Sevilla – 25 May 2017

Management of Meteorological Uncertainty

Meteorology and ATM Capacity

Carlos Caspueñas MuñozHead ATS Division South Region

Aircraft Engineerenaire.es

g

Datos actualizados: 27/02/2017

SUMMARYSUMMARY

1. What ENAIRE is1. What ENAIRE is

2. Present ATC situation

The meteorological threats

Constraints

Tools

Capacity monitoringCapacity monitoring

3. Significant ATS weather related incidents

4 ENAIRE Meteo procedures4. ENAIRE Meteo procedures

5. The ATC needs

enaire.es 1

SUMMARYSUMMARY

1. What ENAIRE is1. What ENAIRE is

2. Present ATC situation

The meteorological threats

Constraints

Tools

Capacity monitoringCapacity monitoring

3. Significant ATS weather related incidents

4 ENAIRE Meteo procedures4. ENAIRE Meteo procedures

5. The ATC needs

enaire.es 2

Five Regions:gCentro-NorteEsteSurBalearC iCanaria

enaire.esDivisión de Planificación y Certificación

3

ENAIRE in numbers

• 1,87 million of flights in 2016

• 4th European ANSP

• 2 2 millions Km2 controlled airspace2,2 millions Km controlled airspace

• 3700 employees (51% ATCOs)

• 8 out 10 tourists come to Spain by plane

• Traffic growth forecast: 4% for the next 3 yearsg y

enaire.esDivisión de Planificación y Certificación

4

SUMMARYSUMMARY

1. What ENAIRE is1. What ENAIRE is

2. Present ATC situation

The meteorological threats

Constraints

Tools

Capacity monitoringCapacity monitoring

3. Significant ATS weather related incidents

4 ENAIRE Meteo procedures4. ENAIRE Meteo procedures

5. The ATC needs

enaire.es 5

The meteorological threats

Terminal area (TMA):• Icing conditions

B ild

Airport disruption:• LVP

Pl h ldi

Take Off & Landing:• Windshear

C i d

En-route:• CBs

“S ” i• Buildups• SIDs/STARs off• Capacity monitoring• Comm overload

• Planes holding• Massive deviations• De-icing procedure

• Crosswind• Tailwind• Go around

• “Storm” airways• Capacity monitoring• Comm overload• FL changes• Comm overload • FL changes

enaire.esDivisión de Planificación y Certificación

6

Constraints: very demanding airspace design

DangerousDangerous

Restricted

P hibi dProhibited

Segregated

enaire.esDivisión de Planificación y Certificación

7

Meteorological information of interest for ATS

• Wind direction and intensity (windshear)

• Visibility (Fog, haze, RVR, VV)

• Turbulence reports

• Storm activity (CBs)

I i diti• Icing conditions

enaire.esDivisión de Planificación y Certificación

8

ATS present tools

• GAMET/SIGMET/AIRMET

• METAR/TAFOR/TREND/SPECI

• AIREPAIREP

• PSR Meteorological information

• VIA (Aerodrome Information Window)

enaire.esDivisión de Planificación y Certificación

9

METAR & VIA

enaire.esDivisión de Planificación y Certificación

10

Capacity Monitoring

• The possible delays are managed on the ground.

• For every IFR traffic, there is a calculated time

over each sector according to Flight Plan (FPL)over each sector according to Flight Plan (FPL).

• If there are slots at the time, no delay. If not, the

flight is allocated in the closest slot.

• Sector capacity is defined considering thep y g

complexity of the flow and the actions required.

The local FMPs monitor demand vs capacity and• The local FMPs monitor demand vs capacity and

propose regulations, re-routings or other STAMs.

enaire.esDivisión de Planificación y Certificación

11

Capacity Monitoring

enaire.esDivisión de Planificación y Certificación

12

Sectors Hourly Capacity vs. Occupancy

enaire.esDivisión de Planificación y Certificación

13

SUMMARYSUMMARY

1. What ENAIRE is1. What ENAIRE is

2. Present ATC situation

The meteorological threats

Constraints

Tools

Capacity monitoringCapacity monitoring

3. Significant ATS weather related incidents

4 ENAIRE Meteo procedures4. ENAIRE Meteo procedures

5. The ATC needs

enaire.es 14

Significant weather related ATS gIncidents

Airport: LEMD En route: YES VOR

enaire.es 15

Incident 058/16: April 29, 2016

enaire.es 16

Incident 160922-LECS-I-B

enaire.es 17

Daily weather delays report

enaire.es 18

SUMMARYSUMMARY

1. What ENAIRE is1. What ENAIRE is

2. Present ATC situation

The meteorological threats

Constraints

Tools

Capacity monitoringCapacity monitoring

3. Significant ATS weather related incidents

4 ENAIRE Meteo procedures4. ENAIRE Meteo procedures

5. The ATC needs

enaire.es 19

ENAIRE M t P dENAIRE Meteo Procedures

enaire.es 20

enaire.es 21

Ai t ff t d LEMD LEBL LEPA LEMG d GCLP GCTSAirports affected: LEMD, LEBL, LEPA, LEMG and GCLP-GCTS

enaire.es 22

enaire.es 23

SUMMARYSUMMARY

1. What ENAIRE is1. What ENAIRE is

2. Present ATC situation

The meteorological threats

Constraints

Tools

Capacity monitoringCapacity monitoring

3. Significant ATS weather related incidents

4 ENAIRE Meteo procedures4. ENAIRE Meteo procedures

5. The ATC needs

enaire.es 24

The ATC needs

• Accurate 4D forecast: Position / FLs / Time

(T-3h)

• Training and simulations• Training and simulations

• FUA (SESAR enforced)

• Meteorological Radar (FLs)

enaire.esDivisión de Planificación y Certificación

25

Muchas gracias por su atención

Q iQuestions