michael hobgood architectural portfolio 2013

65
MICHAEL HOBGOOD 2013 ARCHITECTURE PORTFOLIO NORTH CAROLINA STATE UNIVESITY

Upload: mhobgood

Post on 09-Apr-2016

218 views

Category:

Documents


1 download

DESCRIPTION

BEDA and B. ARCH academic works

TRANSCRIPT

Page 1: Michael Hobgood Architectural Portfolio 2013

MICHAEL HOBGOOD 2013 ARCHITECTURE PORTFOLIO

NORTH CAROLINA STATE UNIVESITY

Page 2: Michael Hobgood Architectural Portfolio 2013

MICHAEL HOBGOODNorth Carolina State University

[ College of Design ] School of Architecture B. ARCH

[ Poole College of Management ] B.S. OF BUSINESS ADMINISTRATION, FINANCE

ADDRESS7410 BIG HORN DRIVE | HILLSBOROUGH NC

TEL[ 919 ] 724-7029

[email protected]

WEBSITEcargocollective.com/mhobgood

Page 3: Michael Hobgood Architectural Portfolio 2013

2013 ARCHITECTURE PORTFOLIO

NORTH CAROLINA STATE UNIVESITY

1 | 2

Page 4: Michael Hobgood Architectural Portfolio 2013
Page 5: Michael Hobgood Architectural Portfolio 2013

3 | 4

Page 6: Michael Hobgood Architectural Portfolio 2013
Page 7: Michael Hobgood Architectural Portfolio 2013

TABLE OF CONTENTS

GOWANUS COMMUNITY CENTER + CSOBROOKLYN, NY

JENKINS CRAFT CENTERFALLINGWATER PRESERVATION | MILL RUN, PA

REIMAGINING TALL CTBUH 2012 COMPETITION | CHICAGO, IL

US LACROSSE CENTERRESTORING THE HARBOR | BALTIMORE, MD

HOLESOVICE 2030URBAN PLAN | PRAGUE, CZ

LECA DE PALMEIRA VISITOR’S CENTERSIZA ADDITION | MATOSINHOS, PORTUGAL

BIKE SHELTER DESIGN + BUILD NCSU CAMPUS | RALEIGH, NC

GEORGETOWN MUSEUM PRECINCT STUDY + DESIGN | GEORGETOWN, DC

DETAILS + HAND DRAWINGS DETAIL DRAWINGS | RALEIGH, NC

0715

23

3139

43

47

51

5 | 6

57

Page 8: Michael Hobgood Architectural Portfolio 2013

Revit | Sketchup | Illustrator | Photoshop

GOWANUS COMMUNITY CENTER + CSOARC 502 COMPREHENSIVE STUDIO | FALL 2013Instructor: STALLINGS + RAND

The Gowanus Canal has an aged patina that is certainly worth preserving. Through modernity, we can embrace her beautiful past and engage a lively future for residents and visitors of the canal.

“Preservation requires innovation”-Alvaro Siza

*VIEW FROM CANAL WALK

Page 9: Michael Hobgood Architectural Portfolio 2013

ARC 502 COMPREHENSIVE STUDIO | FALL 2013Instructor: STALLINGS + RAND

7 | 8*VIEW FROM CANAL WALK

Page 10: Michael Hobgood Architectural Portfolio 2013

Revit | Sketchup | Illustrator | Photoshop

HIGH

LOW

The Gowanus Canal has an aged patina that is certainly worth preserving. Through modernity, we can embrace her beautiful past and engage a lively future for residents and visitors of the canal.

“Preservation requires innovation”-Alvaro Siza

*VIEW FROM CANAL WALK

3D WALL SECTION DETAIL

Page 11: Michael Hobgood Architectural Portfolio 2013

HIGH

LOW

9 | 10

*VIEW FROM CANAL WALK

AA | SECTION THROUGH GALLERY

WEST ELEVATION

Page 12: Michael Hobgood Architectural Portfolio 2013

3D WALL SECTION DETAIL

Preserving the character of the 200+ year-old canal is a top priority for members of the community. The canal’s Controlled Sewage Over�ow (CSO) tanks must be updated along with the dredging of the canal and replacement of contaminated soils. Many of the old buildings stand to be lost and new construction will eventually take their place. The community center + CSO and the integrated canal walk have a careful blend of industrial heritage and modern functionality and sustainability.

