melbourne metro rail project - planning · 1. introduction 1.1 this document is an incorporated...
TRANSCRIPT
Melbourne Metro Rail Project Incorporated Document December 2016
Incorporated Document in the Maribyrnong, Melbourne, Port Phillip and Stonnington Planning Schemes pursuant to section 6(2)(j) of the Planning and Environment Act 1987 (Vic).
1. INTRODUCTION
1.1 This document is an Incorporated Document in the Maribyrnong, Melbourne, Port Phillip and Stonnington Planning Schemes (Planning Schemes) pursuant to section 6(2)(j) of the Planning and Environment Act 1987 (Vic).
1.2 This Incorporated Document facilitates the delivery of the Melbourne Metro Rail Project (Project).
1.3 The control in clause 4 prevails over any contrary or inconsistent provisions in the Planning Schemes.
2. PURPOSE
2.1 The purpose of the control in clause 4 is to permit and facilitate the use and development of land described in clause 3 for the purposes of the Project, in accordance with clauses 4 and 5.
3. LAND DESCRIPTION
3.1 The control in clause 4 applies to the land described as Project Land for the Melbourne Metro Rail Project as shown on Maps 1 to 16 at Appendix 1.
4. CONTROL
Exemption from Planning Scheme Requirements
4.1 Despite any provision to the contrary or any inconsistent provision in the Planning Schemes, no planning permit is required for, and no provision in the Planning Schemes operates to prohibit, control or restrict the use or development of the Project Land in accordance with the control in this clause for the purposes of, or related to, constructing or maintaining the Project or using any aspect of the Project infrastructure to operate passenger train and tram services.
4.2 The Project infrastructure to which this control applies includes, but is not limited to:
a) Railways, including twin railway tunnels, about 9km long, between South Kensington and South Yarra, and tunnel portals at those locations
b) Underground and above-ground railway lines between and adjacent to the tunnel portals
c) Underground Railway stations, Retail premises and support structures at Arden, Parkville, CBD North, CBD South and Domain
d) Above ground Railway station works and modifications at West Footscray Station
e) Ventilation structures and systems
f) Utility installations and services to construct and operate any aspect of the Project, including any Project infrastructure and the operation of passenger trains or trams. Such services include traction energy, communications and rail operating systems
1
g) Tramways
h) Emergency and maintenance access shafts and infrastructure
i) Bridges, transport interchanges and road works
j) Earthworks and related structures, kerbs, channels, water quality and soil treatment structures or works, retaining walls, noise and screening barriers, cuttings, batters and fill associated with the Project
4.3 The use and development of the Project Land for the purposes of, or related to, the Project includes, but is not limited to:
a) Use and development of laydown areas for construction purposes
b) Removing, destroying and lopping trees and vegetation
c) Demolishing and removing buildings, fixtures, structures and infrastructure
d) Constructing or carrying out works for excavation, fences, temporary barriers, noise attenuation walls, stabilisation, creating bunds or mounds, landscaping, shared use paths, wetlands or ground treatment
e) Creating or altering access to a road in a Road Zone, Category 1
f) Constructing and using temporary site workshops and storage, administration and amenities buildings
g) Manufacturing any materials required for the Project within the Arden precinct
h) Constructing and using temporary access roads, diversion roads and vehicle parking areas
i) Displaying construction, directional and business identification signage
j) Carrying out of preparatory works including, but not limited to, those set out in clause 4.12
k) Subdividing and consolidating land
l) Altering or relocating rail lines, tram lines and Utility installations
m) Any activity, buildings or works that the Minister for Planning confirms in writing is for the purposes of the Project.
4.4 Land uses in italics have the same meaning as in clause 74 of the Planning Schemes.
2
Conditions
4.5 The use and development permitted by this Incorporated Document must be undertaken in accordance with the following conditions:
4.6 Development Plans
4.6.1 Subject to clause 4.12, a Development Plan must be approved by the Minister for Planning for development that relates to each of the following:
a) Western tunnel portal
b) Eastern tunnel portal
c) Arden Station
d) Parkville Station
e) CBD North Station
f) CBD South Station
g) Domain Station
h) Rail turnback at West Footscray Station
i) Any other above-ground works or structures that are part of the Project.
4.6.2 A Development Plan must address surface works that are associated with each of the items listed in clause 4.6.1. A Development Plan for a station must address underground areas from the station entrance to the ticket gate.
4.6.3 A Development Plan must include:
a) A site layout plan/s
b) Architectural, landscape and public realm plans and elevations including lighting, signage, pedestrian access, bicycle access and other ancillary facilities
c) An explanation demonstrating how the Development Plan (including materials and external finishes) is in accordance with the approved Urban Design Strategy and the approved Environmental Performance Requirements included within the Environmental Management Framework.
4.6.4 Prior to submission of a Development Plan to the Minister for Planning for approval under clause 4.6.1, a Development Plan must be:
a) Provided to the Office of the Victorian Government Architect and relevant council/s for consultation.
3
b) Where relevant, provided to the Roads Corporation, Public Transport Development Authority, Melbourne Water and Heritage Victoria for consultation.
c) Made available for public inspection and comment on a clearly identifiable Project website for 15 business days. The website must set out details about the entity and contact details to which written comments can be directed during that time and specify the time and manner for the making of written comments.
For the avoidance of doubt, consultation in accordance with (a) and (b) can occur prior to or after the public inspection and comment period in (c).
Before, or on the same day as a Development Plan is made available in accordance with clause 4.6.4(c), a notice must be published in a newspaper generally circulating in the area to which a Development Plan applies informing the community of the matters set out in clause 4.6.4(c).
