the expenditure rates forecasted for A-E in the capital program is as follows:

Grant revenue is assumed only for grants that have been awarded or where an award in likely and imminent.

Kjristine
Typewritten Text
11
Kjristine
Typewritten Text
Kjristine
Typewritten Text
Kjristine
Typewritten Text
Kjristine
Typewritten Text
Kjristine
Typewritten Text
Kjristine
Typewritten Text
Kjristine
Typewritten Text
Kjristine
Typewritten Text
Page 13: MEETING TIME AND LOCATION Wednesday, July 26, · PDF fileMarlla Mhoon, Covington; Councilmember Erika Morgan, Black Diamond; Councilmember Tom Odell, Sammamish; Councilmember Byron

Annual Expenditures

Cash Fund Balance

Kjristine
Typewritten Text
12
Page 14: MEETING TIME AND LOCATION Wednesday, July 26, · PDF fileMarlla Mhoon, Covington; Councilmember Erika Morgan, Black Diamond; Councilmember Tom Odell, Sammamish; Councilmember Byron

July 19th Preliminary Draft - King County Flood Control District Changes since hard copy distributed 7/13/17

2015-2016 Flood Damage Repairs

2018 - 2023 Six-Year CIP Project Allocations Grant/External Funding

Attachment H Cost Share

2017 Mid-Year Revision

King County Road Services Division Projects

No. Title Basin Flood Risk %

Implement

%

Type of

project

2016 Inception

to Date

Expenditure

2017

Revised

Inception to

Date Budget

2017 Available

Budget

2018

Requested

2019

Projected

2020

Projected

2021

Projected

2022

Projected

2023

Projected

6-Year CIP

Total

Project Life

Total Comments

1 WLFL0 MILLER R RD RVTMNT 2016 REPAIR SF Skykomish Repair N/A WLR $1,409 $760,799 $759,390 ($334,425) $0 $0 $0 $0 $0 ($334,425) $426,374

Damage to revetment. Very large rock removed from revetment, vertical banks and exposed subgrade in several locations

totaling approximately 350 feet of damage. If not repaired, Miller River Road could be severely damaged.

2 WLFL0 SKYKOMISH HOME BUYOUTS SF Skykomish Acqu/Elev $380 $380 $0 $0 $0 $0 $0 $0 $0 $0 $380 Acquisition of at-risk single family homes in the Town of Skykomish.

3 WLFL0 SF SKYKMSH REP LOSS MIT SF Skykomish 74% 46% Acqu/Elev $295,404 $690,838 $395,434 $54,566 $0 $0 $0 $0 $119,405 $173,971 $864,809

This project will elevate or buyout individual structures in the South Fork Skykomish Basin to eliminate the risk of flooding

or erosion damage during future flood events.

4 WLFL0 SKY W RVR DR FLOOD STUDY SF Skykomish 63% 36% WLR $2,475 $81,237 $78,762 $0 $0 $0 $0 $0 $0 $0 $81,237

This project would improve infrastructure at the mouth of Maloney Creek and on the SF Skykomish River to reduce the

frequency of flooding of homes and property within the Town of Skykomish.

5 WLFL0 SKYKOMISH LB DOWN 2016 REPAIR SF Skykomish Repair N/A WLR $61,767 $150,000 $88,233 $0 $0 $0 $0 $0 $0 $0 $150,000

Approximately 50-foot-long section of missing armor rock immediately downstream of the bridge. Further flooding may

compromise or severly damage facility.

6 WLFL0 SKYKOMISH LB UP 2016 REPAIR SF Skykomish Repair N/A WLR $7,658 $309,433 $301,775 $0 $0 $0 $0 $0 $0 $0 $309,433

Three pockets of missing armor rock: 15, 10 and 75 feet wide and eroded topsoil from upper sections of levee. Further

flooding may compromise or severely damage facility.

7 WLFL0 TIMBER LN EROSN BUYOUTS SF Skykomish 76% 46% Acqu/Elev $1,571,273 $2,586,513 $1,015,240 $223,361 $0 $0 $0 $0 $0 $223,361 $2,809,874

This project will continue to acquire and remove homes along a stretch of the Skykomish River that are endangered by

erosive forces as well as inundation in some places.

8 WLFL0 TIMBERLANE 2016 REPAIR SF Skykomish Repair N/A WLR $11,040 $52,500 $41,460 ($36,460) $20,000 $20,000 $20,000 $20,000 $0 $43,540 $96,040

Old privately built facility in Timberlane Village on County property. Riverside rockery walls continue to oversteepen,

settle and fall into the river.

9 WLFL1 428TH AVE SE BR FEASIBILITY Upper Snoq FCD FCD WLR $168,614 $300,000 $131,386 ($31,386) $0 $0 $0 $0 $0 ($31,386) $268,614

FCD-requested project to reduce neighborhood isolation from flooding. Develop a set of alternatives for improvements to

428th Avenue SE, SE 92nd Street, and Reinig Road to reduce the frequency of community isolation caused by

floodwaters overtopping these roadways.

10 WLFL1 USACE PL 84-99 SF SNO Upper Snoq WLR $0 $0 $0 $150,223 $183,154 $352,868 $363,454 $0 $0 $1,049,698 $1,049,698

Ensure eleven South Fork Snoqualmie River levees meet the standards of the US Army Corps of Engineers PL 84-99

program in order to receive future assistance from the Corps in the event of flood damage to the levees..

11 WLFL1 SF SNO LEVEE REMEDIATION Upper Snoq WLR $0 $0 $0 $295,673 $374,439 $727,790 $749,623 $0 $0 $2,147,526 $2,147,526

Six levee deficiencies have been identified in this leveed segment. The project will design and reconstruct the impaired

segment of levee in place.

12 WLFL1 RIBARY CREEK Upper Snoq WLR $0 $0 $0 $0 $636,492 $815,106 $2,338,618 $2,408,777 $0 $6,198,993 $6,198,993

Address flooding from Ribary Creek at Bendigo Blvd in North Bend as the Snoqualmie levees prevent drainage to the

river during high flows.

13 WLFL1 REIF RD LEVEE IMPROVEMENTS Upper Snoq WLR $0 $0 $0 $0 $0 $265,438 $318,421 $385,937 $457,218 $1,427,015 $1,427,015

Conduct a feasibility study to determine ways of preventing the overtopping of the Reif Rd Levee. Potential solutions

include: repair and/or raise levee in place / setback levee / gravel removal / home elevations.

14 WLFL1 CIRCLE RVR RANCH RISK RED Upper Snoq N/A N/A WLR $64,225 $150,000 $85,775 $278,505 $513,426 $1,608,159 $1,738,003 $0 $0 $4,138,093 $4,288,093

This project will determine a preferred action to reduce long term risks from channel migration in the Circle River Ranch

Neighborhood on the South Fork Snoqualmie River. Being conducted concurrent with South Fork Snoqualmie Corridor

Plan.

15 WLFL1 MASON THRSN EXT 2016 REPAIR Upper Snoq Repair N/A WLR $0 $240,000 $240,000 $0 $0 $0 $0 $0 $0 $0 $240,000

Large scour hole in bank at upstream end of Mason Thorson Extension rock-faced levee. Significant settlement and

displacement of face rock at upstream end of facility. Scour hole in bank threatens to end-run facility and damage

adjacent private property. Damage to levee face-rock compromises levee integrity and may lead to progressive failure,

especially at upstream end.

16 WLFL1 MF SNO CORRIDOR IMP Upper Snoq 76% 51% WLR $954 $1,100,000 $1,099,046 $0 $2,243,361 $1,591,350 $1,311,272 $0 $0 $5,145,983 $6,245,983 Placeholder for corridor plan implementation project(s)

17 WLFL1 MF SNO CORRIDOR PLAN Upper Snoq 76% 33% WLR $1,310,605 $1,824,912 $514,307 $0 $0 $0 $0 $0 $0 $0 $1,824,912 Middle Fork Snoqualmie Corridor Planning, scheduled for completion in 2018.

