micronas jig

22
Great Company Great People 2006.02.14 Dong-Yul Jung DDC Laboratory CM Gr. 1 VCTI Upgrade Instruction 2 SCALER Upgrade Instruction ISP Manual

Upload: abraham-ioan

Post on 20-Mar-2016

280 views

Category:

Documents


8 download

DESCRIPTION

doc , micronas jig interface

TRANSCRIPT

Page 1: Micronas Jig

Great Company Great People

2006.02.14

Dong-Yul Jung

DDC Laboratory CM Gr.

1 VCTI Upgrade Instruction

2 SCALER Upgrade Instruction

ISP Manual

Page 2: Micronas Jig

Blue Ocean P³ InnovationGreat Company Great People 2 /22

LGE Confidential

VCTI Upgrade Instruction

CHAPTHER 1

Page 3: Micronas Jig

Blue Ocean P³ InnovationGreat Company Great People 3 /22

LGE Confidential1.1 Preparation for External ISP

1. Use VCTI JIG outside a SET to connect with an Internal Memory of VCTI IC for ISP

- Connect VCTI JIG, PC and SET (Refer to pictures) ⓐConnect VCTI JIG with Printer Port of PC directly ⓑConnect USB Cable between VCTI JIG and USB Port of PC

(Supply Power to VCTI JIG using USB Cable) ⓒUsing DsubToDVI Cable, connect VCTI JIG with a SET ⓓBe sure to leave PUSH SWITCH of VCTI JIG pressed before plugging

into POWERCORD ⓔSupply Power to POWERCORD plugged into a SET ⓕCheck if LED is red in a SET (STAND-BY status) ⓖPress PUSH SWITCH of VCTI JIG to be released

Internal FLASH Memory of VCTi IC

External FLASH Memory of SCALER IC

DVI

ML041E(23/26/32inch)

<VCTI JIG Switch>

▷ ML041E/F SET has two memories of ISP(In-System-Programming).

VCTi: Connection

RZ/RT-23/26/32LZ55C/H

Page 4: Micronas Jig

Blue Ocean P³ InnovationGreat Company Great People 4 /22

LGE Confidential1.1 Preparation for External ISP VCTi: Connection

Stereo PhoneJack Type

ML041F(20inch)

USB

VCTI Jig

Jig for 20”

RZ/RT-20LZ50C

Internal ISP cable

Note bookLPT

Page 5: Micronas Jig

Blue Ocean P³ InnovationGreat Company Great People 5 /22

LGE Confidential

2. Execute ISP inside FLASH MEMORY of VCTI IC to connect directly to CHASSIS

- Connect VCTI JIG, PC and SET (refer to the above picture)

ⓐConnect VCTI JIG with Printer Port of PC directly ⓑConnect USB Cable to VCTI JIG, USB Port of PC

(Supply Power to VCTI JIG using USB Cable) ⓒUsing 15P D-SUB Cable, connect VCTI JIG with a SET ⓓBe sure to leave PUSH SWITCH of VCTI JIG pressed before plugging into POWERCORD ⓔSupply Power to POWERCORD plugged into a SET ⓕCheck if LED is red in a SET (STAND-BY status)ⓖPress PUSH SWITCH of VCTI JIG to be released

1.2 Internal ISP(improper to use External ISP)

ML041E(23-32inch)ML041F(20inch)

3PIN WAFER

3PIN WAFER

USB

USBPORT

VCTIJIG

PC(Notebook)

VCTi: Connection

Page 6: Micronas Jig

Blue Ocean P³ InnovationGreat Company Great People 6 /22

LGE Confidential1.3 Program Installation

<How to INSTALL>

1.Install VISUAL I2C Program ▶ Setup_Visual_I2C_v3-1-7c.exe

2.Install LPT DRIVER ▶ if(OS==WIN98)

INSTALL(Setup_LptDrv_v0104_9x.exe) ;if(OS==WIN2000)

INSTALL(Setup_LptDrv_v0104_NT.EXE) ;if(OS==WIN XP)

INSTALL(Setup_LptDrv_v0202_XP_2000.EXE) ;

3.Double click ‘vct49xyi_start.vi2c’ in the folder ‘VCTiVIIC’

Double click this file to execute.

1

2

VCTi : Installation

Page 7: Micronas Jig

Blue Ocean P³ InnovationGreat Company Great People 7 /22

LGE Confidential

Check Point.

1.If LPT Driver is set up, You can see LPT1 or LPT2….and LPT driver must be ECP mode in CMOS of the PC

Click File->Preferences->LPT Preferences.

2.If upload speed is too fast, you can increase delay time. Maybe ‘7’ is proper at WindowsXP and ‘1’ at Windows2000.* Normal upload time is minimum 1minute.

3.If the upgrade failures although this process, I think there are some problems in JIG. You have to change JIG another things.

1.3 Program Installation VCTi : Setup

3

Page 8: Micronas Jig

Blue Ocean P³ InnovationGreat Company Great People 8 /22

LGE Confidential

더블클릭하여 실행시킨다.

4

Click on TVT to open a new window.

5

This is the path and name of the firmware.

Double click it to select the firmware.

1.4 ISP Execution VCTi : Upgrade

Page 9: Micronas Jig

Blue Ocean P³ InnovationGreat Company Great People 9 /22

LGE Confidential

6

1

2

1.4 ISP Execution VCTi : Upgrade

choose the firmware to upgrade VCTi.

3

Page 10: Micronas Jig

Blue Ocean P³ InnovationGreat Company Great People 10 /22

LGE Confidential

Click a small square slowlyuntil is displayed. “16” ison the screen. (If “16” is not displayed, VctiIs not as Slave. Control SCL to be LOW)

7 2

3

Click [Erase Flash] twiceevery 1 second.

