Owner Technology Engineer Project ValueCity of Somersworth Microsand Pretreatment
SystemWright-Pierce $7,038,941
SCOPE OF SERVICES
Equipment Setting•
Phased Site Work•
Concrete Construction•
Piping & Process Treatment•
MIC
RO
SA
ND
PR
ET
RE
AT
ME
NT
SY
ST
EM
SO
ME
RS
WO
RT
H, N
H
Methuen Construction prepared a 110-year-old building to acceptthefirstBallastedMicrosandPretreatmentsystemintheNortheastwhilemaintaining3MGDofplantflowandassociated treatment. After optimizing the new pretreat-ment systemMethuen refurbished a 30-year-old upflowclarifier filtering system by replacing and installing fourMulti-Media Underdrain Filters. In addition, sections of the historic building were converted into Chemical Treatment rooms without negatively impacting the existing architec-tural detail.
PROJECT DESCRIPTION
PROJECT HIGHLIGHTS
Winner of 2008 ABC Excellence in Construction Eagle Award
-
Earth Tech Town of Clinton, MA $11.6 Million Water Filtration
Plant
SCOPE OF SERVICES
PROJECT DESCRIPTION
Methuen Construction Co., Inc. | 40 Lowell Road, Salem, NH 03079 | Phone: 603-328-2222 | FAX: 603-328-2233
www.methuenconstruction.com
WA
TE
R F
ILT
RA
TIO
N P
LA
NT
C
LIN
TO
N, M
A
General Contractor responsible for:
Site Work & Excavation
Concrete
Equipment Set, Installation & Testing
Process Piping & Mechanical Construction
Building Construction & Landscaping
This project presented multiple challenges for the
project team. The first, and most significant, was
overcoming serious errors made during the original
design of the new facility. Methuen Construction
worked closely with the new design team and the
Town to make the needed revisions to the scope,
construction schedule and equipment to ensure the
completion of a successful project. The owner
acknowledged MC’s willingness to resolve issues in an
“efficient, cost effective, and expeditious manner.”
“In my opinion this is the finest water
t r e a t m e n t p l a n t i n t h e
Commonwealth ,” Christopher
McGown, Supt. of Public Works,
Town of Clinton. Worcester
Telegram & Gazette, 9/14/07.
CLIENT RECOGNITION
-
Tata & Howard Town of Wayland $8.0 Million Membrane Filtration
SCOPE OF SERVICES
PROJECT DESCRIPTION
Methuen Construction Co., Inc. | 40 Lowell Road, Salem, NH 03079 | Phone: 603-328-2222 | FAX: 603-328-2233
www.methuenconstruction.com
General Contractor for entire project coordinating
efforts of all major suppliers and subcontractors
including Sitework, Utilities, Concrete, Structural Steel,
Controls, Process Piping, Mechanical, Commissioning.
WA
TE
R T
RE
AT
ME
NT—
ME
MB
RA
NE
FIL
TR
AT
ION
W
AY
LA
ND
, MA
1.5 MGD Water Treatment Facility utilizing Membrane
Ultra Filtration to remove iron and manganese from the
drinking water supply. Work included construction of a
new Masonry building above concrete holding tanks,
replacement of existing well pumps, Ozone Generation,
Compressed Air, Membrane Filtration, Chemical Feed,
and SCADA systems. The scope of work also included
upgrades to the existing Waterworks building, a
Backwash Filter Structure, new Septic System and
various MEP elements.
Methuen was able to successfully complete the project
on-time and well under the Town of Wayland’s budget,
without impacting the environmentally protected
Baldwin Pond ecosystem or Wayland Waterworks
operations.
PROJECT HIGHLIGHTS
Constructed State of the Art Water
Treatment Facility on a “postage
stamp” site along the banks of
Baldwin Pond while maintaining the
Wayland Water Works Facility and
Maintenance Garage at same locale.
-
Earth Tech City of Gardner, MA $3.7 Million Ultra-filtration
Membrane Filtration
SCOPE OF SERVICES
PROJECT DESCRIPTION
Methuen Construction Co., Inc. | 40 Lowell Road, Salem, NH 03079 | Phone: 603-328-2222 | FAX: 603-328-2233
www.methuenconstruction.com
3 M
GD
W
AT
ER
T
RE
AT
ME
NT
FA
CIL
IT
Y
GA
RD
NE
R, M
A
Provide construction management, sitework,
concrete work, miscellaneous metals,
structural metals, carpentry, thermal and
moisture protection.
Provide doors, frames, hardware, windows,
floor hatches, gypsum wallboard, resilient
tile flooring, acoustical ceilings and building
specialties.
Setting of process equipment, installation of
lab equipment and loading dock equipment.