18 WLFL1 NORTH FORK BRIDGE 2016 REPAIR Upper Snoq Repair N/A WLR $111 $385,000 $384,889 $0 $0 $0 $0 $0 $0 $0 $385,000

The North Fork Bridge was originally built in 1951 and is extreamely vulnerable to scour as the channel thalweg migrates.

In order to keep the bridge safe and reliable during a flood, it is important to protect the piers and abutments from scour

failure.

19 WLFL1 REIF RD 2016 REPAIR Upper Snoq Repair N/A WLR $0 $253,000 $253,000 $0 $0 $0 $0 $0 $0 $0 $253,000

Length 50-80 feet. Face rock has appeared to have settled 1-2 feet exposing core material above near upper part of levee

face. Larger face rock missing in pockets upstream end of this damage site. Continued damage could compromise

facility which provides flood protection for several residences landward of the facility.

20 WLFL1 SF SNO CORR EARLY ACTION Upper Snoq 95% 49% WLR $1,373,089 $5,562,744 $4,189,655 ($4,039,655) $0 $0 $0 $0 $0 ($4,039,655) $1,523,089

Project identified by Board to alleviate potential flooding of I-90 in North Bend. Currently evaluating project alternatives,

including levee setback and gravel removal.

21 WLFL1 SF SNO CORRIDOR IMP Upper Snoq 95% 49% WLR $0 $130,771 $130,771 ($57,971) $0 $0 $0 $0 $0 ($57,971) $72,800 Placeholder for corridor plan implementation project(s)

22 WLFL1 SF SNO CORRIDOR PLAN Upper Snoq 79% 49% WLR $2,472,914 $2,682,914 $210,000 $0 $0 $0 $0 $0 $0 $0 $2,682,914 SF Snoqualmie Corridor planning process and development of capital investment strategy.

23 WLFL1 SHAKE MILL LB 2016 REPAIR Upper Snoq Repair N/A WLR $0 $800,000 $800,000 ($647,676) $709,356 $0 $0 $0 $0 $61,680 $861,680

Total breach of levee - erosion and lateral channel migration is ongoing. No immediately adjacent private property or

infrastructure. Continued erosion could threaten 428th Ave embankment or bridge.

24 WLFL1 SHAKE MILL RB 2016 REPAIR Upper Snoq Repair N/A WLR $0 $197,500 $197,500 $620,575 $0 $0 $0 $0 $0 $620,575 $818,075

Between 428th St Bridge and Tate Creek, several locations on levee where toe-rock dislodged and corresponding minor

bank erosion along 50-60 feet of river bank. Actual gaps range between 6-10 feet. Missing toe rock compromises levee

integrity, increasing its vulnerability to further scour and potential failure. Failure of this facility could result in damage to a

heavily used county road (428th Ave SE).

25 WLFL1 SR202 SF BRIDGE LENGTHEN Upper Snoq 76% 26% WLR $0 $0 $0 $0 $0 $0 $0 $0 $100,000 $100,000 $100,000

Placeholder funding to partner with WSDOT to expand bridge SR202 opening over South Fork Snoqualmie and Ribary

Creek to improve conveyance and reduce upstream flood impacts. Supported by North Bend. Requires state or federal

funding. Relative contribution of this project is being evaluated in the SF Snoqualmie Corridor Plan.

26 WLFL1 UPPER SNOQ 2015 FLOOD REPAIR Upper Snoq Repair N/A WLR $5,673 $1,465,673 $1,460,000 $15,450 $0 $0 $0 $0 $0 $15,450 $1,481,123

Flood damage repairs from January 2015 flood event. Locations include Mason-Thorson Ells and Mason-Thorson

Extension (Middle Fork Snoqualmie); North Park (North Fork Snoqualmie); and Record Office, Meadowbrook, and

Railroad (Snoqualmie mainstem).

27 WLFL1 UPR SNO RES FLD MITIGTN Upper Snoq 89% 54% Acqu/Elev $9,163,547 $11,971,284 $2,807,737 $1,454,158 $2,412,151 $2,484,516 $2,559,051 $2,635,823 $0 $11,545,699 $23,516,983

This project will continue to acquire or elevate flood-prone structures in the Upper Snoqualmie basin to reduce the risk of

flood, erosion, and channel migration damage. Partnership with Cities of Snoqualmie and North Bend. As of May 2016

260 remain to be elevated or acquired. This amount assumes 10-12 home elevations per year.

28 WLFL2 DUTCHMAN RD REPAIR Lower Snoq Repair N/A WLR $0 $209,914 $209,914 $338,679 $0 $0 $0 $0 $0 $338,679 $548,593

Repair approximately 200 feet of revetment. Dutchman Road in this location provides the sole access to residences and

business on the west side of the Snoqualmie Valley downstream of Duvall. Continued erosion of the revetment could

result in erosion of the road (West Snoqualmie Valley Road NE) which would severely limit access to the downstream

property owners during or following a flood event.

29 WLFL2 DUVALL BRIDGE 1136A Lower Snoq FCD FCD Agreement $0 $30,000 $30,000 $120,000 $0 $0 $0 $0 $0 $120,000 $150,000

The foundation of the main-span pier is exposed and is vulnerable to destabilization during a flood. Add scour mitigation

measures to protect footing. Bridge crosses the Snoqualmie River at Duvall and is the city's primary route.

30 WLFL2 FARM FLOOD TSK FORCE IMP Lower Snoq 58% 79% WLR $668,348 $763,759 $95,411 $111,858 $115,214 $118,670 $122,230 $125,897 $0 $593,869 $1,357,628

This project provides technical and cost-sharing assistance to residential and agricultural landowners in the Lower

Snoqualmie floodplain to help them better withstand the impacts of flooding. Specific project actions include farm pads,

elevations of homes, and elevation or flood proofing of agricultural structures.

31 WLFL2 L SNO REP LOSS MITGTION Lower Snoq 74% 21% Acqu/Elev $1,269,231 $1,712,699 $443,468 ($17,028) $0 $0 $0 $0 $0 ($17,028) $1,695,671 Funding as possible local match for FEMA grants to elevate or acquire at-risk structures.

32 WLFL2 L SNO/ALDAIR CORRDOR PLN Lower Snoq 84% 97% WLR $5,644,814 $7,252,761 $1,607,947 $113,053 $742,630 $655,636 $0 $0 $0 $1,511,319 $8,764,080

Cost-shared contribution to multiple levee setbacks and high priority flood risk reduction acquisitions in the Fall City reach

of the Lower Snoqualmie. Projects reduce flood and erosion risk to revetments, roads, and landowners. FCD expenditure

leverages habitat restoration funding from other sources.

33 WLFL2 LWR SNO RESDL FLD MITGTN Lower Snoq FCD FCD Acqu/Elev $1,927,117 $3,306,276 $1,379,159 ($27,959) $737,924 $0 $0 $0 $0 $709,965 $4,016,241

This project provides technical and cost-sharing assistance to residential and agricultural landowners in the Lower

Snoqualmie floodplain to help them better withstand the impacts of flooding. Specific project actions include farm pads,

elevations of homes, and elevation or flood proofing of agricultural structures.

34 WLFL2 SE 19TH WAY REVETMENT Lower Snoq FCD FCD WLR $292,549 $1,706,294 $1,413,745 $0 $0 $0 $0 $0 $0 $0 $1,706,294

Rebuild revetment to protect road access to high value agricultural operations and lands. Construction of road anticipated

2017; bank repair anticipated in 2018.

35

WLFL2 SE DAVID POWELL RD

DOWNSTREAM Lower Snoq FCD FCD WLR $149,535 $1,036,456 $886,921 $0 $0 $0 $0 $0 $0 $0 $1,036,456

FCD-requested project to reduce neighborhood isolation from flooding. Prevent slope failure of sole access roadway that

would isolate 150 homes.