Click [Load Bin Flash].You can see the progress

status of upload in a pop-up window.

Pop-up window displaysthe progress. A window isclosed if upload is completed.

Pre-Condition 1. Press JIG switch 2. Plug POWER CORD to a

SET 3. Release JIG switch

If SCL is low when POWER is ON, VCTi is SLAVE. You can control

from PC.

1

4

1.4 ISP Execution VCTi : Upgrade

Page 11: Micronas Jig

Blue Ocean P³ InnovationGreat Company Great People 11 /22

LGE Confidential

SCALER Upgrade Instruction

CHAPTHER 2

Page 12: Micronas Jig

Blue Ocean P³ InnovationGreat Company Great People 12 /22

LGE Confidential

1. Use SCALER JIG outside a SET to execute ISP in SCALER FLASH Memory

- Connect with SCALER JIG, PC and a SET (refer to the above picture)

ⓐConnect SCALER JIG with Serial Port of PC directly (ex. COM1) ⓑUse USB Cable to supply power to SCALER JIG.

(USB Cable is used for supplying power to IC in JIG) ⓒUse DsubToDVI Cable to connect JIG with a SET.

- SCALER JIG is operated if a SET is ACTIVE. (with the screen on, power LED is green) (it is not operated if STAND-BY status, power LED is red)

2.1 Preparation for external ISP

DVI

ML041E(23/26/32inch) ML041F(20inch)USBPORT

SCALER JIG

D-SUB

COMPORT

SCALER: Connection

RZ/RT-23/26/32LZ55C/H

Page 13: Micronas Jig

Blue Ocean P³ InnovationGreat Company Great People 13 /22

LGE Confidential2.1 Preparation for external ISP SCALER: Connection

RZ/RT-20LZ50C

Stereo PhoneJack Type

ML041F(20inch)

USB

Scaler Jig

Jig for 20”

Internal ISP cable

Note book

RS232C

Page 14: Micronas Jig

Blue Ocean P³ InnovationGreat Company Great People 14 /22

LGE Confidential2.2 Internal ISP (Improper to use External ISP)

3. Using SCLER JIG in Chassis, execute ISP in SCALER FLASH Memory

- The connection between SCALER JIG, PC and Chassis is like the above. ⓐ Connect SCALER JIG with Serial Port of PC (ex. COM1) directly. ⓑ Supply power to SCALER JIG with USB Cable.

(USB Cable is used to supply power to IC in JIG) ⓒ Use 4P Cable to connect JIG with Chassis.

-SCALER JIG is operated if a SET is ACTIVE (the screen is on, power of LED is green). (it is not operated if STAND-BY status, power of LED is red)

*Position of 4 Pin wafer is different from each Chassis.

ML041F(20inch)

SCALERJIG

ML041E(23-32inch)

SCALER: Connection

Page 15: Micronas Jig

Blue Ocean P³ InnovationGreat Company Great People 15 /22

LGE Confidential

2. Check before executing SCALER ISP outside a SET

ⓐClick “INSTART” in SERVICE ADJUST REMOCON.(If you don’t have SVC Remocon, Press simultaneously the ‘MENU’ keys both on the remote control and the local key, for about 10seconds)

ⓑModels have OSD like the above pictures. ⓒPress Up and Down Key on the remote controller to move the cursor to ‘Download’(SCALER upload). ⓓPress Right Key on the remote controller. ⓔSCALER ISP becomes available.

(* To execute an Internal ISP on CHASSIS, this is unnecessary)

2.3 Preparation for ISP SCALER: change mode

Scaler D/N

20” Over 23”

Page 16: Micronas Jig

Blue Ocean P³ InnovationGreat Company Great People 16 /22

LGE Confidential2.4 Program Installation SCALER : INSTALL

1 Install these two software.

When the installation completes, the program isinstalled in the path of [C:₩Program Files₩Genesis Microchip₩GProbe 5].1. Copy and Paste1folder ‘ISP’ into the GProbe 5

folder.

2

1

Page 17: Micronas Jig

Blue Ocean P³ InnovationGreat Company Great People 17 /22

LGE Confidential2.5 ISP Execution SCALER : Execution

Double click this file to execute the program

Page 18: Micronas Jig

Blue Ocean P³ InnovationGreat Company Great People 18 /22

LGE Confidential

2

2

1

Click the ‘GProbe connection setup’

2.5 ISP Execution

Select[SERIAL1], [COM1],[115200]

SCALER : Setup

Page 19: Micronas Jig

Blue Ocean P³ InnovationGreat Company Great People 19 /22

LGE Confidential2.5 ISP Execution SCALER : Test

TESTType ‘test’ and press ‘Enter’ key on the keyboard.It will check whether it is connected correctly or not.

3 Press this icon to connect1

2

Page 20: Micronas Jig

Blue Ocean P³ InnovationGreat Company Great People 20 /22

LGE Confidential2.5 ISP Execution SCALER : Batch file

Double click this batch file to change the path of firmware for Scaler.

4

1

Change the directory and file name.2

Page 21: Micronas Jig

Blue Ocean P³ InnovationGreat Company Great People 21 /22

LGE Confidential

5

1

2

upload Procedure.

2.5 ISP Execution SCALER : Upgrade

3

4

Page 22: Micronas Jig

Blue Ocean P³ InnovationGreat Company Great People 22 /22

LGE Confidential

6

Emergency: How to handle if Test is successful but upload is failed ;

1. Remove Power cord

2. Remove FLASH ROM

3. Re-connect Power cord with a Set

4. Switch on a Set

5. Insert FLASH ROM into a Slot

6. Execute Batch file again to start upload

2.5 ISP Execution

=> When upload completed, Reset the Power

SCALER : Upgrade