HOJA DE METRADO
LONGITUD TOTAL: 11+678.43 KM
Item PARTIDAS Und. N VECES LARGO ANCHO ALTO PARCIAL SUB. TOT TOTAL01.00.00 OBRAS PRELIMINARES01.01.00 CARTEL DE OBRA 3.60X2.40M glb 1.00 1.00 1.00 1.00 1.0001.02.00 CASETA PARA ALMACEN-GUARDIANIA mes 1.00 1.00 1.00 1.00 1.0001.03.00 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 1.00 1.00 1.00 1.00
01.04.00 TRAZO, NIVELACION Y REPLANTEO km 11.68 11.681.00 11.68 11.68
01.05.00 TRAZO, NIVELACION Y REPLANTEO DURANTE EL PROCESO km 11.68 11.681.00 11.68 11.68
01.06.00 TRANSPORTE DE MATERIALES glb 1.00 1.00 1.00 1.00 1.00
02.00.00 EXPLANACIONES02.01.00 CORTE DE MATERIAL SUELTO m3 1.00 98986.74 98986.74 98986.74 98986.74
02.02.00 PERFILADO Y COMPACTACION DE SUBRASANTE m2 1.00 11678.61 5.00 58393.05 58393.05 58393.05
02.03.00 RELLENO CON MATERIAL PROPIO m3 1.00 65250.23 65250.23 65250.23 65250.23
02.04.00 ELIMINACION DE MATERIAL EXEDENTE m3 1.20 33736.52 40483.82 40483.82 40483.82
03.00.00 AFIRMADO e=15 cm03.01.00 EXTRACCION Y APILAMIENTO (20% ESPONJAMIENTO) m3 1.20 11678.61 5.00 0.15 10510.75 10510.75 10510.75
03.02.00 CARGUIO(20% ESPONJAMIENTO) m3 1.20 11678.61 5.00 0.15 10510.75 10510.75 10510.75
03.03.00 TRANSPORTE (20% ESPONJAMIENTO) m3 1.20 11678.61 5.00 0.15 10510.75 10510.75 10510.75
03.04.00 EXTENDIDO Y COMPACTACION (20% ESPONJAMIENTO) m2 1.00 11678.61 5.00 58393.05 58393.05 58393.05
04.00.00 ALCANTARILLAS TIPO I 1104.01.00 TRAZO Y REPLANTEO04.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 1.00 8.30 5.10 42.33 42.33 465.6304.02.00 MOVIMIENTO DE TIERRAS04.02.01 EXCAVACION DE TIERRAS PARA ESTRUCTURAS m3 37.03 407.352
ZAPATAS-ENTRADA 1.00 3.80 2.10 0.40 3.19ZAPATAS-SALIDAS 2.00 2.62 0.60 0.40 1.26
1.00 1.40 0.90 0.40 0.50ALETAS-SALIDA 2.00 2.62 0.60 1.95 6.13ALIVIADERO-ENTRADA 1.00 3.80 2.10 1.82 14.52ALCANTARILLA-TMC 36" 1.00 5.10 1.40 1.60 11.42
04.02.02 MATERIAL GRANULAR PARA BASE m3 1.20 5.10 1.40 0.45 3.86 3.86 42.4104.02.03 CAMA DE APOYO PARA ALCANTARILLAS TMC m3 1.00 5.10 1.40 0.35 2.50 2.50 27.49
04.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3 7.34 80.784ALCANTARLLA-TMC 36" 1.00 5.10 1.40 1.50 10.71DESCUENTA VOLUMEN DE ALCANTARILLA -1.00 5.10 0.66 -3.37
04.02.05 ELIMINACION DE MATERIAL EXEDENTE m3 1.00 29.07 29.07 29.07 319.77
04.03.00 OBRAS DE CONCRETO SIMPLE04.03.01 ENCOFRADO Y DESENCOFRADO m2 515.328
MUROS ALIVIADERO- ENTRADA 2.00 3.40 1.6 10.88 46.852.00 1.10 1.6 3.524.00 1.12 1.6 7.172.00 1.40 1.6 4.484.00 1.12 0.5 2.24