4.6.5 A Development Plan submitted to the Minister for Planning for approval under clause 4.6.1 must be accompanied by all written comments received under clause 4.6.4 and a summary of consultation and response to issues raised during the consultation.
4.6.6 Before deciding whether to approve a Development Plan under clause 4.6.1, the Minister for Planning must consider all written comments received under clause 4.6.4 and the consultation and response summary provided under clause 4.6.5.
4.6.7 A Development Plan must be approved by the Minister for Planning prior to the commencement of any development relating to an item in clause 4.6.1, except for Early Works that are carried out in accordance with clause 4.9.
4.6.8 A Development Plan may be prepared and approved in stages or parts, and may be amended from time to time with the approval of the Minister for Planning. The Minister must require an application for approval of an amendment to a Development Plan to comply with the requirements of clauses 4.6.3, 4.6.4, 4.6.5 and 4.6.6 unless, in the opinion of the Minister:
a) the proposed amendment:
i) does not result in a material detriment to any person; or
ii) a person who may suffer a material detriment as a result of the Minister’s approval of the amendment has already been sufficiently consulted in respect of the amendment; and
b) any amendment does not involve any change to an approved Environmental Performance Requirement.
4.6.9 For land to which a Development Plan applies, development must be carried out in accordance with an approved Development Plan.
4
4.7 Environmental Management Framework
4.7.1 Prior to the commencement of any buildings or works associated with the Project (including Early Works under clause 4.9), an Environmental Management Framework (EMF) must be approved by the Minister for Planning. The EMF must include Environmental Performance Requirements addressing the following areas and any other relevant matters:
a) Aboriginal heritage
b) Air quality
c) Arboriculture
d) Biodiversity
e) Business
f) Contaminated land and spoil management
g) Greenhouse gas
h) Ground movement
i) Ground water
j) Historical cultural heritage
k) Land use and planning
l) Noise and vibration
m) Social and community
n) Surface water
o) Transport
p) Urban design, landscape and visual
4.7.2 The EMF must also include Residential Impact Mitigation Guidelines and Business Support Guidelines for Construction.
4.7.3 The EMF must set out the process and timing for development of an Environmental Management System/s, Construction Environment Management Plan/s, Site Environment Implementation Plan/s and plans referenced in Appendix 2 of this Incorporated Document as relevant to any stage or part of the Project, including process and timing for consultation with relevant council/s, Heritage Victoria, the Roads Corporation, Melbourne Water, Public Transport Development Authority, the Environment Protection Authority, and key affected stakeholders as relevant.
4.7.4 The EMF must identify the entity responsible for approval of each plan required under this Incorporated Document or the Environmental
5
Performance Requirements, in accordance with the table in Appendix 2 to this Incorporated Document.
4.7.5 The EMF must identify requirements for monitoring, reporting and auditing of compliance with the Environmental Performance Requirements, this Incorporated Document, and each plan set out in the table in Appendix 2 to this Incorporated Document.
4.7.6 The EMF (including the Environmental Performance Requirements, the Residential Impact Mitigation Guidelines and the Business Support Guidelines for Construction) submitted to the Minister for Planning for approval under clause 4.7.1 must be accompanied by a statement explaining any differences between it, and the matters set out in the Minister’s Assessment under the Environment Effects Act 1978 dated 20 December 2016, in particular in relation to Table A2.
4.7.7 The EMF must be submitted to and approved by the Minister for Planning and may be prepared and approved in stages or parts and may be amended from time to time with the approval of the Minister for Planning.
4.7.8 The use and development for the Project must be carried out in accordance with the approved EMF and the approved Environmental Performance Requirements.
4.8 Urban Design Strategy
4.8.1 Prior to the submission of a Development Plan under clause 4.6, an Urban Design Strategy must be approved by Minister for Planning.
4.8.2 The Urban Design Strategy may be prepared and approved in stages or parts and may be amended from time to time with the approval of the Minister for Planning.
4.8.3 The use and development for the Project must be carried out in accordance with the approved Urban Design Strategy.
4.9 Early Works Plans
4.9.1 Early Works identified in the Environment Effects Statement for the Project as Early Works may be carried out before a Development Plan is approved, provided that an Early Works Plan is approved by the Minister for Planning.
4.9.2 Early works for the Project identified in the Environment Effect Statement include:
a) Utility service relocation and protection of utility assets;
b) Site preparation works, including demolition works, removal or relocation of trees and monuments, minor road / transport network changes; and
c) Works for construction of shafts at CBD North and CBD South station precincts.
6
4.9.3 An Early Works Plan must include site layout plan/s and demonstrate how the Early Works Plan is in accordance with the approved Environmental Performance Requirements and the approved Urban Design Strategy.
4.9.4 Prior to the submission of an Early Works Plan to the Minister for Planning for approval under clause 4.9.1, an Early Works Plan prepared in accordance with clause 4.9.2 must be:
a) Provided to the relevant council/s for consultation.
b) Provided to affected utility service providers for consultation.
c) Where relevant, provided to the Roads Corporation, Public Transport Development Authority, Melbourne Water and Heritage Victoria for consultation.
d) Where relevant, provided to key stakeholders for consultation.
e) Made available for public inspection and comment on a clearly identifiable Project website for 15 business days. The website must set out details about the entity and contact details to which written comments can be directed during that time and specify the time and manner for the making of written comments.
For the avoidance of doubt, consultation in accordance with (a) to (d) can occur prior to or after the public inspection and comment period in (e).
Before, or on the same day as an Early Works Plan is made available in accordance with clause 4.9.4(e), a notice must be published in a newspaper generally circulating in the area to which the Early Works Plan applies informing the community of the matters set out in clause 4.9.4(e).
