Mid-rise timber construction overview [email protected] Program Development Manager Mid-Rise Construction

Upload: others

Post on 01-Apr-2020

44 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

Mid-rise timber constructionoverview

[email protected] Development ManagerMid-Rise Construction

Page 2: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

- Different system options

- NCC 2019 changes

- Mid-rise Advisory Program

- Conclusion

OUTLINE

Page 3: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

MID-RISE WOOD PRODUCTSStrength graded, kiln dried

Cross Laminated Timber (CLT) Laminated Veneer Lumber (LVL)

Studs and Plates Glulam (GLT)Joists and Trusses

AS1720:CALCULATION

AS1684:DETAILING

Page 4: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

LIGHT (STUD) FRAMESScaling up Residential Design

MORE OR STRONGER STUDS AT

LOWER WALLS

STANDARDFRAMING AT

UPPER WALLS

Page 5: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

CROSS LAMINATED TIMBER (CLT)A “jumbo plywood”

DIAPHRAGM, LESS SPLITS,

DIMENSIONALSTABILITY

Page 6: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

LAMINATED VENEER LUMBER (LVL)High strength&stiffness/weight ratio

FLOORCASSETTES,BRACING,3D TRUS

Page 7: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

GLULAM (GLT)Flexible floorplans, aesthetics

3D TRUSSES,POST & BEAM,FLOOR SLABS

Page 8: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

DIFFERENT SYSTEMSCAN BE COMBINED IN A PROJECT…

Light Frames

Post & Beam

Post-Tensioned

CLT, LVL, GLT…

CassetteFloor/Wall

FRAMES

PANELS

VOLUMES

PortalFrames

Unit, pod, shaft, stair..

...TO GET HARMONY

AND OPTIMSERESULTS.

Page 9: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

RESIDENTIALOffsite assembly, onsite speed

Timelapse

Page 10: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

COMMERCIALHybrid structure, optimal result

Timelapse

Page 11: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

STUDENT ACCOMMODATIONMassive timber, passive house

Page 12: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

SAFETY & EFFICIENCYDesign For Manufacturing and Assembling

Page 13: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

STIFFER CORESfor slender buildings

Page 14: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

OPEN FLOORPLANSfor larger grids / flexible use

Page 15: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

CONTROL FLOOR DEPTHto limit building height

Page 16: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

ACOUSTICS Timber is intrinsically quiet

HIGH DAMPING,

LOWFLANKING

Page 17: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

DURABILITYA LOT OF EXPERIENCE

TERMITES

CORROSION

OF FASTENERS

DECAY

(ABOVE GROUND)BRISBANE

1913 & 2018

Page 18: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

NCCCOMPLIANTBASED ONAS 1720+ EC5

ACRO-TIM Automated Calculation ROutines of mid-rise TIMber structures under combined wind and quake actions (VNA440-1718)

FREEASSISTANCE

TO ENGINEERSFOR MID-RISE

PROJECTS

STRUCTURAL DESIGNGuide and software

Page 19: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

COST ENGINEERINGHow to cost timber structures

COMING SOON, WITH

A SUMMARYOF MAP’sDATA AND

EXPERIENCES

Page 20: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

ZERO70%

TOTAL ON-SITE WASTE REDUCED BY

TIMBER WASTE GENERATED

ON SITE

WASTE GENERATED PER WEEK

Eurban, UK Lendlease, Vic Strongbuild, NSW

WASTE REDUCTIONIS VERY SIGNIFICANT

Page 21: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

THE ONLY RENEWABLEBUILDING MATERIALS

Once turned into Engineered Wood Products, this equates to

970 m31-1.5 hrsLendlease, Melbourne

2,700 m33-4 hrsStrongbuild, Sydney

4,300 m35-6.5 hrsAtelier, Melbourne

1,700 m32-2.5 hrsMultiplex, Melbourne

11-15 m3/min

30-40 m3/min

Australiansoftwoodplantations(>1Mha) grow

Page 22: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

HEALTHIER FOR OUR ENVIRONMENT

Wood is a “sink” for CO2 , with • low embodied energy and • low operation energy

Image: chrofi.com

https://www.woodsolutions.com.au

/articles/carbon-storage

Page 23: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

Typically from lower blood pressure and heart rate, as demonstrated by clinical researches:• school children have less

stress and concentrate better (Austria)

• timber-built retirement villages promote tranquillity (UK, Finland)

• benefits in timber-based neurological clinics (Japan).

HEALTHIER FOR HUMANS

http://makeitwood.org/documents/doc-1501-

wood---nature-inspired-design-report-v3.pdf

Page 24: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

Key findings (1,000 office workers):

• higher levels of satisfaction

• higher levels of concentration

• improved mood and productivity

• less sick leave

WELLNESS AND PRODUCTIVITY IN OFFICES

https://www.woodsolutions.

com.au/wood-at-work

Page 25: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

- Different system options

- NCC 2019 changes

- Mid-rise Advisory Program

- Conclusion

OUTLINE

Page 26: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

PERFORMANCE REQUIREMENTSOur Guidelines and Test Reports

OUR TDGsARE ALMOST

AN «INDUSTRY STANDARD»

Page 27: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

• automatic sprinkler systems

• fire-protected structural timber (general or massive)

• non-combustible insulation

• cavity barriers (if applicable)

DTS PROVISIONS (2016)A direct pathway to approval

Page 28: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

• automatic sprinkler systems

• fire-protected structural timber (general or massive)