ALETAS-SALIDA 4.00 2.20 1.6 14.082.00 1.40 1.6 4.48
04.03.02 CONCRETO f'c=140 kg/cm2 EN ZAPATAS m3 4.95 54.49ZAPATAS-ENTRADA 1.00 3.80 2.10 0.40 3.19ZAPATAS-SALIDA 2.00 2.62 0.60 0.40 1.26
1.00 1.40 0.90 0.40 0.5004.03.03 CONCRETO f'c=175 kg/cm2 m3 53.416
MUROS ALIVIADERO- ENTRADA 1.00 3.40 0.20 1.50 1.02 4.862.00 0.90 0.20 1.50 0.542.00 1.12 0.25 1.50 0.841.00 1.40 0.30 1.50 0.63
PROYECTO: MEJORAMIENTO DE CAMINO VECINAL TRAMO PUENTE SAN FRANCISCO - PUCATICLLA - JCM - CHUPACA, DISTRITO DE ACORIA - HUANCAVELICA - HUANCAVELICA
DEPARTAMENTO : HUANCAVELICAPROVINCIA : HUANCAVELICADISTRITO : ACORIALUGAR : PUCATICLLA
-
-1.00 0.30 0.66 -0.204.00 0.60 0.10 0.50 0.12
ALETAS-SALIDA 2.00 2.20 0.20 1.52 1.341.00 1.40 0.30 1.52 0.64-1.00 0.30 0.66 -0.201.00 1.40 0.30 0.30 0.13
04.04.00 ACABADOS04.04.01 TARRAJEO CON MORTERO 1:2 m2 260.656
MUROS ALIVIADERO- ENTRADA 1.00 3.60 1.50 5.40 23.702.00 0.70 1.50 2.102.00 0.90 1.50 2.701.00 1.40 1.50 2.10-1.00 0.66 -0.661.00 3.00 0.90 2.704.00 0.60 0.50 1.20
ALETAS-SALIDA 2.00 2.20 1.52 6.691.00 1.40 1.52 2.13-1.00 0.66 -0.66
04.05.00 INSTALACION DE TUBERIAS-ARMCO04.05.01 ALCANTARILLA METALICA CIRCULAR TMC =36" C-12 m 1.00 5.10 5.10 5.10 56.10
05.00.00 ALCANTARILLA TIPO II(PONTON LUZ 10M) 1.0005.01.00 TRABAJOS PROVISIONALES05.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 1.00 10.00 8.85 88.50 88.50 88.50
05.02.00 MOVIMIENTO DE TIERRAS05.02.01 EXCAVACION DE TIERRAS PARA ESTRUCTURAS m3 138.69 138.69
ZAPATAS-ENTRADA Y SALIDA 4.00 3.80 0.75 0.50 5.70ALETAS ENTRADA Y SALIDA 4.00 3.80 0.75 3.10 35.34ALCANTARILLA TMC 100" 1.00 9.00 3.50 3.10 97.65
05.02.02 MATERIAL GRANULAR PARA BASE m3 1.00 4.50 3.50 0.45 7.09 7.09 7.0905.02.03 CAMA DE APOYO PARA ALCANTARILLAS TMC m3 1.00 3.70 3.50 0.50 6.48 6.48 6.48
05.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3 59.50 59.50ALCANTARILLA-TMC 100" 1.00 10.00 3.50 3.10 108.50DESCUENTA VOLUMEN DE ALCANTARILLA -1.00 10.00 4.90 -49.00
05.02.05 ELIMINACION DE MATERIAL EXEDENTE m3 1.00 85.67 85.67 85.67 85.67
05.03.00 OBRAS DE CONCRETO SIMPLE05.03.01 ENCOFRADO Y DESENCOFRADO m2 43.40 43.40
ENTRADA 4.00 3.50 3.1 43.40
05.03.02 CONCRETO f'c=175 kg/cm2 m3 7.42 7.42ENTRADA 2.00 3.50 0.30 3.10 6.51
2.00 3.50 1.10 0.50 3.85-2.00 0.30 4.90 -2.94
05.04.00 OBRAS DE CONCRETO ARMADO05.04.01 ENCOFRADO Y DESENCOFRADO m2 76.88 76.88
ALETAS 8.00 3.10 3.1 76.88
05.04.02 CONCRETO F'C= 210 Kg/cm2 m3 15.31 15.31ZAPATAS 4.00 3.80 0.75 0.50 5.70ALETAS 4.00 3.10 0.25 3.10 9.61
