Experimental Hall
Hall:
L = 47 m W = 12 m H = 8 m
S = 564 m2 V = 4512 m3
Two overhead cranes (8 tonnes each)
Mice Hall
Existing Area & Beam Line
-- is still there - as seen in Summer
-- Beam Line used to end of year
Technical Update & Issues
•Beam Line•RF System•Absorbers•Magnets & Cryogenics•Detectors
•Infrastructure & Layout
•RAL & ISIS Perspectives•Programme•Expected Progress
Beam Line• P < 400 MeV/c• Rejection of protons and pions <10%• few muons per s
• Two solutions:– solenoid
» cryogenics availability » release by PSI
– quadrupoles
Performance
Rate depends on muon momentum:e.g. at 200 MeV/c3000 / ms for solenoid~300 /ms in quadrupole
(assumed a Ti wire target: 1cm long and 4mm Ø)
Purity should be better than 90% against scattered protons
1.E-09
1.E-08
1.E-07
1.E-06
1.E-05
1.E-04
1.E-03
1.E-02
0 100 200 300 400 500 600
p
RF System
Cooling Channel Envelope
AbsorberTuning Bellows
RF Cavity Cavities
Raft
Solenoid Magnet
1 MW per cavity
8MW total
Low Duty Factor
1-2 ms1-10 Hz
average power~1kW/Hz
~
RF Drive
TH116 TH781 RS2058EX SPS
7651EX RAL
LEVEL CONTROL
SOURCE
OTHER DRIVE CHAIN
10mW4kW40kW400kW4MW
DRIVE TO 4 CAVITIES VIA PHASE SHIFTERS AND 70db COUPLERS POWER SPLITTERS AND CIRCULATORS
40 kV 20 kV 12kV 5kV
R.A. Church RAL
- a possible scheme
“
-beam
Detector 1 Absorber 1 Detector 2Absorber 2 Absorber 3 RF 1 RF 2
Vacuum LH2 He Detector gas
“
-beam
Detector 1
Absorber 1
Detector 2
Absorber 2 Absorber 3
RF 1 RF 2
“
-beam
Detector 1 Absorber 1 Detector 2Absorber 2 Absorber 3 RF 1 RF 2
Absorber II
Magnets & CryogenicsPrinciple Issues
– Fringe Fields– Cryogenic Requirements
Blue contours:10 mT
Orange:0.5 mT
Detectors
Issues:SiFi - Large cyro cooling needed for VLPCsTPG – HV & flamable gas (next to Lig.H cell)
Infrastructure
Plant: Electrical PowerCooling PowerCryogenic SystemHydrogen Delivery & Handling
Installationphased build of the experiment
ISIS PerspectiveCritical Issues: Beam Line
Long ShutdownBreak into ISIS Synchrotron from MICE HallHave Shielding available+Have Stands available
Competes with other ISIS projects• 300 A upgrade*• Second Target Station*• RFQ Installation• delivery of contracted neutron amp.hours
* work in synch. vault +2nd target station – friend or foe?
Expected Progress
Proposal submitted expect the review to take place Mid Feb till May (?)
- international review panel
MICE is part of the UK’s Science road map- but funds are not yet allocated
Internal Review green light following international rp
Management & Oversight Structure(s) need to be in place