• non-combustible insulation

• cavity barriers (if applicable)

DTS PROVISIONS (2016)A direct pathway to approval

< 75mm > 75mm

and glued

Page 29: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

FIRE-PROTECTED TIMBERRequirements

> 75mm

and glued

< 75mm

GENERAL: 2x13mm FRPB (each side for walls, lower side for floors)

MASSIVE: 1x16mm FRPB (each side for walls, lower side for floors)

MANYALERNATIVE

LAY-UPSARE

POSSIBLE

Page 30: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

NCC2019Another step forward

• Fire protected timber as DTS for all the Building Classes• Sprinklers for all Class 2&3 mid-rise buildings, regardless of

the construction material• With sprinklers, an increase in travel distances to fire exits,

from 6m to 12m (bigger footprint), for all building materials• The definition of Massive Timber now includes also “non-

chemically bonded” materials• Most sarking products now deemed “non combustible”.

Page 31: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

- Different system options

- NCC 2019 changes

- Mid-rise Advisory Program

- Conclusion

OUTLINE

Page 32: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

CODE,CRANE,

SEQUENCE,CONFLICTS,SYSTEMS...

THE MID-RISE ADVISORYFeasibility analysis

Page 33: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

PROGRAM,DETAILS,

ACOUSTICS,COSTS...

THE MID-RISE ADVISORYCosting analysis

Page 34: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

EXAMPLEBenchmarking a built project

Type Lay-up Depth Fire Acoustic

• Carpet• 2x 18mm MgOx Board• 15mm Plywood• 200mm Engineered Joist with

75mm Glasswool• Furring channel on resilient m.• 2x 16mm FRPB

330mm FRL90/90/90

Rw+Ctr: 64Lnw: 34

• Carpet• 200mm Concrete• 60mm Fiberglass insulation• Suspended steel grid• 13mm Plasterboard

330mm FRL90/90/90

Rw+Ctr: 64Lnw: 29

QUICKER TO INSTALL

=LOWER COST

Page 35: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

EXAMPLEBenchmarking a built project

Type Lay-up Depth Fire Acoustic

• 2x 13mm FRPB• 90 x 45 stud• 20 mm gap• 90 x 45 stud• 2x 13mm FRPB

257mm FRL90/90/90

Rw+Ctr: 58

• 2x 13mm FRPB• 64mm Steel Stud• 11kg/m3 insulation• Gap (for columns)• 64mm Steel Stud• 13mm FRPB

300mm FRL90/90/90

Rw+Ctr: 59

INCREASE OF NET

SELLABLE AREA

Page 36: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

2 YEARS OF MID-RISE ADVISORYNumbers (almost) tell the story

MOST PROJECTS ARE STILL

AT PLANNINGSTAGE

Page 37: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

ALREADY 15 PROJECTSare being built or in tender

WOODUSED:

30,000 m3$38 Mil.

7 BUILT OR ON SITE

8 NOW IN TENDER

Page 38: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

SOME TYPICAL FEATURESof a Mid-Rise project

• Urban infill (boundaries, shading)

• Height/shading constraints

• Eccentric core

• Cantilevers (balconies/floors)

• Voids, wall misalignements

• Extension over existing buildings

• Weak soils

• Acoustic/Fire integration

Page 39: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

UNDERSTANDING MID-RISEDemo at Holmesglen TAFE

IMPROVE CONFIDENCE

OF SURVEYORS AND

BUILDERS

WITH A FIXED AND A

DISMOUNTABLECOMPONENT

Page 40: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

• National advisory + R&D program focused on skills development

• Partnership across the whole building industry, based on existing and new “best practices”, that can maximise the results for both the partners and the community

PARTNERSHIPA flexible and efficient tool for the next stage

Page 41: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

Activity ALL OPT

Advisory to design/development teams (feasibility, costing…) X

Focus on Institutions and Government initiatives (eg schools, social housing…) X

Improve off-site solutions, site safety and efficiency X

Develop Industry Standards and Codes of Practice X

Support education programs in collaboration with Universities & TAFEs X

Market Intelligence (planning reports, trend analyses…) X X

Accreditation/certification training programs/schemes X X

Tender Analysis and Value Management assessment X

Innovation, R&D and testing to develop company/shared IP X

Tailored staff training for partners (internship with the advisory team) X

ACTIVITIESA flexible mix with multiple benefits

ALL = Common activities shared by all the Partners. May involve external stakeholders.

OPT = Company-tailored, optional activities. May require confidentiality.

Page 42: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

EXPECTED OUTCOMESwith prudent assumptions

JUST FOR MID-RISE,WE EXPECTA 20-30%GROWTH

PLUS THEGROWTH FOR ASSOCIATEDMATERIALS & SERVICES

Page 43: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

- Different system options

- NCC 2019 changes

- Mid-rise Advisory Program

- Conclusion

OUTLINE

Page 44: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

THE VALUE PROPOSITION OFTIMBER OFF-SITE SYSTEMS

THE BESTSOLUTION FOR

THE RIGHTOPPORTUNITY

Page 45: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

BUILD OUR CITIES IN TIMBER ?IT’S HAPPENING…

Page 46: Mid-rise timber construction - WoodSolutions€¦ · cross laminated timber (clt) ... structural design guide and software. cost engineering how to cost timber structures coming soon,

HOW WILL TIMBER STRUCTURES BE USED IN YOUR NEXT PROJECT ?