05.04.03 ACERO FY=4200 Kg/ cm2 kg 987.36 987.36ZAPATAS
LONGITUDINAL 1/2" @ 0.20 4.00 18.00 1.02 73.44TRANSVERSAL 1/2 @ 0.20 4.00 19.20 1.02 78.34
ALETASLONGITUDINAL 1/2" @ 0.20 4.00 108.80 1.02 443.90TRANSVERSAL 1/2 @ 0.20 4.00 96.00 1.02 391.68
05.05.00 ACABADOS05.05.01 TARRAJEO CON MORTERO 1:2 m2 50.34 50.34
ALETAS- ENTRADA Y SALIDA 4.00 3.10 3.10 38.442.00 3.50 3.1 21.70-2.00 4.90 -9.80
05.06.00 INSTALACION DE TUBERIAS-ARMCO05.06.01 ALCANTARILLA METALICA CIRCULAR TMC =100" m 1.00 10.00 10.00 10.00 10.00
06.00.00 BADEN 6.00 X 5.10 M 2.0006.01.00 TRABAJOS PROVISIONALES06.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 1.00 7.00 6.10 42.70 42.70 85.40
06.02.00 MOVIMIENTO DE TIERRAS06.02.01 EXCAVACION DE TIERRAS PARA ESTRUCTURAS m3 25.87 51.74
-
1.00 6.00 5.10 0.20 6.121.00 5.10 0.40 0.80 1.631.00 5.10 1.00 2.80 14.282.00 6.00 0.40 0.80 3.84
06.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 1.00 5.00 4.30 0.2 4.30 4.30 8.6006.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 1.00 21.57 21.57 21.57 43.14
06.03.00 OBRAS DE CONCRETO ARMADO06.03.01 ENCOFRADO Y DESENCOFRADO m2 51.00 102.00
2.00 5.10 1.00 10.201.00 6.00 1.00 6.001.00 6.00 2.80 16.801.00 6.00 3.00 18.00
06.03.02 CONCRETO f'c=175 kg/cm2 EN ZAPATAS Y ANCLAJES m3 16.06 32.132.00 4.10 0.40 0.80 2.621.00 6.00 0.40 0.80 1.921.00 6.00 0.60 2.80 10.081.00 6.00 0.40 0.60 1.44
06.03.03 CONCRETO f'c=210 kg/cm2 EN LOSA m3 1.00 6.00 5.10 0.2 6.12 6.12 12.24
06.03.04 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 821.92 1643.83 LONGITUDINAL 1/2" @ 0.15 54 9.5 1.02 523.26 TRANSVERSAL 1/2 @ 0.15 48 6.1 1.02 298.656
07.00.00 CUNETAS07.01.00 PERFILADO DE CUNETAS 50X30 CM. m 1.00 11678.61 11678.61 11678.61 11678.61
08.00.00 SEALIZACION08.01.00 SUMINISTRO E INSTALACION DE HITOS KILOMETRICOS und 13.00 1.00 13.00 13.00 13.0008.02.00 SEALES INFORMATIVAS 1.00 m x 2.20 m und 10.00 1.00 10.00 10.00 10.00
09.00.00 FLETE TERRESTRE09.01.00 FLETE TERRESTRE glb 1.00 1.00 1.00 1.00 1.00
10.00.00 MITIGACION AMBIENTAL10.01.00 ACONDICIONAMIENTO DE BOTADEROS glb 1.00 1.00 1.00 1.00 1.0010.02.00 REACONDICIONAMIENTO DE AREA OCUPADA/CAMPAMENTO glb 1.00 1.00 1.00 1.00 1.0010.03.00 ESTABILIZACION DE TALUDES (REVEGETACION) glb 1.00 1.00 1.00 1.00 1.0010.01.01 CAPACITACION Y SENCIBILIZACION glb 1.00 1.00 1.00 1.00 1.00
-
HOJA DE METRADO
LONGITUD TOTAL: 11+678.43 KMALTERNATIVA 02
