meydenbauer bay park & land use plan bellevue, …...trees, and planting of native forbs, shrubs...
TRANSCRIPT
MEYDENBAUER BAY PARK & LAND USE PLAN September 2008EDAW - 08100030.01BELLEVUE, WASHINGTON
Perteet
Lake Washington Boulevard
Main Street
100t
h A
venu
e N
E
99th
Ave
nue
NE Downtown Park
Wildwood Park
ALTERNATIVE 1:
EDUCATIONAL EMPHASIS
0 50’ 100’ 200’ 300’
Scale: 1” = 100’ - 0”
Park Program Elements
Fully day-lighted stream with interpretive/education nodes along adjacentpedestrian path
Ravine enhancements (Contiguous canopy forested areas to be retained and enhanced; invasive plants removed)
Relocated Wetland (Incorporation of wetlands with the stream/shoreline delta to form a contiguous surface water structure)
Water detention features (bioswales)
Upper viewing terrace (+/- 10 short-term parking spaces)
Surface parking lot (15 to 25 spaces)
Playground (for school-aged children)
Grass picnic area with shade structure
Youth Environmental Education Center: restrooms, gathering space, outdooreducation green, and terraced gardens
Waterfront pathway with pedestrian and emergency vehicle access
Restrooms (with green roof and interpretive/educational signage)
Short-term marina parking (10 to 15 spaces) and dropoff area
Removal of Piers 2 and 3
Public dock with viewing platform and 14 transient moorage slips
Integrated ADA accessible terraced walkway with stormwater feature
Whaling Building: Historical/Cultural Maritime Center
Enhanced hillside woodland (Removal of invasive species, preservation of significant trees, and planting of native forbs, shrubs and trees)
Artificial swim beach with people propelled vessel launch
Softened shoreline (improved nearshore habitat and addition of native riparianvegetation, including overhanging plants and woody debris)
Trail connects Lake-to-Lake Trail system
Yacht Club
Site Subsections
Ravine Corridor
Upper Terrace
Shoreline
Kite Parcel
NE 1st Street
Meydenbauer Way SE
101s
t Ave
nue
SE
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
A’
A
Marina Program Existing Alternative 1
Pier Removal NA Removes Piers 2 & 3
Permanent Long-term Moorage 87 slips 18 to 28 slips
Not in Service/Transient 25 slips 14 slips South side of floating pier
People Propelled Vessels (PPV) No facilities Up to 15 PPV slips South side of floating pier and at beach
Boat Storage No facilities Limited potential on land
16
17
18
19
20
01
02
03
04
05
06
07
08
09
10
11
12
13
14
15
16
17
18
19
20
R
U
S
K
R
U
S
K
B’
B
MEYDENBAUER BAY PARK & LAND USE PLAN September 2008EDAW - 08100030.01BELLEVUE, WASHINGTON
Perteet
Lake WashingtonBoulevard
Enhanced Hillside Woodland
WalkParking Lot
WaterfrontPathway
Shoreline Enhancement
Sidewalk
Enhanced Hillside Woodland
ALTERNATIVE 1:
EDUCATIONAL EMPHASISRavine Corridor
Upper Terrace
Key Map
Lake Washington Boulevard
99th
Ave
nue
NE
0 25’ 50’ 100’ 150’
Scale: 1” = 50’ - 0”
0 10’ 20’ 40’ 60’
Scale: 1” = 20’ - 0”
Section A - A’
A
C
A
C
B
B
A’
01
01
02
03
04
Fully day-lighted stream
Interpretive/education nodes along adjacent pedestrian path
Ravine enhancements (Contiguous canopy forested areas to beretained and enhanced; invasive plants removed)
Water detention features (bioswales)
Upper viewing terrace (+/- 10 short-term parking spaces)
Surface parking lot (15 to 25 spaces)
Youth Environmental Education Center: restrooms, gathering space
Outdoor education green
Terraced gardens
Enhanced hillside woodland (Removal of invasive species, preservation of signi� cant trees, and planting of native forbs, shrubs and trees)
02
03
05
06
07
01
02
03
01
02
03
04
05
06
07
MEYDENBAUER BAY PARK & LAND USE PLAN September 2008EDAW - 08100030.01BELLEVUE, WASHINGTON
Perteet
ALTERNATIVE 1:
EDUCATIONAL EMPHASIS
Shoreline
Kite Parcel
Key Map
Lake Washington Boulevard
A
A
0 25’ 50’ 100’ 150’
Scale: 1” = 50’ - 0”Yacht Club
B
01
01
B
Relocated Wetland (Incorporation of wetlands with the stream/shoreline delta to form a contiguous surface water structure)
Playground (for school-aged children)
Grass picnic area with shade structure
Waterfront pathway with pedestrian and emergency vehicle access
Restrooms (with green roof and interpretive/educational signage)
Short-term marina parking (10 to 15 spaces) and dropoff area
Removal of Piers 2 and 3
Public dock with viewing platform and 14 transient moorage slips
Whaling Building: Historical/Cultural Maritime Center
Artificial swim beach with people propelled vessel launch
Softened shoreline (improved nearshore habitat and addition of native riparian vegetation, including overhanging plants and woody debris)
Trail connects Lake-to-Lake Trail system
Integrated ADA accessible terraced walkway
Stormwater feature02
02
03
04
05
06
07
08
09
10
11
12
01
02
01
02
03
04
05
06
07
08
09
10
11
12
Meydenbauer bay Park & land use Plan september 2008edaW - 08100030.01bellevue, WasHInGTOn
Perteet
alTernaTIve 1:
eduCaTIOnal eMPHasIs
lake Washingtonboulevard
sidewalkstormwater
Feature
stormwaterFeature
stormwaterFeature
stormwaterFeature
Walk
Walk
Walk
Walk
Walk
Walk
Walk
shoreline enhancement
WaterfrontPathway
landscapearea
landscapearea
landscapearea
landscape areaneighboring
Condoaccesss
section b - b’
0 10’ 20’ 40’ 60’
scale: 1” = 20’ - 0”