mercer island parking expansion concept study
TRANSCRIPT
Mercer Island Parking Expansion Concept Study
Prepared for
Sound Transit
November 25, 2014
Huitt-Zollars 818 Stewart Street
Suite 1120 Seattle, WA 98101-1479
1
Table of Contents
Overview ....................................................................................................................................... 2
Alternative 1 Narrative (Structured Parking) .............................................................................. 4
Alternative 1 Drawings (Structured Parking) ............................................................................. 5
Alternative 2 Narrative (Surface Parking) .................................................................................. 6
Alternative 2 Drawings (Surface Parking) ................................................................................. 7
Technical Summary Memorandum ............................................................................................... 8
Survey, Easements and Right-of-Way ...................................................................................... 9
Stormwater Quality and Quantity ............................................................................................ 11
Architectural and Landscaping ................................................................................................ 12
Structural ................................................................................................................................. 15
Geotechnical ........................................................................................................................... 18
Wet Utilities ............................................................................................................................. 21
Electrical and Lighting ............................................................................................................. 23
Delivery Schedule ....................................................................................................................... 25
2
Overview
The intent of this study is to identify preferred parking expansion alternatives at the existing Mercer Island Community & Event Center (MICEC), and to inform Sound Transit as they prepare to administer a design and construction effort for this project.
Sound Transit and Huitt-Zollars provided eight parking expansion concepts to the City of Mercer Island on September 24, 2014 and requested guidance on preferred alternatives. The City and Sound Transit met on October 2 and on October 22 to identify the preferred alternatives. This study represents the two preferred alternatives that have been modeled on the following guidance principles:
Provide separate and distinct entrances for Transit parking and MICEC parking
Provide uninterrupted vehicle drop off at the front of the MICEC
Minimize disruption to the MICEC during construction and once the parking facility is
operational
The two preferred parking alternatives are summarized in the table below:
Alternative Parking Type Transit Stall #
MICEC Stall #Total
Stall #
1 Structured Parking 229 213 442
2 Surface Parking 203* 224** 427
*Includes 6 motorcycle/scooter stalls, **Includes 3 motorcycle/scooter stalls
Included in this overview section are narratives and drawing concepts for each of the alternatives.
This study is supported further by a Technical Summary Memorandum and Design-Build Delivery Schedule.
4
Alternative 1 Narrative (Structured Parking)
The new three level open Parking Structure in Alternative 1 will be located at the existing hill at the northwest corner of the site. The location will have minimum disruption to the existing surface parking lot and the MICEC. Access to the new Parking Structure will be from a new driveway that connects the lower existing parking lot at the south side to a higher grade of the new Parking Structure. Entrance to the new driveway is placed as far as possible from the existing drop off and accessible parking stalls to minimize impact to the existing parking for the MICEC. The van accessible parking spaces, which often require higher vertical clearance, are located outside the Parking Structure to keep the 10 ft floor to floor height for all levels in the new structure. The top of the parking surface will be at elevation 156 ft, which is approximately 4 ft below the top of the current existing hill. The top of the staircase and elevator towers will be at elevation 166 ft. Because the Parking Structure is multi-level, it will make the smallest footprint on the site, leaving a wider open space between the Parking Structure and the existing MICEC. New pedestrian walkway is provided to connect the new Parking Structure to SE 24th Street. We propose to use similar exterior materials used on the existing MICEC building for the new Parking Structure as shown on the attached exterior elevations drawings. Reference the Structural Narrative for additional comments about the impact of the Parking Structure to the existing condition. Number of parking stalls for Alternative 1 is approximately 229. There will be 6 existing parking stalls demolished for the new driveway, and 5 existing parking stalls converted to 4 accessible parking stalls. The total combined parking spaces between the new Parking Structure and existing MICEC parking is 442.
SE 2
4TH
ST
84TH AVE SE
Lukas Shu
Lukas Shu
Lukas Shu
Dennis Erwood
NOT TO SCALE
11/03/2014
LINK LIGHT RAIL PROJECTEAST CORRIDOR
ALTERNATIVE 1
SITE PLAN
PXX-AS101
8 0
804040 20 0
SCALE IN FEET
No. DATE DSN CHK APP REVISION
SUBMITTED BY: DATE: APPROVED BY: DATE: DATE:
CONTRACT No.:
FILENAME:
SCALE: DRAWING No.:
SHEET No.: REV:LI
NE
IS 1
" A
T
FU
LL S
CA
LE
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
10/3
1/14
