TRANSCRIPT

Page 1: Melbourne Metro Rail Project - Planning · 1. INTRODUCTION 1.1 This document is an Incorporated Document in the Melbourne, Port Maribyrnong, Phillip and Stonnington Planning Schemes

Melbourne Metro Rail Project Incorporated Document December 2016

Incorporated Document in the Maribyrnong, Melbourne, Port Phillip and Stonnington Planning Schemes pursuant to section 6(2)(j) of the Planning and Environment Act 1987 (Vic).

Page 2: Melbourne Metro Rail Project - Planning · 1. INTRODUCTION 1.1 This document is an Incorporated Document in the Melbourne, Port Maribyrnong, Phillip and Stonnington Planning Schemes

1. INTRODUCTION

1.1 This document is an Incorporated Document in the Maribyrnong, Melbourne, Port Phillip and Stonnington Planning Schemes (Planning Schemes) pursuant to section 6(2)(j) of the Planning and Environment Act 1987 (Vic).

1.2 This Incorporated Document facilitates the delivery of the Melbourne Metro Rail Project (Project).

1.3 The control in clause 4 prevails over any contrary or inconsistent provisions in the Planning Schemes.

2. PURPOSE

2.1 The purpose of the control in clause 4 is to permit and facilitate the use and development of land described in clause 3 for the purposes of the Project, in accordance with clauses 4 and 5.

3. LAND DESCRIPTION

3.1 The control in clause 4 applies to the land described as Project Land for the Melbourne Metro Rail Project as shown on Maps 1 to 16 at Appendix 1.

4. CONTROL

Exemption from Planning Scheme Requirements

4.1 Despite any provision to the contrary or any inconsistent provision in the Planning Schemes, no planning permit is required for, and no provision in the Planning Schemes operates to prohibit, control or restrict the use or development of the Project Land in accordance with the control in this clause for the purposes of, or related to, constructing or maintaining the Project or using any aspect of the Project infrastructure to operate passenger train and tram services.

4.2 The Project infrastructure to which this control applies includes, but is not limited to:

a) Railways, including twin railway tunnels, about 9km long, between South Kensington and South Yarra, and tunnel portals at those locations

b) Underground and above-ground railway lines between and adjacent to the tunnel portals

c) Underground Railway stations, Retail premises and support structures at Arden, Parkville, CBD North, CBD South and Domain

d) Above ground Railway station works and modifications at West Footscray Station

e) Ventilation structures and systems

f) Utility installations and services to construct and operate any aspect of the Project, including any Project infrastructure and the operation of passenger trains or trams. Such services include traction energy, communications and rail operating systems

1

Page 3: Melbourne Metro Rail Project - Planning · 1. INTRODUCTION 1.1 This document is an Incorporated Document in the Melbourne, Port Maribyrnong, Phillip and Stonnington Planning Schemes

g) Tramways

h) Emergency and maintenance access shafts and infrastructure

i) Bridges, transport interchanges and road works

j) Earthworks and related structures, kerbs, channels, water quality and soil treatment structures or works, retaining walls, noise and screening barriers, cuttings, batters and fill associated with the Project

4.3 The use and development of the Project Land for the purposes of, or related to, the Project includes, but is not limited to:

a) Use and development of laydown areas for construction purposes

b) Removing, destroying and lopping trees and vegetation

c) Demolishing and removing buildings, fixtures, structures and infrastructure

d) Constructing or carrying out works for excavation, fences, temporary barriers, noise attenuation walls, stabilisation, creating bunds or mounds, landscaping, shared use paths, wetlands or ground treatment

e) Creating or altering access to a road in a Road Zone, Category 1

f) Constructing and using temporary site workshops and storage, administration and amenities buildings

g) Manufacturing any materials required for the Project within the Arden precinct

h) Constructing and using temporary access roads, diversion roads and vehicle parking areas

i) Displaying construction, directional and business identification signage

j) Carrying out of preparatory works including, but not limited to, those set out in clause 4.12

k) Subdividing and consolidating land

l) Altering or relocating rail lines, tram lines and Utility installations

m) Any activity, buildings or works that the Minister for Planning confirms in writing is for the purposes of the Project.

4.4 Land uses in italics have the same meaning as in clause 74 of the Planning Schemes.

2

Page 4: Melbourne Metro Rail Project - Planning · 1. INTRODUCTION 1.1 This document is an Incorporated Document in the Melbourne, Port Maribyrnong, Phillip and Stonnington Planning Schemes

Conditions

4.5 The use and development permitted by this Incorporated Document must be undertaken in accordance with the following conditions:

4.6 Development Plans

4.6.1 Subject to clause 4.12, a Development Plan must be approved by the Minister for Planning for development that relates to each of the following:

a) Western tunnel portal

b) Eastern tunnel portal

c) Arden Station

d) Parkville Station

e) CBD North Station

f) CBD South Station

g) Domain Station

h) Rail turnback at West Footscray Station

i) Any other above-ground works or structures that are part of the Project.

4.6.2 A Development Plan must address surface works that are associated with each of the items listed in clause 4.6.1. A Development Plan for a station must address underground areas from the station entrance to the ticket gate.

4.6.3 A Development Plan must include:

a) A site layout plan/s

b) Architectural, landscape and public realm plans and elevations including lighting, signage, pedestrian access, bicycle access and other ancillary facilities

c) An explanation demonstrating how the Development Plan (including materials and external finishes) is in accordance with the approved Urban Design Strategy and the approved Environmental Performance Requirements included within the Environmental Management Framework.

4.6.4 Prior to submission of a Development Plan to the Minister for Planning for approval under clause 4.6.1, a Development Plan must be:

a) Provided to the Office of the Victorian Government Architect and relevant council/s for consultation.

3

Page 5: Melbourne Metro Rail Project - Planning · 1. INTRODUCTION 1.1 This document is an Incorporated Document in the Melbourne, Port Maribyrnong, Phillip and Stonnington Planning Schemes

b) Where relevant, provided to the Roads Corporation, Public Transport Development Authority, Melbourne Water and Heritage Victoria for consultation.

c) Made available for public inspection and comment on a clearly identifiable Project website for 15 business days. The website must set out details about the entity and contact details to which written comments can be directed during that time and specify the time and manner for the making of written comments.

For the avoidance of doubt, consultation in accordance with (a) and (b) can occur prior to or after the public inspection and comment period in (c).