Item PARTIDAS Und. N VECES LARGO ANCHO ALTO PARCIAL SUB. TOT01.00.00 OBRAS PRELIMINARES01.01.00 CARTEL DE OBRA 3.60X2.40M glb 1.00 1.00 1.00 1.0001.02.00 CASETA PARA ALMACEN-GUARDIANIA mes 1.00 1.00 1.00 1.0001.03.00 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 1.00 1.00 1.00
01.04.00 TRAZO, NIVELACION Y REPLANTEO km 11.681.00 11.68 11.68
01.05.00 TRAZO, NIVELACION Y REPLANTEO DURANTE EL PROCESO km 11.681.00 11.68 11.68
01.06.00 TRANSPORTE DE MATERIALES glb 1.00 1.00 1.00 1.00
02.00.00 EXPLANACIONES02.01.00 CORTE DE MATERIAL SUELTO m3 1.00 98986.74 98986.74 98986.74
02.02.00 PERFILADO Y COMPACTACION DE SUBRASANTE m2 1.00 11678.61 5.00 58393.05 58393.05
02.03.00 RELLENO CON MATERIAL PROPIO m3 1.00 65250.23 65250.23 65250.23
02.04.00 ELIMINACION DE MATERIAL EXEDENTE m3 1.20 33736.52 40483.82 40483.82
03.00.00 AFIRMADO e=20 cm03.01.00 EXTRACCION Y APILAMIENTO (20% ESPONJAMIENTO) m3 1.20 11678.61 5.00 0.20 14014.33 14014.33
03.02.00 CARGUIO(20% ESPONJAMIENTO) m3 1.20 11678.61 5.00 0.20 14014.33 14014.33
03.03.00 TRANSPORTE (20% ESPONJAMIENTO) m3 1.20 11678.61 5.00 0.20 14014.33 14014.33
03.04.00 EXTENDIDO Y COMPACTACION (20% ESPONJAMIENTO) m2 1.00 11678.61 5.00 58393.05 58393.05
04.00.00 ALCANTARILLAS TIPO I 1104.01.00 TRAZO Y REPLANTEO04.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 1.00 8.30 5.10 42.33 42.3304.02.00 MOVIMIENTO DE TIERRAS04.02.01 EXCAVACION DE TIERRAS PARA ESTRUCTURAS m3 37.03
ZAPATAS-ENTRADA 1.00 3.80 2.10 0.40 3.19ZAPATAS-SALIDAS 2.00 2.62 0.60 0.40 1.26
1.00 1.40 0.90 0.40 0.50ALETAS-SALIDA 2.00 2.62 0.60 1.95 6.13ALIVIADERO-ENTRADA 1.00 3.80 2.10 1.82 14.52ALCANTARILLA-TMC 36" 1.00 5.10 1.40 1.60 11.42
04.02.02 MATERIAL GRANULAR PARA BASE m3 1.20 5.10 1.40 0.45 3.86 3.8604.02.03 CAMA DE APOYO PARA ALCANTARILLAS TMC m3 1.00 5.10 1.40 0.35 2.50 2.50
04.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3 7.34ALCANTARLLA-TMC 36" 1.00 5.10 1.40 1.50 10.71DESCUENTA VOLUMEN DE ALCANTARILLA -1.00 5.10 0.66 -3.37
04.02.05 ELIMINACION DE MATERIAL EXEDENTE m3 1.00 29.07 29.07 29.07
04.03.00 OBRAS DE CONCRETO SIMPLE04.03.01 ENCOFRADO Y DESENCOFRADO m2
MUROS ALIVIADERO- ENTRADA 2.00 3.40 1.6 10.88 46.852.00 1.10 1.6 3.524.00 1.12 1.6 7.172.00 1.40 1.6 4.484.00 1.12 0.5 2.24
ALETAS-SALIDA 4.00 2.20 1.6 14.082.00 1.40 1.6 4.48
04.03.02 CONCRETO f'c=140 kg/cm2 EN ZAPATAS m3 4.95ZAPATAS-ENTRADA 1.00 3.80 2.10 0.40 3.19ZAPATAS-SALIDA 2.00 2.62 0.60 0.40 1.26
1.00 1.40 0.90 0.40 0.5004.03.03 CONCRETO f'c=175 kg/cm2 m3
