www.methuenconstruction.com Methuen Construction Co., Inc. | 40 Lowell Road | Salem, NH 03079 | Phone: 603.328.2222 | Fax: 603.328.2233 Owner Technology Engineer Project Value City of Somersworth Microsand Pretreatment System Wright-Pierce $7,038,941 SCOPE OF SERVICES Equipment Setting Phased Site Work Concrete Construction Piping & Process Treatment MICROSAND PRETREATMENT SYSTEM SOMERSWORTH, NH Methuen Construction prepared a 110-year-old building to accept the first Ballasted Microsand Pretreatment system in the Northeast while maintaining 3MGD of plant flow and associated treatment. After optimizing the new pretreat- ment system Methuen refurbished a 30-year-old upflow clarifier filtering system by replacing and installing four Multi-Media Underdrain Filters. In addition, sections of the historic building were converted into Chemical Treatment rooms without negatively impacting the existing architec- tural detail. PROJECT DESCRIPTION PROJECT HIGHLIGHTS Winner of 2008 ABC Excellence in Construction Eagle Award

Upload: others

Post on 21-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

  • www.methuenconstruction.com

    Methuen Construction Co., Inc. | 40 Lowell Road | Salem, NH 03079 | Phone: 603.328.2222 | Fax: 603.328.2233

    Owner Technology Engineer Project ValueCity of Somersworth Microsand Pretreatment

    SystemWright-Pierce $7,038,941

    SCOPE OF SERVICES

    Equipment Setting•

    Phased Site Work•

    Concrete Construction•

    Piping & Process Treatment•

    MIC

    RO

    SA

    ND

    PR

    ET

    RE

    AT

    ME

    NT

    SY

    ST

    EM

    SO

    ME

    RS

    WO

    RT

    H, N

    H

    Methuen Construction prepared a 110-year-old building to acceptthefirstBallastedMicrosandPretreatmentsystemintheNortheastwhilemaintaining3MGDofplantflowandassociated treatment. After optimizing the new pretreat-ment systemMethuen refurbished a 30-year-old upflowclarifier filtering system by replacing and installing fourMulti-Media Underdrain Filters. In addition, sections of the historic building were converted into Chemical Treatment rooms without negatively impacting the existing architec-tural detail.

    PROJECT DESCRIPTION

    PROJECT HIGHLIGHTS

    Winner of 2008 ABC Excellence in Construction Eagle Award

  • Earth Tech Town of Clinton, MA $11.6 Million Water Filtration

    Plant

    SCOPE OF SERVICES

    PROJECT DESCRIPTION

    Methuen Construction Co., Inc. | 40 Lowell Road, Salem, NH 03079 | Phone: 603-328-2222 | FAX: 603-328-2233

    www.methuenconstruction.com

    WA

    TE

    R F

    ILT

    RA

    TIO

    N P

    LA

    NT

    C

    LIN

    TO

    N, M

    A

    General Contractor responsible for:

    Site Work & Excavation

    Concrete

    Equipment Set, Installation & Testing

    Process Piping & Mechanical Construction

    Building Construction & Landscaping

    This project presented multiple challenges for the

    project team. The first, and most significant, was

    overcoming serious errors made during the original

    design of the new facility. Methuen Construction

    worked closely with the new design team and the

    Town to make the needed revisions to the scope,

    construction schedule and equipment to ensure the

    completion of a successful project. The owner

    acknowledged MC’s willingness to resolve issues in an

    “efficient, cost effective, and expeditious manner.”

    “In my opinion this is the finest water

    t r e a t m e n t p l a n t i n t h e

    Commonwealth ,” Christopher

    McGown, Supt. of Public Works,

    Town of Clinton. Worcester

    Telegram & Gazette, 9/14/07.

    CLIENT RECOGNITION

  • Tata & Howard Town of Wayland $8.0 Million Membrane Filtration

    SCOPE OF SERVICES

    PROJECT DESCRIPTION

    Methuen Construction Co., Inc. | 40 Lowell Road, Salem, NH 03079 | Phone: 603-328-2222 | FAX: 603-328-2233

    www.methuenconstruction.com

    General Contractor for entire project coordinating

    efforts of all major suppliers and subcontractors

    including Sitework, Utilities, Concrete, Structural Steel,

    Controls, Process Piping, Mechanical, Commissioning.

