michael sol collection - milwaukeeroadarchives.com

2
154 THE RAILWAY AND ENGINEERING REVIEW :\1arch 16, 190!. thereof shall be admitted as evidence or used for any purpo e against such railroad so making such report in any uit or action for damages growing out of any matter mention ed in saici report. Sec. 4. "That the Int er stat Co mmerce Commis- sion i autho ri zed to prescribe for uch ommon c: uri ers a meth od awl form for makin oo the report s in the foregoino- section pro,· id ed." Appro\ TCd, Mar<:11 3, 1901. New C., M. & St. P. Ore Dock at Esc anaba, Mich. There has r tt> nlly been completed at E ·canal.Ja , )li ch., fo r the Chicao-o, : filwauk ee & t. Pau l Ry .. aa ore dock Of modern de ig n, whic h, in point of capac ity and in re p ct of the engineering work irwolvcd, take· ra nk with the mo t noted t ru c tures of this clas in thi co un t r y. The dock ha been bu il t to handle the ore business of the C., & St. a nd l ight te nd er formerly used on the vestib ule trains of this compa ny between Chicago and 1in- ncapoli . Th i car wa set up between the yard and the dock, and it al o furnished light, by both arc and incandescent la mp , for the ni ght opera- tion , the wor k on the clock being pro ecuted both ni ght and dny. 'l'he work of driving pi le for the foundation of the do ·l< wa · ta rt ecl .\ pril 5. WOO, n t tlre ea t end of the dock. All of the pi l · iu the wnt er, for both the dock nncl the adjoining enll of the approach, were driv en by wat er j t, two tra ck pile driver being ri gged up wit h app:uat us for this purpose. In the erect ion of the cl o<" k cach of the four tier of bent (the A-fram e au tl poeket ' coun ting ns two l.Jc·nt s) as rectecl ·epa rat el y. The gen era l direc- tion of the dock i ea ·t and The work of erecting the bottom tier of bents was ta r ted at tbe ea t end, or that \Y hi h show at the right hand in FIG. 1- GENERAL VIE W, EW C., "!\1. & ST. P. RY. ORE DOCK, E CANABA, l\1 ICH. P. Ry., which will be deliv er d to it o,·er the new Fig . 1 an d 2, a nd proceeded toward the we t. The line of this ompany (the E canaba & Lake Su- erect ing derrick wa t hen ja cked up to the n ext perior Ry .) from Channing to E canab a. The do · k level and ru n ba ck to the ea t end, wh re it started proper i 750 ft. long, 52 ft. wide on top, 59 ft. wide on the erection of the eco nd tier of bents. At th' out to out of fende r rails and 66¥2 ft. high above co mpl et ion of thi tier th e dock derrick was li fted the water. It ha 120 pocket and it capac i ty i Uf J to the thi rJ level by a derrick on the approach, 2 ,000 tons of ore. A gene ral view of the dock i a nd th en the dock derrick began the erection of th<' hown as Fig. 1 of the accom panying illu st rati ons. A-frame, moving from the west toward th e east and The trestle approach to the dock is 3100 ft. in length , making the co mbin ed le ngth of the do ck nnd approach, which a lso appear s in the figur e, practi ca ll y three -qu art r of a mi le. Fig u re 2 is a view of the east end of the dock, and Fig. 3 is a eros ec tion showing the gene ral dimension and framing. At the time wo rk wa tarted on this dock, about one yea r ago, the low-lying land urroundin <> the ite of the dock and the approac h to th e same w as cover ed thickly with eco nd -g r owt h trees and un- de rbru h, thu neces Hating the cleari ng of a con- s iderable ar ea of land. A ve ry essential feat ure of the work , pre li minary to that of bu ilding the dock, wa s the laying out of a temporary timber ya rd for handlin"', to ring a nd f ramin o- the very Iaroo e quan- tity of timber requir ed in co n tr u ct ion. Thi yard i illu trated in F ig. 4. It con i ted of fo ur t ra cks, of a combined lengt h oE abo ut 2¥2 m il es . All th es<' tr acks app ea r in th e figure. The inb ound l umb er wa brought over th e two tracks whicL appear :tt the left, a nd between these two trac ks there wa a aw m ill wher e a ll the ti mbe r were cut to length for framing , and numb ered for the exact po ition in th e clock. The boiler and part of t hi aw mill appear at the left, in th e view . Th e next track to th e ri ght , or the third one fr om the lef t, wa s th e loading track, between which and the second tra ek ' ·ere grea ed way s l aid to a sl ight down g rad e o•er the inter vening s pa ce, which wa about 100 ft. Th e loading track was depr es ed about 2¥.. ft. , nn arrangement by whic h the wo rk of moving the tim- ber from the ways and onto tbe cars wa s much fa cilitated. Th e c urv ed track b ran ch ing out f r om thi loading track was the p ur over which the timb er was moved for delivery to the dock. 'Ihi t ra ck extend ed along the north id e of the dock its who le l ngtb. Th e track at the ex tr eme ri ght u ed for the deli very of mat erial whi ch re- qu irecl to be store d. Th e eri of clark object app earin o- along thi track we re heaps of spo uts for the po l ;ets. La rge quanti ti es of oth er material was a! o tempor arily tor ed along thi tra ck. Thi ya rcl stood near the water, at right angle to the "'eneral direction of the do ck a nd approa ch. Th e Yie w wa s taken from the approach to the dock, th e latt er being towaro the right hand, in the pi ct ur e. FIG. 6- PILE DRIVER AT VVORK ON THE A.l'PROACH, E CA ARA ORE DocK. fo ll owed by the approach derri ck, which was used in ere ct ing the top. Th e work of erection in prog- res i shown in Fig. 5. The tr aveling de rri ck ap- · p ea r on the second level, erecting the second tier of bents, from the e ast toward the west . The tem- porary track on which the timb er were delivered within reach of the derri ck appears in the view. .... L..c -- Fo r hand lin "' cars of timb er to and from the yard a swit ch engine was co nstant ly at the ervice of th e er ectin<> force. All boring, both at the mill and on th e do k, wa done with pn eu matic boring ma - chine . ompres ed air wa uppli ed from a heat FIG. 3-Cnoss SECTION OF EscA.NARA ORE DocK, C., M. & ST. P. RY. Michael Sol Collection