36 WLFL2 SE DAVID POWELL RD UPSTREAM Lower Snoq FCD FCD Agreement $0 $250,000 $250,000 $700,000 $1,250,000 $0 $0 $0 $0 $1,950,000 $2,200,000

The river is scouring the road away and David Powell Road is collapsing into the river. This project will repair an existing

failing revetment and extend MSE wall to prevent undercutting of the riverbank and roadway.

37 WLFL2 SE FISH HATCHERY RD Lower Snoq FCD FCD WLR $124,843 $527,905 $403,062 $0 $0 $0 $0 $0 $0 $0 $527,905

FCD-requested project to reduce neighborhood isolation from flooding. Prevent slope failure of sole access roadway that

would isolate 20-30 homes.

38 WLFL2 SINNEMA QUAALE 2011 REPR Lower Snoq 100% N/A WLR $11,974,543 $12,508,516 $533,973 $0 $0 $0 $0 $0 $0 $0 $12,508,516

Large capital project to repair 1000 linear feet of the Sinnema Quaale Upper revetment. Protects SR 203, two regional

fiber optic lines, and Snoqualmie Valley Trail. Construction to be completed in 2017; project anticipated to be closed out

in 2018.

7/20/17

Page 1 of 4

Kjristine
Typewritten Text
13
Page 15: MEETING TIME AND LOCATION Wednesday, July 26, · PDF fileMarlla Mhoon, Covington; Councilmember Erika Morgan, Black Diamond; Councilmember Tom Odell, Sammamish; Councilmember Byron

No. Title Basin Flood Risk %

Implement

%

Type of

project

2016 Inception

to Date

Expenditure

2017

Revised

Inception to

Date Budget

2017 Available

Budget

2018

Requested

2019

Projected

2020

Projected

2021

Projected

2022

Projected

2023

Projected

6-Year CIP

Total

Project Life

Total Comments

39 WLFL2 SNOQUALMIE VALLEY FEASIBILITY Lower Snoq FCD FCD Agreement $0 $0 $0 $0 $0 $0 $250,000 $250,000 $0 $500,000 $500,000

Regional flooding in the Snoqualmie Valley cuts off access to eastern cities. Determine which major roadway(s) that

cross the Snoqualmie Valley would be the most cost effective to improve in the valley with chronic flood issues impacting

over 25,000 daily drivers.

40 WLFL2 TOLT PIPELINE PROTECTION Lower Snoq 84% 49% WLR $1,515,788 $3,271,375 $1,755,587 $6,162,541 $42,436 $0 $0 $0 $0 $6,204,977 $9,476,352

This project will repair approximately 800 linear feet of the Winkelman (formerly RM 13.5) revetment. Erosion along the

right bank of the Snoqualmie River channel threatens to undermine the Seattle Public Utilities water supply line at this

location south of Duvall. Construction anticipated 2017.

41

WLFL2 WOODINVILLE DUVALL BR

1136B/1136E Lower Snoq FCD FCD Agreement $0 $100,000 $100,000 $300,000 $0 $0 $0 $0 $0 $300,000 $400,000

These two bridges are subject to having the roadway approach fill wash out during a flood. Excavate approaches and

rebuild approaches to prevent loosing approaches during flooding. A similar repair was done on Woodinville-Duvall

Bridge No. 1136D.

42 WLFL3 FREW LEVEE 2016 REPAIR Tolt Repair N/A WLR $0 $150,000 $150,000 $0 $0 $0 $0 $0 $0 $0 $150,000

Face rock displaced along approximately 50 feet of levee face. Some core material appears to have been lost, resulting in

an oversteepened bank relative to upstream and downstream undamaged levee sections. Top of damaged face

approximately 6 feet from edge of gravel trail. Continued erosion will cut off popular riverside trail. Potential impact to

highway if facility breaches during a major flood.

43 WLFL3 GIRL SCOUT LEVEE 2016 REPAIR Tolt Repair N/A WLR $0 $60,000 $60,000 $0 $0 $0 $0 $0 $0 $0 $60,000

Approximately 20 feet of face and toe rock dislodged from Girl Scout Camp levee revetment below side channel

confluence with mainstem. Missing face and toe rock compromises levee integrity, increasing its vulnerability to further

scour and potential failure.

44 WLFL3 HOLBERG FEASIBILITY Tolt WLR $0 $200,000 $200,000 $0 $0 $0 $0 $0 $0 $0 $200,000

Feasibility study to determine the nature and extent of levee improvements necessary to remove four homes in

unincorporated King County from the regulatory Channel Migration Zone as mapped in the March 2017 Draft Tolt River

Channel Migration study

45 WLFL3 LOWER FREW LEVEE SETBACK Tolt WLR $0 $175,000 $175,000 $1,236,000 $1,823,962 $0 $0 $0 $0 $3,059,962 $3,234,962

Capital Investment Strategy: Design, based on level of service analysis, the highest priority levee setback for flood risk

reduction. FCD 6-year includes funds needed for grant match for future grant applications.

46 WLFL3 LOWER TOLT RIVER ACQUISITION Tolt 0% Acqu/Elev $529,475 $744,475 $215,000 $0 $0 $0 $0 $0 $0 $0 $744,475 Acquisition between the Swiftwater development and the river for the future setback of the Upper Frew Levee

47 WLFL3 RIO VISTA PROPERTY ACQ Tolt Acqu/Elev $0 $0 $0 $500,000 $0 $0 $0 $0 $0 $500,000 $500,000

Capital Investment Strategy: Acquire 2 at-risk homes from willing sellers; acquire remaining 14 homes as funds become

available.

48 WLFL3 SAN SOUCI NBRHOOD BUYOUT Tolt 82% 79% Acqu/Elev $4,127,691 $5,553,353 $1,425,662 $0 $0 $0 $0 $0 $0 $0 $5,553,353

This project will buyout remaining properties and remove all homes and privately-constructed rubble levee at upstream

end of the community access road, ultimately completing project initiated 20 years ago by others. When completed, will

result in removing approximatlely 20 homes from high hazard areas within and just upstream and downstream of San

Souci neighborhood.

49 WLFL3 SAN SOUCI REACH IMPRVMNTS Tolt WLR $0 $0 $0 $100,000 $250,000 $700,000 $700,000 $750,000 $0 $2,500,000 $2,500,000

Capital Investment Strategy: Construct Tolt Road NE road elevation in one location. Remove illegal revetment and roads

in San Souci neighborhood.

50 WLFL3 SEDIMENT MGMT FEAS Tolt WLR $0 $0 $0 $209,605 $205,284 $0 $0 $0 $0 $414,889 $414,889

Capital Investment Strategy: Conduct sediment management feasibility study and develop a plan. Update and include

upper watershed sediment production estimates

51 WLFL3 SR 203 BR IMPRVMNTS FEAS Tolt WLR $0 $0 $0 $205,743 $181,306 $0 $0 $0 $0 $387,049 $387,049

Capital Investment Strategy: Initiate study (with potential future design and construct) to add bridge span(s), raise the

highway and relocate King County Parks parking area.

52 WLFL3 TOLT 2015 FLOOD REPAIRS Tolt Repair N/A WLR $46,790 $900,000 $853,210 $0 $0 $0 $0 $0 $0 $0 $900,000

Flood damage repairs from January 2015 flood event. Locations include Frew, Upper Frew, Remlinger, and Girl Scout

Camp.

53 WLFL3 TOLT CORRIDOR IMPLMNTN Tolt WLR $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Placeholder for corridor plan implementation project(s).

54 WLFL3 TOLT CORRIDOR PLAN Tolt 87% 82% WLR $958,717 $1,153,657 $194,940 $0 $0 $0 $0 $0 $0 $0 $1,153,657

The corridor plan for the lower 6 miles of the Tolt River will develop a prioritized implementation strategy for near-term and

long-term floodplain management actions. Scheduled for adoption in 2017.