|11
:51
AM
|LS
HU
V:\P
RO
JEC
TS
\201
4 -
SM
S\1
4105
.01
ST
ON
-CA
LL 0
206-
13\C
AD
DR
AW
ING
S &
GR
AP
HIC
S\C
UR
RE
NT
\A-1
01-S
TR
UC
TU
RE
.DW
G
A-101-STRUCTURE LOCATION ID:
PRELIMINARY2001 WESTERN AVE SUITE 200 SEATTLE WA 98121T:206.587.7797 F: 206.587.0588 www.studioms.com
Lukas Shu
Lukas Shu
Lukas Shu
Dennis Erwood
NOT TO SCALE
11/03/2014
LINK LIGHT RAIL PROJECTEAST CORRIDOR
ALTERNATIVE 1
FLOOR PLANS AND BUILDING SECTION
PXX-AP101
8 0
402020 10 0
SCALE IN FEET
No. DATE DSN CHK APP REVISION
SUBMITTED BY: DATE: APPROVED BY: DATE: DATE:
CONTRACT No.:
FILENAME:
SCALE: DRAWING No.:
SHEET No.: REV:LI
NE
IS 1
" A
T
FU
LL S
CA
LE
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
10/3
1/14
|11
:50
AM
|LS
HU
V:\P
RO
JEC
TS
\201
4 -
SM
S\1
4105
.01
ST
ON
-CA
LL 0
206-
13\C
AD
DR
AW
ING
S &
GR
AP
HIC
S\C
UR
RE
NT
\A-1
01-S
TR
UC
TU
RE
.DW
G
A-101-STRUCTURE LOCATION ID:
PRELIMINARY2001 WESTERN AVE SUITE 200 SEATTLE WA 98121T:206.587.7797 F: 206.587.0588 www.studioms.com
201010 5 0
SCALE IN FEET
Lukas Shu
Lukas Shu
Lukas Shu
Dennis Erwood
NOT TO SCALE
11/03/2014
LINK LIGHT RAIL PROJECTEAST CORRIDOR
ALTERNATIVE 1
EXTERIOR ELEVATIONS AND BUILDING SECTION
PXX-AE101
8 0No. DATE DSN CHK APP REVISION
SUBMITTED BY: DATE: APPROVED BY: DATE: DATE:
CONTRACT No.:
FILENAME:
SCALE: DRAWING No.:
SHEET No.: REV:LI
NE
IS 1
" A
T
FU
LL S
CA
LE
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
10/3
1/14
|11
:52
AM
|LS
HU
V:\P
RO
JEC
TS
\201
4 -
SM
S\1
4105
.01
ST
ON
-CA
LL 0
206-
13\C
AD
DR
AW
ING
S &
GR
AP
HIC
S\C
UR
RE
NT
\A-1
01-S
TR
UC
TU
RE
.DW
G
A-101-STRUCTURE LOCATION ID:
PRELIMINARY2001 WESTERN AVE SUITE 200 SEATTLE WA 98121T:206.587.7797 F: 206.587.0588 www.studioms.com
201010 5 0
SCALE IN FEET
6
Alternative 2 Narrative (Surface Parking)
Alternative 2 is a surface parking layout that generally maximizes parking stalls in the area of the existing hill. This alternative provides separate and distinct entrances for Transit parking and MICEC parking, including separate entrances from SE 24th Street. The existing parking lot will be separated into two lots, the west lot will be designated for Transit parking and the east lot will be designated for MICEC parking. The Transit parking area will be made up of the existing west lot circulating into the new west aisle parking area. The MICEC parking area will be made up of the existing east lot circulating into the new east aisles parking area. Parking separation is achieved by placement of removable bollards in the existing parking lot and in the new parking lot. Bollards may be removed to provide full circulation between parking lots. Access locations to the new parking lot are positioned to not interrupt the existing drop off area. Minor reconfiguration of the existing parking lot will be needed to provide flow through vehicle circulation for both Transit parking and MICEC parking.
The new parking configuration allows for two way traffic aisles and 90 degree parking on each side with the exception of few parallel parking stalls. Grades will generally not exceed 5% slope in areas of parking. A drive ramp (approximately 12%) is provided between the west parking aisle and the vehicle access to accommodate the elevation difference.
A pedestrian walkway will be provided from the new parking lot and connect to SE 24th Street. The existing path that leads to the p-patch will be relocated around the parking lot. A p-patch load area is included in the new parking lot to provide opportunities for the loading and unloading of materials to serve the p-patch. A combination of cut retaining wall and catch grading (2H: 1V) will likely be needed at the west side of the parking lot. Landscape screening may be used to screen the parking lot from the adjacent residences to the west. Catch grading appears to be feasible along the north and east side of the new parking lot.
Alternative 2 will yield approximately 203 Transit parking stalls and 224 MICEC parking stalls. The total combined parking spaces between the new surface parking and existing MICEC parking is 427 (including motorcycle/scooter parking).
The Huitt-Zollars team also looked at providing some compact width stalls to increase the parking stall count. This Alternative 2 (Compact) will yield approximately 207 Transit parking stalls and 228 MICEC parking stalls. The total combined parking spaces between the new surface parking and existing MICEC parking is 435 (including motorcycle/scooter parking). The Alternative 2 (Compact) layout is included as the last page of the Alternative 2 Drawings.
SE
24T
H S
T
84TH AVE SE
1
4
0
1
1
0
1
2
0
130
140
150
160
1
6
0
1
5
0
1
3
0
1
2
6
1
2
4
1
2
2
124
EXISTING COMMUNITY CENTER
EXISTING
P-PATCH
E
X
I
S
T
I
N
G
D
R
O
P
O
F
F
LANDSCAPING
SCREENING
TURN AROUND AREA
RELOCATE PATH
COMMUNITY CENTER
INGRESS/EGRESS
5 FT. WIDE PEDESTRIAN
WALKWAY
BOLLARDS TYP.
TRANSIT INGRESS/EGRESS
20
'
TY
P
ADA PARKING STALLS
EXISTING ADA
PARKING STALLS
P-PATCH LOAD AREA
LANDSCAPE GRADE
TRANSITION TYP.
RETAINING WALL
EXISTING COMMUNITY CENTER
PARKING. APPROX 220 STALLS
No. DATE DSN CHK APP REVISION
SUBMITTED BY: DATE: APPROVED BY: DATE: DATE:
CONTRACT No.:
FILENAME:
SCALE: DRAWING No.:
SHEET No.: REV:
LIN
E IS
1" A
T
FU
LL S
CA
LE
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
11/25/14
| 8:48 A
M | JA
RR
EO
LA
J:\30273701_S
T_O
N-C
ALL_M
ER
CE
R_IS
LA
ND
\06 D
ES
IG
N_C
AD
\02 E
XH
IB
IT
S\20141028-G
EN
SIT
EP
LA
N.D
WG
LOCATION ID:
DRAFT
1"=40'
RTA / LR XXXX-XX
10/28/14
MERCER ISLAND PARKING EXPANSION
RTA/AE 0206-13
ALTERNATIVE 2
GENERAL SITE PLAN
#
804040 20 0
SCALE IN FEET
ALL PARKING SPACES ARE STANDARD
SIZE 8.5' WIDE X 18.5' LONG
PARKING LOT INFORMATION
PARKING AREA
TYPE
PARKING STALLS
(CAR)
PARKING STALLS
(MOTORCYCLE)
TOTAL
TRANSIT 197** 6 203
COMMUNITY
CENTER
221** 3 224
TRANSIT PARKING DESIGNATED.