TERRACE POOL

EXISTING CONDITION

Page 13: Michael Hobgood Architectural Portfolio 2013

11 | 12

WEST ELEVATION

BIVINS STREET

LOBBY

Page 14: Michael Hobgood Architectural Portfolio 2013

GROUND PLAN

Page 15: Michael Hobgood Architectural Portfolio 2013

NORTH ELEVATION

13 | 14

LEVEL 2 LEVEL 2

Page 16: Michael Hobgood Architectural Portfolio 2013

AutoCAD | Revit | Sketchup | Illustrator | Photoshop

ARC 502 COMPREHENSIVE SPRING 2013Instructor: VINCENT PETRARCA

*VIEW FROM MEADOW

“In the long history of human and animal-kind, those who have learned to collaborate and improvise most effectively have prevailed”

_Charles Darwin

JENKINSCRAFTCENTER

Page 17: Michael Hobgood Architectural Portfolio 2013

ARC 502 COMPREHENSIVE SPRING 2013Instructor: VINCENT PETRARCA

*VIEW FROM MEADOW

“In the long history of human and animal-kind, those who have learned to collaborate and improvise most effectively have prevailed”

_Charles Darwin

15 | 16

Page 18: Michael Hobgood Architectural Portfolio 2013

AutoCAD | Revit | Sketchup | Illustrator | Photoshop

ARC 502 COMPREHENSIVE SPRING 2013Instructor: VINCENT PETRARCA

ENTRY

Page 19: Michael Hobgood Architectural Portfolio 2013

ARC 502 COMPREHENSIVE SPRING 2013Instructor: VINCENT PETRARCA

15 | 16

17 | 18

3/8” CHUNK MODEL

1/16” MODEL IN CONTEXT

Page 20: Michael Hobgood Architectural Portfolio 2013

ENTRY

MEDIA LABENTRY LEVEL

LOWER LEVEL

Page 21: Michael Hobgood Architectural Portfolio 2013

17 | 18

19 | 20

1/16” MODEL IN CONTEXT

PAINTING STUDIO

MEDIA LAB

Page 22: Michael Hobgood Architectural Portfolio 2013

GALLERY

Page 23: Michael Hobgood Architectural Portfolio 2013

19 | 20

21 | 22

Page 24: Michael Hobgood Architectural Portfolio 2013

HOW WOULD YOU BUILD

THE WORLD’STALLEST SKYSCRAPER?

AutoCAD 3D | Rhino | Sketchup | Illustrator | Photoshop

ARC 402 VERTICAL STUDIOSPRING 2012Instructor: WAYNE PLACE

Chicago’s Wolf Point peninsula is one of the few remaining prominent unde-veloped sites on the Magnificent Mile. The site is a peninsula located at the intersection of the North, South and Main Branches of the Chicago River and is adjacent to what was once the largest building in the city. If Chicago were to desire its first “megatall”, the following proposal would offer twelve times more leasable sq. ft. than the Willis Tower with appropriate lease spans and aesthetics for the Chicago market.