Upload: others

Post on 08-Jun-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Michael Sol Collection - milwaukeeroadarchives.com

154 THE RAILWAY AND ENGINEERING REVIEW :\1arch 16, 190!.

thereof shall be admitted as evidence or used for any purpo e against such railroad so making such report in any uit or action for damages growing out of any matter mentioned in saici report.

Sec. 4. "That the Interstat Co mmerce Comm is­sion i autho ri zed to p rescribe for uch ommon c:uriers a method awl form for makin oo the reports in the foregoino- section pro ,·ided ."

Appro\TCd, Mar<:11 3, 1901.

New C., M. & St. P. Ore Dock at Escanaba, Mich.

The re has r tt>nlly bee n co mpleted at E ·canal.Ja , )lich., fo r the Chicao-o, :filwauk ee & t. Pau l Ry .. aa ore dock Of modern de ign, whi ch, in point of capac ity and in re p ct of the eng ineerin g work irwolvcd, take· rank with the mo t noted tru ctures of this clas in thi co un try. The dock ha been buil t to handl e the ore business of the C., ~1. & St.

a nd light tender formerly used on the vestibule trains of this company between Chicago and 1in­ncapoli . Th i car wa set up between the yard and the dock, and it al o furnished light, by both arc and incandescent lamp , for the night opera­tion , the work on the clock being pro ecu ted both night and dny.

'l'he work of driving pi le for the foundation of the do ·l< wa · ta rtecl .\ pril 5. WOO, n t tlre ea t end of the dock. All of the pi l · iu the wnter, for both the dock nncl the adjoining enll of the approach, were driven by water j t, two tra ck pile driver being rigged up wit h app:uatus for this purpose. In the erection of the cl o<" k cach of the four tier of bent (the A-frame au tl poeket ' cou nting ns two l.Jc·nts) " ·as rectecl ·eparately. The general direc­tion of the dock i ea ·t and we~t. The work of erecting the bottom tier of bents was tar ted at tbe ea t end, or that \Y hi h show at the right hand in