(REMAINDER OF PARKING IS FOR
THE EXISTING COMMUNITY CENTER)
**INCLUDES 4 ADA STALLS
SE
24T
H S
T
84TH AVE SE
1
4
0
1
1
0
1
2
0
130
140
150
160
1
6
0
1
5
0
1
3
0
1
2
6
1
2
4
1
2
2
124
EXISTING GRADE TYP .
FINISH GRADE TYP.
126'
127'
123'
130'
137'
139.7'
143'
141.5'
132.5'
EXISTING COMMUNITY CENTER
EXISTING
P-PATCH
140'
E
X
I
S
T
I
N
G
D
R
O
P
O
F
F
CATCHMENT POINT TYP
REFER TO NOTE 1
RETAINING WALL
S
D
S
D
S
D
SD
SD
SD
SD
S
D
S
D
STORM WATER VAULT
CONNECT TO EXISTING
124'
122'
1"=40'
RTA / LR XXXX-XX
10/15/14
MERCER ISLAND PARKING EXPANSION
RTA/AE 0206-13
ALTERNATIVE 2
GRADING AND DRAINAGE PLAN
#
804040 20 0
SCALE IN FEET
No. DATE DSN CHK APP REVISION
SUBMITTED BY: DATE: APPROVED BY: DATE: DATE:
CONTRACT No.:
FILENAME:
SCALE: DRAWING No.:
SHEET No.: REV:
LIN
E IS
1" A
T
FU
LL S
CA
LE
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
11/25/14
| 8:52 A
M | JA
RR
EO
LA
J:\30273701_S
T_O
N-C
ALL_M
ER
CE
R_IS
LA
ND
\06 D
ES
IG
N_C
AD
\02 E
XH
IB
IT
S\20141014-G
RA
DIN
G_D
RA
IN
AG
EP
LA
N.D
WG
LOCATION ID:
DRAFT
APPROXCATCHMENT
POINTAPPROX.WALL
HEIGHTR1R2R3R4R5C1C2C3C4C5C6
R2R3 R4 R5
C1
C2
C3
C4C5
C6
C7
C8
7.5' W/ 2:1 CATCH
NOTES:1.
C7
NEW CATCH BASIN
SDNEW STORM WATER PIPE
LEGEND
BB
A
A
R1
C8
8' W/ 2:1 CATCH6' W/ 2:1 CATCH6' W/ 2:1 CATCH3' W/ 2:1 CATCHN/A 2:1 CATCHN/A 2:1 CATCHN/A 2:1 CATCHN/A 2:1 CATCHN/A 2:1 CATCHN/A 2:1 CATCHN/A 2:1 CATCHN/A 2:1 CATCH
PROPOSED GRADE
137'
EX EL=160'
PROPOSED EL=140'
1
2
WALL EL=146'
EX EL=160'
1
2
5'
PROPERTY LINE
PROPOSED EL=141'
WALL EL=147'
EX EL=160'
1
2
WALL EL=146.3'
PROPOSED EL=142.8'
EX EL=160'
PROPOSED EL=143
EX EL=152'
PROPOSED EL=139.7'
EX EL=142'
PROPOSED EL=137'
PROPOSED EL=135.5'
EX EL=137.5'
PROPOSED EL=130'
EX EL=133.5'
PROPOSED EL=122.5'
EX EL=123'
PROPOSED EL=124'
EX EL=122.5'
PROPOSED EL=126.8'
EX EL=124.5'
R2
EX EL=145.5'
1
2
PROPOSED EL=126'
5'
5'
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
5'
WALL EL=134'
2:1 CATCH POINT
EL=154'
2:1 CATCH POINT
EL=147'
2:1 CATCH POINT
EL=140.4'
2:1 CATCH POINT
EL=137'
2:1 CATCH POINT
EL=132'
2:1 CATCH POINT
EL=123'
2:1 CATCH POINT
EL=123.9'
2:1 CATCH POINT
EL=124'
R3
R4
R5
C1
C2
C3
C4
C5
C6
C7
C8
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPOSED EL=125'
1
2
PROPERTY LINE
5'
R1
EX EL=139'
WALL EL=132'
A-A
B-B
PROPOERTY
LINE
PROPOSED
EL =131'
PROPOSED
EL =135'
PROPOSED
EL =143'
1
2
S=0.05%
160'
150'
140'
130'
160'
150'
140'
130'
160'
150'
140'
130'
120'
160'
150'
140'
130'
120'
CATCHMENT EL = 145'
PROPOSED EL = 125'
No. DATE DSN CHK APP REVISION
SUBMITTED BY: DATE: APPROVED BY: DATE: DATE:
CONTRACT No.:
FILENAME:
SCALE: DRAWING No.:
SHEET No.: REV:
LIN
E IS
1" A
T
FU
LL S
CA
LE
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
11/25/14
| 8:52 A
M | JA
RR
EO
LA
J:\30273701_S
T_O
N-C
ALL_M
ER
CE
R_IS
LA
ND
\06 D
ES
IG
N_C
AD
\02 E
XH
IB
IT
S\20141014-E
LE
VA
TIO
NS
_S
EC
TIO
NS
PLA
N.D
WG
LOCATION ID:
DRAFT
1"=10'/20'
RTA / LR XXXX-XX
10/15/14
MERCER ISLAND PARKING EXPANSION
RTA/AE 0206-13
ALTERNATIVE 2
ELEVATIONS AND SECTIONS PLAN
#
201010 5 0
SCALE IN FEET
APPROX. EXISTING GRADE
APPROX. PROPOSED GRADE
LEGEND
SE
24T
H S
T
84TH AVE SE
1
4
0
1
1
0
1
2
0
130
140
150
160
1
6
0
1
5
0
1
3
0
1
2
6
1
2
4
1
2
2
124
CCCCCC
CCCCCCC
CCCCCCC
CCCCCCC
C
C C
CCCCCCC
CCCCCC
CCCCCCC
CCCCCC
C CC
CCCCCCC
CCCCCCC
CCCCCCC
CCCCCCC
C CC
CCCCCCC
CCCCCCC
CCCCCCC
CCCCCCC
C
CC C
EXISTING COMMUNITY CENTER
EXISTING COMMUNITY CENTER
PARKING. APPROX 220 STALLS
EXISTING
P-PATCH
E
X
I
S
T
I
N
G
D
R
O
P
O
F
F
LANDSCAPING
SCREENING
LANDSCAPE GRADE
TRANSITION TYP.