Before, or on the same day as a Development Plan is made available in accordance with clause 4.6.4(c), a notice must be published in a newspaper generally circulating in the area to which a Development Plan applies informing the community of the matters set out in clause 4.6.4(c).

4.6.5 A Development Plan submitted to the Minister for Planning for approval under clause 4.6.1 must be accompanied by all written comments received under clause 4.6.4 and a summary of consultation and response to issues raised during the consultation.

4.6.6 Before deciding whether to approve a Development Plan under clause 4.6.1, the Minister for Planning must consider all written comments received under clause 4.6.4 and the consultation and response summary provided under clause 4.6.5.

4.6.7 A Development Plan must be approved by the Minister for Planning prior to the commencement of any development relating to an item in clause 4.6.1, except for Early Works that are carried out in accordance with clause 4.9.

4.6.8 A Development Plan may be prepared and approved in stages or parts, and may be amended from time to time with the approval of the Minister for Planning. The Minister must require an application for approval of an amendment to a Development Plan to comply with the requirements of clauses 4.6.3, 4.6.4, 4.6.5 and 4.6.6 unless, in the opinion of the Minister:

a) the proposed amendment:

i) does not result in a material detriment to any person; or

ii) a person who may suffer a material detriment as a result of the Minister’s approval of the amendment has already been sufficiently consulted in respect of the amendment; and

b) any amendment does not involve any change to an approved Environmental Performance Requirement.

4.6.9 For land to which a Development Plan applies, development must be carried out in accordance with an approved Development Plan.

4

Page 6: Melbourne Metro Rail Project - Planning · 1. INTRODUCTION 1.1 This document is an Incorporated Document in the Melbourne, Port Maribyrnong, Phillip and Stonnington Planning Schemes

4.7 Environmental Management Framework

4.7.1 Prior to the commencement of any buildings or works associated with the Project (including Early Works under clause 4.9), an Environmental Management Framework (EMF) must be approved by the Minister for Planning. The EMF must include Environmental Performance Requirements addressing the following areas and any other relevant matters:

a) Aboriginal heritage

b) Air quality

c) Arboriculture

d) Biodiversity

e) Business

f) Contaminated land and spoil management

g) Greenhouse gas

h) Ground movement

i) Ground water

j) Historical cultural heritage

k) Land use and planning

l) Noise and vibration

m) Social and community

n) Surface water

o) Transport

p) Urban design, landscape and visual

4.7.2 The EMF must also include Residential Impact Mitigation Guidelines and Business Support Guidelines for Construction.

4.7.3 The EMF must set out the process and timing for development of an Environmental Management System/s, Construction Environment Management Plan/s, Site Environment Implementation Plan/s and plans referenced in Appendix 2 of this Incorporated Document as relevant to any stage or part of the Project, including process and timing for consultation with relevant council/s, Heritage Victoria, the Roads Corporation, Melbourne Water, Public Transport Development Authority, the Environment Protection Authority, and key affected stakeholders as relevant.

4.7.4 The EMF must identify the entity responsible for approval of each plan required under this Incorporated Document or the Environmental

5

Page 7: Melbourne Metro Rail Project - Planning · 1. INTRODUCTION 1.1 This document is an Incorporated Document in the Melbourne, Port Maribyrnong, Phillip and Stonnington Planning Schemes

Performance Requirements, in accordance with the table in Appendix 2 to this Incorporated Document.

4.7.5 The EMF must identify requirements for monitoring, reporting and auditing of compliance with the Environmental Performance Requirements, this Incorporated Document, and each plan set out in the table in Appendix 2 to this Incorporated Document.

4.7.6 The EMF (including the Environmental Performance Requirements, the Residential Impact Mitigation Guidelines and the Business Support Guidelines for Construction) submitted to the Minister for Planning for approval under clause 4.7.1 must be accompanied by a statement explaining any differences between it, and the matters set out in the Minister’s Assessment under the Environment Effects Act 1978 dated 20 December 2016, in particular in relation to Table A2.

4.7.7 The EMF must be submitted to and approved by the Minister for Planning and may be prepared and approved in stages or parts and may be amended from time to time with the approval of the Minister for Planning.

4.7.8 The use and development for the Project must be carried out in accordance with the approved EMF and the approved Environmental Performance Requirements.

4.8 Urban Design Strategy

4.8.1 Prior to the submission of a Development Plan under clause 4.6, an Urban Design Strategy must be approved by Minister for Planning.

4.8.2 The Urban Design Strategy may be prepared and approved in stages or parts and may be amended from time to time with the approval of the Minister for Planning.

4.8.3 The use and development for the Project must be carried out in accordance with the approved Urban Design Strategy.

4.9 Early Works Plans

4.9.1 Early Works identified in the Environment Effects Statement for the Project as Early Works may be carried out before a Development Plan is approved, provided that an Early Works Plan is approved by the Minister for Planning.

4.9.2 Early works for the Project identified in the Environment Effect Statement include:

a) Utility service relocation and protection of utility assets;

b) Site preparation works, including demolition works, removal or relocation of trees and monuments, minor road / transport network changes; and

c) Works for construction of shafts at CBD North and CBD South station precincts.

6

Page 8: Melbourne Metro Rail Project - Planning · 1. INTRODUCTION 1.1 This document is an Incorporated Document in the Melbourne, Port Maribyrnong, Phillip and Stonnington Planning Schemes

4.9.3 An Early Works Plan must include site layout plan/s and demonstrate how the Early Works Plan is in accordance with the approved Environmental Performance Requirements and the approved Urban Design Strategy.

4.9.4 Prior to the submission of an Early Works Plan to the Minister for Planning for approval under clause 4.9.1, an Early Works Plan prepared in accordance with clause 4.9.2 must be:

a) Provided to the relevant council/s for consultation.

b) Provided to affected utility service providers for consultation.

c) Where relevant, provided to the Roads Corporation, Public Transport Development Authority, Melbourne Water and Heritage Victoria for consultation.

d) Where relevant, provided to key stakeholders for consultation.

e) Made available for public inspection and comment on a clearly identifiable Project website for 15 business days. The website must set out details about the entity and contact details to which written comments can be directed during that time and specify the time and manner for the making of written comments.

For the avoidance of doubt, consultation in accordance with (a) to (d) can occur prior to or after the public inspection and comment period in (e).

Before, or on the same day as an Early Works Plan is made available in accordance with clause 4.9.4(e), a notice must be published in a newspaper generally circulating in the area to which the Early Works Plan applies informing the community of the matters set out in clause 4.9.4(e).