FIG. 1- GENERAL VIEW, EW C., "!\1. & ST. P. RY. ORE DOCK, E CANABA, l\1ICH. P. Ry., which will be deliver d to it o,·er the new Fig . 1 and 2, and proceeded toward the we t. The line of this ompany (the E canaba & Lake Su- erecting derri ck wa then ja cked up to the next perior Ry.) f rom Channing to E canaba. The do · k level and run back to the ea t end, wh re it started proper i 750 ft. long, 52 ft. wide on top, 59 ft. wide on the erection of the econd tier of bents. At th' out to ou t of fender rails and 66¥2 ft. high above completion of thi tier the dock derri ck was lifted the water. It ha 120 pocket and it capacity i UfJ to the thi rJ level by a derrick on the approach, 2 ,000 tons of ore. A general view of the dock i and then the dock derrick began the erection of th<' hown as Fig. 1 of the accompanying illustrations. A-frame, moving from the west toward the east and

The t res tle approach to the dock is 3100 ft. in length, making the combined length of the dock nnd approach, which a lso appears in the figur e, practically three-quart r of a mi le. Figure 2 is a view of the east end of the dock, and Fig. 3 is a eros ection showing the general dimension and framing.

At the time work wa tarted on this dock, about one year ago, the low-lying land urroundin <> the

ite of the dock and th e approach to the same was covered thickly with econd-growth trees and un­derbru h, thu neces Hating the clearing of a con­siderable area of land. A very essent ia l feature of the work, preliminary to that of building the dock, was the laying out of a temporary timber yard for handlin"', toring and framin o- the very Iarooe quan­tity of timber required in co n truction. Thi yard i illu trated in F ig. 4. It con i ted of four tracks, of a combined length oE about 2¥2 miles. All thes<' t racks appea r in th e figure. The inbound lumber wa brought over the two tracks whicL appear :tt the left, and between these two tracks there wa • a aw m ill where a ll the t imber were cu t to length for framing, and numbered fo r the exact po ition in the clock. The boiler and part of t hi aw mill appear at the left, in the view. The next track to the right, or the third one from t he lef t, wa s the loading track, between whi ch and the second traek ' ·ere grea ed ways laid to a slight down grad e o•er the intervening space, which wa about 100 ft. The loading track was depres ed about 2¥.. ft. , nn arrangement by which the work of movin g the tim­ber from the ways and onto tbe cars was much fa cilitated. The curved track branching out f rom thi loading track was the pur over whi ch the timber was moved for delivery to t he dock. 'Ihi t rack extended along the north ide of the dock its whole l ng tb. The track at the extreme right wa~ u ed for the delivery of material which re­qu irecl to be stored. The erie· of clark object appearino- a long thi track were heaps of spouts for the po l;ets. La rge quanti ties of other material was a! o temporarily tored alon g thi track. Thi ya rcl stood near the water, at right angle to the "'eneral direction of the dock and approach. The Yiew wa s taken from the approach to the dock, the latter being towaro the r igh t hand, in the picture.

FIG. 6- PILE DRIVER AT VVORK ON THE A.l'PROACH, E CA ARA ORE DocK.

followed by the approach derrick, which was used in erecting the top. The work of erection in prog­res i shown in Fig. 5. The t raveling derrick ap- · pear on the second level, erecting the second tier of bents, from the east toward the west. The tem­porary track on which the timber were delivered within reach of the derrick appears in the view.

.... L..c - -For handlin"' cars of timber to and from the yard

a switch engine was constantly at the ervice of the erectin<> force. All boring, both at the mill and on the do k, wa done with pneumatic boring ma­chine . ompres ed air wa upplied from a heat FIG. 3-Cnoss SECTION OF EscA.NARA ORE DocK, C., M. & ST. P. RY.

Michael Sol Collection

Page 2: Michael Sol Collection - milwaukeeroadarchives.com

March 16, 1901. THE RAILWAY AND ENGINEERING REVIEW ISS

FIG. 4 - TIMilER YARD FOR ERECTIO OF

The tre tie approach to the · dock i on an up­grade of % per cent. In point of construction thi trestle may be divided into three ection of nearly equal length. Starting from the ground end the first section, of about 1000 ft. length, Ol' to the point where the trestle reache a bight of 27 f t., con ists of pile bents. The remainder of the tre tie, or for a di tance of about 2100 ft., con ists of f ramed bent , the cond or midd le section being one deck hi h and the third ection, or that ad­joining the dock, being two deck high. The pile foundation for the framed bent were cut off on a line parallel with the grade of the track, about 3 ft. above ground at the lowe t framed bent. The tre -tie at its higbe t point is 65 ft. high. Figure 6 show one of the tandard track pile driver of the C., M. & t. P. Ry. at work on the pile bents of the approach. On other part of the approa ch a land driver was al o u ed.