MUROS ALIVIADERO- ENTRADA 1.00 3.40 0.20 1.50 1.02 4.862.00 0.90 0.20 1.50 0.542.00 1.12 0.25 1.50 0.841.00 1.40 0.30 1.50 0.63-1.00 0.30 0.66 -0.204.00 0.60 0.10 0.50 0.12
ALETAS-SALIDA 2.00 2.20 0.20 1.52 1.341.00 1.40 0.30 1.52 0.64-1.00 0.30 0.66 -0.201.00 1.40 0.30 0.30 0.13
PROYECTO: MEJORAMIENTO DE CAMINO VECINAL TRAMO PUENTE SAN FRANCISCO - PUCATICLLA - JCM - CHUPACA, DISTRITO DE ACORIA - HUANCAVELICA - HUANCAVELICA
DEPARTAMENTO : HUANCAVELICAPROVINCIA : HUANCAVELICADISTRITO : ACORIALUGAR : PUCATICLLA
-
04.04.00 ACABADOS04.04.01 TARRAJEO CON MORTERO 1:2 m2
MUROS ALIVIADERO- ENTRADA 1.00 3.60 1.50 5.40 23.702.00 0.70 1.50 2.102.00 0.90 1.50 2.701.00 1.40 1.50 2.10-1.00 0.66 -0.661.00 3.00 0.90 2.704.00 0.60 0.50 1.20
ALETAS-SALIDA 2.00 2.20 1.52 6.691.00 1.40 1.52 2.13-1.00 0.66 -0.66
04.05.00 INSTALACION DE TUBERIAS-ARMCO04.05.01 ALCANTARILLA METALICA CIRCULAR TMC =36" C-12 m 1.00 5.10 5.10 5.10
05.00.00 ALCANTARILLA TIPO II(PONTON LUZ 10M) 1.0005.01.00 TRABAJOS PROVISIONALES05.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 1.00 10.00 8.85 88.50 88.50
05.02.00 MOVIMIENTO DE TIERRAS05.02.01 EXCAVACION DE TIERRAS PARA ESTRUCTURAS m3 138.69
ZAPATAS-ENTRADA Y SALIDA 4.00 3.80 0.75 0.50 5.70ALETAS ENTRADA Y SALIDA 4.00 3.80 0.75 3.10 35.34ALCANTARILLA TMC 100" 1.00 9.00 3.50 3.10 97.65
05.02.02 MATERIAL GRANULAR PARA BASE m3 1.00 4.50 3.50 0.45 7.09 7.0905.02.03 CAMA DE APOYO PARA ALCANTARILLAS TMC m3 1.00 3.70 3.50 0.50 6.48 6.48
05.02.04 RELLENO COMPACTADO CON MATERIAL PROPIO m3 59.50ALCANTARILLA-TMC 100" 1.00 10.00 3.50 3.10 108.50DESCUENTA VOLUMEN DE ALCANTARILLA -1.00 10.00 4.90 -49.00
05.02.05 ELIMINACION DE MATERIAL EXEDENTE m3 1.00 85.67 85.67 85.67
05.03.00 OBRAS DE CONCRETO SIMPLE05.03.01 ENCOFRADO Y DESENCOFRADO m2 43.40
ENTRADA 4.00 3.50 3.1 43.40
05.03.02 CONCRETO f'c=175 kg/cm2 m3 7.42ENTRADA 2.00 3.50 0.30 3.10 6.51
2.00 3.50 1.10 0.50 3.85-2.00 0.30 4.90 -2.94
05.04.00 OBRAS DE CONCRETO ARMADO05.04.01 ENCOFRADO Y DESENCOFRADO m2 76.88
ALETAS 8.00 3.10 3.1 76.88
05.04.02 CONCRETO F'C= 210 Kg/cm2 m3 15.31ZAPATAS 4.00 3.80 0.75 0.50 5.70ALETAS 4.00 3.10 0.25 3.10 9.61
05.04.03 ACERO FY=4200 Kg/ cm2 kg 987.36ZAPATAS
LONGITUDINAL 1/2" @ 0.20 4.00 18.00 1.02 73.44TRANSVERSAL 1/2 @ 0.20 4.00 19.20 1.02 78.34
ALETASLONGITUDINAL 1/2" @ 0.20 4.00 108.80 1.02 443.90TRANSVERSAL 1/2 @ 0.20 4.00 96.00 1.02 391.68
05.05.00 ACABADOS05.05.01 TARRAJEO CON MORTERO 1:2 m2 50.34