4.9.5 An Early Works Plan submitted to the Minister for Planning for approval under clause 4.9.1 must be accompanied by all written comments received under clause 4.9.4 and a summary of consultation and response to issues raised during consultation.

4.9.6 Before deciding whether to approve an Early Works Plan under clause 4.9.1, the Minister for Planning must consider all written comments received under clause 4.9.4 and the consultation and response summary provided under clause 4.9.5.

4.9.7 An Early Works Plan must be approved by the Minister for Planning prior to the commencement of any works to which that Early Works Plan relates.

4.9.8 Early Works for the Project may be carried out before a Development Plan is approved under clause 4.6.1 provided that the Minister for Planning has approved an Early Works Plan for such works under clause 4.9.1.

4.9.9 An Early Works Plan may be prepared and approved in stages or parts and may be amended from time to time with the approval of the Minister for Planning. The Minister must require an application for approval of an

7

Page 9: Melbourne Metro Rail Project - Planning · 1. INTRODUCTION 1.1 This document is an Incorporated Document in the Melbourne, Port Maribyrnong, Phillip and Stonnington Planning Schemes

amendment to an Early Works Plan to comply with the requirements of clauses 4.9.3, 4.9.4, 4.9.5, 4.9.6 unless, in the opinion of the Minister:

a) the proposed amendment:

i) does not result in a material detriment to any person; or ii) a person who may suffer a material detriment as a result of the

Minister’s approval of the amendment has already been sufficiently consulted in respect of the amendment; and

b) any amendment does not involve any change to an approved Environmental Performance Requirement.

4.9.10 For land to which an Early Works Plan applies, development must be carried out in accordance with an approved Early Works Plan.

4.10 Native Vegetation

4.10.1 Native vegetation offsets for the removal of native vegetation to construct the Project must be provided in accordance with the Permitted Clearing of Native Vegetation - Biodiversity Assessment Guidelines (Department of Environment and Primary Industries, September 2013), except as otherwise agreed by the Secretary to the Department of Environment, Land, Water and Planning.

4.11 Creating or altering access to a road in a Road Zone, Category 1

4.11.1 Any buildings and works to create or alter access to a road in a Road Zone, Category 1 must be undertaken to the satisfaction of the relevant road authority.

4.12 Preparatory Works

4.12.1 Preparatory works for the Project may commence before the plans and other matters listed in sub-clauses 4.6 to 4.9 are approved.

4.12.2 The preparatory works for the Project permitted under clause 4.12 include, but are not limited to:

a) Works, including vegetation removal, that would not require a permit under the provisions of the Planning Schemes that, but for this Incorporated Document, would apply to the relevant land.

b) Investigations, surveys, testing and preparatory works to determine the suitability of land.

c) Creation of construction access points.

d) Establishment of environmental and traffic controls.

e) Fencing and temporary barriers to enable preparatory works.

8

Page 10: Melbourne Metro Rail Project - Planning · 1. INTRODUCTION 1.1 This document is an Incorporated Document in the Melbourne, Port Maribyrnong, Phillip and Stonnington Planning Schemes

f) utility service relocations and protection works limited to the following locations only:

i) in the CBD North Precinct that are preparatory to works for the construction of shafts at Franklin and A’Beckett Streets (including associated tree removal);

ii) on Flinders Lane between Russell and Swanston Streets that are preparatory to works for shaft construction at City Square; and

iii) at Toorak Road West (between St Kilda Road and Leopold Street) that are preparatory to works associated with diverting tram services along Toorak Road West to connect with St Kilda Road.

4.12.3 For the avoidance of doubt, preparatory works permitted under clause 4.12 do not include excavation of shafts or station caverns, or tunnelling of railway tunnels.

4.13 Availability of approved plans

4.13.1 A current version of each of the following approved plans must be available on a clearly identifiable Project website until commencement of public train operations through the tunnels:

a) Each Development Plan approved under clause 4.6;

b) Environmental Management Framework (including Environmental Performance Requirements, Residential Impact Mitigation Guidelines and Business Support Guidelines for Construction) approved under clause 4.7;

c) Urban Design Strategy approved under clause 4.8; and

d) Each Early Works Plan approved under clause 4.9.

5. EXPIRY

5.1 The control in this Incorporated Document expires if any of the following circumstances applies:

a) The development allowed by the control is not started by 31 December 2018;

b) The development allowed by this control is not completed by 31 December 2028; or

c) The use allowed by the control is not started by 31 December 2028.

5.2 The Responsible Authority may extend these periods if a request is made in writing before the expiry date or within three months afterwards.

9

Page 11: Melbourne Metro Rail Project - Planning · 1. INTRODUCTION 1.1 This document is an Incorporated Document in the Melbourne, Port Maribyrnong, Phillip and Stonnington Planning Schemes

Appendix 1 – Project Land

[MAPS 1 TO 16]

Page 12: Melbourne Metro Rail Project - Planning · 1. INTRODUCTION 1.1 This document is an Incorporated Document in the Melbourne, Port Maribyrnong, Phillip and Stonnington Planning Schemes

Hampden RdMcnam a ra Mew

s

Devon St

Balmer S

t

Childers St

Bakehouse Rd

Bateman Rd

Newton St

Wakefiel

d St

Kirk St

Leices

ter Mew

s

Tennyso

n St

Tankar

d St MercantilePdeFairbairn Dr

Lincol n Mews

Highett St

Clifford Tce

Hobsons Rd

Kensington Rd

Wolseley

Pde

Derby St

Ormond St

Newman St

Guinness Ln

TaylorMews

Nichols Ln

Hodgson Ln

Rayner L

n

Altona St

Mcclure R

d

LegendProject LandProperty Boundary

Melbourne

South Yarra

Kensington

WestFootscray

Map 1 of 16

Data Sources:Contains Vicmap Information © State of Victoria 2015

0 1 KM

G:\MMR-AJM\01_WIP\PW-1-AA-KG_GIS\640_Site_plans\MMR_0333_MMRA_ProjectArea\MMR_0333_MMRA_ProjectLand_P2.mxd

Melbourne Metro Rail ProjectTitle:Melbourne Metro Project Land MapDrawing Number:

MMR-AJM-UGAA-MP-NL-500342Drawn By:

ABApproved By: Date:

EC, GH 19/12/2016

0 50 100Metres

Map Size:A4

Revision:P2

I

Page 13: Melbourne Metro Rail Project - Planning · 1. INTRODUCTION 1.1 This document is an Incorporated Document in the Melbourne, Port Maribyrnong, Phillip and Stonnington Planning Schemes

Langford St

Arden St

Lloyd St

Childers St

Dyno

n-city

link

Out R

amp

Cityli

nk

Bakehouse Rd

BrownsHill Pl

Citylink

In-dynon Ramp

Barrett St

Elizabeth St

Tennyso

n St

Altona St

Derby St

Dynon Rd

Ormond St

Southey St

Radcliffe St

Bruce StBellair St

Green St

Lennon St

Mclennan Dr

Mcclure Rd

LegendProject LandProperty Boundary

Melbourne

South Yarra

Kensington

WestFootscray

Map 2 of 16

Data Sources:Contains Vicmap Information © State of Victoria 2015

0 1 KM

G:\MMR-AJM\01_WIP\PW-1-AA-KG_GIS\640_Site_plans\MMR_0333_MMRA_ProjectArea\MMR_0333_MMRA_ProjectLand_P2.mxd

Melbourne Metro Rail ProjectTitle:Melbourne Metro Project Land MapDrawing Number:

MMR-AJM-UGAA-MP-NL-500342Drawn By:

ABApproved By: Date:

EC, GH 19/12/2016

0 50 100Metres

Map Size:A4

Revision:P2

I

Page 14: Melbourne Metro Rail Project - Planning · 1. INTRODUCTION 1.1 This document is an Incorporated Document in the Melbourne, Port Maribyrnong, Phillip and Stonnington Planning Schemes

Dryb

urgh

St

Macaulay Rd

Haines St

Elm C

tIvy C

t

Geran

ium C

t

LittleBaillie St

Banksia Ct

LittleLothian St

Langford St

Fuch

sia C

t

Jasm

ine C

t

Hibis

cus C

t

Provost St

PlaneTree Way

Fogarty St

Cityl

inkIn-

dyno

n Ram

p

Came

llia C

t

Staw

ell St

Dyno

n-city

link

Out R

amp

Oshanassy St

Muns

terTc

e

Ande

rson

s Ln

Baillie St

Mawby Ln

Azale

a CtDa

isy C

t

Bruce St

Arden St

Lloyd St

Shiel St

Abbo

tsfor

d St

Loth

ian St

Laur

ens S

t

Cityli

nk

Little Provost St

De Feu St

Queensberry St

Gracie St

Henderson St

LittleDryburgh St

Barwise St

Green St

LegendProject LandProperty Boundary

Melbourne

South Yarra

Kensington

WestFootscray

Map 3 of 16

Data Sources:Contains Vicmap Information © State of Victoria 2015

0 1 KM

G:\MMR-AJM\01_WIP\PW-1-AA-KG_GIS\640_Site_plans\MMR_0333_MMRA_ProjectArea\MMR_0333_MMRA_ProjectLand_P2.mxd

Melbourne Metro Rail ProjectTitle:Melbourne Metro Project Land MapDrawing Number:

MMR-AJM-UGAA-MP-NL-500342Drawn By:

ABApproved By: Date:

EC, GH 19/12/2016

0 50 100Metres

Map Size:A4

Revision:P2

I

Page 15: Melbourne Metro Rail Project - Planning · 1. INTRODUCTION 1.1 This document is an Incorporated Document in the Melbourne, Port Maribyrnong, Phillip and Stonnington Planning Schemes

Provost St

Spencer St

Dyno

n-city

link

OutRam

p Loth

ian St

Laurens StRailwayPl Ab

botsf

ord S

t

Dynon Rd

Cityli

nk

Elm St

Citylink In-dynon Ramp

Mawby Ln

Baillie St

LittleProvos t St

Elm P

l

Cityli

nkIn-

footsc

ray Ra

mp

Prendergast Ln

Dryb

urgh

St

Muns

terTc

e

De Feu St

Silk Pl

Miller St

Queensberry St

Staw

ell St

Ande

rson

St

Victoria St

Barwise St

LittleLothian St

LittleDryburgh St

LegendProject LandProperty Boundary

Melbourne

South Yarra

Kensington

WestFootscray

Map 4 of 16

Data Sources:Contains Vicmap Information © State of Victoria 2015

0 1 KM

G:\MMR-AJM\01_WIP\PW-1-AA-KG_GIS\640_Site_plans\MMR_0333_MMRA_ProjectArea\MMR_0333_MMRA_ProjectLand_P2.mxd

Melbourne Metro Rail ProjectTitle:Melbourne Metro Project Land MapDrawing Number:

MMR-AJM-UGAA-MP-NL-500342Drawn By:

ABApproved By: Date:

EC, GH 19/12/2016

0 50 100Metres

Map Size:A4

Revision:P2

I

Page 16: Melbourne Metro Rail Project - Planning · 1. INTRODUCTION 1.1 This document is an Incorporated Document in the Melbourne, Port Maribyrnong, Phillip and Stonnington Planning Schemes

Lanc

ashir

e Ln

GrattanSt

Blackw

ood St

Dryb

urgh

St

Harker S

t

Haine

s Pl

Wreckyn St

Provost St

Baillie St

Haines St

Molesworth St

Chetw

ynd S

t

Arden St

De Le

More

Pl

Elm C

t

Mattin

glys

Ln

Ivy C

t

Geran

ium C

t

Erro

l St

Dangerfield Ln

Little Baillie St

Vale St

Banksia Ct

LittleLothian St

Loug

hmor

e Ln

Fuch

sia C

t

Jasm

ine C

t

Pears

onsP

l

Villiers S

t

Munros

Ln

Hibis

cus C

t

Glass St

Purcell St

Harris St

Stran

g Ln

Kermodes Ln

Quee

nsbe

rryPl

Stewarts

Ln

PlaneTree Way

Arde

n Ln

Jones Ln

Macaulay Rd

Buncles

Pl

Parksid

e Ln

Came

llia C

t

Harcourt S

t

Bulla

Ln

Chapman St

Flemington Rd

Ryans Ln

Ande

rson

s Ln

Isaac

s Ln

Mawby Ln

Azale

a Ct

Shiel St

Daisy

Ct

Wreckyn Pl

Dowling Pl

Oshanassy St

Magn

us Ln

Brightside Ln

W

y lies Ln

Howa

rd S

t

Leve

son S

t

Hotham Pl

J acob

ysLn

Courtney

Pl

Chetwynd Pl

Curzo

n St

Abbo

tsfor

d St

Loth

ian St

W eirs Ln

Cullens Ln

Courtney St

Falsh

aws L

n

Market Ln

Byron St

High St

Murphy St

Hard

wick

e St

Queensberry St

Scotia St

Bendigo St

Tyrone St

Mary St

Little George St

Oxford St

Little Provost St

LittleDryburgh St

LegendProject LandProperty Boundary

Melbourne

South Yarra

Kensington

WestFootscray

Map 5 of 16

Data Sources:Contains Vicmap Information © State of Victoria 2015

0 1 KM

G:\MMR-AJM\01_WIP\PW-1-AA-KG_GIS\640_Site_plans\MMR_0333_MMRA_ProjectArea\MMR_0333_MMRA_ProjectLand_P2.mxd