The framed portion of the tre tie one deck high wa erected by means of a traveling derri k work­ing on the pile foundation, moving toward the ea. t and rai ing the bent in the rear. On the two-neck section of the trestle the method of e rection wa by the arne traveling de rrick, workin"' fir~t on the top of the first deck and erecting the bents in advance, and then rewrnin"' on the arne level and erectin"' the top bents in tbe r ear. All of the erection der­rick , for both the clock and the apJ,Jroach, were operated by team.

The track over the pocket of the dock consist of four rail on each side (Fig. 3), all laid to stan­dard gage, which arrangement provide three track , any one of which an be used by mean of a three-throw witch arrangement, a de cribed ann illu h·ated in the Railway and Engineering Review of Dec. 22, 1900, page 719. For the protection of the clock a ain t fire there is an elaborate fire­extinguishing ystem operated by a pumping plant on bore.

The spout and hoists for the 120 pockets of the

ESCANABA ORE DOCK. FIG. 5-EHECTIO WORK IN PROGRES , ESCANABA ORE DOCK.

dock are of the Denton pattern, furni bed by P et- the \ e ·eJ, it is raised to the horizontal by the

tibone, 1ulliken & Co., oE hicago. A general •\iew cou nte rweight, and from the horizontal up to the

or the e pout appears in Figs. 1 and 2, ancl l<' i~. 7 upper po ition it i lifted by winding on the winch

i a near view bowing the hoi ting winches in bet- The clo k stand between two channels or lip

ter detail. 'l'he spout are counterbalanced and are dredged to a depth of 20 ft., the slip on the south

operated by one man. Referring to the winch for s ide being 175 ft. wide and that on the north ide

pout "o. 119 (Fig. 7) the heave for lifting the 200 ft. wide. The excavation in the e slips amount-

spout app ar at the right. The counterbalance ell to 500,000 c u. yd . The timber in the dock and

11'IG. 7 - WINCHES FOR HOISTING POUTS, ESCANABA ORE DOCK.

hang on a conical-shaped pulley at the left, or on approach aggregates 5, .000 ft., B . M., and the

th opposit side of the upporting post. The piling mea ures 207,000 lineal ft.

po uts are wound part of the way, in moving both All the work of con truction was done by the mil-

up and clown, and the gearing i so arranged that way company' own employee . The plans for all

the crank is always turned in the arne dir ction the work wet'e drawn under the supcrvi ion of Mr.

r gardle s of the direction in which the spout is Onward Bate , engineer and superintendent {}f

moving. From its upper position the spout drop bricl,.es and buildings. Mr. J. C. Hain was tb en-

as far as the horizontal by gravity, but below tl1e "ineer in charge, and l\Ir. W. E. Smith was the su-

horizontal it is necessary to wind it clown. In lift- perintendent of construction. 'Ve are Indebted to

in the spout from its lowermo t po ition, or from a ll of these gentlemen for plan , photograph and data. The dock was completed for shipment of ore Oct. 15. 1900.

Highway Crossings.

Committee R eport to the American Railway En­gineering and Maintenance-of-way Assn.

It is believed that little con !deration need be gh·eu by the as ociation to the numerous crossings of coun­try roads on which travel is infrequent and wher ' no special sources of danger exi t . Although in cer­tain sections, where trains are numerou and high­way traffic heavy, there is a tend~ncy to the gradual elimination of all surface eros ings, the operation of a very large part of our railroad mileage cau e few accidents at the les dangerous crossings, and the prospect of any general and radical cbane:e of method is quite remote.

The theory of protection on which the tate law and, of course, railroad practice proceed is to wam persons near th crossing of the approach of a train, by sign, whistle and bell, and then depend on them to avoid it.

The whistling post on single track i always lo­cated on the engineer's ·ide. about a quarter of a mile from the cro ing and the sign so as to be con­spicuously een from the highway. The form of the ign is necessarily modified by the requirement of the

prescribed lettering, and it i not deemed desirable to recommend a standard form.

Fro. 2-EAST l!JND OF EscANABA ORE DocK, C., M. & ST. P. RY.

The physical condition and arrangement of the crossing should be such as to facilitate the pa sage of a vehicle in the shortest possible time, and with the best possible view of the track. The planking should be mootb. the drainage good, and the grades easy. In the case of those crossings whe~e. for any reason, the whistle and bell cannot be beard, or the approaching train seen, the electric alarm bell bas been resorted to with satisfactory results, giving ad-

Michael Sol Collection