Fabrication of stainless steel process piping.
Furnish and install process piping and raw
water intake, set field instruments and
provide electrical trenching.
The Crystal Lake Water Treatment Facility is a new facility designed to treat and deliver to
the City of Gardner water distribution system a minimum of 3 million gallons per day.
Construction of the main treatment building was on the shore of Crystal Lake and required
continuous protection of the lake during the construction project. The project included a
twenty-four inch diameter supply line that extended one-hundred feet into the lake and was
secured in a saddle to assure continuous supply. Primary filtration consists of four trains of
Koch membrane ultra-filtration systems. Each train is capable of delivering One Million
gallons of finished water. Normal operation is with three trains in operation and one on
standby.
-
www.methuenconstruction.com
Methuen Construction Co., Inc. | 40 Lowell Road | Salem, NH 03079 | Phone: 603.328.2222 | Fax: 603.328.2233
Owner Technology Engineer Project ValueTown of Westford, MA Green Sand Filtration Dufresne-Henry $11,000,000
SCOPE OF SERVICESGeneral Contractor including self-performed site work, concrete, yard piping, structural steel, wood frame construction, equipment installation, process and chemical piping, and coordination of system startup.
Before the construction of these plants, the Town had to field an average of ten calls per day regarding water quality. Since going on line in the Spring of 2003, the calls have been non-existent. Typically, on a public project the Contractor builds strictly ac-cording to the plans and specs. Through value engineering ef-forts of the Methuen Construction team, we were able to make changes which resulted in added value to the Owner without significant changes in the cost. When we asked the Owner to grade us on our service, we received an average of +2.78 within a scale of -3 to +3, with more than 80% of the marks scoring a +3. This is a valued measurement in regard to customer satis-faction at Methuen Construction, and this project also met the ultimate goal: the ability to provide pure drinking water to the residents of Westford.
WA
TE
R T
RE
AT
ME
NT
FAC
ILITY
W
ES
TFO
RD
, MA
The Westford Water Treatment Plants consisted of a 14,540 square foot facility at the Forge Village site and an 11,230 square foot facility at the Nutting Road site. Each plant treats up to 3-million gallons per day of water from the town’s 8 wells. Construction of the facilties included the installation of three 10’ diamater by 37’ long pressurized green sand filters; chemical feed systems consisting of Potassium Hydroxide, Potassium, Permanganate, Aluminum Sulfate, and Sodium Fluoride; MIOX generators; Ultraviolet purification; Aeration towers; and sup-porting equipment and piping.
PROJECT DESCRIPTION
PROJECT HIGHLIGHTS
Winner 2003 ABC Excellence in Construction Eagle Award
-
www.methuenconstruction.com
Methuen Construction Co., Inc. | 40 Lowell Road | Salem, NH 03079 | Phone: 603.328.2222 | Fax: 603.328.2233
Owner Technology Engineer Project ValueLowell Regional Water
UtilitySecurity System & Facility Upgrades
Woodard & Curran $3,589,072
SCOPE OF SERVICES
Security System Upgrade•
Residual Lagoon Reconstruction•
Chemical Feed Upgrades•
Construciton of Booster Pump Station•
WA
TE
R T
RE
AT
ME
NT
PLA
NT
UP
GR
AD
ES
LOW
ELL, M
A
PROJECT DESCRIPTION
This project required Methuen Construciton to assist the Lowell Regional Water Treatment Facility implement a series of up-grades to its existing water treatment facility. MC installled metal security screens fabricated by MC subsidiary Summit Metal fabri-caotrs to meet a MA DEP mandate for water security and safety. In addition, MC installed new chemical pumps and buillt a seper-ateboosterpumpstationtoimproveefficiencyandperformance.Finally, the project required MC to dredge two existing lagoons to ensureproperwaterflowandperformance.
-
Woodard & Curran City of
Leominster, MA
$7.2 Million Water Systems
Improvements
SCOPE OF SERVICES
PROJECT DESCRIPTION
Methuen Construction Co., Inc. | 40 Lowell Road, Salem, NH 03079 | Phone: 603-328-2222 | FAX: 603-328-2233
www.methuenconstruction.com
Installed New Drinking Water Clarifier System
Constructed new Clarifier and Chemical Buildings
Installed new water main from treatment plant
to water storage tank
Installed new well pumps
Methuen Construction was the general contractor on this project to
provide a new water clarification system for the Leominster Notown
Water Treatment Facility. A New Chemical Feed building was built that
houses three (3) chemical tanks, mechanical room, fire pump room and
two (2) 6-MGD raw water pumps. Work also included modifications to the
existing Well House and the rehabilitation of three (3) existing wells,
which included removing the existing pumping equipment and installing
new pumping equipment. Additionally, the project included the installation
of a 24” water main from the water treatment plant to an existing water
storage tank.