Page 25: Michael Hobgood Architectural Portfolio 2013

ARC 402 VERTICAL STUDIOSPRING 2012Instructor: WAYNE PLACE

21 | 22

23 | 24

Page 26: Michael Hobgood Architectural Portfolio 2013

AutoCAD 3D | Rhino | Sketchup | Illustrator | Photoshop

ARC 402 VERTICAL STUDIOSPRING 2012Instructor: WAYNE PLACE

Page 27: Michael Hobgood Architectural Portfolio 2013

ARC 402 VERTICAL STUDIOSPRING 2012Instructor: WAYNE PLACE

23 | 24

25 | 26

Page 28: Michael Hobgood Architectural Portfolio 2013

PLATE & CORE DIAGRAM

FORMAL THEORY

Page 29: Michael Hobgood Architectural Portfolio 2013

25 | 26

27 | 28

MAIN BUILDING COMPONENTS

Page 30: Michael Hobgood Architectural Portfolio 2013

HEIGHT TO ARCHITECTURAL TOP

TYPICAL ATRIUMEXISTING SITE AERIAL

Page 31: Michael Hobgood Architectural Portfolio 2013

27 | 28

29 | 30

PROGRAM

Page 32: Michael Hobgood Architectural Portfolio 2013

USLACROSSECENTER

ArchiCAD | Revit | 3DS Max | Illustrator | Photoshop

ARC 302 SPRING 2011Instructor: Jianxin Hu

Page 33: Michael Hobgood Architectural Portfolio 2013

ARC 302 SPRING 2011Instructor: Jianxin Hu

*VIEW FROM DOCK

29 | 30

31 | 32

Page 34: Michael Hobgood Architectural Portfolio 2013

ArchiCAD | Revit | 3DS Max | Illustrator | Photoshop

ARC 302 SPRING 2011Instructor: Jianxin Hu

3RD FLOOR

2ND FLOOR

GROUND FLOOR

Page 35: Michael Hobgood Architectural Portfolio 2013

ARC 302 SPRING 2011Instructor: Jianxin Hu

31 | 32

33 | 34TYPICAL SECTION DETAIL

Page 36: Michael Hobgood Architectural Portfolio 2013

40' 40' 40' 40'

SECTION A-A

Page 37: Michael Hobgood Architectural Portfolio 2013

35 | 36NORTH ELEVATION

AERIAL + PROPOSED FUTURE DEVELOPMENT

Page 38: Michael Hobgood Architectural Portfolio 2013

HVAC DIAGRAMS

Page 39: Michael Hobgood Architectural Portfolio 2013

37 | 38

Page 40: Michael Hobgood Architectural Portfolio 2013

CZECH REPUBLIC

HOLESOVICE2030

AutoCAD 3D | Rhino | Sketchup | Illustrator | Photoshop

ARC 303FALL 2011Instructor: WAYNE PLACE

Page 41: Michael Hobgood Architectural Portfolio 2013

ARC 303FALL 2011Instructor: WAYNE PLACE

39 | 40

Page 42: Michael Hobgood Architectural Portfolio 2013

AutoCAD 3D | Rhino | Sketchup | Illustrator | Photoshop

ARC 303FALL 2011Instructor: WAYNE PLACE

Page 43: Michael Hobgood Architectural Portfolio 2013

ARC 303FALL 2011Instructor: WAYNE PLACE

41 | 42

Page 44: Michael Hobgood Architectural Portfolio 2013

LECA DE PALMEIRA

VISITOR’SCENTER

AutoCAD 3D | Basswood | Cardboard | Sketchup

ARC 202SPRING 2009Instructor: EPI PAZIENZA

Page 45: Michael Hobgood Architectural Portfolio 2013

ARC 202SPRING 2009Instructor: EPI PAZIENZA

41 | 42

43 | 44

Page 46: Michael Hobgood Architectural Portfolio 2013

AutoCAD 3D | Basswood | Cardboard | Sketchup

ARC 202SPRING 2009Instructor: EPI PAZIENZA

Page 47: Michael Hobgood Architectural Portfolio 2013

ARC 202SPRING 2009Instructor: EPI PAZIENZA

45 | 46

Page 48: Michael Hobgood Architectural Portfolio 2013
Page 49: Michael Hobgood Architectural Portfolio 2013

VIEW FROM BROOKS | 47 | 48

Page 50: Michael Hobgood Architectural Portfolio 2013

[Partners] David Benson | Sara Marley | Tyler Shannon | Mia Mulic | Scott Nelsen | Matt Kelly | Ethan Sitver

Page 51: Michael Hobgood Architectural Portfolio 2013

VIEW FROM BROOKS | 47 | 48

49 | 50

Page 52: Michael Hobgood Architectural Portfolio 2013

[Partners] David Benson | Sara Marley | Tyler Shannon | Mia Mulic | Scott Nelsen | Matt Kelly | Ethan Sitver

GEORGETOWN URBAN STUDY

+ MUSEUM OF THE CITY

Bloodwood | Basswood | Steel Ballast | Arches

ARC 202 SPRING 2009Instructor: SEAN VANCE

The precinct model was treated like a precious piece of hand-crafted furniture and uses rare Bloodwood’s distinct amber color to distinguish the structure of the streets which supports the urban fabric being studied. Basswood “build-ings” are constructed with varying gaps to represent estimated occupancy density and are physically and symolically supported by the street grid. The precinct’s grid is a response to the river and the canal, therefore these two critical site features act as the base which supports the rest of the precinct. The model is cantilevered over 70% with the use of embedded steel ballast that diagrams the location of water on the site.