Melbourne Metro Rail ProjectTitle:Melbourne Metro Project Land MapDrawing Number:

MMR-AJM-UGAA-MP-NL-500342Drawn By:

ABApproved By: Date:

EC, GH 19/12/2016

0 50 100Metres

Map Size:A4

Revision:P2

I

Page 17: Melbourne Metro Rail Project - Planning · 1. INTRODUCTION 1.1 This document is an Incorporated Document in the Melbourne, Port Maribyrnong, Phillip and Stonnington Planning Schemes

Flemington Rd

Grattan St

Elizabeth St

Bedford Pl

Wreckyn

St

Spen

cer

Rd

Wilson

Av

Chetw

ynd S

t

Courtney St

Arden St

Bedford

St

ParkGrove

Vale St

Bouv

erie

St

Leice

ster S

t

Villier

s St

Royal P de

Barry

St

LittleGrattan St

Blackw

ood S

t

Buncles

Pl

Parksid

e Ln

Berkeley St

Park

Dr

Swan

ston S

t

Porte

rs Ln

Malvi

na P

l

Masson RdJa

coby

s Ln

Kernot Rd

Wreckyn Pl

Bainbridge Pl

Dowling Pl

PeelSt

StationaryLn

Church StBrightside Ln

Scotts Pl

Little George St

Medical Rd

Hotham

Pl

High St

Haymarket Wk

Genetics Ln

Pelham St

Lincoln SqTyrone St

Oxford St

Little Pelham St

Monash Rd

LegendProject LandProperty Boundary

Melbourne

South Yarra

Kensington

WestFootscray

Map 6 of 16

Data Sources:Contains Vicmap Information © State of Victoria 2015

0 1 KM

G:\MMR-AJM\01_WIP\PW-1-AA-KG_GIS\640_Site_plans\MMR_0333_MMRA_ProjectArea\MMR_0333_MMRA_ProjectLand_P2.mxd

Melbourne Metro Rail ProjectTitle:Melbourne Metro Project Land MapDrawing Number:

MMR-AJM-UGAA-MP-NL-500342Drawn By:

ABApproved By: Date:

EC, GH 19/12/2016

0 50 100Metres

Map Size:A4

Revision:P2

I

Page 18: Melbourne Metro Rail Project - Planning · 1. INTRODUCTION 1.1 This document is an Incorporated Document in the Melbourne, Port Maribyrnong, Phillip and Stonnington Planning Schemes

Pelha

m St

Bowen St

Gratt

an St

Barkly Pl

Leicester St

Queensberry Pl

Leice

ster P

l

Cardigan Tce

Bouverie St

Cardigan St

Kerno

t Rd

Little Cardigan St

Victor

ia St

LittleGrattan St

DrummondSt

Ievers

Pl

Ogrady Pl

Argy

le Pl

Bella Ln

Gibbo

ns Pl

Wilson Av

Fran

klin S

t

Malvina Pl

Carlto

n Pl

Quee

nsbe

rry St

Austr

al Pl

M a rySt

Bainb

ridge

Pl

LittleQueensberry St

Mona

han L

n

Alma P

lBo

uveri

e Pl

Mage

nta Pl

Rush Pl

Linco

ln Sq Es

sex P

l

Ievers

Tce

Churc

h St

Linco

ln Pl

Earl S

t

Scott

s Pl

Ther

ry St

Russell St

Swanston St

Lansdowne Pl

Haym

arket

Wk

Corne

ll Pl

Trades Hall Pl

Kelvi

n Pl

Orr St

Stewart St

Cumberland Pl

Cana

da Ln

Little

Pelha

m St

Berkeley St

Lygon St

Barry St

LegendProject LandProperty Boundary

Melbourne

South Yarra

Kensington

WestFootscray

Map 7 of 16

Data Sources:Contains Vicmap Information © State of Victoria 2015

0 1 KM

G:\MMR-AJM\01_WIP\PW-1-AA-KG_GIS\640_Site_plans\MMR_0333_MMRA_ProjectArea\MMR_0333_MMRA_ProjectLand_P2.mxd

Melbourne Metro Rail ProjectTitle:Melbourne Metro Project Land MapDrawing Number:

MMR-AJM-UGAA-MP-NL-500342Drawn By:

ABApproved By: Date:

EC, GH 19/12/2016

0 50 100Metres

Map Size:A4

Revision:P2

I

Page 19: Melbourne Metro Rail Project - Planning · 1. INTRODUCTION 1.1 This document is an Incorporated Document in the Melbourne, Port Maribyrnong, Phillip and Stonnington Planning Schemes

Little

Bou

rke S

t

Swanston St

Staughton PlLynch Pl

Albion Al

Cardigan St

Bour

ke St

Shilling Ln

Constance Stone Ln

Lons

dale

St

Little

Lons

dale

St

Bowen St

Fran

klin S

tBouverie St

Sutherland St

Drewery Ln

Queensberry Pl

Knox

Pl

Cardigan Tce

Tattersalls Ln

Orr St

Earl S

t

Snide

rs Ln

Mclea

n Al

Guild

ford

Ln

La Tr

obe S

t

Louden Pl

Flanig

an Ln

Drew

ery A

l

Drew

ery P

l

Turn

er Al

Hughs Al

Elizabeth St

The Causeway

Union Ln

Ther

ry St

Royal Ln

Russell Pl

Victor

iaSt

Driver Ln

Knox Ln

Zevenboom Ln

Globe Al Star Al

Abec

kett S

t

Leicester St

Dean Al

Little

La Tr

obe S

t

Alma P

lBo

uveri

e Pl

Warburton Al

Esse

x Pl

Rodda Ln

Angel Ln

Timothy Ln

Stevenson Ln

Heape Ct

Latrobe Pl

Warburton Ln

Celestial Av

Rankins Ln

Somerset Pl

Jane

Bell

Ln

Artem

is Ln

Red C

ape L

n

Corne

ll Pl

Whitehart Ln

Albe

rt Co

ates L

n

Bullens Ln

Heffernan Ln

Waratah Pl

Caledonian Ln

Niagara Ln

Stewart St

Literature Ln

LegendProject LandProperty Boundary

Melbourne

South Yarra

Kensington

WestFootscray

Map 8 of 16

Data Sources:Contains Vicmap Information © State of Victoria 2015

0 1 KM

G:\MMR-AJM\01_WIP\PW-1-AA-KG_GIS\640_Site_plans\MMR_0333_MMRA_ProjectArea\MMR_0333_MMRA_ProjectLand_P2.mxd