55 WLFL3 TOLT R LEVEE L.O.S. ANALYSIS Tolt WLR $0 $150,000 $150,000 $133,250 $420,000 $0 $0 $0 $0 $553,250 $703,250

Capital Investment Strategy: Conduct a detailed hydraulic analysis to optimize the elevation of new levees to maximize

flood risk reduction benefits

56 WLFL3 TOLT R MILE 1.1 SETBACK Tolt 84% 79% Acqu/Elev $4,097,106 $5,484,360 $1,387,254 ($578,254) $530,450 $0 $0 $0 $0 ($47,804) $5,436,556

Acquisition funding for high risk properties in levee setback project area. Project priorities will be determined by the Board

through adoption of the Tolt Corridor Plan.

57 WLFL3 TOLT R NATURAL AREA ACQ Tolt 66% 64% Acqu/Elev $1,140,067 $2,470,067 $1,330,000 $515,000 $530,450 $109,273 $0 $0 $0 $1,154,723 $3,624,790 Capital investment strategy: acquire at-risk homes from willing sellers.

58 WLFL3 TOLT R RD ELEVATION FEASIBILITY Tolt FCD FCD WLR $0 $250,000 $250,000 $0 $0 $0 $0 $0 $0 $0 $250,000

FCD-requested project to reduce neighborhood isolation from flooding. Evaluate feasibility of elevating sections of Tolt

River Road.

59 WLFL3 TOLT R RD NE IMPROVEMENTS Tolt WLR $0 $0 $0 $0 $0 $50,000 $100,000 $210,000 $800,000 $1,160,000 $1,160,000

Capital Investment Strategy: Initiate design for elevation of one road location to reduce or eliminate isolation. Implement

additional road elevations as funds become available.

60 WLFL3 UPPER FREW LEVEE SETBACK Tolt 0% WLR $0 $0 $0 $0 $0 $100,000 $100,000 $150,000 $0 $350,000 $350,000

Capital Investment Strategy: Initiate the levee setback design in order to apply for grant funding. Levee setback to

increase sediment storage and floodwater conveyance; protect adjacent development; reduce damage to trail bridge.

61

WLFL4 ALPINE MANOR NEIGHBORHOOD

BUYOUTS Raging 76% 79% Acqu/Elev $1,715,652 $2,280,652 $565,000 $405,755 $0 $0 $0 $0 $0 $405,755 $2,686,407

Acquisition of single-family homes and future acquisition of mobile home park at risk of channel migration along the

Raging River in the Alpine Manor neighborhood.

62 WLFL4 RAGING R BRIDGE 1008E Raging FCD FCD Agreement $0 $80,000 $80,000 $0 $0 $0 $0 $0 $0 $0 $80,000

This bridge has a history of scour damage. One of the arch foundations is exposed. Repair scour mitigation measures to

protect the footing. It serves only one house but is a designated King County Landmark.

63 Snoqualmie-South Fork Skykomish Subtotal $52,693,404 $84,023,017 $31,329,613 $8,473,181 $13,922,035 $9,598,805 $10,670,673 $6,936,434 $1,476,623 $51,077,752 $135,100,769

64

65

66 WLFL5 NE 8TH ST AT LAKE ALLEN OUTLET Sammamish FCD FCD Agreement $0 $0 $0 $0 $0 $400,000 $1,400,000 $1,000,000 $1,800,000 $4,600,000 $4,600,000

To address chronic flooding on this sole access roadway with approximately 200 properties, look at upstream and

downstream retention/detention options; study road-raining options; prepare Concept Development Report, analyze and

select best options.

67 WLFL5 SAMMAMISH R BANK REPAIRS Sammamish Repair N/A WLR $106,050 $419,895 $313,845 $721,929 $0 $0 $0 $0 $0 $721,929 $1,141,824

Repair and stabilize two short sections of the right riverbank near I-405 to protect the regional Sammamish River trail.

Work is being coordinated with Parks. Full permitting will be required as work will be below OHW, plus an updated

easement will be required from WSDOT and FHWA due to I-405 proximity. Construction is targeted for summer 2016

and will likely require detouring trail users to adjacent roads.

68 WLFL5 WILLOWMOOR FLDPLAIN REST Sammamish 58% 8% WLR $1,405,468 $2,717,923 $1,312,455 ($181,655) $1,684,709 $2,011,665 $0 $0 $0 $3,514,719 $6,232,642

Willowmoor Floodplain Restoration Project seeks to reduce the frequency and duration of high lake levels in Lake

Sammamish while maintaining downstream Sammamish River flood control performance and enhancing habitat. The

project will reconfigure the Sammamish transition zone to ensure ongoing flow conveyance, downstream flood control,

potential extreme lake level reduction, habitat conditions improvement, and reduction of maintenance impacts and costs.

In June 2016 the Executive Committee approved a motion (2016-04) authorizing 30% design of the split-channel

alternative including various design elements such as variable depth pools, cold water supplementation, and other

elements itemized in the motion.

69 WLFL6 LOWER COAL CRK PH I Lk Wash Tribs 71% 49% Agreement $1,504,751 $3,958,751 $2,454,000 $5,595,000 $4,159,000 $145,000 $120,000 $100,000 $66,000 $10,185,000 $14,143,751

Increase conveyance capacity at the five box culvert crossings. Disconnect local storm drainage outfall from Coal Creek

and redirect them to Lake Washington. Implemented by City of Bellevue. Expenditure forecast to be updated based on

current project schedule.

70 WLFL7 CDR PRE-CONST STRTGC ACQ Cedar 84% 69% Acqu/Elev $2,532,848 $4,330,532 $1,797,684 $0 $0 $0 $0 $0 $0 $0 $4,330,532

This project will acquire strategic real estate upon which several large Flood Control District capital projects are

dependent, namely the levee setback projects at the Herzman, Jan Rd, Rhode, Getchman, and Rutledge-Johnson Lower

Jones Rd levee segments. Acquisition funding related to these projects is now included in the individual capital projects.

71

WLFL7 CEDAR LEVEE SETBACK FEAS

(Cedar Corridor Plan) Cedar 84% 69% WLR $1,624,424 $1,987,587 $363,163 $0 $0 $0 $0 $0 $0 $0 $1,987,587

This six-year flood risk reduction capital investment strategy will cover the Cedar River valley from Landsburg Road SE

(River Mile 22) to Lake Washington. Completion of this plan is expected in September 2016.

72 WLFL7 CEDAR R REP LOSS MITGATN Cedar 74% 8% Acqu/Elev $3,182,250 $3,788,422 $606,172 $0 $0 $0 $0 $0 $0 $0 $3,788,422 Acquire frequently-flooded homes. Placeholder funding until District adopts acquisition policy.

73 WLFL7 CEDAR RIVER TRAIL SITE A BANK Cedar 0% WLR $0 $0 $0 $0 $100,000 $100,000 $200,000 $490,000 $0 $890,000 $890,000

Capital Investment Strategy: Repair eroded section of left bank with bioengineered revetment to stabilize toe of bank and

to prevent large scale bank failure.

74 WLFL7 CEDAR RVR GRAVEL REMOVAL Cedar 89% 59% Agreement $8,480,221 $11,102,885 $2,622,664 $0 $962,613 $104,880 $445,679 $111,267 $114,605 $1,739,044 $12,841,929

The project will ensure the minimum required 100-year flood conveyance capacity along the lower 1.25 miles of the Cedar

River. Project is a required maintenance action for the Army Corps of Engineers 205 Flood Control Project. Project

costs were updated in March 2016.

75

WLFL7 CITY OF RENTON LEVEE

CERTIFICATION Cedar 0% Agreement $0 $0 $0 $750,000 $3,000,000 $1,250,000 $0 $0 $0 $5,000,000 $5,000,000Placeholder for Renton levee certification projects.

76 WLFL7 ELLIOTT BR LEVEE SETBACK Cedar 79% 56% WLR $2,168,073 $2,175,408 $7,335 ($7,335) $0 $0 $0 $0 $0 ($7,335) $2,168,073

Purpose of the project is to setback levees on both sides of the river below the Elliott/154th ST Bridge. Based on the

Cedar Capital Investment Strategy this project is no longer scheduled for the near-term 6-year timeframe.