Page 53: Michael Hobgood Architectural Portfolio 2013

49 | 50

ARC 202 SPRING 2009Instructor: SEAN VANCE

51 | 52

Page 54: Michael Hobgood Architectural Portfolio 2013

Bloodwood | Basswood | Steel Ballast | Arches

ARC 202 SPRING 2009Instructor: SEAN VANCE

Page 55: Michael Hobgood Architectural Portfolio 2013

ARC 202 SPRING 2009Instructor: SEAN VANCE

51 | 52

53 | 54

Page 56: Michael Hobgood Architectural Portfolio 2013

ELEVATION

SECTION

Page 57: Michael Hobgood Architectural Portfolio 2013

53 | 54

55 | 56

Page 58: Michael Hobgood Architectural Portfolio 2013

DETAILS

+ HAND DRAWINGS

AutoCAD | Revit | Sketchup | Pencil | Arches

ARC 301 | D101 | ARC 311 VARIOUSInstructorS: PETRARCA | RAYMOND | PLACE

Nelson Atkinson Museum KANSAS CITY / STEVEN HOLL

Page 59: Michael Hobgood Architectural Portfolio 2013

55 | 56

ARC 301 | D101 | ARC 311 VARIOUSInstructorS: PETRARCA | RAYMOND | PLACE

RDU TERMINAL 2 CASE STUDY | 57 | 58

Page 60: Michael Hobgood Architectural Portfolio 2013

AutoCAD | Revit | Sketchup | Pencil | Arches

ARC 301 | D101 | ARC 311 VARIOUSInstructorS: PETRARCA | RAYMOND | PLACE

1

2

3

4

5

6

7

8

9

10

1

1

2

3

4 5

6

7

8

9

10

3”=1’ WALL SECTION

1 0.8mm aluminum covering roof sealing layer; 13mm oriented-strand board; 75mm two layer rigid foam thermal insulation; steel trapezoidal-section roof decking, 75mm thick

2 two-layer bituminous seal with mineral granules; 150mm polyurethane ther-mal insulation sealing layer; 90mm reinforced concrete on steel trapezoidal-section roof decking, 75mm thick

3 57/400/6mm channel glass; 24mm capilary insert PMMA, 57/400/6mm channel glass in 110mm aluminum frame

4 10mm perforated composite wood accoustic slab; 25mm glass-fiber thermal insulation, aluminum system

5 Projection screen 6 Laminated safety glass (2x9.5mm) etched internally 7 25mm galvanized steel grating, 100/100mm steel SHS frame

8 Ash parquet 25/100mm; black polyurethane coat on 90mm reinforced con-crete on trapezoidal-section decking, 75mm thick

9 3mm (approx.) spray-applied acoustic plaster; 12.5mm plasterboard, bent to shape; 25mm insulating mat, bent to shape; 35mm steel-section supporting structure

10 12.5mm plasterboard, painted; 12.5mm plywood; 12.5mm plasterboard; 92mm steel channel posts; vapor-retarding layer; 92 mm glass-fiber thermal in-sulation; 16mm plasterboard

Page 61: Michael Hobgood Architectural Portfolio 2013

ARC 301 | D101 | ARC 311 VARIOUSInstructorS: PETRARCA | RAYMOND | PLACE

1

2

3

4 5

6

7

ATKINSON MUSEUM CASE STUDY | 59 | 60

Page 62: Michael Hobgood Architectural Portfolio 2013
Page 63: Michael Hobgood Architectural Portfolio 2013

8

59 | 60

HAND DRAWINGS | 61 | 62

Page 64: Michael Hobgood Architectural Portfolio 2013

250’

260’

160’

120’

30’

400’

GROUND

250’

260’

160’

120’

30’

400’

GROUND

Page 65: Michael Hobgood Architectural Portfolio 2013

9

33’

100’

232’

326’

63’100’

130’

120

LEVEL 83

33’

100’

232’

326’

63’100’

130’

120

LEVEL 83SCHEMATIC DETAILS | 63 | 64