4.9.5 An Early Works Plan submitted to the Minister for Planning for approval under clause 4.9.1 must be accompanied by all written comments received under clause 4.9.4 and a summary of consultation and response to issues raised during consultation.
4.9.6 Before deciding whether to approve an Early Works Plan under clause 4.9.1, the Minister for Planning must consider all written comments received under clause 4.9.4 and the consultation and response summary provided under clause 4.9.5.
4.9.7 An Early Works Plan must be approved by the Minister for Planning prior to the commencement of any works to which that Early Works Plan relates.
4.9.8 Early Works for the Project may be carried out before a Development Plan is approved under clause 4.6.1 provided that the Minister for Planning has approved an Early Works Plan for such works under clause 4.9.1.
4.9.9 An Early Works Plan may be prepared and approved in stages or parts and may be amended from time to time with the approval of the Minister for Planning. The Minister must require an application for approval of an
7
amendment to an Early Works Plan to comply with the requirements of clauses 4.9.3, 4.9.4, 4.9.5, 4.9.6 unless, in the opinion of the Minister:
a) the proposed amendment:
i) does not result in a material detriment to any person; or ii) a person who may suffer a material detriment as a result of the
Minister’s approval of the amendment has already been sufficiently consulted in respect of the amendment; and
b) any amendment does not involve any change to an approved Environmental Performance Requirement.
4.9.10 For land to which an Early Works Plan applies, development must be carried out in accordance with an approved Early Works Plan.
4.10 Native Vegetation
4.10.1 Native vegetation offsets for the removal of native vegetation to construct the Project must be provided in accordance with the Permitted Clearing of Native Vegetation - Biodiversity Assessment Guidelines (Department of Environment and Primary Industries, September 2013), except as otherwise agreed by the Secretary to the Department of Environment, Land, Water and Planning.
4.11 Creating or altering access to a road in a Road Zone, Category 1
4.11.1 Any buildings and works to create or alter access to a road in a Road Zone, Category 1 must be undertaken to the satisfaction of the relevant road authority.
4.12 Preparatory Works
4.12.1 Preparatory works for the Project may commence before the plans and other matters listed in sub-clauses 4.6 to 4.9 are approved.
4.12.2 The preparatory works for the Project permitted under clause 4.12 include, but are not limited to:
a) Works, including vegetation removal, that would not require a permit under the provisions of the Planning Schemes that, but for this Incorporated Document, would apply to the relevant land.
b) Investigations, surveys, testing and preparatory works to determine the suitability of land.
c) Creation of construction access points.
d) Establishment of environmental and traffic controls.
e) Fencing and temporary barriers to enable preparatory works.
8
f) utility service relocations and protection works limited to the following locations only:
i) in the CBD North Precinct that are preparatory to works for the construction of shafts at Franklin and A’Beckett Streets (including associated tree removal);
ii) on Flinders Lane between Russell and Swanston Streets that are preparatory to works for shaft construction at City Square; and
iii) at Toorak Road West (between St Kilda Road and Leopold Street) that are preparatory to works associated with diverting tram services along Toorak Road West to connect with St Kilda Road.
4.12.3 For the avoidance of doubt, preparatory works permitted under clause 4.12 do not include excavation of shafts or station caverns, or tunnelling of railway tunnels.
4.13 Availability of approved plans
4.13.1 A current version of each of the following approved plans must be available on a clearly identifiable Project website until commencement of public train operations through the tunnels:
a) Each Development Plan approved under clause 4.6;
b) Environmental Management Framework (including Environmental Performance Requirements, Residential Impact Mitigation Guidelines and Business Support Guidelines for Construction) approved under clause 4.7;
c) Urban Design Strategy approved under clause 4.8; and
d) Each Early Works Plan approved under clause 4.9.
5. EXPIRY
5.1 The control in this Incorporated Document expires if any of the following circumstances applies:
a) The development allowed by the control is not started by 31 December 2018;
b) The development allowed by this control is not completed by 31 December 2028; or
c) The use allowed by the control is not started by 31 December 2028.
5.2 The Responsible Authority may extend these periods if a request is made in writing before the expiry date or within three months afterwards.