77 WLFL7 FBD CORRIDOR IMPLEMENTATION Cedar 84% 69% Acqu/Elev $932,547 $5,705,500 $4,772,953 $806,284 $0 $0 $0 $0 $0 $806,284 $6,511,784

Washington State Floodplains by Design grant from the Department of Ecology. The project will buyout residents in high

risk areas, increase the capacity for flood storage, and provide corresponding environmental improvements. The project

has cost-share funding from the City of Seattle

78

WLFL7 HERZMAN LEVEE SETBACK AND

TRAIL Cedar WLR $0 $0 $0 $944,872 $226,184 $3,979,360 $78,786 $81,149 $83,584 $5,393,935 $5,393,935

Capital Investment Strategy: Setback levee; excavate side-channel to reduce pressure on revetment; reconstruct,

reinforce and/or extend revetment; acquire up to 5 properties.

Page 2 of 4

Kjristine
Typewritten Text
14
Page 16: MEETING TIME AND LOCATION Wednesday, July 26, · PDF fileMarlla Mhoon, Covington; Councilmember Erika Morgan, Black Diamond; Councilmember Tom Odell, Sammamish; Councilmember Byron

No. Title Basin Flood Risk %

Implement

%

Type of

project

2016 Inception

to Date

Expenditure

2017

Revised

Inception to

Date Budget

2017 Available

Budget

2018

Requested

2019

Projected

2020

Projected

2021

Projected

2022

Projected

2023

Projected

6-Year CIP

Total

Project Life

Total Comments

79 WLFL7 JAN ROAD NEIGHBORHOOD Cedar WLR $0 $0 $0 $900,000 $0 $0 $0 $0 $0 $900,000 $900,000

Capital Investment Strategy: Suite of solutions to be determined as part of feasibility study. Includes raise road, partial

removal of Jan Road levee, contruction of side channel, and mitigation of at-risk properties.

80 WLFL7 TBD Cedar WLR $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 TBD

81 WLFL7 LOWER CEDAR FEASIBILITY STUDY Cedar WLR $0 $0 $0 $200,000 $200,000 $100,000 $0 $0 $0 $500,000 $500,000

Capital Investment Strategy: Conduct feasibility study of Lower Cedar reach in City of Renton to 1) quantity economic

damage potential 2) determine infrastructure modifications to improve flood resiliency and sediment storage potential, and

30 conduct cost-benefit analysis.

82

WLFL7 LOWER JONES ROAD

NEIGHBORHOOD Cedar WLR $0 $36,000 $36,000 $3,057,792 $1,738,873 $4,569,548 $1,544,801 $40,575 $0 $10,951,589 $10,987,589

Capital Investment Strategy: Raise in place or setback Jones Road; excavate and stabilize right bank to increase

conveyance capacity; reinforce one revetment; remove portion of another revetment; acquire 8 at risk properties

83 WLFL7 MAPLEWOOD FEASIBILITY STUDY Cedar WLR $0 $440,000 $440,000 $0 $0 $0 $0 $0 $0 $0 $440,000

Capital Investment Strategy: Conduct site specific landslide risk assessment study; conduct a feasibility study to

evaluate opportunities to modify the Erickson Levee.

84 WLFL7 RIVERBEND MHP ACQ Cedar 82% 46% WLR $3,496,466 $5,357,042 $1,860,576 $0 $0 $0 $0 $0 $0 $0 $5,357,042

This project represents the Flood District contribution to a larger project that relocates mobile home park tenants and

initiates preliminary engineering design for potential levee setback / realignment to reduce flood heights, velocities and

channel migration risk in this reach.

85 WLFL7 SE 162ND AVE AT 266TH CT Cedar FCD FCD Agreement $0 $150,000 $150,000 $250,000 $400,000 $700,000 $0 $0 $0 $1,350,000 $1,500,000

To address a culvert failure affecting approximately 10 properties, prepare Concept Development Report to analyze and

select best culvert replacement and road-raising option; and analyze upstream and downstream retention/detention

impacts.

86 WLFL7 SR 169 FEASIBILITY STUDY Cedar FCD FCD WLR $0 $260,000 $260,000 $61,800 $0 $0 $0 $0 $0 $61,800 $321,800

Conduct feasibility study in coordination with WSDOT to evaluate flood risk reduction opportunities, such as elevating SR

169, upgrading the local drainage infrastructure, and / or installation of back flow prevention gates.

87 Cedar-Sammamish Subtotal $25,433,098 $42,429,945 $16,996,847 $13,098,687 $12,471,379 $13,360,453 $3,789,266 $1,822,991 $2,064,189 $46,606,965 $89,036,910

88

89

90 WLFL8 BRISCOE LEVEE SETBACK Green 82% 36% Agreement $21,361,073 $23,330,271 $1,969,198 $0 $0 $0 $0 $0 $0 $0 $23,330,271 Floodwall construction at four locations completed by the City of Kent. Final expenditures for the remainder of 2017 will

91 WLFL8 BRPS BLACK R PUMP STATION Green 100% 72% WLR $5,134,042 $5,374,203 $240,161 ($229,161) $0 $0 $0 $0 $0 ($229,161) $5,145,042

Expenditures here include sediment removal, fuel system upgrades, life-cycle efficiency analysis to inform future

upgrades, and priority items from recently completed needs assessment (2015). New line items established below to

account for discrete project elements.

92 WLFL8 BRPS CONTROL BLDG RPLCMT Green 100% 72% WLR $0 $50,000 $50,000 $480,368 $1,554,622 $7,577,624 $25,887 $0 $0 $9,638,501 $9,688,501

This project will design and build the second phase of renovations to the Black River pump station. Major components

include replacement of the control building, replacement of the trash rake system, and replacement of the screen spray

system.

93 WLFL8 BRPS FISH PASS IMPRVMNTS Green 72% WLR $0 $0 $0 $0 $0 $0 $831,751 $2,241,456 $6,316,655 $9,389,862 $9,389,862

This project will design and build the fourth phase of renovations to the Black River pump station, revising and replacing

the obsolete fish passage systems.

94 WLFL8 BRPS HIGH-USE ENGINES Green 100% 72% WLR $0 $252,900 $252,900 $221,179 $1,414,074 $25,133 $0 $0 $0 $1,660,386 $1,913,286

This project will design and build the first phase of renovations to the Black River pump station, replacing the three

smaller pump engines which run much more frequently than the other, larger pump engines.

95 WLFL8 BRPS SUPPORT SYS UPGRADES Green 72% WLR $0 $0 $0 $0 $175,261 $822,168 $779,584 $26,663 $0 $1,803,676 $1,803,676

This project will design and build the third phase of renovations to the Black River pump station, replacing support

systems such as engine control panels, cooling systems, oilers and hoists.

96 WLFL8 DESIMONE USACE 2015 Green 100% N/A Agreement $1,634,698 $2,563,620 $928,922 ($923,922) $0 $0 $0 $0 $0 ($923,922) $1,639,698 Cost-share flood damage repair from March 2014 high flows with Corps of Engineers. Construction in 2016.

97 WLFL8 DYKSTRA USACE 2015 Green 100% N/A Agreement $638,356 $692,856 $54,500 $6,695 $0 $0 $0 $0 $0 $6,695 $699,551 Cost-share flood damage repair from March 2014 high flows with Corps of Engineers. Construction in 2016.

98 WLFL8 GREEN R PL84-99 MITIGATN Green 89% 72% WLR $3,668,478 $4,043,988 $375,510 $1,616,554 $52,000 $25,000 $25,000 $0 $0 $1,718,554 $5,762,542

This project will result in actions to mitigate environmental damage from tree cutting during 2008-9 (as required by

permitting agencies) to maintain eligibility for US Army Corps of Engineers PL84-99 program.