RELOCATE PATH
5 FT. WIDE PEDESTRIAN
WALKWAY
RETAINING WALL
BOLLARDS TYP.
8.5' X 18.5' STALLS TYP.
20
'
TY
P
COMMUNITY CENTER
INGRESS/EGRESS
TRANSIT INGRESS/EGRESS
ADA PARKING STALLS
EXISTING ADA
PARKING STALLS
TURN AROUND AREA
P-PATCH LOAD AREA
No. DATE DSN CHK APP REVISION
SUBMITTED BY: DATE: APPROVED BY: DATE: DATE:
CONTRACT No.:
FILENAME:
SCALE: DRAWING No.:
SHEET No.: REV:
LIN
E IS
1" A
T
FU
LL S
CA
LE
DESIGNED BY:
DRAWN BY:
CHECKED BY:
APPROVED BY:
11/25/14
| 8:53 A
M | JA
RR
EO
LA
J:\30273701_S
T_O
N-C
ALL_M
ER
CE
R_IS
LA
ND
\06 D
ES
IG
N_C
AD
\02 E
XH
IB
IT
S\20141028-G
EN
SIT
EP
LA
NW
IT
HC
OM
PA
CT
.D
WG
LOCATION ID:
DRAFT
1"=40'
RTA / LR XXXX-XX
10/28/14
MERCER ISLAND PARKING EXPANSION
RTA/AE 0206-13
ALTERNATIVE 2
GENERAL SITE PLAN
COMPACT STALL OPTION
#
804040 20 0
SCALE IN FEET
PARKING LOT INFORMATION
PARKING AREA
TYPE
PARKING STALLS
(CAR)
PARKING STALLS
(MOTORCYCLE)
TOTAL
TRANSIT 201** 6 207
COMMUNITY
CENTER
225** 3 228
**INCLUDES 4 ADA STALLS
NOTE: 'C' INDICATES PARKING
STALLS WITH DIMENSIONS 8' X 18.5'
TRANSIT PARKING DESIGNATED.
(REMAINDER OF PARKING IS FOR
THE EXISTING COMMUNITY CENTER)
9
Survey, Easements and Right-of-Way
1. Existing grade contours shown are based on 100% CD drawings from the MICEC
project with the exception of the 162’ and 164’ contours at the top of the hill. It was
indicated during discussion with the City of Mercer Island that this mound (approximately
4’) at the top of the hill was shaved down at the request of adjacent neighbors. Parking
layouts will likely need to be modified once actual topographic information is obtained.
2. Property Description:
"THE SOUTH 768.32 FEET OF THE EAST 524 FEET OF GOVERNMENT LOT 1,
SECTION 1, TOWNSHIP 24 N, RANGE 4 E, W.M.; EXCEPT THE SOUTH 30 FEET
THEREOF (SE 24TH ST); EXCEPT THE EAST 30 FEET THEREOF (VACATED 84TH
AVE SE)."
The property is bounded by SE 24th St on the south, by vacated 84th Ave SE on the
east, by Luther Burbank Park on the north, and by Block 18, Plat of Mercer Park, and
Plat of Mercer Beach Park on the west.
There appears to be no issues to calculate and field locate the property lines. According
to survey records, there are enough monuments and data to locate the boundary. (Note:
This assumption is made without a current title report or field inspection.)
3. Easements:
According to Warranty Deed (Rec. No. 20030717001793) there appear to be two
easements affecting the property:
a. Rec. No. 4655713 for Sewer Line on the westerly portion of the property (no
description available on-line) Note: Mercer Island GIS shows a sewer line in the
south half of the property along the westerly property line (from SE 24th St);
there is also an approximately 100 feet sewer stub at the northerly portion along
the westerly line (coming for the north).
b. Rec. No. 6348106 for Air Vent Line with all Connections, Manholes and
Appurtenances at the westerly portion within a strip of 10 feet in width. Note:
exact location not identified (no description available on-line).
Note: Full easement descriptions and other easements not listed above might be
contained in a Title Report. Further investigation of the Title Report and other record
documents may identify constraints that could impact the parking alternatives.
10
Also the GIS image shows sewer, storm and water lines and structures at the easterly
and northerly portion; and a path leading from the existing parking lot to the northerly
property line and to the Luther Burbank Park.
11
Stormwater Quality and Quantity
1. Existing Drainage Conditions
The proposed parking area, in both alternatives, currently drains to an 8-inch on-site storm drain system. This system drains to the east, where it discharges into a 12-inch CMI storm drain flowing north along 84th Avenue SE. This system eventually discharges to a small stream that flows into Lake Washington near Calkins Point. This stream is identified as “potential fish use” in the Inventoried Watercourse And/or Streams on Mercer Island.
