mep 3d modelling
DESCRIPTION
mepTRANSCRIPT
-
Preparation to BIM
Phase 1 Phase 2 Phase 3 Phase 4
Evaluate available software
Prepare for transition
Training Hardware Software
Mindset Change
Immediate
transition
Removal of Non-related
software
Knowledge
sharing
-
Sketch Up AutoCAD
BIM Level-Up Strategies
Removal of Non Related BIM Software
Retained Software Applications
Process Optimization
Eliminating Softwares not needed
Collaboration of all Softwares
Removed Software Applications
-
Our Design Process Design Development Phase
Structural Elements
-
Our Design Process Design Development Phase
Architectural Elements
-
Our Design Process Design Development Phase
Building Services Elements
-
Our Design Process Design Development Phase
Modeling of MEPF
-
Our Design Process Design Development Phase
Modeling of MEPF
-
Our Design Process Design Development Phase
Modeling of MEPF
-
Our Design Process Integrated Construction Document Phase
Clash Detection
-
Our Design Process Integrated Construction Document Phase
Clash Detection
-
Our Design Process Integrated Construction Document Phase
Clash Detection
-
Our Design Process Integrated Construction Document Phase
Clash Detection
-
Our Design Process Integrated Construction Document Phase
Clash Detection
-
Our Design Process Integrated Construction Document Phase
Clash Detection
-
Our Design Process Integrated Construction Document Phase
Clash Detection Report
-
Our Design Process Integrated Construction Document Phase
-
Our Design Process Integrated Construction Document Phase
-
Our Design Process Integrated Construction Document Phase
-
Our Design Process Integrated Construction Document Phase
-
Our Design Process Integrated Construction Document Phase
-
Our Design Process Integrated Construction Document Phase
-
Our Design Process Integrated Construction Document Phase
-
Our Design Process Integrated Construction Document Phase
-
Our Design Process Integrated Construction Document Phase
-
Quantity Take - Off
Quantities are derived based
on the 3D model using Vico.
Construction Phase
-
Facilities Management
The structures components
are identified and tagged for
maintenance purposes.
Documentation is prepared
for reference.
Construction Phase
-
Concept
Schematic
Design Development
Contract Documents
0 5 10 15
Before BIM With BIM
Effects and Results of Using BIM Time