9
Appendix 1 – Project Land
[MAPS 1 TO 16]
Hampden RdMcnam a ra Mew
s
Devon St
Balmer S
t
Childers St
Bakehouse Rd
Bateman Rd
Newton St
Wakefiel
d St
Kirk St
Leices
ter Mew
s
Tennyso
n St
Tankar
d St MercantilePdeFairbairn Dr
Lincol n Mews
Highett St
Clifford Tce
Hobsons Rd
Kensington Rd
Wolseley
Pde
Derby St
Ormond St
Newman St
Guinness Ln
TaylorMews
Nichols Ln
Hodgson Ln
Rayner L
n
Altona St
Mcclure R
d
LegendProject LandProperty Boundary
Melbourne
South Yarra
Kensington
WestFootscray
Map 1 of 16
Data Sources:Contains Vicmap Information © State of Victoria 2015
0 1 KM
G:\MMR-AJM\01_WIP\PW-1-AA-KG_GIS\640_Site_plans\MMR_0333_MMRA_ProjectArea\MMR_0333_MMRA_ProjectLand_P2.mxd
Melbourne Metro Rail ProjectTitle:Melbourne Metro Project Land MapDrawing Number:
MMR-AJM-UGAA-MP-NL-500342Drawn By:
ABApproved By: Date:
EC, GH 19/12/2016
0 50 100Metres
Map Size:A4
Revision:P2
I
Langford St
Arden St
Lloyd St
Childers St
Dyno
n-city
link
Out R
amp
Cityli
nk
Bakehouse Rd
BrownsHill Pl
Citylink
In-dynon Ramp
Barrett St
Elizabeth St
Tennyso
n St
Altona St
Derby St
Dynon Rd
Ormond St
Southey St
Radcliffe St
Bruce StBellair St
Green St
Lennon St
Mclennan Dr
Mcclure Rd
LegendProject LandProperty Boundary
Melbourne
South Yarra
Kensington
WestFootscray
Map 2 of 16
Data Sources:Contains Vicmap Information © State of Victoria 2015
0 1 KM
G:\MMR-AJM\01_WIP\PW-1-AA-KG_GIS\640_Site_plans\MMR_0333_MMRA_ProjectArea\MMR_0333_MMRA_ProjectLand_P2.mxd
Melbourne Metro Rail ProjectTitle:Melbourne Metro Project Land MapDrawing Number:
MMR-AJM-UGAA-MP-NL-500342Drawn By:
ABApproved By: Date:
EC, GH 19/12/2016
0 50 100Metres
Map Size:A4
Revision:P2
I
Dryb
urgh
St
Macaulay Rd
Haines St
Elm C
tIvy C
t
Geran
ium C
t
LittleBaillie St
Banksia Ct
LittleLothian St
Langford St
Fuch
sia C
t
Jasm
ine C
t
Hibis
cus C
t
Provost St
PlaneTree Way
Fogarty St
Cityl
inkIn-
dyno
n Ram
p
Came
llia C
t
Staw
ell St
Dyno
n-city
link
Out R
amp
Oshanassy St
Muns
terTc
e
Ande
rson
s Ln
Baillie St
Mawby Ln
Azale
a CtDa
isy C
t
Bruce St
Arden St
Lloyd St
Shiel St
Abbo
tsfor
d St
Loth
ian St
Laur
ens S
t
Cityli
nk
Little Provost St
De Feu St
Queensberry St
Gracie St
Henderson St
LittleDryburgh St
Barwise St
Green St
LegendProject LandProperty Boundary
Melbourne
South Yarra
Kensington
WestFootscray
Map 3 of 16
Data Sources:Contains Vicmap Information © State of Victoria 2015
0 1 KM
G:\MMR-AJM\01_WIP\PW-1-AA-KG_GIS\640_Site_plans\MMR_0333_MMRA_ProjectArea\MMR_0333_MMRA_ProjectLand_P2.mxd
Melbourne Metro Rail ProjectTitle:Melbourne Metro Project Land MapDrawing Number:
MMR-AJM-UGAA-MP-NL-500342Drawn By:
ABApproved By: Date:
EC, GH 19/12/2016
0 50 100Metres
Map Size:A4
Revision:P2
I
Provost St
Spencer St
Dyno
n-city
link
OutRam
p Loth
ian St
Laurens StRailwayPl Ab
botsf
ord S
t
Dynon Rd
Cityli
nk
Elm St
Citylink In-dynon Ramp
Mawby Ln
Baillie St
LittleProvos t St
Elm P
l
Cityli
nkIn-
footsc
ray Ra
mp
Prendergast Ln
Dryb
urgh
St
Muns
terTc
e
De Feu St
Silk Pl
Miller St
Queensberry St
Staw
ell St
Ande
rson
St
Victoria St
Barwise St
LittleLothian St
LittleDryburgh St
LegendProject LandProperty Boundary
Melbourne
South Yarra
Kensington
WestFootscray
Map 4 of 16
Data Sources:Contains Vicmap Information © State of Victoria 2015
0 1 KM
G:\MMR-AJM\01_WIP\PW-1-AA-KG_GIS\640_Site_plans\MMR_0333_MMRA_ProjectArea\MMR_0333_MMRA_ProjectLand_P2.mxd
Melbourne Metro Rail ProjectTitle:Melbourne Metro Project Land MapDrawing Number:
MMR-AJM-UGAA-MP-NL-500342Drawn By:
ABApproved By: Date:
EC, GH 19/12/2016
0 50 100Metres
Map Size:A4
Revision:P2
I
Lanc
ashir
e Ln
GrattanSt
Blackw
ood St
Dryb
urgh
St
Harker S
t
Haine
s Pl
Wreckyn St
Provost St
Baillie St
Haines St
Molesworth St
Chetw
ynd S
t
Arden St
De Le
More
Pl
Elm C
t
Mattin
glys
Ln
Ivy C
t
Geran
ium C
t
Erro
l St
Dangerfield Ln
Little Baillie St
Vale St
Banksia Ct
LittleLothian St
Loug
hmor
e Ln
Fuch
sia C
t
Jasm
ine C
t
Pears
onsP
l
Villiers S
t
Munros
Ln
Hibis
cus C
t
Glass St
Purcell St
Harris St
Stran
g Ln
Kermodes Ln
Quee
nsbe
rryPl
Stewarts
Ln
PlaneTree Way
Arde
n Ln
Jones Ln
Macaulay Rd
Buncles
Pl
Parksid
e Ln
Came
llia C
t
Harcourt S
t
Bulla