    WA

    TE

    R T

    RE

    AT

    ME

    NT—

    ME

    MB

    RA

    NE

    FIL

    TR

    AT

    ION

    W

    AY

    LA

    ND

    , MA

    1.5 MGD Water Treatment Facility utilizing Membrane

    Ultra Filtration to remove iron and manganese from the

    drinking water supply. Work included construction of a

    new Masonry building above concrete holding tanks,

    replacement of existing well pumps, Ozone Generation,

    Compressed Air, Membrane Filtration, Chemical Feed,

    and SCADA systems. The scope of work also included

    upgrades to the existing Waterworks building, a

    Backwash Filter Structure, new Septic System and

    various MEP elements.

    Methuen was able to successfully complete the project

    on-time and well under the Town of Wayland’s budget,

    without impacting the environmentally protected

    Baldwin Pond ecosystem or Wayland Waterworks

    operations.

    PROJECT HIGHLIGHTS

    Constructed State of the Art Water

    Treatment Facility on a “postage

    stamp” site along the banks of

    Baldwin Pond while maintaining the

    Wayland Water Works Facility and

    Maintenance Garage at same locale.

  • Earth Tech City of Gardner, MA $3.7 Million Ultra-filtration

    Membrane Filtration

    SCOPE OF SERVICES

    PROJECT DESCRIPTION

    Methuen Construction Co., Inc. | 40 Lowell Road, Salem, NH 03079 | Phone: 603-328-2222 | FAX: 603-328-2233

    www.methuenconstruction.com

    3 M

    GD

    W

    AT

    ER

    T

    RE

    AT

    ME

    NT

    FA

    CIL

    IT

    Y

    GA

    RD

    NE

    R, M

    A

    Provide construction management, sitework,

    concrete work, miscellaneous metals,

    structural metals, carpentry, thermal and

    moisture protection.

    Provide doors, frames, hardware, windows,

    floor hatches, gypsum wallboard, resilient

    tile flooring, acoustical ceilings and building

    specialties.

    Setting of process equipment, installation of

    lab equipment and loading dock equipment.

    Fabrication of stainless steel process piping.

    Furnish and install process piping and raw

    water intake, set field instruments and

    provide electrical trenching.

    The Crystal Lake Water Treatment Facility is a new facility designed to treat and deliver to

    the City of Gardner water distribution system a minimum of 3 million gallons per day.

    Construction of the main treatment building was on the shore of Crystal Lake and required

    continuous protection of the lake during the construction project. The project included a

    twenty-four inch diameter supply line that extended one-hundred feet into the lake and was

    secured in a saddle to assure continuous supply. Primary filtration consists of four trains of

    Koch membrane ultra-filtration systems. Each train is capable of delivering One Million

    gallons of finished water. Normal operation is with three trains in operation and one on

    standby.

  • www.methuenconstruction.com

    Methuen Construction Co., Inc. | 40 Lowell Road | Salem, NH 03079 | Phone: 603.328.2222 | Fax: 603.328.2233

    Owner Technology Engineer Project ValueTown of Westford, MA Green Sand Filtration Dufresne-Henry $11,000,000

    SCOPE OF SERVICESGeneral Contractor including self-performed site work, concrete, yard piping, structural steel, wood frame construction, equipment installation, process and chemical piping, and coordination of system startup.

    Before the construction of these plants, the Town had to field an average of ten calls per day regarding water quality. Since going on line in the Spring of 2003, the calls have been non-existent. Typically, on a public project the Contractor builds strictly ac-cording to the plans and specs. Through value engineering ef-forts of the Methuen Construction team, we were able to make changes which resulted in added value to the Owner without significant changes in the cost. When we asked the Owner to grade us on our service, we received an average of +2.78 within a scale of -3 to +3, with more than 80% of the marks scoring a +3. This is a valued measurement in regard to customer satis-faction at Methuen Construction, and this project also met the ultimate goal: the ability to provide pure drinking water to the residents of Westford.