99 WLFL8 HSB BREDA SETBACK Green 95% 41% WLR $107,999 $4,350,720 $4,242,721 $4,727,850 $9,524,860 $5,444,560 $0 $0 $0 $19,697,270 $24,047,990

New project to implement interim SWIF adopted by Board of Supervisors.This project will reconstruct the Horseshoe

Bend Levee at the Breda reach (RM 24.46-24.72) to a more stable configuration in order to reduce flood risk to the

surrounding areas.  The project will also raise levee crest elevations to contain the 500-year (0.2% annual chance) flood. 

This segment of the levee has the lowest factor of safety rating of the Horseshoe Bend levee.

100 WLFL8 HSB MCCOY REALIGNMENT Green FCD FCD WLR $0 $400,000 $400,000 $0 $0 $0 $0 $0 $0 $0 $400,000

New project to implement interim SWIF adopted by Board of Supervisors.This PL 84-99 levee segment contains a

‘Minimally acceptable’ rating by the USACE due to a slope deficiency at RM 24.3 (oversteepened slopes from 1.3 to

1.7H:1V for 500 feet).  The City of Kent constructed a secondary containment levee in this reach, set back from the

river’s edge, which is currently not part of the federal levee. The only remaining structure between the two levees is a

Puget Sound Energy facility.  The Horseshoe Bend Levee Certification Report calculated Factor of Safety (FOS) values

for rapid drawdown of 1.08 and 1.55 at about RM 24.3 and RM 24.4, respectively.  River bed scour in this reach between

1986 and 2011 is 2.7 feet at RM 24.24.

101 WLFL8 HSB NURSING HOME SETBACK Green FCD FCD WLR $0 $0 $0 $759,625 $734,673 $1,356,512 $1,191,462 $214,020 $18,370 $4,274,662 $4,274,662

New project to implement interim SWIF adopted by Board of Supervisors.The Nursing Home levee is over-steepened and

does not meet current engineering standards.  The economic consequence of levee failure or overtopping to the lower

Green River valley is extensive and could cause tens of millions of dollars in damage.  This capital project area contains a

‘Minimally Acceptable’ deficiency by the US Army Corps of Engineers at RM 25. 5 (over steepened slopes from 1. 25 to

1.  7H:1V for 225 feet).  The Horseshoe Bend Levee Certification Report calculated a Factor of Safety (FOS) value for

rapid drawdown of 1.  01 at RM 25.  57 (Section F).  This is barely above the minimum FOS (1.  0) from the US Army

Corps of Engineers manual.

102 WLFL8 INTERIM SWIF IMPLEMENTATION Green FCD WLR $0 $30,000 $30,000 $0 $0 $0 $0 $0 $0 $0 $30,000

Coordination and planning activities to implement recommendations of interim SWIF. Maintenance work associated with

the interim SWIF is included in the operating budget.

103 WLFL8 LOWER RUSSELL ACQ KENT Green FCD Agreement $0 $1,000,000 $1,000,000 $0 $0 $0 $0 $0 $0 $0 $1,000,000 Acquisitions by the City of Kent for the Lower Russell levee setback project.

104 WLFL8 LWR GRN R CORRIDOR PLAN/EIS Green FCD FCD WLR $0 $1,743,249 $1,743,249 $0 $0 $0 $0 $0 $0 $0 $1,743,249 Lower Green River Corridor Planning and Environmental Impact Statement.

105 WLFL8 LWR RUSSELL LEVEE SETBACK Green 76% 56% WLR $6,041,888 $12,077,130 $6,035,242 $2,478,808 $13,910,520 $18,357,812 $63,028 $0 $0 $34,810,168 $46,887,298

Remove and replace the existing flood containment system of levee and revetments along the right (east) bank of the

Green River between river mile 17.85 (S 212th St) and river mile 19.25 (S 231st Way) in the City of Kentr to provide long-

term flood protection and improve riparian and aquatic habitat. Increased expenditure authority to match interim SWIF

adopted by Board of Supervisors.

106 WLFL8 MILWAUKEE LEVEE #2-KENT Green FCD FCD Agreement $10,768 $8,500,000 $8,489,232 $0 $0 $0 $0 $0 $0 $0 $8,500,000

Prepare an analysis and study of design and construction alternatives to provide flood protection, scour protection, enable

levee certification and secure necessary land rights. Current ILA with Kent for this first phase is $3.65 million, the ILA

assumes that the total project cost is $8.5 million.

107 WLFL8 PATTON BRIDGE 3015 Green FCD FCD Agreement $0 $150,000 $150,000 $0 $0 $0 $0 $0 $0 $0 $150,000

The river is scouring the road away and David Powell Road is collapsing into the river. This project will repair an existing

failing revetment and extend MSE wall to prevent undercutting of the riverbank and roadway.

108 WLFL8 PORTER LEVEE Green 39% 41% WLR $0 $720,000 $720,000 $0 $0 $0 $0 $0 $0 $0 $720,000

Contribute the cost of a repair ($720,000) to a $7 million levee setback project. By relocating the levee, future repair costs

for the Flood Control District are reduced. In response to community concerns, the project also includes funding to

elevate the road so that the school bus serving this neighborhood does not have to drive in the oncoming lane to avoid

floodwaters.

109 WLFL8 REDDINGTON REACH SETBACK Green 68% 62% WLR $16,564,851 $16,889,083 $324,232 $0 $0 $0 $0 $0 $0 $0 $16,889,083 Project expenditures will continue into 2017; closeout anticipated in 2018.

110 WLFL8 RUSSELL RD UPPER KENT Green 92% 72% Agreement $6,020,673 $6,072,173 $51,500 $0 $0 $0 $0 $0 $0 $0 $6,072,173

Project is to improve the levee by providing a minimum of 3 feet of freeboard above the predicted 500-year flood event

and improve slope stability. These segments of the Russell Road Upper Levee have over-steepened slopes and

therefore lack adequate structural stability to provide adequate safety.

111

WLFL8 S 180TH ST BRIDGE FLOODWALL

EXT Green FCD FCD Agreement $0 $65,378 $65,378 $0 $0 $0 $0 $0 $0 $0 $65,378The project will increase the height of a flood wall to provide approximately 30" of additional flood protection.

112 WLFL8 S 277TH ST REVETMENT Green FCD FCD WLR $90,528 $300,000 $209,472 $1,726,802 $44,558 $0 $0 $0 $0 $1,771,360 $2,071,360

This project will conduct a feasibility analysis of channel migration hazards from river mile 21.1 to 21.7. No design or

construciton funding at this time.

113 WLFL8 SE 380 PL AT SR 164 Green FCD FCD Agreement $0 $0 $0 $90,000 $100,000 $400,000 $100,000 $0 $0 $690,000 $690,000 This project will analyze culvert replacement and road-raising options and implement the preferred option.

114 WLFL8 SE 384 ST @ 176 AVE SE Green FCD FCD Agreement $0 $0 $0 $0 $0 $0 $0 $150,000 $0 $150,000 $150,000

These two bridges are subject to having the roadway approach fill wash out during a flood. Excavate approaches and

rebuild approaches to prevent loosing approaches during flooding. A similar repair was done on Woodinville-Duvall

Bridge No. 1136D.

115 WLFL8 SIGNATURE POINTE REVETMENT Green FCD FCD WLR $0 $300,000 $300,000 $0 $0 $0 $0 $0 $0 $0 $300,000

Signature Pointe is a revetment/levee on the Green River between river mile 22.06 and 23.18 that does not meet the

FEMA requirements for accreditation due to inadequate freeboard.  This project includes development of a project charter

and an alternatives analysis to select an alternative to achieve increased flood protection, embankment and toe protection

in a manner that can be certified and accredited.

116 WLFL8 TUK-205 RATOLO FLOODWALL Green FCD FCD WLR $0 $0 $0 $0 $0 $0 $0 $1,500,000 $300,000 $1,800,000 $1,800,000

New project to implement interim SWIF adopted by Board of Supervisors. This project will construct a 0.15 mile floodwall

and sloped embankment to protect adjacent businesses from flooding.  The floodwall alignment (including embankment

slope, factors of safety, and necessary real estate) will be finalized during the project design phase.