Ln
Chapman St
Flemington Rd
Ryans Ln
Ande
rson
s Ln
Isaac
s Ln
Mawby Ln
Azale
a Ct
Shiel St
Daisy
Ct
Wreckyn Pl
Dowling Pl
Oshanassy St
Magn
us Ln
Brightside Ln
W
y lies Ln
Howa
rd S
t
Leve
son S
t
Hotham Pl
J acob
ysLn
Courtney
Pl
Chetwynd Pl
Curzo
n St
Abbo
tsfor
d St
Loth
ian St
W eirs Ln
Cullens Ln
Courtney St
Falsh
aws L
n
Market Ln
Byron St
High St
Murphy St
Hard
wick
e St
Queensberry St
Scotia St
Bendigo St
Tyrone St
Mary St
Little George St
Oxford St
Little Provost St
LittleDryburgh St
LegendProject LandProperty Boundary
Melbourne
South Yarra
Kensington
WestFootscray
Map 5 of 16
Data Sources:Contains Vicmap Information © State of Victoria 2015
0 1 KM
G:\MMR-AJM\01_WIP\PW-1-AA-KG_GIS\640_Site_plans\MMR_0333_MMRA_ProjectArea\MMR_0333_MMRA_ProjectLand_P2.mxd
Melbourne Metro Rail ProjectTitle:Melbourne Metro Project Land MapDrawing Number:
MMR-AJM-UGAA-MP-NL-500342Drawn By:
ABApproved By: Date:
EC, GH 19/12/2016
0 50 100Metres
Map Size:A4
Revision:P2
I
Flemington Rd
Grattan St
Elizabeth St
Bedford Pl
Wreckyn
St
Spen
cer
Rd
Wilson
Av
Chetw
ynd S
t
Courtney St
Arden St
Bedford
St
ParkGrove
Vale St
Bouv
erie
St
Leice
ster S
t
Villier
s St
Royal P de
Barry
St
LittleGrattan St
Blackw
ood S
t
Buncles
Pl
Parksid
e Ln
Berkeley St
Park
Dr
Swan
ston S
t
Porte
rs Ln
Malvi
na P
l
Masson RdJa
coby
s Ln
Kernot Rd
Wreckyn Pl
Bainbridge Pl
Dowling Pl
PeelSt
StationaryLn
Church StBrightside Ln
Scotts Pl
Little George St
Medical Rd
Hotham
Pl
High St
Haymarket Wk
Genetics Ln
Pelham St
Lincoln SqTyrone St
Oxford St
Little Pelham St
Monash Rd
LegendProject LandProperty Boundary
Melbourne
South Yarra
Kensington
WestFootscray
Map 6 of 16
Data Sources:Contains Vicmap Information © State of Victoria 2015
0 1 KM
G:\MMR-AJM\01_WIP\PW-1-AA-KG_GIS\640_Site_plans\MMR_0333_MMRA_ProjectArea\MMR_0333_MMRA_ProjectLand_P2.mxd
Melbourne Metro Rail ProjectTitle:Melbourne Metro Project Land MapDrawing Number:
MMR-AJM-UGAA-MP-NL-500342Drawn By:
ABApproved By: Date:
EC, GH 19/12/2016
0 50 100Metres
Map Size:A4
Revision:P2
I
Pelha
m St
Bowen St
Gratt
an St
Barkly Pl
Leicester St
Queensberry Pl
Leice
ster P
l
Cardigan Tce
Bouverie St
Cardigan St
Kerno
t Rd
Little Cardigan St
Victor
ia St
LittleGrattan St
DrummondSt
Ievers
Pl
Ogrady Pl
Argy
le Pl
Bella Ln
Gibbo
ns Pl
Wilson Av
Fran
klin S
t
Malvina Pl
Carlto
n Pl
Quee
nsbe
rry St
Austr
al Pl
M a rySt
Bainb
ridge
Pl
LittleQueensberry St
Mona
han L
n
Alma P
lBo
uveri
e Pl
Mage
nta Pl
Rush Pl
Linco
ln Sq Es
sex P
l
Ievers
Tce
Churc
h St
Linco
ln Pl
Earl S
t
Scott
s Pl
Ther
ry St
Russell St
Swanston St
Lansdowne Pl
Haym
arket
Wk
Corne
ll Pl
Trades Hall Pl
Kelvi
n Pl
Orr St
Stewart St
Cumberland Pl
Cana
da Ln
Little
Pelha
m St
Berkeley St
Lygon St
Barry St
LegendProject LandProperty Boundary
Melbourne
South Yarra
Kensington
WestFootscray
Map 7 of 16
Data Sources:Contains Vicmap Information © State of Victoria 2015
0 1 KM
G:\MMR-AJM\01_WIP\PW-1-AA-KG_GIS\640_Site_plans\MMR_0333_MMRA_ProjectArea\MMR_0333_MMRA_ProjectLand_P2.mxd
Melbourne Metro Rail ProjectTitle:Melbourne Metro Project Land MapDrawing Number:
MMR-AJM-UGAA-MP-NL-500342Drawn By:
ABApproved By: Date:
EC, GH 19/12/2016
0 50 100Metres
Map Size:A4
Revision:P2
I
Little
Bou
rke S
t
Swanston St
Staughton PlLynch Pl
Albion Al
Cardigan St
Bour
ke St
Shilling Ln
Constance Stone Ln
Lons
dale
St
Little
Lons
dale
St
Bowen St
Fran
klin S
tBouverie St
Sutherland St
Drewery Ln
Queensberry Pl
Knox
Pl
Cardigan Tce
Tattersalls Ln
Orr St
Earl S
t
Snide
rs Ln
Mclea
n Al
Guild
ford
Ln
La Tr
obe S
t
Louden Pl
Flanig
an Ln
Drew
ery A
l
Drew
ery P
l
Turn
er Al
Hughs Al
Elizabeth St
The Causeway
Union Ln
Ther
ry St
Royal Ln
Russell Pl
Victor
iaSt
Driver Ln
Knox Ln
Zevenboom Ln
Globe Al Star Al
Abec
kett S
t
Leicester St
Dean Al
Little
La Tr
obe S
t
Alma P
lBo
uveri
e Pl
Warburton Al
Esse
x Pl
Rodda Ln
Angel Ln
Timothy Ln
Stevenson Ln
Heape Ct
Latrobe Pl
Warburton Ln
Celestial Av
Rankins Ln
Somerset Pl
Jane
Bell
Ln
Artem
is Ln
Red C
ape L
n
Corne
ll Pl
Whitehart Ln
Albe
rt Co
ates L
n
Bullens Ln
Heffernan Ln
Waratah Pl
Caledonian Ln
Niagara Ln
Stewart St
Literature Ln