2. Assumptions
a. Jurisdiction is City of Mercer Island
b. Code Requirements: City has adopted DOE Stormwater Manual for Western
Washington: flow control and basic water quality treatment
c. Site drains directly to Lake Washington via open ditches and buried storm drain
pipes
i. Flow control assumed to be needed
d. Site area to be developed not feasible for infiltration per City LID feasibility
mapping; and not feasible for dispersion based on site conditions (LID does not
appear to be feasible).
3. Conceptual Storm Water Solution:
Flow control and water quality will be provided by a combined underground wet vault/ flow control vault. This solution appears most compatible with available land and site topography. Preliminary sizing presented below is based on modeling using the Western Washington Hydrology Model, Version 4, with site areas estimated from the attached drawings for Alternative 1 and 2. The sizing below is based on flow duration control modeling. If it is determined that peak matching flow control modeling is acceptable then the size of the flow control facility will likely be reduced.
Table 1 summarizes conceptual vault sizing for the alternatives.
Table 1 Storm Water Vault Design Summary
Alternative Impervious Area, acres
Required Water Quality
Volume, CF
Required Flow Control Volume, CF
Vault Dimensions, FT (depth includes 1’ of freeboard)
Length Width Depth 1 0.87 1,700 18,000 112 36 6 2 1.8 3,800 40,000 160 56 6
12
Architectural and Landscaping
Alternative 1 - Architectural and Landscaping
1. Assumptions
a. New structure’s height shall be generally below the existing grades as to not
block views from the houses to the West. If elevator and/or stair tower is included
in the project, then there may be partial view impacts that are at an elevation
above the existing grade.
b. An Elevator is shown in the drawings and described in the narratives. Elevators
are common elements for parking garages but do not appear to be required by
code for this project. An elevator could be an optional item which needs further
discussion.
c. A shading study has not been completed for the parking garage. If elevator
and/or stair tower are included in this project then there may be potential for
changes to existing shade patterns during certain times of year and day.
d. New parking will be north of the site while the existing parking for the MICEC will
remain on the south side.
e. The existing hill area may be used for the structure.
f. Use contour lines shown in the 100% Construction Document set of the MICEC.
g. May not disturb the existing p-patch to the north.
h. Pedestrian path can be constructed along the west of the existing parking lot
connecting the new structured parking to NE 24th St.
i. NE 24th St can accommodate additional traffic brought by the new parking
structure.
j. Minimize impact to west neighbors and MICEC
k. Dry pipe sprinkler system
2. Code Requirements
a. Current Mercer Island Municipal Code.
b. Current International Building Code as adopted by City of Mercer Island.
c. Current International Fire Code as adopted by City of Mercer Island.
d. Current Uniform Plumbing Code as adopted by City of Mercer Island.
e. Current Washington Cities Electrical Code as adopted by City of Mercer Island.
3. Constructability Issues
13
a. Unforeseeable underground condition during excavation.
b. Noise, vibration, and potential soil settlement impact to the houses on the west
from soil excavation.
c. Sidewalk connection to SE 24th Street may be challenging due to limited space
between the existing parking and the adjacent property line.
4. Conceptual Architectural and Landscaping Solution
a. Structure will be located in the existing hill area at the northwest corner of the site
where there is enough space to accommodate the required number of parking
spaces.
b. Minimize disruption to the existing south parking lot.
c. Locate access to the new Parking Structure as far as possible from the MICEC to
improve clear distinction between two different uses.
d. Work with existing grade to maintain a low non-intrusive structure to the
neighboring houses on the west, while at the same time minimizing costly
excavation and high retaining wall.
e. Maximize open space between the existing MICEC Building and the new Parking
Structure.
f. Single Threaded Helix with One Level Bay parking design provides repetitive,
easy to understand for drivers and better visibility across the structure which then
improve safety/security.
g. 90 degree parking stall with 2-way driveway provides the most efficient parking
layout.
h. Staircases and elevator are located on the level part for ease of use and
construction, and at corners where these spaces are non-usable as parking
spaces, hence improve efficiency.
i. The new structure shares similar contextual design with the existing Community
Center.
j. Provide potential landscape screening
Alternative 2 - Architectural and Landscaping
1. Assumptions
a. Same assumptions as listed in Alternative 1 except this will be a surface parking
instead of a parking structure.
14
b. Sound Transit commuters will be generally on the West side of the site, and
parking for the MICEC will be generally on the East side.
c. Some impact to the existing MICEC parking lot will be allowed.
d. A sidewalk can be constructed along the west side of the parking lot by the west
property line
2. Code Requirements
a. Current Mercer Island Municipal Code
b. Current Washington Cities Electrical Code as adopted by City of Mercer Island.
3. Constructability Issues
a. Unforeseeable underground condition during excavation.
b. Noise and vibration impact to the houses on the west from soil excavation.
c. Retaining wall on the west side (cut) and south side (fill).
d. Sidewalk connection to SE 24th Street may be challenging due to limited space
between the existing parking and the adjacent property line.
4. Conceptual Architectural and Landscaping Solution
a. Generally maximizes surface parking at the existing hill.
b. Completely separate and distinct entrance from NE 24th St for the new Sound
Transit Parking. Sound Transit parking entrance at the west and MICEC parking
at the east.
c. Ability to combine the Sound Transit parking with the MICEC parking into one lot
in the future. Also may combine parking areas in the interim with use of
removable bollards.
d. Preserve most of the existing accessible parking stalls and drop-off area at the
MICEC.
e. Allow enough space on the west property line to minimize high retaining wall.
f. Use wall in combination with 2:1 catch slopes.
g. Parking stalls are oriented 90 degree with 2-way driveway for efficiency.
h. Provide landscaping in planter areas between parking rows and potential
screening around perimeter of parking lot.
i. Provide measures to reduce the impacts of headlight glare.