Melbourne Metro Rail ProjectTitle:Melbourne Metro Project Land MapDrawing Number:

MMR-AJM-UGAA-MP-NL-500342Drawn By:

ABApproved By: Date:

EC, GH 19/12/2016

0 50 100Metres

Map Size:A4

Revision:P2

I

Page 20: Melbourne Metro Rail Project - Planning · 1. INTRODUCTION 1.1 This document is an Incorporated Document in the Melbourne, Port Maribyrnong, Phillip and Stonnington Planning Schemes

Staughton PlLynch Pl

Swanston St

Albion AlHowey Pl

Little

Coll

ins St

Little

Bou

rke S

t

Bour

ke St

Tattersalls Ln

Russell St

Centre Pl

Collin

s St

ClydeWay

Ramsden Pl

Royal Ln

Block Pl

BoathouseDr

Rainbow Al

St Kilda Rd

Flind

ers L

nEquitable Pl

Scott Al

Portl

and L

n

Louden Pl

Turn

er Al

Lush Ln

Hughs Al

Hosier Ln

Belm

an Pl

Bean

ey Ln

Melbo

urne

Pl

Flind

ers S

t

Cocker Al

Driver Ln Balcombe Pl

Flinders Way

Globe Al

PresgravePl

Star Al

Lingham Ln

Athenaeum Pl

Royston Pl

Dean Al

Dame Edna Pl

Deg raves Pl

Staughton Al

Degraves St

Sugden Pl

Rothsay Ln

Angel Ln

Carson Pl

Stevenson Ln

Southgate Av

Latrobe Pl

Monaghan Pl

Dona

ldson

Ln

Celestial Av

Somerset Pl

Chapter House Ln

Masons Ln

Watson Pl

Rutledge Ln

Baptist Pl

Whitehart Ln

Waratah Pl

Heffernan Ln

Caledonian Ln

Bullens Ln

Elizabeth St

Flinders Ct

Russell Pl

Union Ln

Regent Pl

The Causeway

Manchester Ln

LegendProject LandProperty Boundary

Melbourne

South Yarra

Kensington

WestFootscray

Map 9 of 16

Data Sources:Contains Vicmap Information © State of Victoria 2015

0 1 KM

G:\MMR-AJM\01_WIP\PW-1-AA-KG_GIS\640_Site_plans\MMR_0333_MMRA_ProjectArea\MMR_0333_MMRA_ProjectLand_P2.mxd

Melbourne Metro Rail ProjectTitle:Melbourne Metro Project Land MapDrawing Number:

MMR-AJM-UGAA-MP-NL-500342Drawn By:

ABApproved By: Date:

EC, GH 19/12/2016

0 50 100Metres

Map Size:A4

Revision:P2

I

Page 21: Melbourne Metro Rail Project - Planning · 1. INTRODUCTION 1.1 This document is an Incorporated Document in the Melbourne, Port Maribyrnong, Phillip and Stonnington Planning Schemes

St Kilda Rd

Boathouse Dr

Wade

y St

South

bank

Bvd

Wells St

Alexand

ra Av

FawknerSt

SouthgateAv

Doma

in Tu

nnel

Linlithgow Av

Russell St

Swanston St

Kavanagh St

City Rd

Gran

t St

Fanning St

Government

House Dr

Burn

ley Tu

nnel

Dodds St

Sturt St

LegendProject LandProperty Boundary

Melbourne

South Yarra

Kensington

WestFootscray

Map 10 of 16

Data Sources:Contains Vicmap Information © State of Victoria 2015

0 1 KM

G:\MMR-AJM\01_WIP\PW-1-AA-KG_GIS\640_Site_plans\MMR_0333_MMRA_ProjectArea\MMR_0333_MMRA_ProjectLand_P2.mxd

Melbourne Metro Rail ProjectTitle:Melbourne Metro Project Land MapDrawing Number:

MMR-AJM-UGAA-MP-NL-500342Drawn By:

ABApproved By: Date:

EC, GH 19/12/2016

0 50 100Metres

Map Size:A4

Revision:P2

I

Page 22: Melbourne Metro Rail Project - Planning · 1. INTRODUCTION 1.1 This document is an Incorporated Document in the Melbourne, Port Maribyrnong, Phillip and Stonnington Planning Schemes

Dodds St

Birdwood Av

St Kilda Rd

Albert Rd

Doma

in Tu

nnel

King

s -ci ty

l ink I

n Ram

p

Cove

ntry

St

Wells St

Middleton Ln

Anzac Av

Park

St

Little

Bank

St

Government House Dr

Linlithgow Av

Domain

Rd

Bank

St

Miles

St

Dorca

s St

Anthony Ln

Palmerston Cr

Gran

t St

CitylinkOut-kings Ramp

Sturt St

Wells

Pl

Bur n

leyTu

nnel

Wade

y St

LegendProject LandProperty Boundary

Melbourne

South Yarra

Kensington

WestFootscray

Map 11 of 16

Data Sources:Contains Vicmap Information © State of Victoria 2015

0 1 KM

G:\MMR-AJM\01_WIP\PW-1-AA-KG_GIS\640_Site_plans\MMR_0333_MMRA_ProjectArea\MMR_0333_MMRA_ProjectLand_P2.mxd

Melbourne Metro Rail ProjectTitle:Melbourne Metro Project Land MapDrawing Number:

MMR-AJM-UGAA-MP-NL-500342Drawn By:

ABApproved By: Date:

EC, GH 19/12/2016

0 50 100Metres

Map Size:A4

Revision:P2

I

Page 23: Melbourne Metro Rail Project - Planning · 1. INTRODUCTION 1.1 This document is an Incorporated Document in the Melbourne, Port Maribyrnong, Phillip and Stonnington Planning Schemes

Park

St

Kings Pl

Toorak Rd

Bowen Ln

Albe

rtRd

Dr

Bowe

n Cr

Kings Way

Anthony Ln

Dorca

s St

Middleton Ln

Dallas Brooks Dr

Bromby St

Palmerston Cr

Wells St

Cobden St

Matthews L

n

Wells

Pl

Palmerston Pl

Arnold St

Domain Rd

Adams St

St Kilda Rd

Millers Ln

Domain St

Hope St

Albert Rd

Queens Ln

Bank

St

Little Bank St

Queens Rd

LegendProject LandProperty Boundary

Melbourne

South Yarra

Kensington

WestFootscray

Map 12 of 16

Data Sources:Contains Vicmap Information © State of Victoria 2015

0 1 KM

G:\MMR-AJM\01_WIP\PW-1-AA-KG_GIS\640_Site_plans\MMR_0333_MMRA_ProjectArea\MMR_0333_MMRA_ProjectLand_P2.mxd

Melbourne Metro Rail ProjectTitle:Melbourne Metro Project Land MapDrawing Number:

MMR-AJM-UGAA-MP-NL-500342Drawn By:

ABApproved By: Date:

EC, GH 19/12/2016

0 50 100Metres

Map Size:A4

Revision:P2

I

Page 24: Melbourne Metro Rail Project - Planning · 1. INTRODUCTION 1.1 This document is an Incorporated Document in the Melbourne, Port Maribyrnong, Phillip and Stonnington Planning Schemes

Mills

wyn S

t

Park

St

Doma

in St

Arthur St

Slater St

Queens Rd

Mason St

Bromby St

Mona Pl

Randall Pl

St Martins Ln

Park Pl

Little Park St

Arno

ld St

Queens Ln

Adam

s St

Toorak Rd

Float

Ln

Kings Way

St Kilda Rd

Hope

St

Leop

old S

t

Marn

e St

Walsh

St

LegendProject LandProperty Boundary

Melbourne

South Yarra

Kensington

WestFootscray

Map 13 of 16

Data Sources:Contains Vicmap Information © State of Victoria 2015

0 1 KM

G:\MMR-AJM\01_WIP\PW-1-AA-KG_GIS\640_Site_plans\MMR_0333_MMRA_ProjectArea\MMR_0333_MMRA_ProjectLand_P2.mxd

Melbourne Metro Rail ProjectTitle:Melbourne Metro Project Land MapDrawing Number:

MMR-AJM-UGAA-MP-NL-500342Drawn By:

ABApproved By: Date:

EC, GH 19/12/2016

0 50 100Metres

Map Size:A4

Revision:P2

I

Page 25: Melbourne Metro Rail Project - Planning · 1. INTRODUCTION 1.1 This document is an Incorporated Document in the Melbourne, Port Maribyrnong, Phillip and Stonnington Planning Schemes

Powe

ll St

Macfarlan Ln

Avoc

a St

Carol

ineStToorak Rd

Clare

mont

St

SouthwickLn

Davis

Av

Darli

ng St

O sbo

rne S

t

Portl

and P

l

Alexandra St

Punt

Rd

Willia

m St

Northampton P l

Macfa

rlan S

t

Macfarlan Pl

Arthur St

Lang St

Station St

Yarra

St

Mona Pl

Park Pl

Murp

hy St

Leop

old S

t

Marn

e St

Myrtl

e St

Walsh

St

Ralston St

LegendProject LandProperty Boundary

Melbourne

South Yarra

Kensington

WestFootscray

Map 14 of 16

Data Sources:Contains Vicmap Information © State of Victoria 2015

0 1 KM

G:\MMR-AJM\01_WIP\PW-1-AA-KG_GIS\640_Site_plans\MMR_0333_MMRA_ProjectArea\MMR_0333_MMRA_ProjectLand_P2.mxd

Melbourne Metro Rail ProjectTitle:Melbourne Metro Project Land MapDrawing Number:

MMR-AJM-UGAA-MP-NL-500342Drawn By:

ABApproved By: Date:

EC, GH 19/12/2016

0 50 100Metres

Map Size:A4

Revision:P2

I

Page 26: Melbourne Metro Rail Project - Planning · 1. INTRODUCTION 1.1 This document is an Incorporated Document in the Melbourne, Port Maribyrnong, Phillip and Stonnington Planning Schemes

Cromwell

Cr

Toorak Rd

Garden St

Surrey Rd

Powe

ll St

Drain Reserve Rd

Macfarlan Ln

Fitzgerald St

Rive

r St

Avoc

a St

Tivoli

Rd

Poth

itos L

n

Station St

Fors

ter St

Peter

St

Bray

St

TilletLn

Fawkner St

Bond St

Moor

eSt

Medley PlCh

ambe

rs St

Davis Av

Stables Ln

Osbo

rne S

t

Lang St

Alexandra St

Time Ln

Willia

m St

Oxfor

d Ln

Arthur St

Cunn

ingha

m St

Clar

aSt

Almeida Cr

Rock

y Ln

Macfa

rlan S

t

Palermo St

Oxford St

Macfarlan Pl

River Ln

Yarra

St

Clare

mont

St

Penny Ln

Wise

would

Ln

Murp

hy St

Phoe

nix S

t

Chap

el St

Darli

ng St

Davis

on P

l

Portl

and P

l

Rock

ley R

d

Myrtl

e St

LegendProject LandProperty Boundary

Melbourne

South Yarra

Kensington

WestFootscray

Map 15 of 16

Data Sources:Contains Vicmap Information © State of Victoria 2015

0 1 KM

G:\MMR-AJM\01_WIP\PW-1-AA-KG_GIS\640_Site_plans\MMR_0333_MMRA_ProjectArea\MMR_0333_MMRA_ProjectLand_P2.mxd

Melbourne Metro Rail ProjectTitle:Melbourne Metro Project Land MapDrawing Number:

MMR-AJM-UGAA-MP-NL-500342Drawn By:

ABApproved By: Date:

EC, GH 19/12/2016

0 50 100Metres

Map Size:A4

Revision:P2

I

Page 27: Melbourne Metro Rail Project - Planning · 1. INTRODUCTION 1.1 This document is an Incorporated Document in the Melbourne, Port Maribyrnong, Phillip and Stonnington Planning Schemes