LegendProject LandProperty Boundary
Melbourne
South Yarra
Kensington
WestFootscray
Map 8 of 16
Data Sources:Contains Vicmap Information © State of Victoria 2015
0 1 KM
G:\MMR-AJM\01_WIP\PW-1-AA-KG_GIS\640_Site_plans\MMR_0333_MMRA_ProjectArea\MMR_0333_MMRA_ProjectLand_P2.mxd
Melbourne Metro Rail ProjectTitle:Melbourne Metro Project Land MapDrawing Number:
MMR-AJM-UGAA-MP-NL-500342Drawn By:
ABApproved By: Date:
EC, GH 19/12/2016
0 50 100Metres
Map Size:A4
Revision:P2
I
Staughton PlLynch Pl
Swanston St
Albion AlHowey Pl
Little
Coll
ins St
Little
Bou
rke S
t
Bour
ke St
Tattersalls Ln
Russell St
Centre Pl
Collin
s St
ClydeWay
Ramsden Pl
Royal Ln
Block Pl
BoathouseDr
Rainbow Al
St Kilda Rd
Flind
ers L
nEquitable Pl
Scott Al
Portl
and L
n
Louden Pl
Turn
er Al
Lush Ln
Hughs Al
Hosier Ln
Belm
an Pl
Bean
ey Ln
Melbo
urne
Pl
Flind
ers S
t
Cocker Al
Driver Ln Balcombe Pl
Flinders Way
Globe Al
PresgravePl
Star Al
Lingham Ln
Athenaeum Pl
Royston Pl
Dean Al
Dame Edna Pl
Deg raves Pl
Staughton Al
Degraves St
Sugden Pl
Rothsay Ln
Angel Ln
Carson Pl
Stevenson Ln
Southgate Av
Latrobe Pl
Monaghan Pl
Dona
ldson
Ln
Celestial Av
Somerset Pl
Chapter House Ln
Masons Ln
Watson Pl
Rutledge Ln
Baptist Pl
Whitehart Ln
Waratah Pl
Heffernan Ln
Caledonian Ln
Bullens Ln
Elizabeth St
Flinders Ct
Russell Pl
Union Ln
Regent Pl
The Causeway
Manchester Ln
LegendProject LandProperty Boundary
Melbourne
South Yarra
Kensington
WestFootscray
Map 9 of 16
Data Sources:Contains Vicmap Information © State of Victoria 2015
0 1 KM
G:\MMR-AJM\01_WIP\PW-1-AA-KG_GIS\640_Site_plans\MMR_0333_MMRA_ProjectArea\MMR_0333_MMRA_ProjectLand_P2.mxd
Melbourne Metro Rail ProjectTitle:Melbourne Metro Project Land MapDrawing Number:
MMR-AJM-UGAA-MP-NL-500342Drawn By:
ABApproved By: Date:
EC, GH 19/12/2016
0 50 100Metres
Map Size:A4
Revision:P2
I
St Kilda Rd
Boathouse Dr
Wade
y St
South
bank
Bvd
Wells St
Alexand
ra Av
FawknerSt
SouthgateAv
Doma
in Tu
nnel
Linlithgow Av
Russell St
Swanston St
Kavanagh St
City Rd
Gran
t St
Fanning St
Government
House Dr
Burn
ley Tu
nnel
Dodds St
Sturt St
LegendProject LandProperty Boundary
Melbourne
South Yarra
Kensington
WestFootscray
Map 10 of 16
Data Sources:Contains Vicmap Information © State of Victoria 2015
0 1 KM
G:\MMR-AJM\01_WIP\PW-1-AA-KG_GIS\640_Site_plans\MMR_0333_MMRA_ProjectArea\MMR_0333_MMRA_ProjectLand_P2.mxd
Melbourne Metro Rail ProjectTitle:Melbourne Metro Project Land MapDrawing Number:
MMR-AJM-UGAA-MP-NL-500342Drawn By:
ABApproved By: Date:
EC, GH 19/12/2016
0 50 100Metres
Map Size:A4
Revision:P2
I
Dodds St
Birdwood Av
St Kilda Rd
Albert Rd
Doma
in Tu
nnel
King
s -ci ty
l ink I
n Ram
p
Cove
ntry
St
Wells St
Middleton Ln
Anzac Av
Park
St
Little
Bank
St
Government House Dr
Linlithgow Av
Domain
Rd
Bank
St
Miles
St
Dorca
s St
Anthony Ln
Palmerston Cr
Gran
t St
CitylinkOut-kings Ramp
Sturt St
Wells
Pl
Bur n
leyTu
nnel
Wade
y St
LegendProject LandProperty Boundary
Melbourne
South Yarra
Kensington
WestFootscray
Map 11 of 16
Data Sources:Contains Vicmap Information © State of Victoria 2015
0 1 KM
G:\MMR-AJM\01_WIP\PW-1-AA-KG_GIS\640_Site_plans\MMR_0333_MMRA_ProjectArea\MMR_0333_MMRA_ProjectLand_P2.mxd
Melbourne Metro Rail ProjectTitle:Melbourne Metro Project Land MapDrawing Number:
MMR-AJM-UGAA-MP-NL-500342Drawn By:
ABApproved By: Date:
EC, GH 19/12/2016
0 50 100Metres
Map Size:A4
Revision:P2
I
Park
St
Kings Pl
Toorak Rd
Bowen Ln
Albe
rtRd
Dr
Bowe
n Cr
Kings Way
Anthony Ln
Dorca
s St
Middleton Ln
Dallas Brooks Dr
Bromby St
Palmerston Cr
Wells St
Cobden St
Matthews L
n
Wells
Pl
Palmerston Pl
Arnold St
Domain Rd
Adams St
St Kilda Rd
Millers Ln
Domain St
Hope St
Albert Rd
Queens Ln
Bank
St
Little Bank St
Queens Rd
LegendProject LandProperty Boundary
Melbourne
South Yarra
Kensington
WestFootscray
Map 12 of 16
Data Sources:Contains Vicmap Information © State of Victoria 2015
0 1 KM
G:\MMR-AJM\01_WIP\PW-1-AA-KG_GIS\640_Site_plans\MMR_0333_MMRA_ProjectArea\MMR_0333_MMRA_ProjectLand_P2.mxd
Melbourne Metro Rail ProjectTitle:Melbourne Metro Project Land MapDrawing Number:
MMR-AJM-UGAA-MP-NL-500342Drawn By:
ABApproved By: Date:
EC, GH 19/12/2016
0 50 100Metres