    WA

    TE

    R T

    RE

    AT

    ME

    NT

    FAC

    ILITY

    W

    ES

    TFO

    RD

    , MA

    The Westford Water Treatment Plants consisted of a 14,540 square foot facility at the Forge Village site and an 11,230 square foot facility at the Nutting Road site. Each plant treats up to 3-million gallons per day of water from the town’s 8 wells. Construction of the facilties included the installation of three 10’ diamater by 37’ long pressurized green sand filters; chemical feed systems consisting of Potassium Hydroxide, Potassium, Permanganate, Aluminum Sulfate, and Sodium Fluoride; MIOX generators; Ultraviolet purification; Aeration towers; and sup-porting equipment and piping.

    PROJECT DESCRIPTION

    PROJECT HIGHLIGHTS

    Winner 2003 ABC Excellence in Construction Eagle Award

  • www.methuenconstruction.com

    Methuen Construction Co., Inc. | 40 Lowell Road | Salem, NH 03079 | Phone: 603.328.2222 | Fax: 603.328.2233

    Owner Technology Engineer Project ValueLowell Regional Water

    UtilitySecurity System & Facility Upgrades

    Woodard & Curran $3,589,072

    SCOPE OF SERVICES

    Security System Upgrade•

    Residual Lagoon Reconstruction•

    Chemical Feed Upgrades•

    Construciton of Booster Pump Station•

    WA

    TE

    R T

    RE

    AT

    ME

    NT

    PLA

    NT

    UP

    GR

    AD

    ES

    LOW

    ELL, M

    A

    PROJECT DESCRIPTION

    This project required Methuen Construciton to assist the Lowell Regional Water Treatment Facility implement a series of up-grades to its existing water treatment facility. MC installled metal security screens fabricated by MC subsidiary Summit Metal fabri-caotrs to meet a MA DEP mandate for water security and safety. In addition, MC installed new chemical pumps and buillt a seper-ateboosterpumpstationtoimproveefficiencyandperformance.Finally, the project required MC to dredge two existing lagoons to ensureproperwaterflowandperformance.

  • Woodard & Curran City of

    Leominster, MA

    $7.2 Million Water Systems

    Improvements

    SCOPE OF SERVICES

    PROJECT DESCRIPTION

    Methuen Construction Co., Inc. | 40 Lowell Road, Salem, NH 03079 | Phone: 603-328-2222 | FAX: 603-328-2233

    www.methuenconstruction.com

    Installed New Drinking Water Clarifier System

    Constructed new Clarifier and Chemical Buildings

    Installed new water main from treatment plant

    to water storage tank

    Installed new well pumps

    Methuen Construction was the general contractor on this project to

    provide a new water clarification system for the Leominster Notown

    Water Treatment Facility. A New Chemical Feed building was built that

    houses three (3) chemical tanks, mechanical room, fire pump room and

    two (2) 6-MGD raw water pumps. Work also included modifications to the

    existing Well House and the rehabilitation of three (3) existing wells,

    which included removing the existing pumping equipment and installing

    new pumping equipment. Additionally, the project included the installation

    of a 24” water main from the water treatment plant to an existing water

    storage tank.

    WA

    TE

    R S

    YS

    TE

    MS

    IMP

    RO

    VE

    ME

    NT

    S

    LE

    OM

    INS

    TE

    R, M

    A

  • Earth Tech City of Fitchburg $12.5 Million Direct Filtration of

    River Water

    SCOPE OF SERVICES

    Methuen Construction Co., Inc. | 40 Lowell Road, Salem, NH 03079 | Phone: 603-328-2222 | FAX: 603-328-2233

    www.methuenconstruction.com

    12

    M

    GD

    W

    AT

    ER

    T

    RE

    AT

    ME

    NT

    FA

    CIL

    IT

    Y

    FIT

    CH

    BU

    RG

    , M

    A

    The construction of this filtration facility into the

    sloping site allowed continuation of the use of the

    existing gravity fl ow system and its associated

    benefits. Treated water is discharged into a two-

    zone, 2-million gallon storage tank, and then into

    the adjoining existing 36-inch diameter water

    transmission main that serves the regional water

    district.