Page 3 of 4

Kjristine
Typewritten Text
15
Page 17: MEETING TIME AND LOCATION Wednesday, July 26, · PDF fileMarlla Mhoon, Covington; Councilmember Erika Morgan, Black Diamond; Councilmember Tom Odell, Sammamish; Councilmember Byron

No. Title Basin Flood Risk %

Implement

%

Type of

project

2016 Inception

to Date

Expenditure

2017

Revised

Inception to

Date Budget

2017 Available

Budget

2018

Requested

2019

Projected

2020

Projected

2021

Projected

2022

Projected

2023

Projected

6-Year CIP

Total

Project Life

Total Comments

117 WLFL8 TUK-205 SEGALE FLOODWALL Green FCD FCD WLR $0 $0 $0 $0 $0 $601,000 $562,754 $3,188,003 $3,283,643 $7,635,400 $7,635,400

New project to implement interim SWIF adopted by Board of Supervisors. The Gaco portion of the Tukwila-205 levee

between river mile 15.75 and 15.88 is over-steepened and damaged and cannot be adequately repaired using the existing

easements. This project would acquire properties landward of the damaged levee to enable a levee setback and repair of

the embankment and toe scour at this outside bend, in coordination with the Army Corps of Engineers PL 84-99

rehabilitation program.

118 WLFL8 TUK-205 USACE GACO REPAIR Green R N/A WLR $44,246 $9,064,053 $9,019,807 $3,796,580 $15,913 $0 $0 $0 $0 $3,812,493 $12,876,546

600 feet of scour has exposed rock armor. No sign of armor loss. Interim SWIF capital project is for 0.33 miles of

floodwall and toe/scour protection. Increased vulnerability to further scour and damage to facility.

119 WLFL8 USACE SWIF Green FCD FCD WLR $2,209,817 $2,209,817 $0 $0 $0 $0 $0 $0 $0 $0 $2,209,817Green River Corridor Planning (under System-Wide Improvement Framework agreement with Army Corps of Engineers)

120 Green-Duwamish Subtotal $63,527,418 $100,179,441 $36,652,024 $14,751,378 $27,526,481 $34,609,809 $3,579,466 $7,320,142 $9,918,668 $97,705,944 $197,885,385

121

122

123 WLFL9 BUTTE AVE FLOOD MITIGATION White FCD FCD Agreement $0 $470,000 $470,000 $0 $0 $0 $0 $0 $0 $0 $470,000

This project will reduce flood risks to residences and businesses in the Cities of Pacific and Algona by addressing

backwatering and drainage problems in Government Canal from high river flows. The project will design and permit a

stormwater pump station which will significantly reduce flood risks to approximately five hundred homes and businesses.

The completed project will also reduce long-term road closures that have occurred in the past due to flooding.

124 WLFL9 COUNTYLINE TO A STREET White 87% 74% WLR $12,662,360 $24,004,419 $11,342,059 $0 $0 $0 $0 $0 $0 $0 $24,004,419

Reduces flood elevations that impact residential neighborhoods in the City of Pacific (200 homes, with $52 million of

assessed and $13 million content value), improves sediment storage and enhances habitat.

125 WLFL9 RED CREEK ACQUISITIONS White 71% 41% Acqu/Elev $0 $0 $0 $0 $0 $0 $0 $0 $100,000 $100,000 $100,000

Permanently eliminate the risk to public safety along this reach by acquiring and removing residential structure.

Placeholder funding for appraisal and/or grant match dependent on landowner willingness.

126 WLFL9 RIGHT BANK LEVEE SETBACK White 79% 64% WLR $10,578,055 $12,151,199 $1,573,144 $1,079,358 $1,989,187 $7,887,849 $5,797,495 $69,556 $0 $16,823,445 $28,974,644

Construct a new levee setback in the City of Pacific, extending from BNSF railroad bridge embankment to endpoint at

Butte Ave. by White River Estates neighborhood.

127 WLFL9 WHITE - GREENWATER ACQ White 66% 44% Acqu/Elev $0 $0 $0 $0 $0 $0 $0 $0 $100,000 $100,000 $100,000 This project would acquire flood prone residence along the White River near the Greenwater River.

128 White Subtotal $23,240,415 $36,625,618 $13,385,203 $1,079,358 $1,989,187 $7,887,849 $5,797,495 $69,556 $200,000 $17,023,445 $53,649,063

129

130

131 WLFLS SOUTH PARK PUMPSTATION Seattle 79% 64% Agreement $1,786,219 $6,001,331 $4,215,112 ($4,215,112) $0 $4,718,781 $0 $0 $0 $503,669 $6,505,000

Cost-share construction of pump station to reduce flooding in industrial area. Allocation of funds by year may be revised

based on updated project schedule. Implemented by the City of Seattle. Expenditure forecast to be updated based on

current project schedule.

132

WLFLS S PARK DRAINAGE

IMPROVEMENTS Seattle FCD FCD Agreement $720 $1,000,000 $999,280 $0 $1,550,000 $1,455,000 $0 $0 $0 $3,005,000 $4,005,000

The South Park Drainage Conveyance Improvements Project will install a  formal conveyance system in the streets, to

get flows to the pump station.  The  conveyance improvements will work in conjunction with the Pump Station.

133 Seattle Subtotal $1,786,939 $7,001,331 $5,214,392 ($4,215,112) $1,550,000 $6,173,781 $0 $0 $0 $3,508,669 $10,510,000

134

135

136

WLFLX CORRIDOR PLN DESIGN/CONST

PLACEHOLDER Countywide N/A N/A WLR $0 $142,610 $142,610 $0 $0 $0 $0 $0 $27,000,000 $27,000,000 $27,142,610Placeholder for corridor plan implementation project(s)

137 Countywide Corridor Plan Imp Subtotal $0 $142,610 $142,610 $0 $0 $0 $0 $0 $27,000,000 $27,000,000 $27,142,610

138

139

140 WLFLG FLOOD REDUCTION GRANTS Countywide FCD FCD Grant $2,585,919 $11,600,690 $9,014,771 $3,083,749 $3,161,191 $3,235,317 $3,309,131 $3,383,823 $3,458,923 $19,632,134 $31,232,824 Competitive grant program for flood reduction projects. Increases as a proportion of total FCD tax revenue.

141 WLFLG WRIA GRANTS Countywide FCD FCD Grant $11,348,474 $23,099,255 $11,750,781 $4,390,296 $4,520,525 $4,654,618 $4,792,688 $4,934,853 $5,081,236 $28,374,215 $51,473,470

Cooperative Watershed Management Grant Program; priorities recommended by watershed groups. Increase based on

assumed inflation rate.

142 WLFLM EFFECTIVENESS MONITORING Countywide N/A N/A WLR $1,616,734 $2,218,519 $601,785 $1,076,734 $702,778 $830,323 $813,940 $767,476 $510,698 $4,701,949 $6,920,468 Evaluation of capital projects to determine effectiveness and identify project design improvements.

143 WLFLO SUBREGNL OPPRTNTY FUND Countywide FCD FCD Grant $27,038,460 $43,683,268 $16,644,808 $5,755,774 $5,879,816 $6,017,689 $6,154,984 $6,293,910 $6,433,597 $36,535,770 $80,219,038

Allocation to all King County jurisdictions for flooding, water quality, or watershed management projects. Increases as a

proportion of total FCD tax revenue.

144 WLFLX CENTRAL CHARGES Countywide N/A N/A WLR $652,217 $781,493 $129,276 $130,000 $132,600 $135,252 $137,957 $140,716 $143,531 $820,056 $1,601,549 Central charges related to the FCD's capital fund.