Map Size:A4
Revision:P2
I
Mills
wyn S
t
Park
St
Doma
in St
Arthur St
Slater St
Queens Rd
Mason St
Bromby St
Mona Pl
Randall Pl
St Martins Ln
Park Pl
Little Park St
Arno
ld St
Queens Ln
Adam
s St
Toorak Rd
Float
Ln
Kings Way
St Kilda Rd
Hope
St
Leop
old S
t
Marn
e St
Walsh
St
LegendProject LandProperty Boundary
Melbourne
South Yarra
Kensington
WestFootscray
Map 13 of 16
Data Sources:Contains Vicmap Information © State of Victoria 2015
0 1 KM
G:\MMR-AJM\01_WIP\PW-1-AA-KG_GIS\640_Site_plans\MMR_0333_MMRA_ProjectArea\MMR_0333_MMRA_ProjectLand_P2.mxd
Melbourne Metro Rail ProjectTitle:Melbourne Metro Project Land MapDrawing Number:
MMR-AJM-UGAA-MP-NL-500342Drawn By:
ABApproved By: Date:
EC, GH 19/12/2016
0 50 100Metres
Map Size:A4
Revision:P2
I
Powe
ll St
Macfarlan Ln
Avoc
a St
Carol
ineStToorak Rd
Clare
mont
St
SouthwickLn
Davis
Av
Darli
ng St
O sbo
rne S
t
Portl
and P
l
Alexandra St
Punt
Rd
Willia
m St
Northampton P l
Macfa
rlan S
t
Macfarlan Pl
Arthur St
Lang St
Station St
Yarra
St
Mona Pl
Park Pl
Murp
hy St
Leop
old S
t
Marn
e St
Myrtl
e St
Walsh
St
Ralston St
LegendProject LandProperty Boundary
Melbourne
South Yarra
Kensington
WestFootscray
Map 14 of 16
Data Sources:Contains Vicmap Information © State of Victoria 2015
0 1 KM
G:\MMR-AJM\01_WIP\PW-1-AA-KG_GIS\640_Site_plans\MMR_0333_MMRA_ProjectArea\MMR_0333_MMRA_ProjectLand_P2.mxd
Melbourne Metro Rail ProjectTitle:Melbourne Metro Project Land MapDrawing Number:
MMR-AJM-UGAA-MP-NL-500342Drawn By:
ABApproved By: Date:
EC, GH 19/12/2016
0 50 100Metres
Map Size:A4
Revision:P2
I
Cromwell
Cr
Toorak Rd
Garden St
Surrey Rd
Powe
ll St
Drain Reserve Rd
Macfarlan Ln
Fitzgerald St
Rive
r St
Avoc
a St
Tivoli
Rd
Poth
itos L
n
Station St
Fors
ter St
Peter
St
Bray
St
TilletLn
Fawkner St
Bond St
Moor
eSt
Medley PlCh
ambe
rs St
Davis Av
Stables Ln
Osbo
rne S
t
Lang St
Alexandra St
Time Ln
Willia
m St
Oxfor
d Ln
Arthur St
Cunn
ingha
m St
Clar
aSt
Almeida Cr
Rock
y Ln
Macfa
rlan S
t
Palermo St
Oxford St
Macfarlan Pl
River Ln
Yarra
St
Clare
mont
St
Penny Ln
Wise
would
Ln
Murp
hy St
Phoe
nix S
t
Chap
el St
Darli
ng St
Davis
on P
l
Portl
and P
l
Rock
ley R
d
Myrtl
e St
LegendProject LandProperty Boundary
Melbourne
South Yarra
Kensington
WestFootscray
Map 15 of 16
Data Sources:Contains Vicmap Information © State of Victoria 2015
0 1 KM
G:\MMR-AJM\01_WIP\PW-1-AA-KG_GIS\640_Site_plans\MMR_0333_MMRA_ProjectArea\MMR_0333_MMRA_ProjectLand_P2.mxd
Melbourne Metro Rail ProjectTitle:Melbourne Metro Project Land MapDrawing Number:
MMR-AJM-UGAA-MP-NL-500342Drawn By:
ABApproved By: Date:
EC, GH 19/12/2016
0 50 100Metres
Map Size:A4
Revision:P2
I
Pilgrim St
Hewit t Av
Margare
t St
Alexander St
Charles St
Buckley St
EmpressAv
Carmichael St
Warle
igh R
d
Chirn
side S
t
Queensvil le St
Mcdougall Dr
Dickson St
Robe
rts S
t
Barkly St
Batman St
Cres
wick
St
Beaurepaire Pde
CoronationSt
Gor don St
Argy
le St
Beec
h St
Geelong St
Beam
e St
Marke
t St
Carm
ody W
ay
Summ
erhil
l Rd
Newman Dr
Braid St
Dove St
Buxto
n St
Blan
dford
St
Russ
ell St
Ann S
t
Henr
y St
Edwa
rd St
Jame
s St
Willia
m St
Alfre
d St
SuttonWay
Cross St
Clark
e St
Busch St
John St
Milton St
Cuthb
ert St
Lily St
Darling St
Queen St
Stanhope St
R OW Y
Rook Way
Indwe St
Errol St
Buckingham St
Broad St Latrobe St
Curra
jong S
t
Punt Ln
Derri
mut S
t
Darw
in St
Scott St
Robbs Rd
Sunshine Rd
Elphin
stone
St
Comm
ercia
l Rd
Wolve
rham
pton S
t
Willia
msto
wn R
d
Emma St
Sydn
ey St
Adela
ide St
Swan
St
Sout
hamp
ton S
t
Hock
ingSt
Ever
ard S
t
Elean
or S
t
Lean
der S
t
Staff
ord S
t
Dudle
y St
Liverp
ool S
t
Geelong Rd
Sydenham StAitken St
Souter CrClive St
Rupert St
Strad
brok
e St
Grain
gers
Rd
LegendProject LandProperty Boundary
Melbourne
South Yarra
Kensington
WestFootscray
Map 16 of 16
Data Sources:Contains Vicmap Information © State of Victoria 2015
0 1 KM
G:\MMR-AJM\01_WIP\PW-1-AA-KG_GIS\640_Site_plans\MMR_0333_MMRA_ProjectArea\MMR_0333_MMRA_ProjectLand_P2.mxd
Melbourne Metro Rail ProjectTitle:Melbourne Metro Project Land MapDrawing Number:
MMR-AJM-UGAA-MP-NL-500342Drawn By:
ABApproved By: Date:
EC, GH 19/12/2016
0 50 100Metres
Map Size:A4