ALETAS- ENTRADA Y SALIDA 4.00 3.10 3.10 38.442.00 3.50 3.1 21.70-2.00 4.90 -9.80
05.06.00 INSTALACION DE TUBERIAS-ARMCO05.06.01 ALCANTARILLA METALICA CIRCULAR TMC =100" m 1.00 10.00 10.00 10.00
06.00.00 BADEN 6.00 X 5.10 M 2.0006.01.00 TRABAJOS PROVISIONALES06.01.01 TRAZO Y REPLANTEO PRELIMINAR m2 1.00 7.00 6.10 42.70 42.70
06.02.00 MOVIMIENTO DE TIERRAS06.02.01 EXCAVACION DE TIERRAS PARA ESTRUCTURAS m3 25.87
1.00 6.00 5.10 0.20 6.121.00 5.10 0.40 0.80 1.631.00 5.10 1.00 2.80 14.282.00 6.00 0.40 0.80 3.84
06.02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 1.00 5.00 4.30 0.2 4.30 4.3006.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 1.00 21.57 21.57 21.57
06.03.00 OBRAS DE CONCRETO ARMADO06.03.01 ENCOFRADO Y DESENCOFRADO m2 51.00
2.00 5.10 1.00 10.201.00 6.00 1.00 6.00
-
1.00 6.00 2.80 16.801.00 6.00 3.00 18.00
06.03.02 CONCRETO f'c=175 kg/cm2 EN ZAPATAS Y ANCLAJES m3 16.062.00 4.10 0.40 0.80 2.621.00 6.00 0.40 0.80 1.921.00 6.00 0.60 2.80 10.081.00 6.00 0.40 0.60 1.44
06.03.03 CONCRETO f'c=210 kg/cm2 EN LOSA m3 1.00 6.00 5.10 0.2 6.12 6.12
06.03.04 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 821.92 LONGITUDINAL 1/2" @ 0.15 54 9.5 1.02 523.26 TRANSVERSAL 1/2 @ 0.15 48 6.1 1.02 298.656
07.00.00 CUNETAS07.01.00 PERFILADO DE CUNETAS 50X30 CM. m 1.00 11678.61 11678.61 11678.61
08.00.00 SEALIZACION08.01.00 SUMINISTRO E INSTALACION DE HITOS KILOMETRICOS und 13.00 1.00 13.00 13.0008.02.00 SEALES INFORMATIVAS 1.00 m x 2.20 m und 10.00 1.00 10.00 10.00
09.00.00 FLETE TERRESTRE09.01.00 FLETE TERRESTRE glb 1.00 1.00 1.00 1.00
10.00.00 MITIGACION AMBIENTAL10.01.00 ACONDICIONAMIENTO DE BOTADEROS glb 1.00 1.00 1.00 1.0010.02.00 REACONDICIONAMIENTO DE AREA OCUPADA/CAMPAMENTO glb 1.00 1.00 1.00 1.0010.03.00 ESTABILIZACION DE TALUDES (REVEGETACION) glb 1.00 1.00 1.00 1.0010.01.01 CAPACITACION Y SENCIBILIZACION glb 1.00 1.00 1.00 1.00
-
HOJA DE METRADO
LONGITUD TOTAL: 11+678.43 KMALTERNATIVA 02
TOTAL
1.001.001.00
11.68
11.68
1.00
98986.74
58393.05
65250.23
40483.82
14014.33
14014.33
14014.33
58393.05
465.63
407.352
42.4127.49
80.784
319.77
515.328
54.49
53.416
PROYECTO: MEJORAMIENTO DE CAMINO VECINAL TRAMO PUENTE SAN FRANCISCO - PUCATICLLA - JCM - CHUPACA, DISTRITO DE ACORIA - HUANCAVELICA -
-
260.656
56.10
88.50
138.69
7.096.48
59.50
85.67
43.40
7.42
76.88
15.31
987.36
50.34
10.00
85.40
51.74
8.6043.14
102.00
-
32.13
12.24
1643.83
11678.61
13.0010.00
1.00
1.001.001.001.00
ALTERNATIVA 01ALTERNATIVA 02