145 WLFLX FLOOD EMERGENCY CONTGNCY Countywide N/A N/A WLR $300,001 $800,917 $500,916 $0 $250,000 $250,000 $250,000 $250,000 $250,000 $1,250,000 $2,050,917 Contingency for emergency response actions during a flood event.

146 Countywide Subtotal $43,541,805 $82,184,142 $38,642,337 $14,436,553 $14,646,910 $15,123,199 $15,458,700 $15,770,778 $15,877,984 $91,314,124 $173,498,266

147

148 Grand Total $210,223,079 $352,586,104 $142,363,026 $47,624,045 $72,105,993 $86,753,896 $39,295,600 $31,919,902 $56,537,464 $334,236,899 $686,823,003

Page 4 of 4

Kjristine
Typewritten Text
16
Page 18: MEETING TIME AND LOCATION Wednesday, July 26, · PDF fileMarlla Mhoon, Covington; Councilmember Erika Morgan, Black Diamond; Councilmember Tom Odell, Sammamish; Councilmember Byron

KingCountyFloodControlDistrictSubregionalOpportunityFundPaymentsbyCity7/20/17

ProjectDescription 2009 2010 2011 2012 2013 2014 2015 2016

2017YTD

(7/18/17)

TotalExp-Inceptionto

Date(7/18/17)

TotalBudget-Inceptionto

DateRemainingBalance

WLFLOALGONASUBRGNLOP $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $66,177 $66,177WLFLOAUBURNSUBRGNLOP $0 $0 $0 $211,441 $48,744 $40,949 $69,816 ($110,765) $300,000 $560,185 $801,999 $241,814WLFLOBEAUXARTSSUBRGNLOP $0 $0 $0 $0 $0 $0 $17,189 $19,999 $0 $37,188 $47,189 $10,001WLFLOBELLEVUESUBRGNLOP $605,318 $86,771 $76,276 $16,193 $0 $1,329,483 $24,689 $112,713 $126,011 $2,377,455 $4,330,665 $1,953,210WLFLOBLACKDIAMONDSUBRGNLOP $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $77,680 $77,680WLFLOBOTHELLSUBRGNLOP $0 $86,476 $0 $0 $11,073 $55,139 $0 $0 $0 $152,688 $381,286 $228,598WLFLOBURIENSUBRGNLOP $0 $0 $0 $0 $275,123 $0 $38,260 ($7,346) $0 $306,037 $544,465 $238,428WLFLOCARNATIONSUBRGNLOP $921 $0 $0 $0 $0 $0 $9,022 $0 $0 $9,943 $52,992 $43,049WLFLOCLYDEHILLSUBRGNLOP $3,640 $0 $0 $0 $0 $40,942 $69,485 $0 $0 $114,067 $206,653 $92,586WLFLOCOVINGTONSUBRGNLOP $4,146 $37,312 $19,406 $0 $39,319 $0 $40,431 $0 $58,317 $198,931 $225,825 $26,894WLFLODESMOINESSUBRGNLOP $0 $0 $58,000 $0 $0 $0 $0 $196,181 $0 $254,181 $333,715 $79,534WLFLODUVALLSUBRGNLOP $0 $10,842 $3,941 $30,049 $0 $0 $48,476 ($48,476) $0 $44,832 $106,709 $61,877WLFLOENUMCLAWSUBRGNLOP $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $130,923 $130,923WLFLOFEDERALWAYSUBRGNLOP $181,962 $90,249 $0 $0 $0 $0 $283,797 $307,000 $43,195 $906,203 $1,025,185 $118,982WLFLOHUNTSPOINTSUBRGNLOP $0 $0 $0 $0 $0 $0 $59,468 $0 $0 $59,468 $101,968 $42,500WLFLOISSAQUAHSUBRGNLOP $0 $142,154 $0 $77,210 $15,375 $0 $300,000 $0 $0 $534,738 $780,100 $245,362WLFLOKENMORESUBRGNLOP $0 $0 $0 $0 $0 $157,000 $0 $0 $0 $157,000 $374,071 $217,071WLFLOKENTSUBRGNLOP $0 $223,943 $0 $211,520 $183,920 $140,328 $14,661 $189,053 $137,119 $1,100,544 $1,481,646 $381,102WLFLOKINGCOUNINCSUBRGNLOP $0 $737,000 $920,730 $300,655 $76,242 $318,386 $435,678 $646,557 $131,814 $3,567,063 $4,897,008 $1,329,945WLFLOKIRKLANDSUBRGNLOP $0 $71,963 $94,917 $284,441 $176,230 $0 $0 $237,903 $0 $865,453 $1,824,995 $959,542WLFLOLAKEFRSTPRKSUBRGNLOP $0 $0 $69,000 $0 $0 $55,748 $0 $0 $0 $124,748 $571,715 $446,967WLFLOMAPLEVALLEYSUBRGNLOP $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $314,287 $314,287WLFLOMEDINASUBRGNLOP $0 $0 $0 $0 $68,654 $0 $0 $12,729 ($12,729) $68,654 $349,146 $280,492WLFLOMERCERISLANDSUBRGNLOP $0 $0 $0 $0 $1,093 $50,806 $289,334 $39,190 $0 $380,423 $1,167,917 $787,494WLFLOMILTONSUBRGNLOP $0 $0 $0 $0 $0 $0 $0 $0 $35,426 $35,426 $45,426 $10,000WLFLONEWCASTLESUBRGNLOP $43,755 $11,491 $0 $21,927 $0 $16,000 ($16,000) $0 $0 $77,173 $261,041 $183,868WLFLONORMANDYPARKSUBRGNLOP $0 $0 $0 $0 $0 $17,062 $8,593 $0 $0 $25,655 $157,440 $131,785WLFLONORTHBENDSUBRGNLOP $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $106,471 $106,471WLFLOPACIFICSUBRGNLOP $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $68,477 $68,477WLFLOREDMONDSUBRGNLOP $0 $232,663 $136,657 $0 $131,338 $134,526 $0 $199,314 $0 $834,498 $1,584,851 $750,353WLFLORENTONSUBRGNLOP $0 $214,824 $0 $242,733 $146,545 $101,146 $185,103 $111,955 $0 $1,002,306 $1,406,423 $404,117WLFLOSAMMAMISHSUBRGNLOP $189,343 $0 $0 $0 $0 $0 $0 $851,078 $0 $1,040,421 $1,229,925 $189,504WLFLOSEATACSUBRGNLOP $89,120 $44,895 $0 $0 $87,153 $0 $0 $0 $0 $221,168 $377,106 $155,938WLFLOSEATTLESUBRGNLOP $0 $1,462,662 $293,526 $2,102,069 $1,454,851 $1,445,568 $3,006,393 $1,436,633 $829,723 $12,031,425 $15,955,040 $3,923,615WLFLOSHORELINESUBRGNLOP $0 $49,876 $12,064 $183,820 $80,325 $168,601 $175,886 $110,898 $0 $781,470 $894,652 $113,182WLFLOSKYKOMISHSUBRGNLOP $0 $0 $0 $0 $0 $0 $4,900 $9,415 $0 $14,315 $41,568 $27,253WLFLOSNOQUALMIESUBRGNLOP $0 $0 $1,852 $6,598 $30,747 $41,435 $0 $0 $0 $80,631 $226,490 $145,859WLFLOTUKWILASUBRGNLOP $0 $135,364 $0 $45,885 $0 $58,787 $101,157 $0 $0 $341,193 $524,189 $182,996WLFLOWOODINVILLESUBRGNLOP $0 $77,344 $0 $0 $55,867 $28,320 $0 $0 $0 $161,531 $322,641 $161,110WLFLOYARROWPOINTSUBRGNLOP $17,403 $8,315 $0 $0 $0 $0 $41,870 $21,684 $0 $89,272 $103,059 $13,787Total $1,135,607 $3,724,143 $1,686,369 $3,734,541 $2,882,599 $4,200,226 $5,208,208 $4,335,716 $1,648,876 $28,556,285 $43,499,115 $14,942,830

Kjristine
Typewritten Text
17