15
Structural
Alternative 1 – Structural
1. Assumptions
Based on information provided by the City, the top of existing grade at the northwest
corner of the property is located at approximately elevation 160. From there the grade
slopes down to the south and east. According to available geotechnical information, the
top 25 feet of soil consists largely of fill with competent soil located below elevation 135.
The maximum allowable temporary slope is 1.5:1 and the maximum permanent slope is
2:1. It is assumed permanent easements outside of the MICEC property will not be
permitted. Therefore, soldier pile walls with permanent tie backs extending outside
property lines are not feasible. In addition, soil nail walls are not recommended due to
their ineffectiveness in the loose fill material.
2. Code Requirements
Structural Design of the parking structure and retaining walls will be governed by the
current City of Mercer Island Municipal Code and the International Building Code as
adopted by the City.
3. Conceptual Structural Solution and Constructability
Alternative 1 is a three-level parking structure with some exterior surface parking stalls.
The parking structure could be constructed with either precast elements and/or cast-in-
place concrete, with slabs and beams supported on columns. It is 280 feet long along
the north-south axis and 115 feet wide. Vehicles enter the south end of the ramp at
elevation 136. The floor to floor height of the ramp is 10 feet and the upper level
elevation is 156. The top elevation is slightly lower than the approximate existing ground
elevation of 160 to minimize visual impact to residences behind the west property line.
Since the majority of the parking ramp is below existing grade retaining walls are
required along both the west and a portion of the north side of the structure. Existing
ground along the south and east sides of the structure can be permanently removed to
minimize or eliminate retaining walls.
Cost savings can be achieved by limiting the height of the retaining walls. While it is
preferable to locate the structure away from the MICEC on the east, this needs to be
16
balanced by maintaining sufficient distance from the west property line to minimize
retaining wall height. Alternative 1 places the west side of the ramp 30 feet from the
property line. The first 5 feet from the line is level while the remaining 25 feet to the
parking structure wall slopes down at a 2:1 slope. The slope intersects the ramp
structure at approximately elevation 148 which is near the lowest level on the west side
of the ramp (elevation 146). As a result only a short retaining wall is required. Lowering
the finished ground line along the west side of the structure exposes approximately 8
feet of the parking structure. However, landscaping can help mitigate the visual impact of
the exposed surface. For safety, a barrier or rail along the upper perimeter of the parking
structure will be required.
The base elevation for the west side of the ramp is 146, approximately 10 feet above
competent soil. Since the overlying fill lacks bearing capacity spread footing foundations
would need to be located below elevation 135. This would require substantial excavation
and tall temporary shoring walls. Instead, drilled shafts foundations extending below
elevation 135 can be used to support the parking structure. The shafts would be 3 or 4
feet in diameter and space approximately 10 feet on center. A short temporary wall
located 4 feet from the edge of the parking structure would be required to construct the
shafts. A cantilevered soldier pile wall is feasible for the temporary wall. To minimize wall
height a temporary 1.5:1 slope from the property line could be used.
Portions of the ramp structure will consist of slab on grade. Since the soil above
elevation 135 consists largely of fill, slabs above this level may require ground
improvements or over excavation to support the slab. Possible ground improvements
could include stone columns, preloading, or deep soil mixing. Over excavation would
require substantial temporary retaining walls along the west and north sides of the
parking structure.
Alternative 2 - Structural
1. Assumptions
Based on information provided by the City, the top of existing grade at the northwest
corner of the property is located at approximately elevation 160. From there the grade
slopes down to the south and east. According to available geotechnical information, the
top 25 feet of soil consists largely of fill with competent soil located below elevation 135.
17
The maximum allowable temporary slope is 1.5:1 and the maximum permanent slope is
2:1. It is assumed permanent easements outside of the MICEC property will not be
permitted. Therefore, soldier pile walls with permanent tie backs extending outside
property lines are not feasible. In addition, soil nail walls are not recommended due to
their ineffectiveness in the loose fill material.
2. Code Requirements
Structural Design of the parking structure and retaining walls will be governed by the
current City of Mercer Island Municipal Code and the International Building Code as
adopted by the City.
3. Conceptual Structural Solution & Constructability
Alternative 2 is a 2-tiered surface parking lot. It is located approximately 40 feet from the
west property line and 15 feet from the north property line. The three main parking rows
are aligned north-south, although the southern portion of the parking lot follows the curve
along the northern edge of the existing surface parking. Parking elevations vary from
approximately 123 on the southeast corner to 143 at the northwest corner.
As noted above the top existing grade elevation at the northwest portion of the property
is approximately 160. Since the west edge of the parking lot varies in elevation from 140
to 135 a retaining wall will likely be required. To minimize wall height the finished ground
line from the west property lines can be graded at a 2:1 slope. The first 5 feet from the
property line will remain level to minimize disturbance to the existing property owners.
The remaining 30 feet slopes down to the edge of parking walkway. At a 2:1 slope the
grade drops approximately 15 feet which places the catch point at about elevation 145.
This is close to the parking surface elevation. However, a cut wall will likely be required
to provide a drainage ditch and prevent runoff onto the parking ramp. Since the wall is
relatively short a cantilevered soldier pile wall is feasible. Alternatively, an MSE wall may
be suitable.
Since the soil above elevation 135 is primarily fill, parking surface elevations above this
level may require some over excavation and replacement with structural fill. Note that
over excavation may require temporary retaining walls along the west and north sides of
the surface lot.
18
Geotechnical
Alternative 1 - Geotechnical
1. Assumptions
a. Design and construction considerations will be developed based on adequate
geotechnical site explorations and laboratory tests to characterize existing soil
and groundwater conditions.
b. The construction area will be adequately set back from the property boundary
lines to minimize impacts and disturbances to adjacent properties.
c. Temporary open cuts at 1.5H:1V slope for excavations less than 20 feet deep will
be possible in the existing fill stockpile area where the parking structure will be
located.
d. Temporary support of vertical excavations and permanent retaining walls
exceeding about 10 feet are not expected.