    Design of the main treatment facility yielded a

    compact, lowprofile building that resulted in ground

    level access being provided to both levels. It further

    resulted in an easy to maintain and operate facility

    with future expansion capability.

    General Contractor including self-performing site

    work, excavation, concrete, yard piping, process

    piping, civil, lagoons, buildings, equipment

    installation, and coordination of plant start-up.

    PROJECT DESCRIPTION

    In order to maintain continued use of the

    gravity system, the storage tank was built

    as a low-profi le reinforced concrete

    underground tank with two one-million

    gallon zones.

    CONSTRUCTION ELEMENTS

    Two half-acre supply lagoons

    Two 1,000,000 gallon storage tanks

    Two 4,200 gpm backwash pumps

    Four 208 sq. ft. adsorption clarifiers

    Eight 208 sq. ft. multi-media filters

  • Owner Technology Engineer Project ValueCity of Lowell, MA Sand Media Filtration Woodard & Curran $7,584,000

    PROJECT HIGHLIGHTS

    Over 10,000 sf of fi ltration • replaced

    More than 15,000 accident-free • manhours

    SCOPE OF SERVICESPrime Contractor for the rehabilitation of two water fi ltration plants, a pumping, station, and an administration building, requiring civil, mechanical, architectural, and electrical/instrumentation services.

    from single stage to dual stage tapered fl occulation. We also automated sludge collection and removal from three of the six sedimentation basins. Sequenced replacement invloved three sand media fi lters, four dual media fi lters, and four carbon fi lters. Post-disinfecting was converted from chlorine gas to to liquid sodium hypochlorite.

    The project further included installation of analytical and pro-cess instruments to be incorporated into a new control system, a new ventilation system for the offi ce space within the building, a new boiler, miscellaneous door replacements, and installation of a stand-by generator for the pumping station with appurtenant utilities and services.

    30 MG

    D W

    AT

    ER

    TR

    EA

    TM

    EN

    T FA

    CILIT

    YLow

    ell, MAAs Prime Contractor for the 30 mgd facility rehabilitation, we

    were required to maintain ongoing operation of the water supply system while performing a major conversion of the facilities. The facility includes a 10 mgd fi ltration plant, a 20 mgd fi ltration plant, and a 30 mgd raw water pumping station. Working together with the owner and engineer, Methuen established a phased con-struction schedule for the facility, sequenced to seasonal water demand cycles. We succeeded in completing the project safely, on budget, and per the mutually agreed upon shedule.

    Construction also included the conversion from chlorine di-oxide for pre-oxidation and pre-disinfecting, and conversion

    PROJECT DESCRIPTION

  • www.methuenconstruction.com

    Methuen Construction Co., Inc. | 40 Lowell Road | Salem, NH 03079 | Phone: 603.328.2222 | Fax: 603.328.2233

    Owner Technology Engineer Project ValueTown of Wellesley, MA Corrosion Control/

    Iron & Manganese Earth Tech $7,143,000

    PROJECT HIGHLIGHTS

    Simultaneously constructed three new Water Treatment Facilities under one

    Contract with the Owner

    SCOPE OF SERVICESGeneral Contractor including self-perform of site work, excavation, concrete, yard piping, utility and process piping, civil construction, structural fabrication and installation, building modifications, equipment installation,

    and coordination of process commissioning.

    5 MG

    D W

    AT

    ER

    TR

    EA

    TM

    EN

    T FA

    CILIT

    YW

    ellesley, MAConstruction of three new Corrosion Control Facilties for the

    purposes of water treatment related to the removal of iron and manganese from the City’s well-water supply. The process included the installation of chemical feed systems, processes control, and Pressure Filtration Systems utilizing “Green Sand.” Work was constructed while maintaining flow from the existing wells for the municpal water supply.

    PROJECT DESCRIPTION