Pilgrim St

Hewit t Av

Margare

t St

Alexander St

Charles St

Buckley St

EmpressAv

Carmichael St

Warle

igh R

d

Chirn

side S

t

Queensvil le St

Mcdougall Dr

Dickson St

Robe

rts S

t

Barkly St

Batman St

Cres

wick

St

Beaurepaire Pde

CoronationSt

Gor don St

Argy

le St

Beec

h St

Geelong St

Beam

e St

Marke

t St

Carm

ody W

ay

Summ

erhil

l Rd

Newman Dr

Braid St

Dove St

Buxto

n St

Blan

dford

St

Russ

ell St

Ann S

t

Henr

y St

Edwa

rd St

Jame

s St

Willia

m St

Alfre

d St

SuttonWay

Cross St

Clark

e St

Busch St

John St

Milton St

Cuthb

ert St

Lily St

Darling St

Queen St

Stanhope St

R OW Y

Rook Way

Indwe St

Errol St

Buckingham St

Broad St Latrobe St

Curra

jong S

t

Punt Ln

Derri

mut S

t

Darw

in St

Scott St

Robbs Rd

Sunshine Rd

Elphin

stone

St

Comm

ercia

l Rd

Wolve

rham

pton S

t

Willia

msto

wn R

d

Emma St

Sydn

ey St

Adela

ide St

Swan

St

Sout

hamp

ton S

t

Hock

ingSt

Ever

ard S

t

Elean

or S

t

Lean

der S

t

Staff

ord S

t

Dudle

y St

Liverp

ool S

t

Geelong Rd

Sydenham StAitken St

Souter CrClive St

Rupert St

Strad

brok

e St

Grain

gers

Rd

LegendProject LandProperty Boundary

Melbourne

South Yarra

Kensington

WestFootscray

Map 16 of 16

Data Sources:Contains Vicmap Information © State of Victoria 2015

0 1 KM

G:\MMR-AJM\01_WIP\PW-1-AA-KG_GIS\640_Site_plans\MMR_0333_MMRA_ProjectArea\MMR_0333_MMRA_ProjectLand_P2.mxd

Melbourne Metro Rail ProjectTitle:Melbourne Metro Project Land MapDrawing Number:

MMR-AJM-UGAA-MP-NL-500342Drawn By:

ABApproved By: Date:

EC, GH 19/12/2016

0 50 100Metres

Map Size:A4

Revision:P2

I

Page 28: Melbourne Metro Rail Project - Planning · 1. INTRODUCTION 1.1 This document is an Incorporated Document in the Melbourne, Port Maribyrnong, Phillip and Stonnington Planning Schemes

Appendix 2 – Approval of plans

Document Approved by Relevant provision

Strategic framework and Development Plans

Development Plans

Prepared by each Contractor to the extent relevant to its works

Minister for Planning Incorporated Document clause 4.6.

Environmental Management Framework, including Environmental Performance Requirements

Prepared by Melbourne Metro Rail Authority (MMRA)

Minister for Planning Incorporated Document clause 4.7.

Urban Design Strategy

Prepared by MMRA

Minister for Planning Incorporated Document clause 4.8.

Early Works Plans

Prepared by Early Works Contractor for works contemplated by clause 4.9 of the Incorporated Document.

Minister for Planning Incorporated Document clause 4.9.

Community and Stakeholder Engagement Management Plan

Prepared by MMRA

Minister for Planning To be referenced in the Environmental Performance Requirements for the Project to be prepared as part of the Environmental Management Framework.

Management of broad impacts

Construction Environmental Management Plan

Prepared by each Contractor to the extent relevant to their works.

State of Victoria as party to the relevant contract (MMRA)

For Public Private Partnership (PPP), also approved by Independent Reviewer

Incorporated Document clause 4.7.

To be referenced in the Environmental Performance Requirements for the Project to be prepared as part of the Environmental Management Framework.

Site Environment Implementation Plan

Prepared by each Contractor to the extent relevant to their

State of Victoria as party to the relevant contract (MMRA)

For PPP, also approved

Incorporated Document clause 4.7.

To be referenced in the Environmental Performance Requirements for the Project to be prepared as part of the

Page 29: Melbourne Metro Rail Project - Planning · 1. INTRODUCTION 1.1 This document is an Incorporated Document in the Melbourne, Port Maribyrnong, Phillip and Stonnington Planning Schemes

Document Approved by Relevant provision

works. by Independent Reviewer

Environmental Management Framework.

Transport Management Plan/s (T1)

Prepared by each Contractor to the extent relevant to their works.

State of Victoria as party to the relevant contract (MMRA)

For PPP, also approved by Independent Reviewer

To be referenced in the Environmental Performance Requirements for the Project to be prepared as part of the Environmental Management Framework.

Operations Environmental Management Plan.

Prepared by PPP Contractor.

State of Victoria as party to the relevant contract (MMRA)

For PPP, also approved by Independent Reviewer

To be referenced in the Environmental Performance Requirements for the Project to be prepared as part of the Environmental Management Framework.

Business Disruption Plan.

Prepared by each Contractor to the extent relevant to their works.

State of Victoria as party to the relevant contract (MMRA)

For PPP, also approved by Independent Reviewer

To be referenced in the Environmental Performance Requirements for the Project to be prepared as part of the Environmental Management Framework.

Construction Noise and Vibration Management Plan.

Prepared by each Contractor to the extent relevant to their works.

State of Victoria as party to the relevant contract (MMRA)

For PPP, also approved by Independent Reviewer

To be referenced in the Environmental Performance Requirements for the Project to be prepared as part of the Environmental Management Framework.

Technical plans

Plans required by the Environmental Performance Requirements for the Project, other than the plans specifically listed above, will be approved as follows:

• For Early Works, Rail Infrastructure Alliance (eastern and western tunnel portals and western turnback) and Rail Systems Alliance (the high capacity signalling, rail systems integration and commissioning) these plans would be approved by the State of Victoria as party to the relevant contract (MMRA); and

• Where prepared by the PPP Contractor (Tunnels and Stations package), these plans would be reviewed and commented on by both the State of Victoria (MMRA) and the Independent Reviewer under the PPP review procedures, and written confirmation provided that the plan complies with all statutory approvals, the Incorporated Document and the approved Environmental Performance Requirements.