WA
TE
R S
YS
TE
MS
IMP
RO
VE
ME
NT
S
LE
OM
INS
TE
R, M
A
-
Earth Tech City of Fitchburg $12.5 Million Direct Filtration of
River Water
SCOPE OF SERVICES
Methuen Construction Co., Inc. | 40 Lowell Road, Salem, NH 03079 | Phone: 603-328-2222 | FAX: 603-328-2233
www.methuenconstruction.com
12
M
GD
W
AT
ER
T
RE
AT
ME
NT
FA
CIL
IT
Y
FIT
CH
BU
RG
, M
A
The construction of this filtration facility into the
sloping site allowed continuation of the use of the
existing gravity fl ow system and its associated
benefits. Treated water is discharged into a two-
zone, 2-million gallon storage tank, and then into
the adjoining existing 36-inch diameter water
transmission main that serves the regional water
district.
Design of the main treatment facility yielded a
compact, lowprofile building that resulted in ground
level access being provided to both levels. It further
resulted in an easy to maintain and operate facility
with future expansion capability.
General Contractor including self-performing site
work, excavation, concrete, yard piping, process
piping, civil, lagoons, buildings, equipment
installation, and coordination of plant start-up.
PROJECT DESCRIPTION
In order to maintain continued use of the
gravity system, the storage tank was built
as a low-profi le reinforced concrete
underground tank with two one-million
gallon zones.
CONSTRUCTION ELEMENTS
Two half-acre supply lagoons
Two 1,000,000 gallon storage tanks
Two 4,200 gpm backwash pumps
Four 208 sq. ft. adsorption clarifiers
Eight 208 sq. ft. multi-media filters
-
Owner Technology Engineer Project ValueCity of Lowell, MA Sand Media Filtration Woodard & Curran $7,584,000
PROJECT HIGHLIGHTS
Over 10,000 sf of fi ltration • replaced
More than 15,000 accident-free • manhours
SCOPE OF SERVICESPrime Contractor for the rehabilitation of two water fi ltration plants, a pumping, station, and an administration building, requiring civil, mechanical, architectural, and electrical/instrumentation services.
from single stage to dual stage tapered fl occulation. We also automated sludge collection and removal from three of the six sedimentation basins. Sequenced replacement invloved three sand media fi lters, four dual media fi lters, and four carbon fi lters. Post-disinfecting was converted from chlorine gas to to liquid sodium hypochlorite.
The project further included installation of analytical and pro-cess instruments to be incorporated into a new control system, a new ventilation system for the offi ce space within the building, a new boiler, miscellaneous door replacements, and installation of a stand-by generator for the pumping station with appurtenant utilities and services.
30 MG
D W
AT
ER
TR
EA
TM
EN
T FA
CILIT
YLow
ell, MAAs Prime Contractor for the 30 mgd facility rehabilitation, we
were required to maintain ongoing operation of the water supply system while performing a major conversion of the facilities. The facility includes a 10 mgd fi ltration plant, a 20 mgd fi ltration plant, and a 30 mgd raw water pumping station. Working together with the owner and engineer, Methuen established a phased con-struction schedule for the facility, sequenced to seasonal water demand cycles. We succeeded in completing the project safely, on budget, and per the mutually agreed upon shedule.
Construction also included the conversion from chlorine di-oxide for pre-oxidation and pre-disinfecting, and conversion
PROJECT DESCRIPTION
-
www.methuenconstruction.com
Methuen Construction Co., Inc. | 40 Lowell Road | Salem, NH 03079 | Phone: 603.328.2222 | Fax: 603.328.2233
Owner Technology Engineer Project ValueTown of Wellesley, MA Corrosion Control/
Iron & Manganese Earth Tech $7,143,000
PROJECT HIGHLIGHTS
Simultaneously constructed three new Water Treatment Facilities under one
Contract with the Owner
SCOPE OF SERVICESGeneral Contractor including self-perform of site work, excavation, concrete, yard piping, utility and process piping, civil construction, structural fabrication and installation, building modifications, equipment installation,
and coordination of process commissioning.
5 MG
D W
AT
ER
TR
EA
TM
EN
T FA
CILIT
YW
ellesley, MAConstruction of three new Corrosion Control Facilties for the
purposes of water treatment related to the removal of iron and manganese from the City’s well-water supply. The process included the installation of chemical feed systems, processes control, and Pressure Filtration Systems utilizing “Green Sand.” Work was constructed while maintaining flow from the existing wells for the municpal water supply.
PROJECT DESCRIPTION