2. Code Requirement
We understand that the design of the parking structure will be based on the International Building Code (IBC 2012) with statewide and City of Mercer Island amendments as applicable.
3. Constructability Issues
a. The existing uncontrolled fill stockpile will be considered for the construction of
the parking structure.
b. Removal and disposal of the surplus excavated soil will need to be considered.
c. The site soils are generally silty and would likely not be suitable for reuse as
structural fill during wet weather construction.
d. Groundwater is not expected to be a significant issue during construction.
e. Required setback and slopes for the temporary open cut excavations should be
assessed based on the results of geotechnical site explorations and laboratory
testing.
4. Conceptual Geotechnical Solutions
a. Seismic design should include adequate considerations of the possible
earthquake-induced geotechnical hazards applicable to the site.
19
b. Adequate subgrade for pavement or slab-on-grade support will likely be available
at or below elevation 135 feet, and over excavation and backfill with structural fill
or other ground improvement will likely be necessary at higher elevations.
c. Use of shallow footings to support column loads will likely be possible where the
floor slab is planned at elevation 136 feet. Short drilled piers or auger-cast piles,
and stone columns or other ground improvements may be used where the floor
slab is planned at elevation 146 feet.
d. Design and construction of retaining walls and permanent slopes should include
static and seismic stability considerations based on the results of geotechnical
site explorations and laboratory testing.
e. If infiltration of surface runoff is planned, a site-specific assessment of the
infiltration potential should be conducted.
Alternative 2 - Geotechnical
1. Assumptions
a. Design and construction considerations will be developed based on adequate
geotechnical site exploration and laboratory tests to characterize existing soil and
groundwater conditions.
b. The construction area will be adequately set back from the property boundary
lines to minimize impacts and disturbances to adjacent properties.
c. Temporary open cuts at 1.5H: 1V slope for excavations less than 20 feet deep
will be possible in the existing fill stockpile area where the surface parking will be
located.
d. Temporary support of vertical excavations and permanent retaining walls
exceeding about 10 feet are not expected.
2. Code Requirement
We understand that the design and construction of the surface parking will be based on the City of Mercer Island Code.
3. Constructability Issues
a. The existing uncontrolled fill stockpile will considered for the construction of the
surface parking.
b. Removal and disposal of the surplus excavated soil will need to be considered.
20
c. The site soils are generally silty and would likely not be suitable for reuse as
structural fill during wet weather construction.
d. Groundwater is not expected to be a significant issue during construction.
e. Required setback and cut slopes for construction of the surface parking should
be assessed based on the results of geotechnical site explorations and
laboratory testing.
4. Conceptual Geotechnical Solutions
a. Seismic design should include adequate considerations of the possible
earthquake-induced geotechnical hazards applicable to the site.
b. Adequate subgrade for the parking pavement support will likely be available at or
below elevation 135 feet, and over excavation and backfill with structural fill or
other ground improvement will likely be necessary at higher elevations.
c. Design and construction of retaining walls and permanent slopes should include
static and seismic stability considerations based on the results of geotechnical
site exploration and laboratory testing.
d. If infiltration of surface runoff is planned, a site-specific assessment of the
infiltration potential should be conducted. Use of permeable pavement may be
considered if feasible.
21
Wet Utilities
1. Existing Conditions
a. Water – City of Mercer Island GIS Portal identifies an existing water main located
in SE 24th Street and 84th Avenue SE. On-site fire hydrants are located at the
main vehicle access at SE 24th Street, the vehicle drop off, and at the north east
corner off the MICEC building.
b. Sewer – City of Mercer Island GIS Portal identifies an existing sewer manhole
and sewer main located adjacent to the west property line.
Alternative 1 – Wet Utilities
1. Assumptions
a. Water and Sewer utilities are available
2. Code Requirements
a. City of Mercer Island
3. Constructability
a. There may be trenching impacts for the water main extension
b. Depth of existing sewer main located adjacent to the west property line will need
to be verified to determine if sewer connection can be made.
4. Conceptual Water and Sewer Solution
a. Provide sewer service for floor drains inside the parking garage and elevator pit.
Sewer service to connect to existing sewer main located adjacent to west
property line.
b. Provide a water main extension for new fire hydrant located near the parking
garage.
c. Provide a domestic water service to serve the garage from existing water main.
Domestic service to serve parking garage hose bibs.
d. Provide irrigation service connection to serve potential landscape screening.
Irrigation service may potentially be connected to existing on-site irrigation
system. Irrigation to provide appropriate cross-connection control.
22
Alternative 2– Wet Utilities
1. Assumptions
a. No sewer service is required
2. Code Requirements
a. City of Mercer Island
3. Constructability
a. There may be trenching impacts for the water main extension
4. Conceptual Water Solution
a. Provide a water main extension for new fire hydrants as required by Fire
Marshall.
b. Provide irrigation service connection to serve planter islands and potential
landscape screening around perimeter. Irrigation service may potentially be
connected to existing on-site irrigation system. Irrigation to provide appropriate
cross-connection control.
23
Electrical and Lighting
1. Power Supply:
A site survey was conducted to determine the best and most economical means to
provide power supply to the site. Electric power for the proposed project can be derived
with two options. The first option is to connect directly to the existing utility power pole
located at the south side of SE 24th Street. Underground primary cable will extend the
utility power from the utility pole to a pad-mounted transformer located adjacent to the
new electrical panel completed with utility metering. The second option is to connect the
power through the existing MICEC electrical distribution system. The existing MICEC
electrical service contains a 225 amperes rated spare breaker which can be utilized to
serve the proposed parking addition.
2. Lighting:
The lighting system will be designed to continue the aesthetic appearance of the MICEC
lighting element. The lighting level will be sufficient for pedestrian and vehicular safety.
