Microsoft FastTrack MigrationCustomer Experience - Exchange to Exchange Online
FastTrack Migration Team
Migration strategies
Migration type Exchange
2003Exchange
2007Exchange
2010Exchange
2013Exchange
2016Exchange
2019
Exchange Hybrid Sync
Exchange Hybrid direct
Exchange minimal Hybrid
Exchange hybrid data migration
Exchange on-
premises
Exchange
Online
For information about the data migration offer from FastTrack, see Data Migration.
Migrate your data
MWA/FM/FE/FRP informs MST
that all prerequisites are done
and gains approval to move
forward.
Migration Engine
performs migration
and sends
notifications.
Customer opens a
ticket with
Microsoft Migration
Support Team (MST)
Any migration
failures?
Microsoft support does
the necessary
troubleshooting and
provides remediation
guidance
Customer performs post-migration tasks with guidance from
the FE/FRP and starts using Outlook Web App or Outlook.
?
Exchange hybrid migration flow
Migration
preparation
• Prepare migration
schedule
• Prepare test mailboxes
and share with FastTrack
• Identify early adopters or
pilot users
• Submit recipient email
addresses for migration
reporting
• Test migration
Office 365
environment
• Office 365
identities, sync
• Hybrid setup
Velocity
migration
TBD(Based on pilots)
Pilot
migration
• Finalize number of users to be
migrated in one event
• Finalize scheduling plan
• Assess network bandwidth
impact
1-2 WEEKS
(Depends on customer)
Migration prerequisites
• FastTrack Agreement terms
and conditions (Ts and Cs)
(as applicable)
• Online Service Agreement
• FastTrack Portal Migration
Library
• FastTrack Portal Project
Creation
• Learning Hub
• Work with MST to enable
FastTrack Migration Site
• Migration schedule file and
policy
Environment
assessment
• Perform
migration tests
end-to-end
Exchange hybrid timeline flow
Customer submits
schedule using for:
• Pilot users
• Velocity Users
Estimated example: 1 WEEK Estimated example: 2 WEEKS Depending on volume
FastTrack Migration Team
Customer or Partner
Fix migration failures
End user communications
End user training and planning
Check and report post-migration issues
Identify and fix the blockers or escalate
to Office 365 support
FastTrack
Tool support and troubleshooting (limited to
migration tools used by FastTrack)
Perform migration events as per the schedule
Provides periodic migration update reports
Migration scope and responsibilities
Managing your migration projects information
Activities to be performed:
• Credential management includes change and deletion of credentials
• Batches management includes viewing of the list of migration events, change migrations events, and delete migration events
Migration schedule – Input file
Download the latest template from the FastTrack Migration Site.o The FM uploads the blank CSV scheduling files to the document collaboration site.
PrimarySMTPAddress Migration Endpoint Partition*
[email protected] o365miglab.com
[email protected] o365miglab.com
[email protected] o365miglab.com
[email protected] o365miglab.com
[email protected] o365miglab.com
[email protected] o365miglab.com
*only fill Partition if applicable
Migration steps and reporting
• Email notifications are sent out at the start of the migration window (kickoff), end
of a migration window (in-flight), and at the end of the migrations.
• Notification contains a link to the Migration Status Power BI Report.
• Power BI credentials are provided via the FastTrack Poral
Select the Power BI link provided in the notification email to view completed migrations (including
failures).
https://aka.ms/FastTrackMigrationPowerBI
Sample final report
Plan ahead
Exchange
on-
premises
Exchange
Online
• The migration endpoints and network throughput are validated.
• The FastTrack Migration Support Team (MST) works 24 hours a day, seven days a week (24x7)
• Passwords are reset every 70 days.
• Don’t modify the headers of the scheduling file.
• Schedule the manager and delegates together.
• Plan for and ensure users are licensed.
• Do not share credentials or PII information over plain email
Next steps
Exchange
on-
premises
Exchange
Online
Migrate your data
For information about the data migration offer from FastTrack, see Data Migration.
MVM and Migration Team disengagement
Exchange
on-
premises
Exchange
Online
• If migration has been paused for 30 days and there’s no confirmed schedule uploaded in the FastTrack Migration
Site for the following 30 days, the Migration Specialist team disengage from the project.
• The Migration Support Team disengages.
• Once the customer is ready to resume migration,
All regionsMigration scheduling tips
For Exchange 2003 (offline move) migrations, we use a direct migration approach as SWRC isn’t supported.
Providing an additional weekday ensures that we have enough time for replication to complete. Due to factors like the total size of mailboxes, the network throughput received, and issues encountered over weekends on source servers and the network, replication sometimes goes on past the weekend and into weekdays (Monday onward).
We recommend scheduling Exchange SWRC events to start on Fridays and have respective cutover events scheduled starting mid-week (for example, Tuesdays) onward to ensure there’s enough time for the SWRC event to complete replication of all users and avoid any unnecessary rescheduling of cutover events or pending users at last moment