Revision:P2
I
Appendix 2 – Approval of plans
Document Approved by Relevant provision
Strategic framework and Development Plans
Development Plans
Prepared by each Contractor to the extent relevant to its works
Minister for Planning Incorporated Document clause 4.6.
Environmental Management Framework, including Environmental Performance Requirements
Prepared by Melbourne Metro Rail Authority (MMRA)
Minister for Planning Incorporated Document clause 4.7.
Urban Design Strategy
Prepared by MMRA
Minister for Planning Incorporated Document clause 4.8.
Early Works Plans
Prepared by Early Works Contractor for works contemplated by clause 4.9 of the Incorporated Document.
Minister for Planning Incorporated Document clause 4.9.
Community and Stakeholder Engagement Management Plan
Prepared by MMRA
Minister for Planning To be referenced in the Environmental Performance Requirements for the Project to be prepared as part of the Environmental Management Framework.
Management of broad impacts
Construction Environmental Management Plan
Prepared by each Contractor to the extent relevant to their works.
State of Victoria as party to the relevant contract (MMRA)
For Public Private Partnership (PPP), also approved by Independent Reviewer
Incorporated Document clause 4.7.
To be referenced in the Environmental Performance Requirements for the Project to be prepared as part of the Environmental Management Framework.
Site Environment Implementation Plan
Prepared by each Contractor to the extent relevant to their
State of Victoria as party to the relevant contract (MMRA)
For PPP, also approved
Incorporated Document clause 4.7.
To be referenced in the Environmental Performance Requirements for the Project to be prepared as part of the
Document Approved by Relevant provision
works. by Independent Reviewer
Environmental Management Framework.
Transport Management Plan/s (T1)
Prepared by each Contractor to the extent relevant to their works.
State of Victoria as party to the relevant contract (MMRA)
For PPP, also approved by Independent Reviewer
To be referenced in the Environmental Performance Requirements for the Project to be prepared as part of the Environmental Management Framework.
Operations Environmental Management Plan.
Prepared by PPP Contractor.
State of Victoria as party to the relevant contract (MMRA)
For PPP, also approved by Independent Reviewer
To be referenced in the Environmental Performance Requirements for the Project to be prepared as part of the Environmental Management Framework.
Business Disruption Plan.
Prepared by each Contractor to the extent relevant to their works.
State of Victoria as party to the relevant contract (MMRA)
For PPP, also approved by Independent Reviewer
To be referenced in the Environmental Performance Requirements for the Project to be prepared as part of the Environmental Management Framework.
Construction Noise and Vibration Management Plan.
Prepared by each Contractor to the extent relevant to their works.
State of Victoria as party to the relevant contract (MMRA)
For PPP, also approved by Independent Reviewer
To be referenced in the Environmental Performance Requirements for the Project to be prepared as part of the Environmental Management Framework.
Technical plans
Plans required by the Environmental Performance Requirements for the Project, other than the plans specifically listed above, will be approved as follows:
• For Early Works, Rail Infrastructure Alliance (eastern and western tunnel portals and western turnback) and Rail Systems Alliance (the high capacity signalling, rail systems integration and commissioning) these plans would be approved by the State of Victoria as party to the relevant contract (MMRA); and
• Where prepared by the PPP Contractor (Tunnels and Stations package), these plans would be reviewed and commented on by both the State of Victoria (MMRA) and the Independent Reviewer under the PPP review procedures, and written confirmation provided that the plan complies with all statutory approvals, the Incorporated Document and the approved Environmental Performance Requirements.