The site lighting will comply with the IESNA design standard for “Parking and Drive
Aisles.” Lighting fixtures will contain cut off shielding to limit the spread of emitted light to
adjacent areas.
Alternative 1 – Electrical and Lighting
1. Electrical Design Element:
a. Ceiling mounted LED type lighting fixture to illuminate parking structure.
b. Control system to integrate day lighting sensors and occupancy sensors to
reduce energy cost.
c. 12 foot tall pole LED lights with full cut-off distribution pattern to illuminate
exterior drive ways.
d. Fire alarm system with horn/strobe and connection to the elevator recall system.
e. Spare raceway for camera and Code Blue Station.
2. Estimated Electrical Load Requirement:
a. Lighting…16 KVA
b. Elevator...15 KVA
Total…… 31 KVA (37 amperes at 277/480 volt)
24
This option requires a complete electrical service panel and distribution system to
support the elevator and parking structure lighting electrical load. A 100 ampere,
480/277 volt electrical service with spare capacity for future load additions (i.e. electrical
car chargers) is recommended.
Alternative 2 – Electrical and Lighting
1. Electrical Design Element:
a. 12 foot tall pole mounted lights with full cut-off LED type.
b. Spare conduit for camera and Code Blue Station.
2. Estimated Electrical Load Requirement:
a. (30) – 12 foot tall pole mounted lights at 80 watt each (2400 watt, 5 ampere at
480 volt).
The proposed lighting addition can be connected to the existing MICEC exterior lighting
circuit. Additional conductors can be installed through existing underground raceway and
pull boxes for connection to the MICEC Exterior lighting control panel.
25
Delivery Schedule
Attached - 1 page at 11x17
Using an acquisition strategy for design-build procurement for the project, the schedule identifies a start date for developing RFQ and RFP documents on 10/17/2014 (assuming this study is part of the procurement document development) which results in project acceptance on 1/26/2017. The development of these procurement documents would be a joint effort of Sound Transit and possible consultant.
The design-build procurement schedule is based on Huitt-Zollars’ understanding of Sound Transit’s design-build procurement process as used on S440, S445, MOW and E360, but simplified without inclusion of a Draft RFP release for industry review and reduced time periods for SOQ evaluations, interviews, one-on-one meetings, ATC reviews and such. We recommend that this procurement schedule be vetted through Sound Transit Contracts and others within DECM. We realize that this is an aggressive delivery schedule given the constraint of a first quarter 2017 delivery date for the project.
Note that parking garages for design-build procedure are allowed by RCW 39.10.300, so no Project Review Committee (PRC) application needs to be made and has not been included in the schedule. If the project is thought to only be provided by a surface parking solution, PRC approval would be required if a design-build procurement strategy is used. Should Sound Transit and Mercer Island decide that a surface parking solution without any garage is preferred, we would recommend that Sound Transit pursue a conventional design-bid-build procurement approach.
ID Task Name Duration Start Finish
1 Mercer Island Parking 595 days Fri 10/17/14 Thu 1/26/17
2 DB Procurement 263 days Fri 10/17/14 Tue 10/20/15
3 Develop RFQ and RFP docs 141 days Fri 10/17/14 Fri 5/1/15
29
30 Issue Public Advertisement to NTP 173 days Thu 2/19/15 Tue 10/20/15
31 RFQ issue, SOQ evaluations & Shortlist 51 days Thu 2/19/15 Fri 5/1/15
41 RFP issue, ATCs review, & receive Proposals 55 days Fri 5/1/15 Fri 7/17/15
51 DB Contractor selection 25 days Mon 7/20/15 Fri 8/21/15
56 CCB to Award 10 days Mon 8/17/15 Fri 8/28/15
61 Board Approval / Contract Award 25 days Wed 8/26/15 Tue 9/29/15
68 DB Contract Execution 15 days Wed 9/30/15 Tue 10/20/15
76
77 DB Contract Design & Construction 327 days Wed 10/28/15Thu 1/26/17
78 Design (assuming 4 packages) 162 days Wed 10/28/15Thu 6/9/16
79 Site Prep & Earthworks Package 6 wks Wed 10/28/15 Tue 12/8/15
80 Utilities and Drainage package 8 wks Wed 11/25/15 Tue 1/19/16
81 Paving and/or Garage package 12 wks Wed 12/16/15 Tue 3/8/16
82 Landscape / Hardscape / Signage Package 8 wks Wed 2/10/16 Tue 4/5/16
83 Permitting 6 mons Wed 12/9/15 Thu 6/9/16
84 Parking Construction 275 days Fri 1/8/16 Thu 1/26/17
85 Site Prep 1 mon Fri 1/8/16 Mon 2/8/16
86 Earthwork Operations 3 mons Fri 3/11/16 Fri 6/10/16
87 UG Utilities & Drainage 3 mons Fri 3/11/16 Fri 6/10/16
88 Paving work 5 mons Mon 6/13/16 Fri 11/11/16
89 Build Garage 7 mons Mon 5/2/16 Thu 12/1/16
90 Fine Grading, Landscape, Hardscape, Signage 2 mons Mon 11/14/16 Thu 1/12/17
91 Commissioning & Testing 3 wks Fri 1/6/17 Thu 1/26/17
92 Project Acceptance & Turnover 0 days Thu 1/26/17 Thu 1/26/17 Project Acceptance &
Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr MayQtr 4, 2014 Qtr 1, 2015 Qtr 2, 2015 Qtr 3, 2015 Qtr 4, 2015 Qtr 1, 2016 Qtr 2, 2016 Qtr 3, 2016 Qtr 4, 2016 Qtr 1, 2017 Qtr 2, 2017
DRAFTMercer Island Parking Expansion ‐ Design‐Build Delivery Schedlue
Tue 11/18/14
Page 1